National Building Consent Authority Competency Assessment System June 2010

NBCA Competency Assessment System

Embed Size (px)

DESCRIPTION

certification system

Citation preview

Page 1: NBCA Competency Assessment System

N ational Building Consent Authority Competency Assessment SystemJune 2010

Page 2: NBCA Competency Assessment System

Disclaimer

This Guide is published by the Department of Building and Housing as guidance information only.

For clarity, parts of this Guide reference requirements in the Building Act 2004 and regulations made under this Act. While this is clearly referenced, readers should always use the source legislation.

Page 3: NBCA Competency Assessment System

Contents

IntroductIon, purpose and objectIves 3

development of a natIonal system 5Localneedsandsystemflexibility5

system framework 7Relationships7

natIonal levels and competency specIfIcatIons 11Residentialexamples12Commercialexamples15Competencyspecificatons18

transItIon 21

assessment process 23Fivestepassessmentprocess24

assessment plannIng – step 1 25Accreditationandmeetingevidencerequirements25Example28

candIdate evIdence – step 2 31Examples32

assessment and decIsIon – steps 3 and 4 55Example56

recordIng outcomes – step 5 59Example59

appendIx 1: competency specIfIcatIons 61

appendIx 2 : competency assessor specIfIcatIons 105

appendIx 3 : templates 107Assessmentplantemplate108Candidateevidenceform:processing112Candidateevidenceform:inspections114Skillsmatrix116

appendIx 4 : resIdentIal and commercIal categorIsatIon flowcharts 117Residentialflowchart118Commercialflowchart119

appendIx 5 : bca polIcy and procedures 121

appendIx 6 : candIdate InformatIon pack 123

appendIx 7: glossary of terms 143

Page 4: NBCA Competency Assessment System

INT

RO

DU

CT

ION

aN

D

De

ve

lOp

me

NTINTRODUCTION aND DevelOpmeNT

Introduction, purpose and objectives 3

Development of a national system 5

Page 5: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 3

Introduction,purposeandobjectives

IntroductIon

ThisdocumenthasbeendevelopedbytheDepartmentofBuildingandHousingtohelpbuildingconsentauthorities(BCAs)meettherequirementsoftheBuilding(AccreditationofBuildingConsentAuthorities)Regulations2006,specificallyRegulations9,10and11.Thedocumentispublishedasguidanceonly.Whileitisnotmandatory,itwilllikelybecomeabenchmarkforgoodindustrypracticebyBCAsandInternationalAccreditationNewZealand(IANZ).Intheinterestofnationalconsistencyandimprovedbuildingcontrolperformanceandcost-efficiency,theDepartmentencouragesallBCAstoadoptthiscompetencyassessmentsystem.

Thisguidancedocumentexplainsthebackgroundtothenationalcompetencyassessmentsystem.ItprovidesanoverviewoftherequirementsofcompetencyassessmentandincludessomeworkedexamplesusingthetemplatesprovidedinAppendix3.

purpose

TheDepartmenthasdevelopedanationalBCAcompetencyassessmentsystemtoachievethefollowingobjectives:

• encouragingnationalstandardisation• facilitatingthegreateruseofsharedresourcesandexpertiseregionallyandnationally• eliminatingtheduplicationofeffortandlackofcost-effectivenessinmaintainingmultiplesystems

acrosseachBCA• improvingnationalconsistencybyhavinganationalbasisformeasuringthecompetencyofbuildingofficials• improvingriskmanagementforBCAs• improvingalignmentwithothernationalprogrammessuchastheLicensedBuildingPractitioner

(LBP)SchemeandinternationalmodelssuchasthoseusedinAustralia• reducingoperatingandcompliancecostsforBCAs• improvingthecompetencyofbuildingofficials.

ThereareconsiderablenationalandregionalbenefitsinhavingasinglenationalcompetencyassessmentsystemforBCAstaff.AnationalsystemprovidesacommonlanguageforBCAstaffandaplatformtohelpBCAsusesharedresourceseitherataregionalsharedserviceslevelornationallyduringtimesofpeakworkload.Thesystemalsofacilitatesstaffrecruitmentbyprovidingstandarddescriptionsforlevelsofbuildingworkandthecompetenciesrequiredtounderpinthese.

Considerableresourcesandcostshavebeenandcontinuetobeconsumedindeveloping,operatingandupdatingindividualBCAcompetencyassessmentsystemsandtrainingprogrammes.Someoftheseareofvaryingqualityandeffectiveness.Asinglenationalsystemcanbemaintainedcentrally,eliminatingthisduplicationofeffortandcost.

AmajorGovernmentgoalisachievingnationalconsistencyinadministeringtheBuildingAct,BuildingCodeandRegulations.Adoptinganationalcompetencyassessmentsystemcontributestothisgoalbyidentifyingthecompetenciesrequiredtoundertakeworkandprovidingacommonnationalsystemofassessment.Overtime,thisshouldresultinmoreconsistent,efficientandbetterqualitydecision-makingbybuildingofficials.

BCAsareabletobettermanagetheirriskbyhavingobjectivecompetencystandardsfortheirstaff.StaffarebetterabletomanagetheBCA’sriskdaytoday,astheyarebetterabletorecognisethelimitsoftheircompetenceandworkwithinthese.

Page 6: NBCA Competency Assessment System

4 natIonal bca competency assessment system june 2010

objectIves of the natIonal bca competency assessment system

Thefirstobjectivewastodevelopasystembuildingonexistingworkcompletedbythebuildingsector.Anumberofdifferentsystems1werereviewedandthebestelementsfromeachhavebeenincorporatedintothenewnationalsystem.

Asecondobjectivewastodevelopastreamlinedapproach.Thishasbeenachievedbyreducingthenumberoflevels.Competencieshavebeendefinedforeachlevel,settingexplicitperformanceindicatorsforeachcompetencyrequirementandprovidingcomprehensiveguidanceforassessors.ThissaveseachassessorfromhavingtodeveloptheirowncompetencymodelforeachBCAorcandidate.

Asummaryskillsmatrixtemplatehasbeendevelopedforrecordingresultsofassessments.ItisastreamlinedandsimplerversiontothatusedbymanyBCAs.ItnolongerrecordscompetencybyindividualBuildingCodeclause,andsoitiseasiertouseinaday-to-dayoperationalsense.AskillsmatrixbasedaroundindividualCodeclausesandthedivisionintoalternativesolutionsandAcceptableSolutionshasproven,formanyBCAs,tobeoverlybureaucraticandunnecessarilycomplicatedandcumbersometooperate,addinglimitedvaluefortheeffortspent.

Inaddition,flowchartshavebeendevelopedtoaidallocationofwork.Theflowchartsofferaconsiderablystreamlinedwaytoachieveworkallocation.Competencylevelsforprocessingandinspectionsaredefinedusingthesamedescriptions,sothereisnoneedtore-categoriseworkwhenallocatinginspections.

Thelicensedbuildingpractitioner(LBP)licensingclassesaredesignedtoacknowledgeseveralofthespecialistareasofworkwithinabuilding,suchasroofing,blocklayingorplastering.Buildingofficials,however,needtohaveawideunderstandingofboththeindividualbuildingcomponentsandalsothebuildingasasystem.Buildingofficialsbythenatureoftheirjobareusuallymoregeneralistthanspecialistswhereasmany,butnotall,LBPsarebeingassessedascompetentinnarrowerfieldssuchasroofing,foundations,carpentryetc.Therearesixcompetencylevelsforbuildingofficials,ratherthanthethreeestablishedcategoriesfortheLBPScheme.However,dependingonthescopeofworkaBCAusuallyperforms,somewillnotneedtooperateallsixlevels(ie,itisenvisagedthatanumberofsmallerruralBCAsmayonlyneedtooperatethreeorfourlevels).

1 Theseincluded:NorthShoreCityCouncil,SelwynDistrictCouncil,DunedinCityCouncilandWellingtonCityCouncil.

Page 7: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 5

Developmentofanationalsystem

project to develop a natIonal system

TheDepartmentofBuildingandHousingestablishedaprojecttodevelopanationalcompetencyassessmentsystemforBCAsinlateOctober2009.AprojectadvisorygroupcomprisingBobdeLeurfromAucklandCityCouncil,RichardTonerfromWellingtonCityCouncilandalsorepresentingBOINZ,JeffFarrellfromWhakataneDistrictCouncil,BevanSmithfromProfessionalBuildingConsultants,MalcolmMacMillanfromtheDepartmentandGeoffHallamfromInternationalAccreditationNewZealandwasestablishedtoprovidesectorinputintothedevelopmentofthesystemandtoensuretheoutputwas‘fitforpurpose.’

AsmallprojectteamcomprisingSteveGarner,PeterSparrowandPaulHobbsfromtheDepartment,BerylOldhamfromNorthShoreCityCouncil,RoseMcLaughlanfromNewZealandBuildingInspectionandTrainingLtd,RosemaryHazlewoodfromBuildingNetworksLtd,andKeithSmithfromAlphaBuildingConsultantswasestablishedtodevelopmaterialforconsiderationandreviewbytheadvisorygroup.Theprojectteamconsideredarangeofexistingsystemsbeforedevelopingthenationalsystemforfieldtesting.

ThesystemwaspilotedatthefollowingBCAs:Auckland,NorthShore,Rodney,Papakura,Waitakere,Manukau,Rotorua,Whakatane,Wellington,NelsonandQueenstownLakesCouncils,andfeedbackfromthepilothasbeenincorporatedintothefinalversion.

local needs and system flexIbIlIty

Thesystemhasbeendesignedtocaterformainstreambuildingtypesandissueswithouttakingintoaccountlocalorregionalconditions.Forexample,thereisanexpectationthatbuildingofficialsnationallywillbeawareofissuesrelatingtocorrosionzonesandwindzones,butallofficialsarenotrequiredtohaveknowledgeoflocalissuessuchasgeothermalconditions,whichmayonlyoccurlocallyorregionally.

Wherelocalorregionalconditionsexistthatrequirespecificcompetencies,itisexpectedthatthesewillbeidentifiedattheBCAorclusterlevel.Forexample,inWellingtonbuildingofficialsmaybeexpectedtohaveanunderstandingofcomplianceissuesrelatingtocablecarswhichmaybeassociatedwithresidentialbuildingconsents.However,thisisbestdealtwithasanexceptionforotherBCAs.Thisprocessisfurtherdiscussedbelow.

Thecompetencylevelshavebeendesignedtocapturemostbuildingactivity.However,innovativeandunusualbuildingdesignswillalsobeproducedandnotfitthedescribedlevels.Ratherthancreatenewlevelstoaccommodatethesebuildings,BCAsshoulddeterminethecompetenciesrequiredtoundertaketheworkandallocatetheworktoanappropriatestaffmemberorstaffmemberswiththosecompetencies.

Thedecisionmade,reasonsforthedecisionandtheoutcomeshouldberecordedintheseexceptionalcircumstances.2Thiscanbeintheformofashortnoteonthebuildingconsentfile.Alterationstobuildingsmaybeconsideredthesameway.Forexample,theunderlyingbuildingmaybewithinthecommercial2competencylevel,butthealterationmaybeminorandcanbeassessedbyacommercial1processor.Toavoidovercomplicatingthingsandunderminingthenationalconsistencytryingtobeachieved,BCAsshouldnotbegintodevelopadditionallevelsorsub-levelsofcompetenciestodealwithsuchexceptions.Again,theyshouldjustrecordthedecision,reasonsforthedecision,andtheoutcome2thattheassignedprocessingofficer(s)and/orinspector(s)arecompetenttodothework.

2 SeeRegulation6(b),(c)and(d)oftheBuilding(AccreditationofBuildingConsentAuthorities)Regulations2006.

Page 8: NBCA Competency Assessment System

6 natIonal bca competency assessment system june 2010

BecausethesystemhasbeendevelopedtocovertherangeofbuildingactivityinNewZealand,someBCAswillfindtheyhavenobuildingactivityatadescribedlevel.Thismeanstheywillnothavetooperateandassessstaffagainstthoselevels.However,theirprocedureswillstillneedtonotethatifworkoutsidetheirlevelswassubmittedforconsent,alternativearrangementswouldneedtobemadetohavetheworkprocessed.ThiscouldbeachievedthroughacontractarrangementwithanotheraccreditedBCAoracontractor.

Bywayofexample,XYZBCAonlyusuallyreceivesworkuptoresidential2andcommercial1competencylevels.Consequently,theyneedtoassessstaffonlytotheselevelsandhaveaprocedurethatrequiresworkoutsidetheselevelstobeprocessedbyanotherBCAthathascompetenciesattherequiredlevel.Thisallowsthemtooperateastreamlinedandsimplecompetencyassessmentsystemofjustthreecompetencylevels(residential1,residential2andcommercial1),thusreducingtheiroperatingandcompliancecosts.

Page 9: NBCA Competency Assessment System

Sy

St

em

fra

me

wo

rk

SyStem framework

System framework 7

Page 10: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 7

Systemframework

Thenationalcompetencyassessmentsystemismadeupoflevelswithperformanceindicatorsandassessorguidanceoninterpretingtheindicators,andasuiteofassessmenttoolsincludingassessmentplans,evidence-gatheringtemplates,skillsmatricesforrecordingthesummaryoutcomeofallassessments,andcategorisationflowchartstohelpallocatework.

relatIonshIp wIth other accredItatIon regulatIons

TheBuilding(AccreditationofBuildingConsentAuthorities)Regulations2006requireaBCAtohavesystemstoidentifythecapacityandcapabilityrequirementsoftheorganisation,allocateworktocompetentstafforcontractors,undertakecompetencyassessmentofstaffandhaveatrainingsystemforstaff.

Thecompetencyassessmentsystemshouldbeseenasacentralcomponentoftheseothersystems.Thecompetencylevelsdescribetherangeofworkwhichoccursnationally.ABCAcandeterminethelevelofworktheynormallyundertakeusingthesedescriptionstomeettherequirementsofregulation8.Thiscompetencyassessmentsystem,ifeffectivelyimplemented,providesthetoolsneededtomeettherequirementsofRegulation10,competencyassessment.

Building(Accreditation

ofBuildingConsent

Authorities)Regulations2006

(Regulation10)

CompetencylevelsResidential1–3Commercial1–3

Performanceindicatorsforeachcompetencylevel

Assessmentplan

Candidateevidenceforms

(inspectionandprocessing)

Skillsmatrix Categorisationflowcharts

lawc

om

peten

cy specifi catio

ns

too

ls

Page 11: NBCA Competency Assessment System

8 natIonal bca competency assessment system june 2010

Theflowchartscanbeusedtocategorisework,whiletheskillsmatricescanbeusedtohelpallocateworktomeettherequirementsofRegulations7and9.Trainingneeds(regulation11)willalsofalloutofthecompetencyassessment.Finally,thecompetencylevelscouldalsobeusedtodescribeaservicespecificationforanotherBCAprovidingservicestoundertakeprocessingofhigherlevelwork(Regulation12).Pleaseseeappendix3forresidentialandcommercialflowcharts.

relatIonshIp wIth the natIonal dIplomas In buIldIng control surveyIng

Assuggestedintheassessmentprocesstothiscompetencyassessmentsystem,theassessormaytakeintoaccountqualificationsheldbythecandidate–indeedtheyshouldiftheyarecurrentandrelevantqualificationssuchastheNationalDiplomasinBuildingControlSurveying.TheNationalDiplomasinBuildingControlSurveyingarequalificationsthatcovermanyofthecompetencyrequirementsrequiredbyRegulation10oftheBuilding (Accreditation of Building Consent Authorities) Regulations 2006.Thetablebelowhelpsillustratesthis.

unIt standard number

natIonal dIploma unIt standard tItle buIldIng (accredItatIon of buIldIng consent authorItIes) regulatIons 2006 reference

1296 Interviewinaninformalone-to-onesituation 10(3)(e)Employees’abilitytocommunicatewithinternalandexternalpersons

11283 Communicatewithclientsinacompliancecontext 10(3)(e)Employees’abilitytocommunicatewithinternalandexternalpersons

22698 Demonstrateknowledgeofbuildingcontrollegislationandrequirements

10(3)(c)Employees’knowledgeandskillinapplyingtheAct,theBuildingCode,andanyotherapplicableregulationsundertheAct

24160 Peerreviewbuildingconsentauthorityqualitymanagementsystemprocessforcompliancewithqualitystandards

10(3)(f)Employees’abilitytocomplywiththebuildingconsentauthority’spolicies,proceduresandsystems

24161 DemonstrateknowledgeofBuildingAct2004processes

10(3)(c)Employees’knowledgeandskillinapplyingtheAct,theBuildingCode,andanyotherapplicableregulationsundertheAct

24162 Demonstrateknowledgeofloads,forcesandphysicaleffectsonstructuralcomponentsandmaterials

10(3)(a)Employees’understandingofthephilosophyandprinciplesofbuildingdesignandconstruction

24172 Completeserviceinspectionsforsmallbuildings 10(3)(d)(ii)Employees’abilitytoinspectbuildingwork

24173 Assessservicesinsmallbuildingconsentapplications 10(3)(d)(i)Employees’abilitytoprocessapplicationsforbuildingconsents

24175 Completebuildinginspectionsforsmallbuildings 10(3)(d)(ii)Employees’abilitytoinspectbuildingwork

24176 Assesssmallbuildingconsentapplications 10(3)(d)(i)Employees’abilitytoprocessapplicationsforbuildingconsents

24177 Describetheprocessesofconsentingandinspectingsmallbuildings

10(3)(d)(i)Employees’abilitytoprocessapplicationsforbuildingconsents

9669 Applyprinciplesfrompublisheddatatoevaluateselectmaterialsandfinishesforbuildings

10(3)(b)Employees’understandingandknowledgeofbuildingproductsandmethods

9617 Determineanddescribetheconstructionmethodsforsmallbuildings

10(3)(a)Employees’understandingofthephilosophyandprinciplesofbuildingdesignandconstruction

24163 Demonstrateknowledgeofsmallbuildingconstructionmethods,materialsandsystems

10(3)(b)Employees’understandingandknowledgeofbuildingproductsandmethods

10(3)(a)Employees’understandingofthephilosophyandprinciplesofbuildingdesignandconstruction

Page 12: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 9

Initself,however,thesequalifications,whilecontributingtotheevidenceofcompetenceduringanassessmentprocess,donotconfirmcompetencebythemselves.Thisispartlybecausethetechnicalrequirementsarealways–andatpresentrapidly–changing,coursematerialforthesediplomasdoesnotcurrentlyexist,andaqualificationisoftenprimarilyaboutconfirmingonehasabodyofknowledgeatacertainpointintimeratherthanthecompetencytosuccessfullyperformaroleandpracticethatknowledge.Competenceisdefinedinthisguidancedocumentas:‘anindividual’sabilitytoapplyknowledgeandskillsattherequiredstandardandinadefinedcontext’.Competencyinthiscontextisabouttheapplicationofknowledge,skillsandabilityonthejob.

TheNationalDiplomasinBuildingControlSurveyinghavenotyetbeenimbeddedandsufficientlytestedwithinthesectorforthiscompetencyassessmentsystemtosuggestthatanindividualwithoneormoreofthesequalificationsiscompetenttoacertaincompetencylevel.Furtherworkandevaluationisstillrequiredbeforethissystemcanprovidecategoricalweightinginrelationtothesequalifications.

Page 13: NBCA Competency Assessment System

10 natIonal bca competency assessment system june 2010

Page 14: NBCA Competency Assessment System

Na

tio

Na

l lev

els

aN

d

co

mp

et

eN

cy

sp

ec

ifica

tio

Ns

NatioNal levels aNd competeNcy specificatioNs

National levels and competency specifications 11

Transition 21

Page 15: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 11

Nationallevelsand competencyspecifications

natIonal levels

Thenewnationalcompetencylevelshavebeengroupedintoresidentialandcommercial.Therearethreeresidentiallevelsandthreecommerciallevels.Thelevelshavebeenfurthersplitintoprocessingandinspections.Withineachgroup,buildingandplumbinganddrainagecompetencieshavealsobeenseparatedout.ThesystemcanthereforebeusedbyBCAswithavarietyofconfigurations,forexampleseparateprocessingandinspectionteams,multi-skilledteams,teamssplitalongbuilding,plumbinganddrainageandsoon.

Level1residentialincludestheleastcomplexwork.InafewBCAssomeofthisworkiscarriedoutbytechnicaladministrationstaff.Ratherthancreateaseparatecategoryforthislevelofwork,technicaladministrationstaffcanbeassessedagainsttheapplicableresidential1specificationthatrelatestotheworkthattheydoandnottotheworktheydon’tdo.Forexample,staffprocessingsolidfuelappliancescansimplybeassessedagainsttheperformanceindicatorsandrequirementsrelatingtothattypeofwork.Thisrestrictionontheircompetency(ie,thattheyonlyprocesssolidfuelappliances)canbenotedontheskillsmatrixandtheindividualstaffmember’scompetencyassessmentfile.Asanotherexample,afrontcountertechnicaladministrationofficercouldbeassessedascompetentinresidential1and2,butonlyforsolidfuelheaterconsentapplications.

Thesixlevelsrepresentsignificantstepsintechnicalknowledgeandbuildingtypecomplexity.Decision-makinggoesfromsimpletomorecomplexanalysiswitheachlevelstep.Thelevelsalsosplitresidentialandcommercialareasofknowledge,forexample,lighttimberframeconstructionusuallyusedinresidentialconstructionandmorecomplexspecificdesigncommercialconstructionsystems.ThelevelsalsoidentifyspecificareasofBuildingCodeknowledgeasitrelatestothetypeofconstruction.

Thelevelsareallunderpinnedbytechnicalconsiderations.Tosimplifythis,anumberofissueswereconsideredincluding:

• buildingtype(eg,garage,carport,retainingwall,dwelling,school,officeetc)• classifiedusetakenfromthe1992BuildingRegulations(eg,commercial,industrial,outbuildings)• activityorpurposegroup(singlehousehold(SH),singleresidential(SR),crowdlarge(CL),etc)• E2/AS1riskscoresandevaluationmatrix• structuralimportanceAS/NZS1170• complexityofdesign• lifesafety(riskofinjurytouser)• intendedoutcome.

Becausethelevelsreflectrisk,complexityandknowledgestepsthereissomecross-overbetweenresidential3andcommercial1.Thedefiningknowledgestepsbetweenresidential3andcommercial1levelsrelatetoknowledgeofverticalandhorizontalfireseparationsandtheuseofspecifiedsystems.Therefore,athree-storeyapartmentblockwithhorizontalfireseparationisdefinedasacommercialbuildingforthepurposesofthiscompetencyassessmentsystem.

Page 16: NBCA Competency Assessment System

12 natIonal bca competency assessment system june 2010

new levels for the natIonal competency system

Residential1

Residentialoutbuildingsandancillarybuildings–asdefinedbytheBuildingRegulations1992.Detacheddwellings(SH)designedtoacommonstandard(eg,NZS3604,NZS4229)thataresinglestoreyandhaveanE2/AS1riskmatrixscorelessthanorequalto6.

SimpleonestoreyresidentialdwellingwithanE2/AS1riskscoreof3

SimpleonestoreyresidentialdwellingwithanE2/AS1riskscoreof6

SimpleonestoreyresidentialdwellingwithanE2/AS1riskscoreof4

Page 17: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 13

new levels for the natIonal competency system

Residential2

Detacheddwellings(SH)designedtoacommonstandard(eg,NZS3604,NZS4229)thatarelessthanorequaltotwostoreysandhaveanE2/AS1riskmatrixscorelessthanorequalto12.

Twostorey(SH)residentialdwellingwithanE2/AS1riskscoreof9

Twostorey(SH)residentialdwellingwithanE2/AS1riskscoreof12

Twostorey(SH)residentialdwellingwithanE2/AS1riskscoreof11(decknotoverlivingarea)

Page 18: NBCA Competency Assessment System

14 natIonal bca competency assessment system june 2010

new levels for the natIonal competency system

Residential3

Detacheddwellings(SH)orotherdwellings(SR)thatarelessthanorequaltothreestoreysbutlimitedtoverticalplanefireseparationanddirectegresstotheoutside.E2/AS1riskmatrixscoreof13–20.3

Twostorey(SR)residentialdwellingwithanE2/AS1riskscoreof17(verticalplanefireseparationonly)

Threestorey(SH)residentialdwellingwithanE2/AS1riskscoreof19

Threestorey(SR)residentialdwellingwithanE2/AS1riskscoreof15(verticalplanefireseparationonly)

3 Thislevelalsoincludesspecificallydesignedresidentialcladdingsystems,components,detailingandjunctionsandwhereariskmatrixscoreofgreaterthan20hasbeencalculated.

Page 19: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 15

new levels for the natIonal competency system

Commercial1

Commercial,industrialandcommunalnon-residentialbuildingsandtheirassociatedoutbuildingsandancillarybuildingsequaltoorlessthantwostoreysandanoccupancyloadofequaltoorlessthan100peopleorSRorSAresidentialbuildingsuptotwostoreysandwithhorizontalfireseparation.

Onestoreycommercialbuildingwithlessthan100occupants

Onestoreycommercialbuildingwithlessthan100occupants

Twostoreymotelwithlessthan100occupants

Page 20: NBCA Competency Assessment System

16 natIonal bca competency assessment system june 2010

new levels for the natIonal competency system

Commercial2

Commercial,industrial,communalresidentialandcommunalnon-residentialbuildingsequaltoorlessthanfourstoreyandanoccupancyloadofequaltoorlessthan500peopleorSCorSDthataresinglestorey.

Twostoreymovietheatrewithlessthan500occupants

Fourstoreycommercialbuildingwithlessthan500occupants

Fourstoreycommercialbuildingwithmixed-use(SR)and(CL)

Page 21: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 17

new levels for the natIonal competency system

Commercial3

Allusesofbuildingsthatareoverfourstoreyshigh,orcontainover500occupantsorSCorSDgreaterthansinglestorey.

High-risebuildinginexcessoffourstoreys

High-risebuildinginexcessoffourstoreysandwithmorethan500occupants

Commercial/publicbuildinginexcessoffourstoreysandwithmorethan500occupants

Page 22: NBCA Competency Assessment System

18 natIonal bca competency assessment system june 2010

competency specIfIcatIons

ThecompetencyspecificationsusedintheNationalBCACompetencyAssessmentSystemhavebeendevelopedtoprovidetheassessorandcandidatewithadetailedspecificationofknowledgeandskillsthatarerequiredforapersontobecompetentataparticularlevel.

Therearesixcompetencyspecifications,oneforeachofthenewnationalcompetencylevels(Residential1–3andCommercial1–3).Eachcompetencyspecificationcontains:

• competenciesrequiredbyRegulation10(3)oftheBuilding(AccreditationofBuildingConsentAuthorities)Regulations2006

• performanceindicatorstomeetthecompetenciesinRegulation10(3)• guidanceforassessorsandcandidatesformeetingtheperformanceindicators.

Asyoucanseeahierarchyisstartingtoappear,startingwiththeRegulations,thentherequirementstomeettheRegulationsthroughperformanceindicatorsandendingwithguidanceonwhatdemonstratescompetencewiththeperformanceindicators.Thisisdiscussedinmoredetailfurtheroninthissection.Theformatofacompetencyspecificationisshownbelow.

Seeappendix1forthefulllistofcompetencyspecifications,performanceindicatorsandrelevantguidanceforassessorsandcandidatesforeachcompetencylevel.

competency – resIdentIal 1

OutbuildingsandancillarybuildingsasdefinedbytheBuildingRegulations1992astheyapplytoResidential.Detacheddwellings(SH)designedtoacommonStandard(eg,NZS3604,NZS4229)thataresinglestoreyandhaveanE2/AS1riskmatrixscorelessthanorequalto6.

Regulation10(3)(a):Understandingthephilosophiesandprinciplesofbuildingdesignandconstruction.

Performanceindicators:

1. Comprehendsandhassatisfactoryknowledgeofsections3,4and5oftheBuildingAct2004.

2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesandconstructionsequencingforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

1. Knowledgeareasmayinclude,butarenotlimitedto:

a. thepurposeoftheBuildingAct2004(theAct)

b. TA’sfunctions,dutiesandpowersundertheAct,particularlyastheyrelatetohouseholdunits

c. candiscussthehierarchyofNewZealandbuildinglegislationandthevariouscompliancepathsprovidedforundertheAct

d. candiscussbuildingdesign,constructiontechniquesandsequencingofbuildingworkasitrelatestothiscompetencylevel.

NotethisinformationiscoveredinSections2.1,2.2,2.3,3.0,3.1,3.2,3.3,3.5,3.6and3.7ofthePrefacetotheBuildingCodeHandbook.

Ineachcompetencyspecificationthissegmentprovidesadescriptionofthebuildingtypeandscope,andplacesspecificlimitationsonthetypesofbuildingworkthatcanbeprocessedorinspectedforthislevel.

ThissegmentoutlineswhichspecificregulationoftheBuilding(AccreditationofBuildingConsentAuthorities)Regulations2006arebeingassessed.

Thesearemandatoryrequirementswhichmustbeachievedtodemonstratecompetence.

Thissectionprovidesguidanceandsubjectmatterforassessorsandcandidatestoconsider.Itisnotintendedtobeexhaustive,butprovidesforthecorerangeofknowledgeineachcompetencylevel.

Page 23: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 19

regulatIon 10(3)

Regulation10(3)oftheBuilding(AccreditationofBuildingConsentAuthorities)Regulations2006requiresthefollowingcompetenciestobeassessedforeachemployee.

a) Understandingofthephilosophyandprinciplesofbuildingdesignandconstructionb) Knowledgeofbuildingproductsandmethodsc) KnowledgeandskillinapplyingtheAct,theBuildingCodeandanyotherapplicableregulations

undertheActd) Abilityto:

(i) processapplicationsforbuildingconsent(ii)inspectbuildingwork(iii)certifybuildingwork

e) Abilitytocommunicatewithinternalandexternalpeoplef) AbilitytocomplywiththeBCA’spolicies,proceduresandsystems.

AllcompetenciesreferredtoinRegulation10(3)areincludedineachcompetencyspecification.

performance IndIcators

ThecompetencyspecificationssetoutaseriesofperformanceindicatorsformeetingRegulation10(3)(a)–(f)foreachnationalcompetencylevel.Tobedeemedcompetent,acandidateunderassessmentmustbeabletoachievetheseperformanceindicatorsandtheremustbesufficientevidencesubstantiatingthis.

guIdance for assessors and candIdates

Thisisthetechnicalcontentofthecompetencyspecifications.Itchangesdependingonthenationalcompetencylevelbeingassessed.Theguidanceforassessorsandcandidateshasbeendevelopedtohelpdetermineiftheperformanceindicatorshavebeenmet.However,itisnotexpectedthatthisguidancematerialactasachecklistbecausethereissomeoverlapwiththeguidancebetweenthenationalcompetencylevels.Forexample,theguidancetomeettheperformanceindicatorforRegulation10(3)(a)(understandingthephilosophiesandprinciplesofbuildingdesignandconstruction)issimilarforresidential1,2and3.

TheassessorandcandidateguidanceforRegulation10(3)(d)(i)(abilitytoprocessapplicationsforbuildingconsent)generallyfollowsthestructureoftheBuildingCode.

TheassessorandcandidateguidanceforRegulation10(3)(d)(ii)(abilitytoinspectbuildingwork)hasbeengroupedaroundthegenericinspectionareasoffoundation,prelineandfinal.Theterms‘foundation’,‘preline’and‘final’havebeenusedtogroupinspectionsthatBCAscommonlyundertake.Thetablesoverpageshowsthisgrouping.

Page 24: NBCA Competency Assessment System

20 natIonal bca competency assessment system june 2010

buIldIng InspectIon groups

Inspectiongroups Foundation Preline Final

Actualinspections • Excavation/fill• Siting• Piles(subfloor)• Concreteslab• Raftfoundation• Masonryblock/bondbeam• Tilt-slab• Stripfooting• Retainingwall

• Structuralframing• Weathertightness

(cladding)• Insulation• Pre-wrap• Post-wrap• Cavitybatten• Brickveneer

• Post-line(gibnail)• Waterproofing• Weathertightness

(cladding)• Firestopping• Accessiblefacilities• Meansofescape

Note:Theactualinspectionsarenotexhaustive;manyBCAsmayhaveotherinspectionrequirementsanduseothernamesforsomeinspections.

plumbIng and draInage InspectIon groups

Inspectiongroups Foundation Preline Final

Actualinspections • Drainageconnections• Under-slabplumbing• Drainlaying

• Stacksystems• Wastes• Pre-plumb(watersupplies)• Weathertightness(pipe

penetration)• Drainlaying

• Finalplumbing• Weathertightness

(pipepenetrations)

Note:Theactualinspectionsarenotexhaustive;manyBCAsmayhaveotherinspectionrequirementsanduseothernamesforsomeinspections.

Bygroupinginspectionsintothreebroadgroups–foundation,prelineandfinal–theassessorcanchooseactualinspectionstoreviewevidenceofandsubstantiatetheachievement(ornot)oftheperformanceindicatorsassociatedwithinspections.Theassessorshouldagreewiththecandidatethenationalcompetencylevel(eg,Residential2)andrelevantinspectionstoundertakeandprovideevidencetosubstantiatecompetence.Morecomplexinspectionsshouldbechosenforcompetencyassessment,asthesewouldprovidegreaterclarityoncompetence.Whatthisprocesseffectivelydoesisreducetheamountofinspectionsthatmayneedtobeassessedandprovidesgreaterfocusonmoreimportantinspections.

Page 25: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 21

Transition

Itisenvisagedthatthebulkofbuildingofficialswhohavealreadyhadtheircompetencyassessedcanbetransferredacrosstothenewnationallevelsrelativelysimply.ThisisrelianthoweverontheBCAalreadyhavingatechnicallyrobustandaccuratecompetencyassessmentprocessandoutcome.Toachieveaneasytransitionthefollowingstepswillneedtobeundertaken.

• Stepone–compareyourexistinglevelswiththenewnationallevelsandidentifyareasofalignment.• Steptwo–maptheoutcomeofthecomparisonofyourexistingBCAbuildingcategoriesagainstthe

newnationallevelsusingthetablebelow.ThisprovidesevidencetoIANZofthetransitionfromyourexistingsystemtothenewnationallevels.

• Stepthree–useyourexistingknowledgeofteammembersto‘map’individualsacrosstothenewnationallevelsnotinganyendorsements,trainingrequirementsorareasofsupervisionrequired.Createanewskillsmatrixtorecordthisoutcome(seethetemplatesinthe‘Recordingoutcomes’sectionofthisguidancedocument).

• Stepfour–duringthereviewofannualcompetence,identifyanychangessincethelastassessment.Thismayresultinaloweringofthelevelachieved,nochangeoranassessmenttoprovideevidencethatanewlevelofcompetencehasbeenachieved.

completed example

natIonal system bca’S exIstIng system

Residential1 Categories 1.1 and 1.2

Residential2 Category 2.1

Residential3 Category 2.2

Commercial1 Categories 2.3 and 3.1

Commercial2 Category 3.2

Commercial3 Categories 3.3 and 3.4EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLECategories 2.3 and 3.1

EXAMPLECategories 2.3 and 3.1

Category 3.2

EXAMPLECategory 3.2Category 3.2

EXAMPLECategory 3.2

Categories 3.3 and 3.4EXAMPLE

Categories 3.3 and 3.4

Page 26: NBCA Competency Assessment System

22 natIonal bca competency assessment system june 2010

Page 27: NBCA Competency Assessment System

As

se

ss

me

nt

pr

oc

es

s

Assessment process

Assessment process 23

Page 28: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 23

AssessmentProcess

fIve step process to usIng the assessment system

Step1–Assessmentplanningandagreement:Identifythelevelorlevelsthataretobeassessed(forexample,Residential1–3inspectionsonly).Theassessorshouldbefamiliarwiththecompetencyspecifications,performanceindicatorsandassessorguidancecorrespondingwiththelevelbeingassessed.Theassessorcompletespart1oftheassessmentplanandrecordsevidenceknowntothem,suchasqualifications,trainingcompleted,relevantknownexperienceandsoon.Theassessormeetswiththecandidatetodiscusstheevidencerecordedandgainsagreementonwhatfurtherevidenceistobesupplied,suchascandidateevidenceformscompletedforparticulartypesofbuildingorinspectionwork.Theassessmentplanandtimingsareagreedbetweenassessorandcandidate.Theassessorandcandidatecanalsoagreetohavecertainworkwitnessed(forexample,accompanyinganinspector)ifthecandidateorassessorbelievesthatthisisthebestwaytoprovideevidenceofcompetence.

Step2–Evidenceobtainedbycandidate:Thecandidategatherssupportingevidencethattheyfeeldemonstratestheircompetenceandalignswiththeevidenceagreedtobeprovidedintheassessmentplan.Thecandidatepreparescandidateevidenceforms,ifrequiredbytheassessmentplan.Ifthecandidatebelievesthebestwaytheycanshowtheassessorevidenceofcompetenceisthroughwitnessingwork(eg,accompanyinganinspector),thecandidateshouldbringthistotheassessor’sattentionandhaveitrecordedintheassessmentplansoitcanhappen.ThiscouldsimplybecarriedoutwhileundertakingtheBCA’stechnicalauditprocedures.

Step3–Assessmentundertaken:Thecandidateprovidesevidencetotheassessor.Afterassessingtheevidenceprovidedbythecandidateandreviewingthecandidate’sexperience,workhistory,traininghistoryandotherinternalevidence,adecisionneedstobemadeonwhetherthecompetenceofthecandidatecanbeconfirmedfromtheevidenceprovided(ifitcan,gotostep4).Ifitcannot,aprofessionalconversationcanbeorganisedtofurtherclarifyorconfirmcompetenceorfurtherevidencerequired.

Step4–Assessmentdecisionsmade:Theassessorrecordsthereasonsfortheirdecisionsinpart2oftheassessmentplan.Evidenceforanassessor’sreasonscanbereferencedhere(forexample,byreferencingaparticularformandbuildingconsentnumber).Theassessorcanalsouseprofessionaljudgement.Thereasonsfordecidingwhetheracandidateiscompetentornotwillbespecifictotheindividualandthesituation.Anexampleofacompletedassessmentplan,includingreasonsfordecisions,iscontainedwithinthisguidancedocumentbeginningonpages28,55,and59.

Step5–Assessorrecordsoutcomes:Theassessorrecordstheoutcomeoftheassessment.Thiscanincludeanylimitations(forexample,residential2inspectiononly,notincludingplumbinganddrainage).DependingonhowtheBCAallocatesitswork,forexamplethroughaskillsmatrix,thesesystemsshouldalsobeupdatedwiththeoutcomeoftheassessment.

Page 29: NBCA Competency Assessment System

24 natIonal bca competency assessment system june 2010

Assessorplansanddocumentsassessmentusingassessmentplan

Evidencemayinclude:

• completedandassessedtraining

• relevantqualifications• relevantworkexperience• recordsfrominternalaudits• witnessingofindividual’swork

Evidencemayinclude:

• completedandassessedtraining

• relevantqualifications• relevantworkexperience• recordsfrominternalaudits• witnessingofindividual’swork

Evidencemayinclude:

• completedandassessedtraining

• relevantqualifications• relevantworkexperience• recordsfrominternalaudits• witnessingofindividual’swork

Assessormeetswithcandidateandagreestotheevidence

tobecollectedandtheassessmentplan

Candidatecompletescandidateevidenceformsandgathers

supportingevidence

Candidateshouldhaveclearunderstandingofthe

evidencerequirementsfromtheassessmentplanandthecompetencyspecificationstothelevelbeingassessed

Assessorreviewsevidenceprovidedbythecandidateand

decideswhetheraprofessionalconversationisrequired

Assessmentdecisionsarerecordedinpart2of

assessmentplan.Thesecanincludereferencestobuilding

consent,documentation,procedures,internalauditsorotherinformationused

forassessments

1

ASSESSMENTPLANNINGAND

AGREEMENT

Outcomeofassessmentisrecordedinpart3of

theassessmentplanand,ifrequired,theorganisation’s

skillsmatrixisupdated

2

EVIDENCEOBTAINEDBYCANDIDATE

3

ASSESSMENTUNDERTAKEN

4

ASSESSMENTDECISIONS

MADE

5

OUTCOMEOFASSESSMENT

RECORDED

fIve step assessment process

Page 30: NBCA Competency Assessment System

As

se

ss

me

nt

pl

An

nin

g –

st

ep

1

Assessment plAnning – step 1

Assessment planning – Step 1  25

Page 31: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 25

Assessmentplanning–Step1

assessment plans

Thepurposeofthispartofthedocumentistohelptheassessoridentifywhatexistingcompetenciesthecandidatehasalreadyachievedandwhatnewevidencetheyneedtogivetodemonstratecompetence.Theassessmentplanalsoformspartofthecompetencyrecordandisusedtorecordtheoutcomeoftheassessment.

Planninganassessmentinthiswayreducestheamountofnewevidencewhichneedstobegathered,recognisescompetenciesalreadyachievedandensurestherightevidenceisprovidedtodemonstratecompetency.

Copiesoftheassessmentplantemplatecanbefoundinappendix1andanexampleofacompletedassessmentplanforaresidential1processorhavebeenprovidedoverthefollowingpages.

accredItatIon and meetIng evIdentIal reQuIrements

Regulation6(b),(c)and(d)requiresBCAstorecordtheirdecisions,reasonsfordecisionsandtheoutcomeofthedecision.Thesystemtemplateshavebeendesignedtomeettheserequirementsandshouldbeused.Theevidenceusedtomakeacompetencydecisionmustbetraceable.Thiscanbeachievedbycross-referencingthesourceoftheinformation,forexample‘seebuildingconsentnumber3057fordetails’.Alternatively,relevantevidencesuchasinterviews,consentprocessingnotesorinspectionrecordscanbecopiedandaddedtothecompetencyassessmentfile.

Arangeofevidencecanbeusedtodemonstratecompetency.Thetablebelowprovidesexamplesofevidencetypeswhichmaybeused.

source of evIdence guIdance notes – possIble examples that could be used to help assess competency

Self-assessmentagainstcompetencyspecification

• Self-assessmentbytheemployeeagainstthecompetenciestobeassessed• Employeerecogniseswhenworkisoutsidetheirability• Employeerecogniseswhenpeerreviewisrequired• Employeeidentifiesstrengths,knowledgeandskillsgaps• Employeeidentifiestrainingneeds

Workexperienceandexamplesofcompletedwork

• Overviewofworkhistoryandrelevantexperienceinthebuildingindustry• Buildingconsentdocumentationtheemployeehasprocessedandapprovedorrejected• Inspectionsundertakenbytheemployee,includingtheirinspectionrecords,lettersorreports

written,noticestheyhaveissued,follow-upactionstaken• Complianceschedules–reviewofcompliancescheduleassessmentsandidentification

ofinspection,maintenanceandreportingprocedures• Codecompliancecertificatesissued–checklistscompletedandanyothermaterialsupporting

thedecisionstheemployeehasmade(eg,photos)• Otherwrittendocumentationorreportstheyhaveauthored(includingletterstostakeholders,

internalmemos,noticestofix,trainingorpublishedarticles)

Writtenstatementsorreferencesfrompeersortechnicallyskilledobservers

• Thiscouldincludestatementsfromindividualswithproventechnicalskillsandexpertise,suchasmanagers,teamleaders,engineersorotherprofessionalcolleagueswhoareeitherinternalorexternaltotheorganisation.Thesestatementsshouldconfirmthattheyhaveobservedtheemployee’sworkdirectly

• Suchreferencesorstatementsshouldnotethedatesandtimeperiodinquestion,thecapabilityandprofessionalcapacityoftheobserver,thecontextoftheworkinquestion,andanyotherrelevantinformation

Page 32: NBCA Competency Assessment System

26 natIonal bca competency assessment system june 2010

source of evIdence guIdance notes – possIble examples that could be used to help assess competency

Directobservationorshadowingoftheemployeeonthejob(witnessing)

• Casualdailyorassessment-specificmonitoringofindividual’sperformance• Howtheemployeeperformsduringsitevisits,vettingapplications,processingbuilding

consents,carryingoutfieldinspections,issuingcodecompliancecertificatesornoticestofixandperformingadministrativetasks,etc

• Howtheemployeecommunicateswithstakeholders(verbalandwritten)• Howtheemployeehandlesanyinstancesofdeviationsfromtheapprovedplansandfollows

uponoutstandingissues• Internalauditsandtheirresults

Organisationalrecords • Previouscompetencyassessmentsandperformancereviewsthatconsiderthekeycompetenciesoftheemployee

• Trainingandcontinuingprofessionaldevelopmentrecords• Anycomplimentsorpositivefeedbackreceivedfromthestakeholders• Recordsofanycomplaintsmadeagainsttheemployeeinquestionandtheoutcomesofany

investigationsarisingfromthese

Evidenceofsuccessfulcompletionofcoursesthatincludeprojectsorcompetency-basedassessment

• Technicalcourses(eg,fire,accessibility,weathertightnesscompliance)• Buildingcontrolscourses(eg,BRANZ,BOINZ,DBH)• Inductiontraining• Informationtechnologytrainingandcourses• Traininginqualityassurancesystemsandauditing

Shortcourses• DBH,BRANZLtd,StandardsNewZealandorBOINZseminarsandcourses• Buildingconsentauthorityinductionorin-housetrainingcourses• Manufacturers’ortradedemonstrations• In-housetrainingonspecificareassuchasbuildingterminology,legislation,NZS3604• TraininginuseoftheBCA‘ssystemsandprocessesandequipment(eg,computertraining,

traininginuseofmoisturemeter,digitalcamera,accreditation-relatedtraining)

Qualificationsthatmayhaverelevancetobuildingcontrol

NationalDiplomasinBuildingControlSurveying.

Thefollowingqualificationsandcoursesmayalsoberelevantinsupportingacompetencyassessment.

BachelorDegrees• Architecture• Engineering(mechanical,civil,structural,fire,geotechnical,etc)• Environmentalscience/health• Buildingscience/buildingtechnology• Constructionmanagement• Quantitysurveying

Diplomasandcertificates• NationalDiplomainBuildingControlSurveying(medium&largebuildings)• NationalDiplomainBuildingControlSurveying(smallbuildings)• Nationaldiplomasinarchitecturaldesign,quantitysurveying,etc• NewZealandCertificateinBuilding,NewZealandCertificateinDrafting,NewZealand

CertificateinEngineering(thesewerereplacedbytheNewZealandQualificationsAuthorityandregisterednationaldiplomasdescribedabove)

• Constructionmanagement(Unitec,WelTec,etc)• Trade,advancedtradeincarpentry• NationalCertificateinCarpentry

Factorstoconsiderwhenassessingtherelevanceofqualificationsandcourses• Whenitwascompleted• Whatfurthertrainingtheindividualhasdonetostaycurrentintheirareaofexpertise• Whethertheindustryandknowledgerequirementshavechangedsincethequalification

wasobtainedand,ifso,whetherthequalificationortrainingisrelevantintoday’senvironment• Whattypeofcourseitwas,ensuringthatitinvolvedanassessmentortest(eg,exam,

completionofaprojectorproductionofanoutput)

Page 33: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 27

source of evIdence guIdance notes – possIble examples that could be used to help assess competency

RegistrationunderStatute CharteredProfessionalEngineersofNewZealandAct2002• CharteredProfessionalEngineer

RegisteredArchitectsAct2005• RegisteredArchitect

Plumbers,GasfittersandDrainlayersAct2006• CertifyingPlumber• CertifyingGasfitter• LicensedDrainlayer

BuildingAct2004• Licensedbuildingpractitioner

Othermaterialtheyhaveproduced

• Papersdevelopedandpresentedatindustryworkshops,conferencesorseminars• Papersdevelopedfortrainingpurposes• Checklistsorproceduresdeveloped• Articleswrittenorpublished

Professionalandindustryaffiliations

• Voluntarymemberships(eg,BOINZ,RegisteredMasterBuilders,CertifiedBuildersAssociation,NewZealandInstituteofRegisteredBuildingSurveyors)

• Industryparticipation(committeemember,officeholder,attendingconferences,etc)• Attendingconferencesortradeshows

Page 34: NBCA Competency Assessment System

28 natIonal bca competency assessment system june 2010

natIonal competency assessment system

Part1:Assessmentplan

Assessorcompletesthisplanandagreesevidencerequirementsanddateswithcandidate.

Personalassessmentplanfor: Bill Ding Permit

Assessmenttype:Newcandidate

Reviewofexistingemployee (Note:Ifthisisacompetencyreviewjustnotewhathas changedsincethelastassessment)

TransitionfromanotherBCAsystem

Levelchange

Competencylevelassessed:Residential2

Assessmentincludes(tickrelevantarea/s):

Plumbinganddrainage

Building

Processing

Inspections

Specialist:………………….……..…………….

Candidate’sworkexperience:

Way Down South District CouncilMulti Skilled Building Offi cial, February 2005 – August 2010

Way Up North City CouncilMulti Skilled Building Inspector, November 2000 – February 2005

Cowboy Builders Ltd Leading Hand/Builder 1998 – November 2000

NZ Army

Carpenter, Royal New Z ealand Engineers 1993–1998

Candidate’squalifications:

• National Certifi cate Carpentry • Trade Certifi cate Carpentry

• Sixth Form Certifi cate, School Certifi cate

Relevanttrainingcompleted

• Senior Building Offi cials’ Forum (February 2010)• BOINZ conference 2010• BOINZ residential weathertightness course (December 2009) • G12 and G13 Acceptable Solution Seminar (January 2009)• Weathertightness training BRANZ (June 2008)• Project management course NZ quality College (November 2007)• The Building Act 2004 by Department of Building and Housing (June 2006)• BOINZ conference 2002• BIA Claddings Forum (March 2002)

EXAMPLEMulti Skilled Building Inspector, November 2000 – February 2005

EXAMPLEMulti Skilled Building Inspector, November 2000 – February 2005

Leading Hand/Builder 1998 – November 2000

EXAMPLELeading Hand/Builder 1998 – November 2000

EXAMPLE

EXAMPLE

Carpenter, Royal New Z ealand Engineers 1993–1998EXAMPLE

Carpenter, Royal New Z ealand Engineers 1993–1998

Page 35: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 29

natIonal competency assessment system

Evidencerequired Comments Daterequired

Completedprocessingsheets/plans/specifications/internalaudit/recordsetc.

Bill will need to supply two processing records, including completed candidate evidence guides of two residential 2 buildings he has processed.

Internal audits of processing and inspection.

14/05/11

Quizresults N/A

Trainingcourseevaluation Training evaluation on Middle District Council ’s policies and procedures.

14/05/11

Copyofqualifications Already provided to council and contained in Bill ’s HR fi le.

N/A

Completedinspectionrecords Bill will need to supply three inspection records for residential 2, including completed candidate evidence guides for inspections (foundation, preline and fi nal).

14/05/11

Witnessingofwork Witnessing of work will be required for foundation, preline and fi nal inspections.

14/05/11

Other(pleasespecify) Professional conversation using the candidate evidence guides (completed)evidence guides (completed)

By 14/05/11

Specialrequirements(listanycompetencyscopelimitations):

Bill is not applying for assessment in the plumbing and drainage aspects as Middle District Council BCA has several experts in plumbing and drainage and separate processes assuring compliance (plumbing and drainage experts in processing and inspection)..............................................................................................................................................................................................................................................................................................................................................

Agreement:

Assessor: AnnGillGrinder..........................................................................................................Date:14/04/11ClusterGroupCompetencyAssessmentManager

Candidate: BillDingPermit..........................................................................................................Date:15/04/11BuildingOfficial

Assessor: AnnGillGrinder..........................................................................................................Date:14/04/11

Candidate: BillDingPermit..........................................................................................................Date:15/04/11

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLEProfessional conversation using the candidate

EXAMPLEProfessional conversation using the candidate By 14/05/11

EXAMPLEBy 14/05/11

Specialrequirements(listanycompetencyscopelimitations):

EXAMPLESpecialrequirements(listanycompetencyscopelimitations):

Bill is not applying for assessment in the plumbing and drainage aspects as Middle District Council BCA has several

EXAMPLEBill is not applying for assessment in the plumbing and drainage aspects as Middle District Council BCA has several experts in plumbing and drainage and separate processes assuring compliance (plumbing and drainage experts in processing

EXAMPLEexperts in plumbing and drainage and separate processes assuring compliance (plumbing and drainage experts in processing

............................................................................................................................................................

EXAMPLE............................................................................................................................................................

..................................................................................................................................................................................

EXAMPLE..................................................................................................................................................................................

EXAMPLE

Page 36: NBCA Competency Assessment System

30 natIonal bca competency assessment system june 2010

Page 37: NBCA Competency Assessment System

Ca

nd

ida

te

ev

ide

nC

e –

St

ep

2

Candidate evidenCe – Step 2

Candidate evidence – Step 2 31

Page 38: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 31

Candidateevidence–Step2

candIdate evIdence form

Thepurposeofthecandidateevidenceformistohelpthecandidaterecordinformationinawaythatisusefultothecandidateandassessor.Theformcontainsaseriesofpromptsandquestionsthatthecandidatehastoanswer.Forcandidateswhoarelessabletowriteanswers,thepromptscanhelpthecandidateordertheirthinkingforaprofessionalconversationwiththeassessor.

TheprocessdescribedintheNationalBCACompetencyAssessmentSystemisacollaborativeprocessbetweenthecandidateandtheassessor.Previously,competencyassessmenttendedtobeaprocessthatwas‘doneto’acandidateratherthanthecandidateworkingwiththeassessortoestablishtheircompetence.

TheNationalBCACompetencyAssessmentSystemhasprovidedmorefocusonthecandidatethanpreviouscompetencyassessmentsystems.Itrequiresthemtoadoptamorehands-onapproach,whichrequiresthecandidateto:

• familiarisethemselveswiththecompetencyspecificationsandhowtomeettheperformanceindicatorsforeachlevel,applicabletothem

• keeppersonalrecordsofinterestingprojects,unusualsituations,workedexamplesandtheiroutcomessothatthecandidatecanusethemtosupporttheirongoingcompetencyassessment

• makedecisionsandagreementswiththeassessoronwhatwillbesuppliedforthecandidate’sassessmentofcompetency

• physicallyobtain,recordandpresenttheevidenceofcompetencetotheassessor.

Thisputsgreaterresponsibilityfordrivingthecompetencyassessmentonthecandidate,whocansometimesknowbestwhatrelevantinformation,documentationandevidencetheycanusetoestablishtheircompetence.

TheNationalBCACompetencyAssessmentSystemalsoacknowledgesthatcandidateshavedifferingstrengthsandweaknesseswhenitcomestopresentingevidenceofcompetence;forexamplesomeprocessingstafftendtobemorecomfortableatprovidingwrittenreports/casestudies/portfoliosofinformationwhereassomeinspectionstafftendtobemorepracticalandprefertoshowandtell(forexample,accompanyinganinspectoronsiteandhavingadiscussion).Byhavingthecandidatedrivingthistheygettomakeanagreementwiththeassessoronwhatwillworkforthem.

Theseformsshouldideallybefilledoutbythecandidateandhaveattachedrelevantinformationthattheybelievehelpsthemdemonstratecompetence.Ifthecandidatefeelsthatheorshecannotexpressthemselveswellinwriting,asdiscussedabove,theyshouldbepreparedtohaveaprofessionalconversationabouttheiragreedbuildingprojectsontheaspectsdiscussedinthisform.Tohelpthecandidatehavediscussions,theycanusephotosofworkundertaken,plansandspecifications,orproceduresandinspectionrecordstotalktoor,asdiscussedabove,theassessorcanalsoaccompanyacandidatewhiletheyundertaketheirwork.Assessorobservationisconsideredaveryvaluablemethodofhelpingestablishacandidate’scompetency.

Evidenceformtemplateshavebeendevelopedforprocessingandinspectionsforresidentialandcommercialwork.

SimplifiedcandidateguidanceisprovidedinAppendix6foranassessortogivetothecandidate.Thecandidateguidanceincludesinformationonhowtocompileandcompletethecandidateevidenceforms.

Page 39: NBCA Competency Assessment System

32 natIonal bca competency assessment system june 2010

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

Candidatename:Mr Richter ScaleDate:22.04.2010

Levelofcompetencybeingassessed:Commercial 2

Agreedbuildingconsentnumber/addressofbuildingbeingusedforassessment:

BC 123/2010

8 Seismic Close

Briefdescriptionofbuildingprojectbeingusedforassessment:

TheBuilding

The building consists of a single storey portal-framed structure that is founded on a reinforced concrete foundation. Lower level external walls consist of pre-cast concrete panels to a height of 2.5 metres with long-run profi led metal sheet cladding fi xed to steel framing above. Offi ce areas are clad with fi bre cement-based sheet on a drained cavity. The roof is clad with long-run metal sheet. The roof design incorporates a small building-plant area, which will house the building’s air-conditioning system. Internally the building is divided into two large open retail spaces, a warehouse with goods stacked in proprietary racking systems (higher than 3 metres) and a drive-through timber yard area. Two small mezzanine areas are provided for staff offi ces, bathrooms, lunch and meeting rooms.

Buildingparticulars

Building use: Commercial, crowd activity (CM) – crowd mediumOccupancy: 250 people Highest fi re hazard category (FHC): 4 Square metres: 950 m2

Specifiedsystems

The applicant listed the following specifi ed systems on the form 2 building consent application:

• Automatic sprinkler system• Emergency warning system • Emergency lighting system• Mechanical ventilation (air-conditioning) • Backfl ow prevention• Means of escape (fi nal exits, fi re separations and signage)

Describeinyourownwordswhatyouconsiderisimportantinrelationtothefollowingaspectsofyourbuildingproject.

1.Site/landthatbuildingisbeingbuilton:

The site includes the following special features.

a. GIS mapping indicates the site is located within a specifi c design wind zone. The design engineer confi rmed this view by calculating the site’s wind speed to be 56 m/sec (designated specifi c engineered design (SED)). Structural design, loading calculations and material selection have all taken the sites relative wind loading into consideration.

b. The geotechnical report has identifi ed the site as generally having good ultimate soil bearing capacity; however a small portion of poor quality soil has been identifi ed at the southeastern end of the site. This localised area of poor ground requires specifi c strengthening attention to ensure the building platform can support the load-path from the super structure; consequently a condition has been added to the building consent under section 90 of the Building Act 2004 for third party verifi cation (PS4 monitoring) of this building work as we do not have the specifi c in-house competency to undertake such monitoring or soil testing. The design engineer responsible for observation work is well known to the BCA and is a practising CPEng.

c. The site is rural and is in zone 2 as defi ned in NZ S 3604:1999, indicating building elements are unlikely to be affected by accelerated atmospheric corrosion from wind blown salt laden air and the like.

d. The site has no easements, encumbrances, consent notices etc listed on the certifi cate of title. So no specifi c limitations/design modifi cations are necessary in this regard. Council records also indicate that the site does not have any land related issues such as hazards, contamination or heritage status etc.

e. A surveyor has been involved in defi ning the allotment’s boundaries, so boundary clearances etc should be relatively easy to establish on site.

EXAMPLEThe applicant listed the following specifi ed systems on the form 2 building consent application:

EXAMPLEThe applicant listed the following specifi ed systems on the form 2 building consent application:

Emergency lighting system

EXAMPLE Emergency lighting system Mechanical ventilation (air-conditioning) EXAMPLE

Mechanical ventilation (air-conditioning)

Page 40: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 33

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

2. Foundations:

Basis for design: AS/NZ S 1170:2002, B1/VM1 and B1/VM4

The building’s foundation is fully engineered and will be monitored at specifi ed times during construction (some specifi c soil testing is required to confi rm design assumptions made regarding poor soil quality at the southeastern end of the site).

The slab ’s DPM is well detailed on plan and within the specifi cation and meets the E2 performance requirements.

Perimeter pre-cast concrete panels are to be welded to base plates that are to be tied into the slab.

Other aspects of the foundation design were considered standard for this type of building work eg concrete strength, ground clearances, shrinkage control joist, steel size, steel cover and lap, DPM etc.

Some services are to be run within the slab, but this is covered in item 6 below.

3. Structureofthebuildingfromfoundation/slabup:

Basis for design: AS/NZ S 1170:2002, B1/VM1

The building’s structural frame/skeleton consists of steel portals and steel horizontal girts that are clad with long-run metal sheet cladding. Pre-cast panels extend 2.5 metres above fl oor level around the perimeter of the slab.

Plans and specifi cations for the project indicate the building structure (roof) is to support the weight of some large air-conditioning units. The air-conditioning units do not feature in any of the design engineer’s sketches and it is unclear if she is aware of the additional super-imposed load associated with these units (a phone call was made to the engineer to confi rm that the design had accounted for the additional loading imposed by these units). The engineer confi rms these units were not included on the plan version she was provided with. As a result the roof loading is recalculated and the units are moved to a more suitable location (amended plans were requested and provided). Fixing details were also requested for securing the units through the roof cladding in order to satisfy clause E2.

4. Buildingenvelope(claddings):

Basis for design: E2/VM1 and E2/AS1 modifi ed and used as an alternative solution for Building Code compliance.

The building is outside the scope and limitations of E2/AS1; however the designer has chosen to use some design principles and fi gures within the Acceptable Solution to prove compliance with clause E2. Given that the site is located in an SED wind zone and the designer has provided junction details that were unconventional it was decided to get the design peer-reviewed by an independent expert. The design was peer-reviewed by a recognised weathertightness expert who confi rms that the building meets clause E.2.3.2. The designer also provides in-service history of a similar building design that is subject to the equivalent wind pressure. A combination of in-service history and expert opinion confi rms the design meets clause E2 of the NZ BC on reasonable grounds.

5. Firesafety:

Basis for design: C/AS1

Active systems included: Basis for compliance

Automatic sprinkler system NZ S 4541:2007

Emergency warning system F7/AS1 NZ S 4512:2003

Emergency lighting system F6/AS1 AS/NZ S 2293:1995

Passive systems included:

Means of escape (fi nal exits, fi re separations and signage) C/AS1

The building is located at least 20 metres away from any boundaries and no other buildings are in close proximity, so spread of fi re beyond the building is unlikely.

The applicant provided a fi re report that used the Compliance Documents Acceptable Solution C/AS1 to illustrate compliance with the NZBC. In line with our BCA’s policies and procedures our lead technical person for the C-Docs (John de-blaze) peer-reviewed the fi re report and associated plans. The internal review confi rmed my fi ndings and agreed the documents met the requirements of C/AS1 and the NZBC.

EXAMPLE

EXAMPLEsuper-imposed load associated with these units (a phone call was made to the engineer to confi rm that the design had accounted for the

EXAMPLEsuper-imposed load associated with these units (a phone call was made to the engineer to confi rm that the design had accounted for the additional loading imposed by these units). The engineer confi rms these units were not included on the plan version she was provided

EXAMPLEadditional loading imposed by these units). The engineer confi rms these units were not included on the plan version she was provided with. As a result the roof loading is recalculated and the units are moved to a more suitable location (amended plans were requested

EXAMPLEwith. As a result the roof loading is recalculated and the units are moved to a more suitable location (amended plans were requested and provided). Fixing details were also requested for securing the units through the roof cladding in order to satisfy clause E2.

EXAMPLEand provided). Fixing details were also requested for securing the units through the roof cladding in order to satisfy clause E2.

Basis for design: E2/VM1 and E2/AS1 modifi ed and used as an alternative solution for Building Code compliance.

EXAMPLEBasis for design: E2/VM1 and E2/AS1 modifi ed and used as an alternative solution for Building Code compliance.

The building is outside the scope and limitations of E2/AS1; however the designer has chosen to use some design principles and fi gures

EXAMPLEThe building is outside the scope and limitations of E2/AS1; however the designer has chosen to use some design principles and fi gures within the Acceptable Solution to prove compliance with clause E2. Given that the site is located in an SED wind zone and the

EXAMPLEwithin the Acceptable Solution to prove compliance with clause E2. Given that the site is located in an SED wind zone and the designer has provided junction details that were unconventional it was decided to get the design peer-reviewed by an independent EXAMPLE

designer has provided junction details that were unconventional it was decided to get the design peer-reviewed by an independent expert. The design was peer-reviewed by a recognised weathertightness expert who confi rms that the building meets clause E.2.3.2. EXAMPLE

expert. The design was peer-reviewed by a recognised weathertightness expert who confi rms that the building meets clause E.2.3.2. The designer also provides in-service history of a similar building design that is subject to the equivalent wind pressure. EXAMPLE

The designer also provides in-service history of a similar building design that is subject to the equivalent wind pressure.

Page 41: NBCA Competency Assessment System

34 natIonal bca competency assessment system june 2010

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

6. Services:

General All services penetrations were checked to have adequate protection (eg, fi re collars, structural support, not compromising sound rated walls etc).

P&DDrainage and plumbing services for clauses (E1, G1, G2, G10, G12 and G13) were assessed by the BCA’s technical person (S Bend). A small issue was identifi ed regarding pipe falls for sanitary services in the slab (pipe falls within the slab were not adequately detailed on plan). S Bend contacted the designer and the appropriate falls were entered on the relevant drawings. Other P and D matters were found to comply with NZ BC.

Prescribed gas and electrical work Covered by an energy work certifi cate (providing a copy of these certifi cates is a condition of the building consent).

Specifi ed systemsIn accordance with section 7 of the Building Act the designer provided a list of the specifi ed systems to be installed in the building and the proposed procedures for inspection and maintenance of those systems. A schematic plan was also appended to this information to help with on site inspection and system identifi cation purposes.

Third-party commissioning certifi cates are required for the installation of the alarm and sprinkler systems (providing this verifi cation/certifi cation were made on condition of the issued building consent).

7. Interiorfinishes:

Spread of fi reFire resistance ratings and surface fi nishes were assessed and peer-reviewed as part of the fi re safety assessment. These items were found to meet the NZ BC.

Slip resistance The designer elected to use materials that met the slip resistance requirements detailed in D1/AS1 (eg, friction coeffi cient of not less than 0.4).

MoistureWet area fl oor and wall services were well detailed within the design documents and generally used E3/AS1 as means of compliance, albeit with a few minor alternative solutions (the design of a level access accessible shower was deemed beyond the scope of the acceptable solution as it used a sheet membrane on fl oor and wall surfaces; however, the design was found to be well detailed and deemed to meet the requirements of E3).

Describeinyourownwordstheareasofthebuildingthatyouconsiderarisk:

• Foundation – the geotechnical report identifi ed areas where poor soil quality was present.• Structural – building plant located on roof (air-conditioning units) • Building envelope – potential for water ingress and alternative solution offered as a means of compliance • Services – penetrations through fi re rated walls, specifi ed systems – correct design standards and inspection and maintenance

requirements. Pipe services in slab did identify falls/gradient.

Why?:

• Foundation – potential for localised building failure due to poor ground conditions. • Structural – potential for building failure due to an unsupported point-load that was not addressed during the design phase.• Building envelope alternative solution offered by applicant was viewed as potential area of weathertightness risk (peer-review requested

to support proposed design).• Services – penetrations through fi re walls create the potential to compromise fi re resistance.

EXAMPLEFire resistance ratings and surface fi nishes were assessed and peer-reviewed as part of the fi re safety assessment. These items were found

EXAMPLEFire resistance ratings and surface fi nishes were assessed and peer-reviewed as part of the fi re safety assessment. These items were found

The designer elected to use materials that met the slip resistance requirements detailed in D1/AS1 (eg, friction coeffi cient of not

EXAMPLEThe designer elected to use materials that met the slip resistance requirements detailed in D1/AS1 (eg, friction coeffi cient of not

Wet area fl oor and wall services were well detailed within the design documents and generally used E3/AS1 as means of compliance, EXAMPLEWet area fl oor and wall services were well detailed within the design documents and generally used E3/AS1 as means of compliance, albeit with a few minor alternative solutions (the design of a level access accessible shower was deemed beyond the scope of the acceptable EXAMPLE

albeit with a few minor alternative solutions (the design of a level access accessible shower was deemed beyond the scope of the acceptable solution as it used a sheet membrane on fl oor and wall surfaces; however, the design was found to be well detailed and deemed to meet EXAMPLE

solution as it used a sheet membrane on fl oor and wall surfaces; however, the design was found to be well detailed and deemed to meet

Page 42: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 35

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

Werethereanyalternativesolutionsusedinthisbuilding?Ifso,pleasedescribeinyourownwordswhattheywereandhowyouassessedthem:

E2: Cladding system. Use of expert opinion and in-service history of a similar product or building method confi rmed compliance with NZ BC.

E3: Accessible shower. Design outside the scope of E3/AS1, but the designer included supporting evidence and testing of product/method used. The shower was assessed against E3’s requirements and was deemed to meet the Building Code.

Inyourownwords,pleasedescribeanylegislativerequirementsyouneededtoconsiderwhenprocessingthebuildingconsentapplication:

• The Building Act 2004, in particular– Sections 17 – all work must comply with NZ BC, 19 – different methods of meeting the NZ BC (eg, Compliance Documents,

product certs, determination etc), 46-51 – processing a building consent, statutory timeframes, NZ FS requirements (is defi ned as relevant building in section 21A of Fire Services Act 1975). 100-105 – compliance schedule considerations as specifi ed systems are being installed as part of the proposed building work. 118 – access and facilities for people with disabilities as the building falls within Schedule 2 of the Building Act 2004

• The Building Regulations, in particular – The Building Regulations 1992 (Schedule 1 the Building Code)– Building (Forms) Regulations 2004

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant

Building Consent BC 123/2010• Building consent BC 123/2010 plans and specifi cations, particularly:

− Records of conversation with engineer about extra roof loading− Requests for further information− Fire report− Alternative solution cladding (details A04, A06,A020 and pages 57–68 of the specifi cations)− Accessible shower details (page A05 and specifi cation pages 72–73)

• Alternative solution processing sheet (cladding and accessible shower)• Producer statement acceptance recordsEXAMPLENote:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobe

EXAMPLENote:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant

EXAMPLEreferenced.Documentsthatyoudoattachorreferenceneedtoberelevant.

EXAMPLE.

Building consent BC 123/2010 plans and specifi cations, particularly:

EXAMPLEBuilding consent BC 123/2010 plans and specifi cations, particularly:

Records of conversation with engineer about extra roof loading

EXAMPLERecords of conversation with engineer about extra roof loading

Alternative solution cladding (details A04, A06,A020 and pages 57–68 of the specifi cations)

EXAMPLEAlternative solution cladding (details A04, A06,A020 and pages 57–68 of the specifi cations)Accessible shower details (page A05 and specifi cation pages 72–73) EXAMPLEAccessible shower details (page A05 and specifi cation pages 72–73)

Alternative solution processing sheet (cladding and accessible shower)EXAMPLE

Alternative solution processing sheet (cladding and accessible shower)Producer statement acceptance recordsEXAMPLE

Producer statement acceptance records

Page 43: NBCA Competency Assessment System

36 natIonal bca competency assessment system june 2010

natIonal competency assessment: candIdate evIdence form – InspectIonto be completed by the candidate.

Candidatename: Mr Richter ScaleMr Richter ScaleMr Richter Scale Date:17.05.2010

Levelofcompetencybeingassessed:Commercial 2

Agreedbuildingconsentnumber/addressofbuildingbeingassessed:

BC 123/20108 Seismic Close

Whattypeofworkistheinspectionrelatingto(tickrelevantwork)?

Building

Plumbinganddrainage

Whattypeofinspectionisbeingassessed(tickrelevantwork)?

Foundation

Preline

Final

Briefdescriptionofbuildingprojectbeingusedforassessment:

The building consists of a single-storey, portal-framed structure that is founded on a reinforced concrete foundation. Lower level external walls consist of pre-cast concrete panels to a height of 2.5 metres with long-run profi led metal sheet cladding fi xed to steel framing above. Offi ce areas are clad with fi bre cement-based sheet on a drained cavity. The roof is clad with long-run metal sheet. The roof design incorporates a small building-plant area, which will house the building’s air-conditioning system. Internally the building is divided into two large open retail spaces, a warehouse with goods stacked in proprietary racking systems (higher than 3 metres) and a drive-through timber yard area. Two small mezzanine areas are provided for staff offi ces, bathrooms, lunch and meeting rooms.

Buildingparticulars

Building use: Commercial, crowd activity (CM) – crowd mediumOccupancy: 250 peopleHighest fi re hazard category (FHC): 4 Square meterage: 950 m2

Briefdescriptionofinspectionbeingundertakenforassessment:

Final inspection for commercial level 2 type building work.

Objective: ensuring the building work has been carried out in accordance with building consent – plans and specifi cations and any amendments, minor variations undertaken during the project and meets the NZ BC requirements.

A review of the consent fi le was undertaken before visiting the site to familiarise myself with the status of the project and identify if there were any outstanding compliance matters.

The project manager responsible for managing the development asked that he be present during the inspection. This was agreed to as it was felt it would be benefi cial should any queries arise about technical matters.

A separate fi nal inspection covering P&D compliance is to be undertaken.

Describeinyourownwordswhatyouconsiderisimportantinrelationtothefollowingrelevantaspectsofyourbuildinginspection:

1. Site/landthatbuildingisbeingbuiltoninrelationtotheinspection:

• As the site is located in a specifi c design wind zone (subject to higher than normal wind pressures) and has some unconventional cladding design details have been used. I will place particular emphasis on inspecting these aspects as it is important to ensure the building’s external envelope has been completed in accordance with plans and specifi cations.

• The site’s geotechnical report identifi ed specifi c requirements for certain areas of the site. As a consequence the project manager has agreed to provide copies of the engineer’s inspection notes and a (PS4) to confi rm the building work undertaken meets the Building Code (means of compliance: Verifi cation Methods cited in the Compliance Document for B1).

EXAMPLEThe roof design incorporates a small building-plant area, which will house the building’s air-conditioning system. Internally the building

EXAMPLEThe roof design incorporates a small building-plant area, which will house the building’s air-conditioning system. Internally the building is divided into two large open retail spaces, a warehouse with goods stacked in proprietary racking systems (higher than 3 metres)

EXAMPLEis divided into two large open retail spaces, a warehouse with goods stacked in proprietary racking systems (higher than 3 metres) and a drive-through timber yard area. Two small mezzanine areas are provided for staff offi ces, bathrooms, lunch and meeting rooms.

EXAMPLEand a drive-through timber yard area. Two small mezzanine areas are provided for staff offi ces, bathrooms, lunch and meeting rooms.

Building use: Commercial, crowd activity (CM) – crowd medium

EXAMPLEBuilding use: Commercial, crowd activity (CM) – crowd medium

Highest fi re hazard category (FHC): 4

EXAMPLEHighest fi re hazard category (FHC): 4

Briefdescriptionofinspectionbeingundertakenforassessment:EXAMPLE

Briefdescriptionofinspectionbeingundertakenforassessment:

Final inspection for commercial level 2 type building work. EXAMPLE

Final inspection for commercial level 2 type building work.

Page 44: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 37

natIonal competency assessment: candIdate evIdence form – InspectIonto be completed by the candidate.

2. Structureanddurabilityinrelationtotheinspection:

• As noted above the engineer’s inspection notes and (PS4) are to be provided during the inspection to confi rm compliance in relation to structural matters conditioned on the building consent.

• A visual inspection of completed work was undertaken to ensure visible fi xings, ties, bracing etc are in place and are compliant. This was not done to redress items already inspected during preline/postline inspections. It was simply undertaken as general observation of the building’s overall structural compliance.

• I inspected the building for any evidence of structural movement, settlement, subsidence, warping, compression etc that would raise concern and may require additional investigation. No such issues were evident.

• A visual inspection of external/internal materials and coatings was undertaken to ensure these items met the plans and specifi cations and the Building Code, in particular clauses B1, E2 and B2.

3. Buildingenvelope(claddings)inrelationtotheinspection:

• I ensured the external envelope had been completed in accordance with building consent (plans and specs). As the building work includes alternative solutions used as a means of compliance, more emphasis was placed on the inspection of unconventional details, such as junction fl ashings between different cladding types. As an additional precaution, internal moisture level readings were taken on internal lined wall surfaces to provide additional support for the end compliance decision.

• I visually checked exposed fl ashings, membranes, cavity vents and drainage and kept an eye out for any un-consented attachments to the building envelope.

4. Firesafetyaspectsofthebuildinginrelationtotheinspection:

• A full walk-through inspection was undertaken to ensure the nominated means of escape was compliant and penetrations to fi re walls were sealed and made good.

• Life-safety systems (specifi ed systems) were confi rmed to be operational. Third-party verifi cation/certifi cation and commissioning information was provided to confi rm the fi re alarm and sprinkler had been installed in accordance with specifi ed NZ Standards (eg, NZ S 4512:2003 for the alarm system).

5. Servicesandassociatedsystemsinrelationtotheinspection:

• P&D inspection is to be undertaken by a BCO with the appropriate P&D competencies (not part of this inspection).• The fi nal inspection revealed that the following specifi ed systems had not been identifi ed during the processing stage of the building

consent. The owner had failed to identify the following specifi ed systems within their application for building consent – smoke control system for removing smoke and a CO detection device for early warning of gas leakage. Both specifi ed systems were located within the car park area of the building (refer to attached photos 1 and 2 for details of these specifi ed systems). Further information was requested regarding the installation, performance, inspection and procedural requirements of these specifi ed systems. Note: The fi nal inspection was failed as a result of this fi nding.

• The project manager was informed of the areas of non-compliance (non-consented building work) and was provided with an inspection report that outlined what was required to resolve these matters (amended plans and specifi cations, and performance, maintenance and reporting procedures for each specifi ed system). The project manager acknowledged the importance of getting these matters resolved and forwarded the information required, which in turn was added to the compliance schedule.

6. Interiorfinishesinrelationtotheinspection:

• Inspection of these elements was undertaken during the inspection of means of escape (in item 4). This included a visual check of fl oor, wall and ceiling fi nishes and fi xtures and fi ttings to ensure they comply with the plans and in particular the fi re report.

EXAMPLE

EXAMPLEA full walk-through inspection was undertaken to ensure the nominated means of escape was compliant and penetrations to fi re

EXAMPLEA full walk-through inspection was undertaken to ensure the nominated means of escape was compliant and penetrations to fi re

Life-safety systems (specifi ed systems) were confi rmed to be operational. Third-party verifi cation/certifi cation and commissioning

EXAMPLELife-safety systems (specifi ed systems) were confi rmed to be operational. Third-party verifi cation/certifi cation and commissioning information was provided to confi rm the fi re alarm and sprinkler had been installed in accordance with specifi ed NZ Standards

EXAMPLEinformation was provided to confi rm the fi re alarm and sprinkler had been installed in accordance with specifi ed NZ Standards

5. Servicesandassociatedsystemsinrelationtotheinspection:

EXAMPLE5. Servicesandassociatedsystemsinrelationtotheinspection:

P&D inspection is to be undertaken by a BCO with the appropriate P&D competencies (not part of this inspection).

EXAMPLEP&D inspection is to be undertaken by a BCO with the appropriate P&D competencies (not part of this inspection).The fi nal inspection revealed that the following specifi ed systems had not been identifi ed during the processing stage of the building EXAMPLEThe fi nal inspection revealed that the following specifi ed systems had not been identifi ed during the processing stage of the building EXAMPLE

consent. The owner had failed to identify the following specifi ed systems within their application for building consent – smoke EXAMPLE

consent. The owner had failed to identify the following specifi ed systems within their application for building consent – smoke control system for removing smoke and a CO detection device for early warning of gas leakage. Both specifi ed systems were located EXAMPLE

control system for removing smoke and a CO detection device for early warning of gas leakage. Both specifi ed systems were located

Page 45: NBCA Competency Assessment System

38 natIonal bca competency assessment system june 2010

natIonal competency assessment: candIdate evIdence form – InspectIonto be completed by the candidate.

Describeinyourownwordstheareasofthebuildingwhatyouconsiderariskareainrelationtoyourinspection:

• Foundation – the geotechnical report identifi ed areas where poor soil quality where present (potential risk of structural failure).• Structural – building plant located on roof (air-condition units creating a superimposed/point-load.) • Building envelope – potential for water ingress as an alternative solution had been offered as a means of compliance• Services – penetrations through fi re rated walls, specifi ed systems – correct design standards and inspection and maintenance

requirements. Pipe services in slab did identify fall/pipe gradients. • Specifi ed systems installed, but not identifi ed within the consented documents. Amended plans and specifi cations required prior

to issuing the CCC.

Why?:

• Foundation – potential for localised building failure due to poor ground conditions. • Structural – super-imposed load to roof could create issues if not correctly designed and/or installed.• Building envelope – the alternative solution offered by the applicant was viewed as potential area of weathertightness risk.

Unconventional design means checking of building envelope is very thorough. • Services – penetrations through fi re walls create the potential to compromise fi re resistance. • Specifi ed systems that are not picked up during a building consent will not end up on the buildings compliance schedule and will

consequently not get inspected and maintained over the life of the building.

Inyourownwordspleasedescribeanylegislativerequirementsyouneededtoconsiderwheninspectingthisbuildingwork:

The Building Act 2004, in particular:

• Section 17 all building work must comply with the Building Code.• Sections 100–105 – compliance schedule considerations as specifi ed systems are being installed as part of the proposed building work• In relation to BCA accreditation regulations the requirement to follow the inspections procedures of the BCA.• The Building Regulations, in particular• The Building Regulations 1992 (Schedule 1 the Building Code)• Building (Forms) Regulations 2004• Building (Accreditation of Building Consent Authorities) Regulations 2006.

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant.

Building Consent BC 123/2010• Building consent BC 123/2010 plans and specifi cations, particularly: − Compliance schedule − Fire report − Completed fi nal inspection checklist and inspection notes • Attached photos and notes on missing specifi ed systems

EXAMPLE

EXAMPLESections 100–105 – compliance schedule considerations as specifi ed systems are being installed as part of the proposed building work

EXAMPLESections 100–105 – compliance schedule considerations as specifi ed systems are being installed as part of the proposed building workIn relation to BCA accreditation regulations the requirement to follow the inspections procedures of the BCA.

EXAMPLEIn relation to BCA accreditation regulations the requirement to follow the inspections procedures of the BCA.

The Building Regulations 1992 (Schedule 1 the Building Code)

EXAMPLEThe Building Regulations 1992 (Schedule 1 the Building Code)Building (Forms) Regulations 2004

EXAMPLEBuilding (Forms) Regulations 2004Building (Accreditation of Building Consent Authorities) Regulations 2006.

EXAMPLEBuilding (Accreditation of Building Consent Authorities) Regulations 2006.

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.EXAMPLE

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobeEXAMPLE

Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant.EXAMPLE

referenced.Documentsthatyoudoattachorreferenceneedtoberelevant.

Page 46: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 39

natIonal competency assessment system: example of photographic evidence provided by candidate for discussion during assessment process.

1. Photo of smoke control system in the car park area. Not listed as a specifi ed system on the building consent and/or picked up during processing of the building consent.

2. Photo of CO (carbon monoxide gas detector) early warning device. Not listed as a specifi ed system on the building consent and/or picked up during processing of the building consent.

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

Page 47: NBCA Competency Assessment System

40 natIonal bca competency assessment system june 2010

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

Candidatename:Bill Ding PermitDate:03.02.2010

Levelofcompetencybeingassessed:Residential 2

Agreedbuildingconsentnumber/addressofbuildingbeingusedforassessment:

10 Smith St, BC 001010

Briefdescriptionofbuildingprojectbeingusedforassessment:

This building is a single storey, monopitched (fl at roof less than 10 degrees), dwelling. The structure of the building is constructed generally in accordance with NZ S 3604:1999. The risk matrix score for this building is 7. The cladding consists of weatherboard (Linea®) and fl at sheet (Axon®) fi xed over a cavity and is generally in accordance with E2/AS1 and longrun corrugate roofi ng. However, the Linea® weatherboards are technically an alternative solution to E2/AS1.

Describeinyourownwordswhatyouconsiderisimportantinrelationtothefollowingaspectsofyourbuildingproject:

1. Site/landthatbuildingisbeingbuilton:

The site has been subdivided and had a geotechnical report and specifi c requirements for certain areas of the site. The geotechnical report requires the western foundation to be deeper due to it being located in close proximity to a sloping bank and the reduced compaction of the ground in this area.

The council ’s GIS register notes that this site is located in a very high wind zone however the designer has provided a wind zone assessment to NZ S 3604: 1999. I have focused on this as it is a site constraint that may affect the structure. I agree that the site is in a high wind zone.

Another aspect is that councils GIS register notes that this site is within the sea spray zone; however, the designer has provided evidence that the most western side of the site is actually just outside the sea spray zone by a few metres. I agree that the site is outside the sea spray zone as stated in NZ S 3604:1999.

2. Foundations:

As discussed above, due to one side of the building being located in close proximity to a sloping bank and the reduced compaction of the ground in this area a specifi c design aspect of the foundation was required. This specifi c design aspect is simply a deepening of the foundation using mass concrete as described in the engineer’s design.

The non-specifi c design foundation is to NZ S 3604:1999 and consists of 2x D12 with D10 starters at 600 mm c/s. The foundation requires 20 mpa concrete (note: not in a sea spray zone). Standard 200 series concrete blocks and header blocks are proposed, laid to the required fl oor level (no minimum fl oor level is required except the standard requirement of E1/AS1 to be above the crown in the road).

The fl oor slab is supported by compacted hardfi ll within the outer perimeter formed by the concrete blocks in max 150mm layers. A vapour barrier consisting of 0.25 polythene with taped joints. A perimeter bar (D12) is shown tied into the starters through the blocks bent over allowing 665 mesh to be placed over the starters.

3. Structureofthebuildingfromfoundation/slabup:

The building structure is generally in accordance with NZ S 3604: 1999 and includes some aspects of specifi c design, such as the garage lintel, trusses and lounge rafters. The timber frames consist of 100 mm x 50 mm MSG 8 at 600 mm c/s treated to H1.2 for the 2.4m high ceilings. Where the ceiling is more than 2.4m, 150 mm x 50 mm placed at spacings ranging from 400 mm to 600mm.

Particular review of the lounge rafters were assessed due to their length. These rafters were designed using the ganglam charts. A parallel girder truss supports the span over the lounge and the loads are transferred to the external foundation through double studs. A roof manufacture’s buildable design is included in the plans and specifi cations (from Mitec).

4. Buildingenvelope(claddings):

The cladding for this building is Linea® weatherboard and Axon® sheet. These products are fi bre (cellulose) cement based claddings and are installed over a 20 mm drained cavity all round. The roof is considered a fl at roof for the purposes of E2/AS1 as they fall below 10 degrees for both areas of roof.

EXAMPLE

EXAMPLEAnother aspect is that councils GIS register notes that this site is within the sea spray zone; however, the designer has provided evidence

EXAMPLEAnother aspect is that councils GIS register notes that this site is within the sea spray zone; however, the designer has provided evidence that the most western side of the site is actually just outside the sea spray zone by a few metres. I agree that the site is outside the sea

EXAMPLEthat the most western side of the site is actually just outside the sea spray zone by a few metres. I agree that the site is outside the sea

As discussed above, due to one side of the building being located in close proximity to a sloping bank and the reduced compaction

EXAMPLEAs discussed above, due to one side of the building being located in close proximity to a sloping bank and the reduced compaction of the ground in this area a specifi c design aspect of the foundation was required. This specifi c design aspect is simply a deepening

EXAMPLEof the ground in this area a specifi c design aspect of the foundation was required. This specifi c design aspect is simply a deepening of the foundation using mass concrete as described in the engineer’s design.EXAMPLEof the foundation using mass concrete as described in the engineer’s design.

The non-specifi c design foundation is to NZ S 3604:1999 and consists of 2x D12 with D10 starters at 600 mm c/s. The foundation EXAMPLE

The non-specifi c design foundation is to NZ S 3604:1999 and consists of 2x D12 with D10 starters at 600 mm c/s. The foundation requires 20 mpa concrete (note: not in a sea spray zone). Standard 200 series concrete blocks and header blocks are proposed, laid to the EXAMPLE

requires 20 mpa concrete (note: not in a sea spray zone). Standard 200 series concrete blocks and header blocks are proposed, laid to the

Page 48: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 41

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

4. Buildingenvelope(claddings):

The Axon® cladding is vertically joined over a 50 mm inseal strip and the cladding itself has a rebated edge to provide approximately 10 mm coverage (lap). The Linea® weatherboards are tongue and grooved at the ends and are joined by placing a bead of silicone in the groove and inserting the tongue end from another length of weatherboard. The corners of the weatherboard are fi tted with corner soakers and the internal corners are butt jointed into either a purpose-made internal corner fl ashing or butt jointed against the Axon® sheet. All internal and external corners are back-fl ashed.

All openings are fl ashed with a proprietary aluminium fl ashing and all openings in the building paper (air and moisture barrier) are taped and fl ashed with a fl exible waterproof membrane.

Details of all cladding junctions, openings and fl ashing requirements have been provided and are deemed to meet the requirements of E2.

5. Passivefireprotectionsystems:

No passive fi re protection systems were involved with this building; however, an active system is included that consists of a hardwired smoke detection and alarm system (early warning device) and was deemed to comply with Clause F7.

6. Services:

Drainage is 100 mm PVC installed to AS/NZ S 3500 to an existing connection to the council main sewer. Stormwater is disposed of on site as no public stormwater connection is provided. Plumbing is mains pressure polybute system installed to G12/AS1 and includes a mains pressure electric 180L HWC. Cooking is gas supplied via a 9kg bottle located outside and piped to cooker. Electricity, phone and gas (not yet supplied to the area) are supplied to the site.

7. Interiorfinishes:

The interior is lined with Gib® plaster board. Aqualine Gib® is detailed to wet areas. The fl oor is carpeted in the living areas and vinyl in the dinning room and kitchen and both bathrooms (wet areas). The vinyl in the wet areas is coved to comply with E3/AS1. Surfaces to the kitchen are easily cleanable and impervious.

Describeinyourownwordstheareasofthebuildingthatyouconsiderarisk:

1. Foundation located in the western side.2. Cladding junctions between different types of cladding and fl ashings to openings.3. Flashing detail between the negative eave and cladding.4. Ensuring that enough fall is provided from the farthest fi xture to the connection to the council sewer.

Why?:

1. I consider the foundation located in the western side of the site a risk because of the reduced stability of the ground due to the proximity of the slope to the foundation. If this is not correct severe settlement could occur and this would be a failure of B1 Structure.

2. I consider the cladding junctions between different types of claddings and fl ashings to openings a risk area as in the past these areas have been known to leak.

3. I consider the fl ashing detail between the negative eave and cladding a risk as this is a commonly forgotten detail and the area is prone to leaking in high winds.

4. I consider that the fall provided from the farthest fi xture to the connection to the council sewer is close to the minimum fall allowed (1:60) although it shows that it complies I would be noting this and asking the drainage inspector to pay particular attention on site.

Werethereanyalternativesolutionsusedinthisbuilding?Ifsopleasedescribeinyourownwordswhattheywere

andhowyouassessedthem:

Yes, as stated above the Linea® weatherboards were technically an alternative solution due to them being a fi bre cement product rather than a timber weatherboard. I justifi ed this by comparing them to the E2/AS1 solution for weatherboards that are similar in construction technique and dimension. I then justifi ed the durability of the product (particularly the fi bre cement aspect) throughthe product’s technical literature and fi bre cement’s historic use.

The consent also specifi es proprietary acrylic shower cubicles of a kind that are commonly installed in dwellings. These types of showers are alternative solutions as they do not strictly comply with E3/AS1. I have accepted these shower cubicles as they meet the relevant performance requirements of E3 Internal Moisture and also have appropriate historic performance.

EXAMPLE

EXAMPLE

EXAMPLEThe interior is lined with Gib® plaster board. Aqualine Gib® is detailed to wet areas. The fl oor is carpeted in the living areas and

EXAMPLEThe interior is lined with Gib® plaster board. Aqualine Gib® is detailed to wet areas. The fl oor is carpeted in the living areas and vinyl in the dinning room and kitchen and both bathrooms (wet areas). The vinyl in the wet areas is coved to comply with E3/AS1.

EXAMPLEvinyl in the dinning room and kitchen and both bathrooms (wet areas). The vinyl in the wet areas is coved to comply with E3/AS1. Surfaces to the kitchen are easily cleanable and impervious.

EXAMPLESurfaces to the kitchen are easily cleanable and impervious.

Describeinyourownwordstheareasofthebuildingthatyouconsiderarisk:

EXAMPLEDescribeinyourownwordstheareasofthebuildingthatyouconsiderarisk:

1. Foundation located in the western side.

EXAMPLE1. Foundation located in the western side.2. Cladding junctions between different types of cladding and fl ashings to openings.

EXAMPLE2. Cladding junctions between different types of cladding and fl ashings to openings.3. Flashing detail between the negative eave and cladding.EXAMPLE

3. Flashing detail between the negative eave and cladding.4. Ensuring that enough fall is provided from the farthest fi xture to the connection to the council sewer.EXAMPLE

4. Ensuring that enough fall is provided from the farthest fi xture to the connection to the council sewer.

Page 49: NBCA Competency Assessment System

42 natIonal bca competency assessment system june 2010

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

Inyourownwordspleasedescribeanylegislativerequirementsyouneededtoconsiderwhenprocessing/inspectingthisbuildingconsent/application:

The legislative requirements assessed with this building consent application include:

• Section 17 all building work must comply with the Building Code• Section 19 how compliance with the Building Code is established• Requirement for building consents 40–43• Section 45 how to apply for a building consent (for the purposes of vetting an application)• Section 48 processing application for a building consent (20 day timeframe, suspending the 20 day timeframe)• Section 49 grant of building consent (being satisfied on reasonable grounds that compliance with the Building Code will be achieved

if built in accordance with the plans and specifications that were with the application)• Section 51 issue of building consent• Section 90 inspections by BCAs• In relation to BCA accreditation regulations the requirement to follow the procedures of the BCA.

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCAssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant.

BC 001010

• Elevations• Site and Drainage• Foundations• Floor Plan

Page 50: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 43

Duringcompetencyassessmentdiscussionscandidatescanutiliseexamplesofconsentdocumentstheyhaveinspectedtotalktothecomplianceissuesinthem.

EXAMPLE

Page 51: NBCA Competency Assessment System

44 natIonal bca competency assessment system june 2010

EXAMPLE

Page 52: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 45

EXAMPLE

Page 53: NBCA Competency Assessment System

46 natIonal bca competency assessment system june 2010

EXAMPLE

Page 54: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 47

natIonal competency assessment: candIdate evIdence form – InspectIon

to be completed by the candidate.

Candidatename:Bill Ding PermitDate:08.05.2010

Levelofcompetencybeingassessed:Residential 2

Agreedbuildingconsentnumber/addressofbuildingbeingassessed:

10 Smith St, BC 001010

Whattypeofworkistheinspectionrelatingto(tickrelevantwork)?

Building

Plumbinganddrainage

Whattypeofinspectionisbeingassessed(tickrelevantwork)?

Foundation

Preline

Final

Briefdescriptionofbuildingprojectbeingusedforassessment:

This building is a single storey, monopitched (fl at roof less than 10 degrees), dwelling. The structure of the building is constructed generally in accordance with NZ S 3604:1999 including a standard foundation in most areas and concrete block work and header block with a 100mm concrete slab. The cladding consists of weatherboard (Linea®) and fl at sheet (Axon®) fi xed over a cavity and is generally in accordance with E2/AS1 and longrun corrugate roofi ng.

Briefdescriptionofinspectionbeingundertakenforassessment:

This inspection is of the slab, prior to pouring concrete.

Describeinyourownwordswhatyouconsiderisimportantinrelationtothefollowingrelevantaspectsofyourbuildinginspection:

1. Site/landthatbuildingisbeingbuiltoninrelationtotheinspection:

The site has a geotechnical report and specifi c requirements for certain areas of the site. The geotechnical report requires the western foundation to be deeper due to it being located in close proximity to a sloping bank and the reduced compaction of the ground in this area.

The site is close to a beach (seaspray zone) however the designer has provided evidence that the most western side of the site is actually just out side the sea spray zone (approximately 512 m). Therefore the required strength of exposed concrete, containing reinforcing steel is 20 mpa.

2. Structureanddurabilityinrelationtotheinspection:

Header blocks appeared to have been laid to the required fl oor level (from datum on plans). The builder on site confi rmed that he had set the level to the datum. I considered that no further fl oor level confi rmation was required as there is not a minimum fl oor level requirement for this site (or in fact the entire area). The standard requirement of E1/AS1 to be above the crown in the road has easily been achieved.

The fl oor slab is supported by compacted hardfi ll within the outer perimeter formed by the concrete blocks in max 150 mm layers. A vapour barrier consisting of 0.25 polythene with taped joints has been installed. A D12 perimeter bar has been tied into the starters around the perimeter of the slab. 665 mesh has been tied over the starters and packed up with plastic chairs. Laps for the D12 perimeter bar are a minimum of 32 x the diameter (most Laps 500-600 mm) and the mesh sheets have been lapped 1x square. Supplementary steel has been placed in internal corners where no shrinkage control joints have been placed.

In relation to durability aspects of this inspection, the steel placement meets the cover requirements of NZ S 3604:1999, the vapour barrier (0.25 polythene) has been placed on sand-blinding to prevent puncture. The concrete strength as discussed above will be 20 mpa.

EXAMPLE

EXAMPLEDescribeinyourownwordswhatyouconsiderisimportantinrelationtothefollowingrelevantaspectsofyourbuilding

EXAMPLEDescribeinyourownwordswhatyouconsiderisimportantinrelationtothefollowingrelevantaspectsofyourbuilding

1. Site/landthatbuildingisbeingbuiltoninrelationtotheinspection:

EXAMPLE1. Site/landthatbuildingisbeingbuiltoninrelationtotheinspection:

The site has a geotechnical report and specifi c requirements for certain areas of the site. The geotechnical report requires the

EXAMPLE The site has a geotechnical report and specifi c requirements for certain areas of the site. The geotechnical report requires the

western foundation to be deeper due to it being located in close proximity to a sloping bank and the reduced compaction of the

EXAMPLEwestern foundation to be deeper due to it being located in close proximity to a sloping bank and the reduced compaction of the

The site is close to a beach (seaspray zone) however the designer has provided evidence that the most western side of the site is EXAMPLE

The site is close to a beach (seaspray zone) however the designer has provided evidence that the most western side of the site is actually just out side the sea spray zone (approximately 512 m). Therefore the required strength of exposed concrete, containing

EXAMPLE

actually just out side the sea spray zone (approximately 512 m). Therefore the required strength of exposed concrete, containing

Page 55: NBCA Competency Assessment System

48 natIonal bca competency assessment system june 2010

natIonal competency assessment: candIdate evIdence form – InspectIon

to be completed by the candidate.

3. Buildingenvelope(claddings)inrelationtotheinspection:

Claddings are yet to be installed; however, in relation to E1 as discussed above the fl oor level is above the crown of the road. I also discussed with the builder the requirement to lower the ground level to the south-eastern corner of the building where the original ground is almost level with the fl oor. The builder informed me that this will be taken care of before installing the cladding.

4. Firesafetyaspectsofthebuildinginrelationtotheinspection:

Not required to be assessed at this inspection.

5. Servicesandassociatedsystemsinrelationtotheinspection:

Plumbing services such as PVC waste pipes have been installed under the slab, the vapour barrier has either been taped to pipe extensions (for vanities or the like) or the slab has been boxed out to provide for an easy-clean waste (for showers). The waste pipes are sleeved through the concrete block foundation with denzo tape. In the north-eastern and south-eastern corners of the building two cells of the concrete blockwork (not containing reinforcing) have been fi lled up with sand to accommodate the installation of the main water supply and the main power and telephone supply.

6. Interiorfinishesinrelationtotheinspection:

Not required to be assessed during this inspection.

Describeinyourownwordstheareasofthebuildingyouconsiderariskinrelationtoyourinspection:

1. Ensuring the laps of steel are correct.2. Checking levels of the slab, especially if fl oor level restrictions exist.3. Making sure that the vapour barrier is installed correctly (as it’s very diffi cult to fi x after pouring).

Why?:

1. I consider that the laps in steel are important as it affects the structural integrity of the building and the signifi cance and probability of structural failure could increase.

2. Checking the levels of slabs is important because there could be signifi cant issues relating to fl ooding or HIRB (height in relation to boundary) issues that are affected if the fl oor level is not correct.

3. I consider the vapour barrier if not installed correctly could cause a major problem down the track (it would not become evident for a considerable time and would cause excessive moisture within the building) – a failure in this area would be very expensive to fi x.

Inyourownwordspleasedescribeanylegislativerequirementsyouneededtoconsiderwheninspectingthisbuildingwork:

Thelegislativerequirementsthatwereassociatedwiththisinspectioninclude:

• Section 17 all building work must comply with the Building Code.• In relation to BCA accreditation regulations the requirement to follow the inspections procedures of the BCA.• Section 94 matters for consideration for issuing a CCC, particularly confi rming that building work complies with the building consent.

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant.

Building Consent BC 001010• Building consent BC 001010 plans and specifi cations, particularly: − Elevations and site plan − Foundation − Floor plan • Attached photo and notes on inspection.

EXAMPLE3. Making sure that the vapour barrier is installed correctly (as it’s very diffi cult to fi x after pouring).

EXAMPLE3. Making sure that the vapour barrier is installed correctly (as it’s very diffi cult to fi x after pouring).

1. I consider that the laps in steel are important as it affects the structural integrity of the building and the signifi cance

EXAMPLE1. I consider that the laps in steel are important as it affects the structural integrity of the building and the signifi cance

and probability of structural failure could increase.

EXAMPLEand probability of structural failure could increase.

2. Checking the levels of slabs is important because there could be signifi cant issues relating to fl ooding or HIRB (height in relation

EXAMPLE2. Checking the levels of slabs is important because there could be signifi cant issues relating to fl ooding or HIRB (height in relation

to boundary) issues that are affected if the fl oor level is not correct.

EXAMPLEto boundary) issues that are affected if the fl oor level is not correct.

3. I consider the vapour barrier if not installed correctly could cause a major problem down the track (it would not become evident EXAMPLE3. I consider the vapour barrier if not installed correctly could cause a major problem down the track (it would not become evident EXAMPLE

EXAMPLE

for a considerable time and would cause excessive moisture within the building) – a failure in this area would be very expensive to fi x. EXAMPLE

for a considerable time and would cause excessive moisture within the building) – a failure in this area would be very expensive to fi x.

Page 56: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 49

Duringcompetencyassessmentdiscussionscandidatescanutiliseexamplesofconsentdocumentstheyhaveprocessedtotalktothecomplianceissuesinthem.

EXAMPLE

Page 57: NBCA Competency Assessment System

50 natIonal bca competency assessment system june 2010

EXAMPLE

Page 58: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 51

EXAMPLE

Page 59: NBCA Competency Assessment System

52 natIonal bca competency assessment system june 2010

EXAMPLE

Page 60: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 53

natIonal competency assessment system: example of photographic evidence provided by candidate for discussion during assessment process

View of the slab looking to the north-east. Note the fully wrapped and taped pipe penetrations through the vapour barrier.

EXAMPLE

Page 61: NBCA Competency Assessment System

54 natIonal bca competency assessment system june 2010

Page 62: NBCA Competency Assessment System

As

se

ss

me

nt

An

d d

ec

isio

n –

st

ep

s 3 A

nd

4

Assessment And decision – steps 3 And 4

Assessment and decision – Steps 3 and 4 55

Page 63: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 55

Assessmentanddecision–Steps3and4

assessment of evIdence – step 3

Oncethecandidatehasprovidedtheassessorwiththeagreedevidence,theassessorneedstocarefullyreviewtheevidenceprovided.

Afterassessingtheevidenceprovidedbythecandidateandreviewingthecandidate’sexperience,workhistory,traininghistoryandotherinternalevidence,adecisionneedstobemadeonwhetherthecompetenceofthecandidatecanbeconfirmedfromtheevidenceprovided(ifitcangotostep4).Ifitcannot,aprofessionalconversationshouldbeorganisedtofurtherclarifyorconfirmcompetenceorfurtherevidencecanberequested.

Evidenceissimplyinformationandexamplesthatestablishwhatthecandidateknowsorcando.Competencyassessmentsneedtobebasedongoodevidence.Objectivesourcesofinformationshouldbeused,butinvariablytherewillbesomelevelofsubjectivity(eg,referencesoftencontainpersonalopinions).Theimportantthingsarethatthecompetencydecisionisasobjectiveaspossible,thatitcanbejustified,isfairandnon-biased,andthatitcanbesupportedbysoundevidence.

Wheretheassessordoesnothavetherequiredleveloftechnicalexpertiseinaspecialistareatoassessacandidate’sevidencetheassessorshouldreferthistoanexpertinthatparticulararea.Forexampleanexpertoncommercialplumbinganddrainageaspectsmaybecalledupontoexamineacandidate’splumbinganddrainageevidenceandprovideadvicetotheassessor.

Thereasonsfordecidingwhetheracandidateiscompetentornotyetcompetentwillbespecifictoeachindividualandthesituation.

assessment decIsIons made – step 4

Onceadecisiononcompetenceismade,theassessorrecordsthereasonsfortheirdecisionsinpart2oftheassessmentplan.Evidenceforanassessor’sreasonscanbereferencedhere(forexample,byreferencingaparticularformandbuildingconsentnumber(s)).Theassessorcanalsouseprofessionaljudgement.

part 2 : reasons for decIsIons

Regulation Performanceindicator Performanceindicatorsweremetby:

Regulation10(3)(a):

Understandingthephilosophiesandprinciplesofbuildingdesignandconstruction.

1. Comprehendsandhassatisfactoryknowledgeofsections3,4and5oftheBuildingAct2004.

2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesandconstructionsequencingforthistypeofbuildingwork.

Bill ’s completed candidate evidence forms for BC 001010 and BC 002219 along with interview discussions provided suffi cient evidence that he has a good overall understanding of design and construction techniques as they relate to this type of construction. Bill has undertaken specifi c training in the Building Act 2004, which has further developed his understanding and knowledge in relation to Parts 1 and 2 of the Building Act 2004.

For the reasons listed above I am satisfi ed that Bill understands the performance indicators.EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE2. Comprehendsandhassatisfactoryknowledge

EXAMPLE2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesand

EXAMPLEofdesignandconstructiontechniquesandconstructionsequencingforthistypeof

EXAMPLEconstructionsequencingforthistypeof

Bill ’s completed candidate evidence forms for

EXAMPLEBill ’s completed candidate evidence forms for BC 001010 and BC 002219 along with interview

EXAMPLEBC 001010 and BC 002219 along with interview discussions provided suffi cient evidence that he

EXAMPLEdiscussions provided suffi cient evidence that he has a good overall understanding of design and

EXAMPLEhas a good overall understanding of design and construction techniques as they relate to this type

EXAMPLEconstruction techniques as they relate to this type

Page 64: NBCA Competency Assessment System

56 natIonal bca competency assessment system june 2010

part 2 : reasons for decIsIons

Regulation10(3)(b):

Understandingandknowledgeofbuildingproductsandmethods.

3. Comprehendsandhassatisfactoryknowledgeofproprietarysystemsandbuildingproductsforthistypeofbuildingwork.

4. Demonstratestheabilitytoresearch,analyseandassessbuildingmethodsandproductsassociatedwiththistypeofbuildingwork.

Bill has worked for two councils and completed specifi c training on construction methodology. He has had extensive experience in the building sector and is a trade qualifi ed carpenter. Bill is currently studying towards the National Diploma In Building Control Surveying (small Buildings) and has completed unit standards 24163 demonstrated knowledge of building construction methods, material and systems; as well as 9617 demonstrated knowledge of construction methods for small buildings.

As Bill has substantial work experience actually doing the work (as a carpenter) and processing and inspecting work previously, I am satisfi ed that Bill meets these performance indicators required under this regulation.

In his short time with Middle District Council Bill has demonstrated that he is capable of identifying, researching and making good technical compliance decisions on innovative building methods (refer to BC00987 and BC00114 for Bill ’s assessment alternative solutions and related processing notes).

Regulation10(3)(c):

KnowledgeandskillinapplyingtheAct,theBuildingCode,andanyotherapplicableregulationsundertheAct.

5. ComprehendsandcanapplyknowledgeoftheapplicationoftheAct.

6. ComprehendsandcanapplyknowledgeoftherolesandresponsibilitiesofaBCAandTA.

7. ComprehendsandcanapplyknowledgeofthelinkageandinterfacebetweentheResourceManagementAct1991andtheBuildingAct2004.

Bill has undertaken specifi c training on this subject matter and was well versed during our discussions regarding the Building Act 2004, the Building Code and associated Building Regulations. Bill was able to identify the different roles that TAs and BCAs perform under the Building Act 2004.

As Bill has substantial experience in processing and inspecting building work and has completed unit standards 22698 – Demonstrated knowledge of building control legislation and 24161 – Building Act Processes of the National Diploma In Building Control Surveying (small Buildings), I consider Bill to have more than adequate skill and knowledge in these areas of building control.

Also refer to the completed candidate evidence forms for (processing and inspection) completed for 10 Smith St, BC 001010 where Bill has identifi ed and accurately quoted relevant building control legislation applicable to this consent.

I am satisfi ed that Bill meets and can apply these performance indicators in his everyday work as a building offi cial.

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLEresearching and making good technical compliance

EXAMPLEresearching and making good technical compliance decisions on innovative building methods (refer to

EXAMPLEdecisions on innovative building methods (refer to BC00987 and BC00114 for Bill ’s assessment

EXAMPLEBC00987 and BC00114 for Bill ’s assessment alternative solutions and related processing notes).

EXAMPLEalternative solutions and related processing notes).

5. Comprehendsandcanapplyknowledge

EXAMPLE5. Comprehendsandcanapplyknowledge

oftheapplicationoftheAct.

EXAMPLEoftheapplicationoftheAct.

6. Comprehendsandcanapplyknowledge

EXAMPLE6. Comprehendsandcanapplyknowledge

oftherolesandresponsibilitiesofaBCA

EXAMPLEoftherolesandresponsibilitiesofaBCA

EXAMPLEandTA.

EXAMPLEandTA.

7. Comprehendsandcanapplyknowledge

EXAMPLE7. Comprehendsandcanapplyknowledge

ofthelinkageandinterfacebetweentheEXAMPLEofthelinkageandinterfacebetweentheResourceManagementAct1991andtheEXAMPLE

ResourceManagementAct1991andtheEXAMPLE

BuildingAct2004.EXAMPLE

BuildingAct2004.

Bill has undertaken specifi c training on this

EXAMPLEBill has undertaken specifi c training on this

Page 65: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 57

part 2 : reasons for decIsIons

Regulation10(3)(d)(i):

Abilitytoprocessapplicationsforbuildingconsent.

8. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(buildingrelatedprocessingonly).

9. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(plumbinganddrainagerelatedprocessingonly).

The building consents sighted as part of this assessment were found to be processed in accordance with the provisions of the Building Act 2004. Please refer to candidate evidence form (processing) completed for 10 Smith St, BC 001010 and BC 02219 19 Browns Road and associated processing notes for further evidence. Bill was also able to accurately discuss the building consent process and the BCA’s procedures in relation to processing, granting and issuing a building consent application. I am further satisfi ed that Bill understands these performance indicators and has the knowledge required to meet the performance indicators listed under this regulation.

Note: Bill is not applying for the plumbing and drainage aspect of residential 2.

Regulation10(3)(d)(ii)

Abilitytoinspectbuildingwork.

10.InspectbuildingworkrelatingtofoundationtypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforthislevel.

11.InspectbuildingworkrelatingtoprelinetypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforthislevel.

12.InspectbuildingworkrelatingtofinaltypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforthislevel.

13.InspectbuildingworktoestablishwhethercompliancewiththeNewZealandBuildingCode(plumbinganddrainagerelatedinspectionsonly)hasbeenestablishedforthislevel.

14.InspectbuildingworktoestablishwhethercompliancewiththeNewZealandBuildingCode(Plumbinganddrainagerelatedinspectionsonly)hasbeenestablishedforthislevel.

I am satisfi ed that Bill meets the performance indicators (for foundation, preline and fi nal inspections) as he has previously completed various types of inspections at this level , which have been audited both on process and technical ability (refer to audit reports AR2354, AR1648, AR3889 and AR3906).

Bill was also observed whilst undertaking a preline and fi nal inspection for RES 2 type building work. Both inspections were undertaken competently and in accordance with BCA’s policies and procedures. Bill ’s inspection records were found to be clear, legible and provided sound reasoning for his assessment of building compliance and the decisions made.

Please refer to the candidate evidence form completed for BC 02219 19 Brown Road for additional inspection evidence.

Note: Bill is not applying for the plumbing and drainage aspect of residential 2.

Regulation10(3)(d)(iii):

Abilitytocertifybuildingwork.

15.Canissuecertification(buildingconsentoracodecompliancecertificate).

Bill was able to verbally describe the process for granting and issuing building consents and outlined the BCA’s process for issuing a CCC. Bill provided completed CCC documentation for 10 Smith St, BC 0010/10 and 23 Bush Drive BC 0234/10. Both examples were found to have been issued in accordance with Building Act’s requirements. I have also witnessed Bill successfully reviewing a building consent application prior to issuing a building consent.

As Bill has substantial documented work experience in certifying building work I am further satisfi ed that Bill meets the performance indicators.

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLEwiththeNewZealandBuildingCode(building

EXAMPLEwiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforthislevel.

EXAMPLEonly)hasbeenachievedforthislevel.12.Inspectbuildingworkrelatingtofinaltype

EXAMPLE12.Inspectbuildingworkrelatingtofinaltype

inspectionstoestablishwhethercompliance

EXAMPLEinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(building

EXAMPLEwiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforthislevel.

EXAMPLEonly)hasbeenachievedforthislevel.

13.Inspectbuildingworktoestablishwhether

EXAMPLE13.Inspectbuildingworktoestablishwhether

EXAMPLEcompliancewiththeNewZealandBuilding

EXAMPLEcompliancewiththeNewZealandBuildingCode(plumbinganddrainagerelatedEXAMPLECode(plumbinganddrainagerelatedinspectionsonly)hasbeenestablishedEXAMPLE

inspectionsonly)hasbeenestablishedforthislevel.EXAMPLE

forthislevel.14.InspectbuildingworktoestablishwhetherEXAMPLE

14.Inspectbuildingworktoestablishwhether

inspections) as he has previously completed various

EXAMPLEinspections) as he has previously completed various types of inspections at this level , which have been

EXAMPLEtypes of inspections at this level , which have been audited both on process and technical ability

EXAMPLEaudited both on process and technical ability (refer to audit reports AR2354, AR1648, AR3889

EXAMPLE(refer to audit reports AR2354, AR1648, AR3889 and AR3906).

EXAMPLEand AR3906).

Page 66: NBCA Competency Assessment System

58 natIonal bca competency assessment system june 2010

part 2 : reasons for decIsIons

Regulation10(3)(e):

Abilitytocommunicatewithinternalandexternalpeople.

16.Communicateswithinternalandexternalpeople.17.Canusephone,email,internetandfax.18.Demonstratesgoodactivelistening,

questioningandassertivenessskillsindealingwithday-to-daytasksandresponsibilities.

Bill was observed to communicate well with internal and external staff and other Council clients. Bill ’s letters, RFIs and written communication were found to be of a very high standard. He was able to articulate his views clearly during our discussions and when sending out RFIs to applicants, he was found to not only explain why information was required, but consistently tied the request for information back to the relevant Building Code clause. Bill ’s communication skills were particularly evident in his candidate evidence forms for (processing and inspection) and within the associated consent correspondence. I am satisfi ed that Bill meets the performance indicators required here.

Regulation10(3)(f):

Abilitytocomplywiththebuildingconsentauthority’spolicies,proceduresandsystems.

19.Observesthebuildingconsentauthority’spolicies,proceduresandsystemsforthistypeofbuildingwork.

I have reviewed Bill ’s training records on Middle District Council ’s policies, procedures and systems. He has successfully completed the BCA’s initial training and the follow-up session, as is a requirement for all technical staff (refer to Bill ’s personal training fi le for details of this training). Bill has also been supervised when undertaking inspections and peer-reviewed on many occasions. The outcome of the audits undertaken has not identifi ed any signifi cant technical or procedural issues (refer to inspection audit and processing peer review on Bill ’s personal training fi le). Bill has utilised the Councils’ continuous improvement system on two occasions this year where he has suggested process improvements. One of Bill ’s suggested changes was trialled and later implemented by the BCA. I am therefore satisfi ed Bill meets the performance indicators under this regulation.

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLEtraining and the follow-up session, as is a

EXAMPLEtraining and the follow-up session, as is a requirement for all technical staff (refer to Bill ’s

EXAMPLErequirement for all technical staff (refer to Bill ’s personal training fi le for details of this training).

EXAMPLEpersonal training fi le for details of this training). Bill has also been supervised when undertaking

EXAMPLEBill has also been supervised when undertaking inspections and peer-reviewed on many occasions.

EXAMPLEinspections and peer-reviewed on many occasions. The outcome of the audits undertaken has not

EXAMPLEThe outcome of the audits undertaken has not

Page 67: NBCA Competency Assessment System

Re

co

Rd

ing

ou

tc

om

es

– s

te

p 5

RecoRding outcomes – step 5

Recording outcomes – Step 5 59

Page 68: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 59

Recordingoutcomes–Step5

Theassessmentplanandcandidateevidenceformsarepartoftheevidenceorrecordoftheassessmentandformthereasonsforthedecision.Theassessmentsummaryisrecordedinpart2oftheassessmentplan.Inaddition,summaryskillsmatriceshavebeendevelopedtorecordprocessingandinspectionscompetencydecisionsinagraphicalform.

part 3 : outcome of assessment

Outcomestatement(andconditionsifapplicable):

I, Ann Gill Grinder, have assessed the competence of Bill Ding Permit and confi rm that he is competent to undertake processing and inspection of buildings up to and including residential 2 with the exception of plumbing and drainage aspects (unless supervised).

Agreement:

Assessor: AnnGillGrinder..........................................................................................................Date:16/05/11 ClusterGroupCompetencyAssessmentManager

Candidate: BillDingPermit..........................................................................................................Date:16/05/11 BuildingOfficial

competency levels (processIng)

Residential1 Residential2 Residential3 Commercial1 Commercial2 Commercial3

Pro

cess

ing

Competent MsImaNewy MrJamesFanlightMrGasHobs

MrRoofusSaggingMsEaveOverhang(Weather-tightnessspecialistE2NZBC)

MrLeeTensileMrRoofusSagging

MrRichterScaleMrSingeBonofire(FireSafetyspecialistC1–C4oftheNZBC)

*

Developing MrJamesFanlightMrGasHobs

MrLeeTensile *

Cer

tifi

cati

on

Competent MrJamesFanlightMrGasHobs

MrRoofusSagging

MrLeeTensileMrRoofusSagging

MrRichterScale

*

Developing MsImaNewy MrJamesFanlightMrGasHobs

MrLeeTensile *

*CompetencyrequirementsforthisinspectiontypearedeemedtobetheequivalentofResidential2**BCAscapabilitydoesnotextendtoundertakinginspectionsatthiscompetencylevel.SeeBCA’spoliciesandproceduresmanualfor

externalcontractingdetails

Assessor: AnnGillGrinder..........................................................................................................Date:16/05/11

Candidate: BillDingPermit..........................................................................................................Date:16/05/11

EXAMPLE

EXAMPLECandidate: BillDingPermit..........................................................................................................Date:16/05/11

EXAMPLECandidate: BillDingPermit..........................................................................................................Date:16/05/11

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLEcompetency levels (processIng)

EXAMPLEcompetency levels (processIng)

Residential2

EXAMPLEResidential2 Residential3

EXAMPLEResidential3

MsImaNewyEXAMPLE

MsImaNewy MrJamesEXAMPLE

MrJamesFanlightEXAMPLE

FanlightEXAMPLECandidate: BillDingPermit..........................................................................................................Date:16/05/11

EXAMPLECandidate: BillDingPermit..........................................................................................................Date:16/05/11

Page 69: NBCA Competency Assessment System

60 natIonal bca competency assessment system june 2010

competency levels ( InspectIons)

Residential1 Residential2 Residential3 Commercial1 Commercial2 Commercial3

Foun

dat

ion

s

Competent MsImaNewy MrBillDingPermitMrLarryHollow-Core

MrBillDingPermit*MrJimDe-RoughlyMrLarryHollow-Core*MrRoofusSagging

MrLeeTensile MrMaximumHalf-Storey

**

Developing MrLeeTensile **

Pre

line

Competent MsImaNewy MrBillDingPermitMrLarryHollow-Core

MrJimDe-RoughlyMrRoofusSagging

MrLeeTensile MrMaximumHalf-Storey

**

Developing MrBillDingPermitMrLarryHollow-Core

MrLeeTensile **

Fin

al

Competent MrBillDingPermitMrLarryHollow-Core

MrJimDe-RoughlyMrRoofusSagging

MrLeeTensile MrMaximumHalf-StoreyMrSingeBonofire(FireSafetyspecialistC1–C4oftheNZBC)

**

Developing MsImaNewy MrBillDingPermitMrLarryHollow-Core

MrLeeTensile **

Cer

tifi

cati

on

Competent MrBillDingPermitMrLarryHollow-Core

MrJimDe-RoughlyMrRoofusSagging

MrLeeTensile MrMaximumHalf-Storey

**

Developing MsImaNewy MrBillDingPermitMrLarryHollow-Core

MrLeeTensile **

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLEMrLarry

EXAMPLEMrLarryHollow-Core

EXAMPLEHollow-Core

MrBillDing

EXAMPLEMrBillDingPermit

EXAMPLEPermitMrLarry

EXAMPLEMrLarryHollow-CoreEXAMPLEHollow-Core

MrJim

EXAMPLEMrJimDe-Roughly

EXAMPLEDe-Roughly

Page 70: NBCA Competency Assessment System

Ap

pe

nd

ix 1:

Co

mp

et

en

Cy

sp

eC

ifiCA

tio

ns

Appendix 1: CompetenCy speCifiCAtions

Competency level – residential 1 63

Competency level – residential 2 69

Competency level – residential 3 75

Competency level – commercial 1 81

Competency level – commercial 2 89

Competency level – commercial 3 97

Page 71: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 61

Appendix1: Competencyspecifications

Residential163

Residential269

Residential375

Commercial181

Commercial289

Commercial397

Page 72: NBCA Competency Assessment System

62 natIonal bca competency assessment system june 2010

Page 73: NBCA Competency Assessment System

Co

mp

et

en

Cy

Lev

eL –

Re

sid

en

tia

L 1

CompetenCy LeveL – ResidentiaL 1

Competency level – residential 1  63

Page 74: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 63

Competencylevel–residential1

4 Building(AccreditationofBuildingConsentAuthorities)Regulations2006.5 AComplianceDocumentpreparedbytheDepartmentofBuildingandHousing.Availableat:http://www.dbh.govt.nz/UserFiles/File/

Publications/Building/Compliance-documents/building-code-handbook.pdf6 Guidanceonitemsa.-q.isprovidedintheBuildingCodeHandbook.

competency – resIdentIal 1

OutbuildingsandancillarybuildingsasdefinedbytheBuildingRegulations1992astheyapplytoResidential.Detacheddwellings(SH)designedtoacommonStandard(eg,NZS3604,NZS4229)thataresinglestoreyandhaveanE2/AS1riskmatrixscorelessthanorequalto6.

Regulation10(3)(a):4

Understandingthephilosophiesandprinciplesofbuildingdesignandconstruction.

Performanceindicators:

1. Comprehendsandhassatisfactoryknowledgeofsections3,4and5oftheBuildingAct2004.

2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesandconstructionsequencingforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

1. Knowledgeareasmayinclude,butarenotlimitedto:

a. thepurposeoftheBuildingAct2004(theAct)b. TAs’functions,dutiesandpowersundertheAct,particularlyastheyrelatetohouseholdunitsc. candiscussthehierarchyofNewZealandbuildinglegislationandthevariouscompliance

pathsprovidedforundertheActd. candiscussbuildingdesign,constructiontechniquesandsequencingofbuildingwork

asitrelatestothiscompetencylevel.

NotethisinformationiscoveredinSections2.1,2.2,2.3,3.0,3.1,3.2,3.3,3.5,3.6and3.7ofthePrefacetotheBuildingCodeHandbook.5

Regulation10(3)(b):Understandingandknowledgeofbuildingproductsandmethods.

Performanceindicators:

3. Comprehendsandhassatisfactoryknowledgeofproprietarysystemsandbuildingproductsforthistypeofbuildingwork.

4. Demonstratestheabilitytoresearch,analyseandassessbuildingmethodsandproductsassociatedwiththistypeofbuildingwork.

Guidanceforassessorsandcandidates:

2. Knowledgeareasmayinclude,butarenotlimitedto:

a. commonlyusedbuildingmaterialsandsystems(eg,pre-nailedtrussandframes,conventionalcladdingandflashingsystems)

b. productliterature,testingandVerificationMethods,appraisalsandproducerstatements.

Regulation10(3)(c):KnowledgeandskillinapplyingtheBuildingAct,theBuildingCode,andanyotherapplicableregulationsundertheAct.

Performanceindicators:

5. ComprehendsandcanapplyknowledgeoftheapplicationoftheAct.

6. ComprehendsandcanapplyknowledgeoftherolesandresponsibilitiesofaBCAandTA.

7. ComprehendsandcanapplyknowledgeofthelinkageandinterfacebetweentheResourceManagementAct1991andtheBuildingAct2004.

Guidanceforassessorsandcandidates:

3. Demonstratesknowledgeandskillinapplying:

a. thebuildingcontrolframework6b. theBuildingAct2004c. purposed. principlese. applicationf. theNewZealandBuildingCodeg. compliancepathsh. producerstatementsi. theDepartmentofBuildingandHousingj. territorialauthoritiesk. buildingconsentauthoritiesl. projectinformationmemorandam.buildingconsents

Page 75: NBCA Competency Assessment System

64 natIonal bca competency assessment system june 2010

competency – resIdentIal 1

n. codecompliancecertificateso. certificatesofacceptancep. noticestofixq. candefinetheterm‘naturalhazard’r. assessmentcriteriaforalterationstoexistingbuildingsinaccordancewithsection112oftheActs. demonstratesanunderstandingoftypeofnationalmultipleusebuildingapprovals

(MultiProof)thatfallwithinthescopeofthiscompetencylevelt. ifinspecting,understandstheMinorVariationsRegulationsandunderstandstheprocess

forformalamendmentstobuildingconsentsu. understandsbuildinglegislation,inparticularsections7–9oftheActandClauseA2

InterpretationoftheNewZealandBuildingCodev. section37requirementsandhowtoidentifyRMAanddistrictplanrequirementsw. theprovisionforinspectionsbyaBCAasdescribedinsection90oftheActx. ifinspecting,theprovisionsoninspectingandrequirementsforenteringlandin

accordancewithsections222–228oftheAct.

Regulation10(3)(d)(i):Abilitytoprocessapplicationsforbuildingconsent.

Performanceindicators:

8. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(buildingrelatedprocessingonly).

Guidanceforassessorsandcandidates:

4. Knowledgeareasmayinclude,butarenotlimitedto:

a. NZS73604,NZS3602andNZS3640forsinglestoreyresidentialdwellings.Includeshowtodeterminecompliancerequirementsforcorrosionzones,groundbearing,piles,footings,foundations,reinforcing,concretestrength,fillandcompaction,bracingdemandanddesign,sub-floorframing,wallframing,roofstructures,timbertreatment,loadpaths,fixingsandconnections,underlayandwraps,claddingsystems,internalliningsanddurability

b. B1,B1/VM1–generalunderstandingofhowthisVerificationMethodandreferencedStandardsareusedforstructuraldesign,B1/VM4–asitrelatestofoundationdesign,B1/AS1–astheyrelatetotheStandardsanditemsraisedinitem4.aabove,B1/AS2andB1/AS2–astheyrelatetobarrierconstruction,B1/AS3

c. durabilityrequirementsB2andB2/AS1astheyrelatetothistypeofbuildingwork(eg,5,15and50yeardurabilityrequirementofnominatedbuildingelements)

d. compliancewithC1–includingmanufacturerrequirementsforinstallationoffreestandingandin-builtsolidfuelheatingappliances,cleanairrequirements,applianceclearances,hearth,insulationbarrier,shielding,restraints,flueheights,flashings,finishesandfurnishings,ventilationandassociatedprescribedelectricalwork(ifapplicable)

e. identifyissuesrelatingtotheAcceptableSolutionforfirecomplianceforthistypeofbuildingworkbyidentifyingthedesignsequencereferredtoinC/AS1Part1

f. C3andC/AS1fireseparationsfromadjacenthouseholdunitsg. C4andC/AS1astheyapplytostructuralfireratedelementsforcarports,garages

andhouseholdunitsh. accesstoandfrombuildingsforD1andD1/AS1(eg,steps,handrailsandnon-slipprovisions)i. weathertightnessandtheexternalenvelopeofoutbuildingsandancillarybuildings

asrequiredbyE2.HasagoodtechnicalknowledgeofE2/AS1(eg,understandsthescopeofE2/AS1andcandeterminecompliancewithE2/AS1uptoariskscoreof6).Understandsandisabletoevaluatecommonlyusedalternativesolutioncladdingsystems(suchasfibre-cementbevel-backweatherboards)

j. internalmoisturemanagementwithinbuildingsasrequiredbyE3andE3/AS1(eg,understandsventilation,temperature,thermalresistance,condensation,impervioussurfacesforfloorandwalllinings)

k. identifyinghazardousagentsorcontaminantsonsiteasrequiredbyF1andF1/AS1andknowshowtoreadaPIMand/orcheckCouncilhazardfilesintheabsenceofaPIM

l. humanimpactforglazingasrequiredbyF2andF2/AS1usingNZS4223:Part3m.sitesafetyrequirementsinaccordancewithF5andF5/AS1n. requirementsofF7,inparticulartheplacementandinstallationofdomesticsmoke

detectorsasrequiredbyF7/AS1o. G1andG1/AS1forlocation,sizingandnumberofsanitaryfixturesp. G2andG2/AS1forspatiallaunderingrequirementsq. spatial,hygiene,storageandpreparationrequirementsforcookingandfoodasrequired

byG3andG3/AS1(eg,impervioussurfaces,foodstorage,cookingandrefrigeration)r. naturalandmechanicalventilationrequirementsfordomesticbuildingsasrequiredbyG4

andG4/AS1(eg,5%floorarea/windowratio,sizingofnaturalventingforoccupiedspaces)s. requirementsfornaturallightandvisualawarenessasrequiredbyG7andG7/AS1

(eg,10%floorarea/ratioforvisualawareness)

7AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 76: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 65

competency – resIdentIal 1

t. requirementsforprovidingartificiallightingtoenablesafemovementasrequiredbyG8andG8/AS1(eg,accessroutesandminimumluxlevels)

u. requirementsforcertifyingcompliancewithelectricityprovisionsasrequiredbyG9,G9/AS1andsections19and94(3)oftheAct

v. requirementsforcertifyingcompliancewithgasasanenergysourceasrequiredbyG11,G11/AS1andsections19and94(3)oftheAct

w. requirementsforassessingenergyefficiencyfordomesticdwellingsasrequiredbyH1andusingtheschedulemethodinH1/AS1(ceilings,walls,windows/doors,hotwateretc)

x. identificationofinspectionrequirementsnecessarytoconfirmcomplianceforthislevelofbuildingwork.

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

9. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(plumbinganddrainagerelatedprocessingonly).

Guidanceforassessorsandcandidates:

5. Areasofknowledgemayinclude,butarenotlimitedto:

a. requirementsforprotectingpeopleandotherpropertyfromadverseeffectsofsurfacewaterasrequiredbyE1andE1/AS1(minimumfloorheights,design,constructionandconveyanceofstormwatercatchments)

b. launderingandspatialrequirementstosatisfyG2andG2/AS1c. requirementsforspecificationandinstallationofdomesticwatersuppliesasrequired

byG12,G12/AS1andG12/VM1(potablewaterrequirements,hotwatersupplysystems,venting/valving/restraint)

d. requirementsforprovisionofsanitaryfixturesandappliancesandforconveyingfoulwatertodrainagesystemsasrequiredbyG13,G13/AS1andAS/NZS3500Part2(systemdesignprinciples–avoidodour,designloading,falls,venting,materials,connections,accessandmaintenance,andimposedloads)

e. identificationofinspectionrequirementsnecessarytoconfirmcomplianceforthislevelofbuildingwork.

Regulation10(3)(d)(ii):Abilitytoinspectbuildingwork.

Performanceindicators:

10.InspectbuildingworkrelatingtofoundationtypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforresidential1buildings.

Guidanceforassessorsandcandidates:

6. Knowledgeareasforinspectionsmayinclude,butarenotlimitedto:

a. demonstratedabilitytoreadandinterpretplansandspecificationsb. useoftechnicalequipment(eg,moisturemeters,cameras,thermometers)and

administrativeresources(checklists,copiesoftechnicalinformationeg,NZS3604)toestablishcompliance

c. NZS83604,NZS3602,NZS3640,NZS3622,NZS4229andtheComplianceDocumentsastheyrelatetoresidentialconstruction;andinparticular:

Foundations

• requirementsforcorrosionzones–concretestrengthrequirements(differentzonesanddifferentfoundationtypes),fixingmaterials

• groundbearing–determinationmethods,fillandcompactionrequirements• pilefoundations–types(includingbracingtypes),sizesanddimensions

(groundclearance,maxheights,foundationdepths,etc),fixingsfordifferentpiletypes,treatmentandidentification,howbracingiscalculatedforsubfloors,pointloadpiles

• concretefoundations(includesconcretemasonry)–reinforcing(lapsandsize),reinforcingtype(identificationofdeformedandround,hightensileornormal,meshandmeshsupport),pipepenetrations,pointloadpads,bondbeams,washouts‘A’,‘B’and‘C’grademasonry

• concreteslabs–reinforcing(laps,size,supplementaryreinforcingrequirements,cover),controljointandslabsizelimitations,pipepenetrations,thicknessandthickeningsofslab,DPM

• certificaterequirementsincludingproducerstatements,geotechnicalreports,compactioncertificates,concretedockets

Page 77: NBCA Competency Assessment System

66 natIonal bca competency assessment system june 2010

competency – resIdentIal 1

11.InspectbuildingworkrelatingtoprelinetypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforresidential1buildings.

Preline

• timberfloorsystems• framingandtrussrequirements–sizespanandspacing,timbergradeandtreatment,

loadpaths,moisturecontent,fixingsandconnections,trussdesignandlayoutinformation,penetrations,bracingsystemsandfixings

• claddingrequirements–underlays/wraps,windbarriersandrigidairbarriers,fixings,penetrationsandflashings,silltapes,airseals,cavitysystems,directfixsystems,penetrations,brickveneerrequirements

• membraneroofanddeckrequirements,includingsubstrates,penetrations,fallandoverflows• insulationinstallation–type,rating,installationrequirements(refertoNZS4246

Energyefficiency–InstallingInsulationinResidentialDwellings

12.InspectbuildingworkrelatingtofinaltypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforresidential1buildings.

Final

• accesstobuilding–subfloorandceiling,steps,stairsinstallation–tread,riser,handrails,barriersnon-slipprovisions

• internalliningsandsurfaces,includingimpervioussurfacerequirements,waterproofmembranes,watersplashareas

• smokedetectors–placementandlocation• ventilation–mechanicalandnatural• fireratedboundarywallsandotherbuildingcomponents• glazingrequirements,safetyglassidentification,locations• finishedgroundlevelandgroundclearancestocladdingsandfloorlevels• thirdpartyverificationeg,producerstatements,energyworkcertificates

d. canfollowmanufacturerrequirementsforinstallationoffreestandingandin-builtsolidfuelheatingappliances,requirementsfor:applianceclearances,hearth,insulationbarrier,shielding,restraints,flueheights,flashings,finishesandfurnishings,ventilationandassociatedprescribedelectricalwork(ifapplicable)

e. identificationandmanagementofriskfromhazardousagentsorcontaminantsonsitef. canidentifywhenexternaltechnicalassistanceisrequiredandcanoutsourceworkfor

technicalreviewwhenrequired.

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

13.InspectbuildingworktoestablishwhethercompliancewiththeNewZealandBuildingCode(plumbinganddrainagerelatedinspectionsonly)hasbeenachievedforresidential1buildings.

Guidanceforassessorsandcandidates:

7. AgoodworkingknowledgeofAS/NZS3500,G12/AS1andAS2,G13/AS1andAS2,E1/AS1,E2/AS1(pipepenetrations,deckdrainageetc),E3/AS1andH1/AS1astheyrelatetoresidentialconstruction;andinparticular:

Foundations

a. pipematerial,gradients,size,bedding,backfill,protection,insulation,accesspoints,jointingandsleeving,testing,supports,changesofdirection,conveyancetoapprovedoutfalls,bridging

b. HWreliefdrainanddischargeoutlet,drainaccesspoints,amendmentstoplansandspecifications

Preline

c. pipematerials,thermalmovement,sizing,compatibility,insulation,testing,penetrationsthroughenvelope,roofflashings,soilstacks(graded),elevateddrainageprinciples,wastepipes,ventingsystems

d. hotwaterandcoldwaterexpansionreliefdraindischargeoutfallpointe. hotwatersupply:

• mains,lowpressure,wetback,solar• tanksupply–structuralsupport/safetray/overflow/seismicrestraint• solar–structuralsupport–penetrations• wetback–openventingofHWCexhaust• networkutilitycoldwatersupplyconnections

f. drainage:• maintenanceofwatertrapseals–floorwastegullies/gullytraps,sewersurchargegully• venting(openorairadmittancevalves)• pipeinspectionpoints,protectionincludingpipetrenchandfoundations,materials,

jointing,bedding,outfall,testing• septictank/sewer(NUO)/othersoakagesystemSW• rainwatertanksupply(potable)/overflowwithinconsentedproperty/pump/gravity

(airlocks)• networkutilitycoldwatersupplyconnections

Page 78: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 67

competency – resIdentIal 1

Final

g. HWCseismicrestraint,hotandcoldwatervalves,temperingdevice,coldwaterexpansionrelief,tundish,safetray

h. HWCwatersupplytemperaturechecks(personalhygiene,legionella)i. wetback/HWCheightabovewoodburner,flowandreturnpipeinsulation,exhaustvent

–pipepenetrationflashingj. solarreliefvalvedischargeposition,structuralsupport,position,pipeinsulation,

installationsameasbuildingconsent,penetrationsflashedk. testsanitaryfixturestrapsealretentionl. equipotentialbondingm.gullydish/gratingheight,wastepipeconnectionstogullyriserorgullydish,surfacewater

ingressn. pipepenetrationswatertighto. maindrainventp. drainageas-builtplan,amendmentstoplans/specificationsq. canidentifyboundaryfirewallsanddeterminecomplianceforpipepenetrations.

Performanceindicators:

14.Canissuecertification(buildingconsentorcodecompliancecertificate)forthisresidential1buildingwork.

Guidanceforassessorsandcandidates:

8. Knowledgeareasmayinclude,butarenotlimitedto:a. candidatecancompileandreviewinformationreceivedduringtheprocessingofa

buildingconsentorinformationreceivedduringtheinspections/constructionprocessanddetermineandrecordtheoutcometoissue,suspend,requestfurtherinformationand/orrefusetoissueabuildingconsentorcodecompliancecertificate(withintheirauthority)forresidential1buildingwork.

Regulation10(3)(e):Abilitytocommunicatewithinternalandexternalpersons.

Performanceindicators:

15.Communicateswithinternalandexternalcustomers.

16.Canusephone,email,internetandfax.

17.Demonstratesgoodactivelistening,questioningandassertivenessskillsindealingwithday-to-daytasksandresponsibilities.

Guidanceforassessorsandcandidates:

9. Knowledgeareasmayinclude,butarenotlimitedto:

a. preparationofsimpleletters,memosandshortreportsunderreviewofseniorstaffb. agoodunderstandingofbuildingrelatedsubject-matterwhendealingwithcustomers

andcolleaguesc. effectivecommunicationwithotherteammembers,consentapplicantsandmembers

ofthepublicd. accurateinputtingofwrittendataoninternalforms,checklists,fieldinspectionrecordsetc;

completesprescribedformsinaccordancewiththeBuildingFormsRegulations2004.

Regulation10(3)(f):Abilitytocomplywiththebuildingconsentauthority’spolicies,proceduresandsystems.

Performanceindicators:

18.Observesthebuildingconsentauthority’spolicies,proceduresandsystemsforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

10.Knowledgeareasmayinclude,butarenotlimitedto:

a. anabilitytoaccuratelyandcarefullyfollowestablishedproceduresforcompletingworktasks.

8AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 79: NBCA Competency Assessment System

68 natIonal bca competency assessment system june 2010

Page 80: NBCA Competency Assessment System

Co

mp

et

en

Cy

Lev

eL –

Re

sid

en

tia

L 2CompetenCy LeveL – ResidentiaL 2

Competency level – residential 2 69

Page 81: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 69

Competencylevel–residential2

competency – resIdentIal 2

Detacheddwellings(SH)designedtoacommonStandard(eg,NZS3604,NZS4229)thatarelessthanorequaltotwostoreysandhaveanE2/AS1riskmatrixscorelessthanorequalto12.

Regulation10(3)(a)9:Understandingthephilosophiesandprinciplesofbuildingdesignandconstruction.

Performanceindicators:

1. Comprehendsandhassatisfactoryknowledgeofsections3,4and5oftheBuildingAct2004.

2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesandconstructionsequencingforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

1. Knowledgeareasmayinclude,butarenotlimitedto:

a. thepurposeoftheBuildingAct2004(theAct)b. TAs’functions,dutiesandpowersundertheAct,particularlyastheyrelatetohouseholdunitsc. candiscussthehierarchyofNewZealandbuildinglegislationandthevariouscompliance

pathsprovidedforundertheActd. candiscussbuildingdesign,constructiontechniquesandsequencingofbuildingwork

asitsrelatestothiscompetencylevel.

NotethisinformationiscoveredinSections2.1,2.2,2.3,3.0,3.1,3.2,3.3,3.5,3.6and3.7ofthePrefacetotheBuildingCodeHandbook.10

Regulation10(3)(b):Understandingandknowledgeofbuildingproductsandmethods.

Performanceindicators:

3. Comprehendsandhassatisfactoryknowledgeofproprietarysystemsandbuildingproductsforthistypeofbuildingwork.

4. Demonstratestheabilitytoresearch,analyseandassessbuildingmethodsandproductsassociatedwiththistypeofbuildingwork.

Guidanceforassessorsandcandidates:

2. Knowledgeareasmayinclude,butarenotlimitedto:

a. commonlyusedbuildingmaterialsandsystems(eg,pre-nailedtrussandframes,conventionalcladdingandflashingandbracingsystems)forthislevelofbuildingwork

b. productliterature,testingandVerificationMethods,appraisalsandproducerstatements.

Regulation10(3)(c):KnowledgeandskillinapplyingtheAct,theBuildingCode,andanyotherapplicableregulationsundertheAct.

Performanceindicators:

5. ComprehendsandcanapplyknowledgeoftheapplicationoftheAct.

6. ComprehendsandcanapplyknowledgeoftherolesandresponsibilitiesofaBCAandTA.

7. ComprehendsandcanapplyknowledgeofthelinkageandinterfacebetweentheResourceManagementAct1991andtheBuildingAct2004.

Guidanceforassessorsandcandidates:

3. Demonstratesknowledgeandskillinapplying:

a. thebuildingcontrolframework11b. theBuildingAct2004c. purposed. principlese. applicationf. theNewZealandBuildingCodeg. compliancepathsh. producerstatementsi. theDepartmentofBuildingandHousingj. territorialauthoritiesk. buildingconsentauthoritiesl. projectinformationmemorandam.buildingconsents

9 Building(AccreditationofBuildingConsentAuthorities)Regulations2006.10AComplianceDocumentpreparedbytheDepartmentofBuildingandHousing.Availableat:http://www.dbh.govt.nz/UserFiles/File/

Publications/Building/Compliance-documents/building-code-handbook.pdf11Guidanceonitemsa.-q.isprovidedintheBuildingCodeHandbook.

Page 82: NBCA Competency Assessment System

70 natIonal bca competency assessment system june 2010

competency – resIdentIal 2

n. codecompliancecertificateso. certificatesofacceptancep. noticestofixq. candefinetheterm‘naturalhazard’r. assessmentcriteriaforalterationstoexistingbuildingsinaccordancewithsection112

oftheActs. demonstratesanunderstandingoftypeofnationalmultipleusebuildingapprovals

(MultiProof)thatfallwithinthescopeofthiscompetencylevelt. ifinspecting,understandstheMinorVariationsRegulationsandunderstandstheprocess

forformalamendmentstobuildingconsentsu. understandsbuildinglegislationinparticularsections7–9oftheActandClauseA2

InterpretationoftheNewZealandBuildingCodev. section37requirementsandhowtoidentifyRMAanddistrictplanrequirementsw. theprovisionforinspectionsbyaBCAasdescribedinsection90oftheActx. ifinspecting,theprovisionsoninspectingandrequirementsforenteringlandin

accordancewithsections222–228oftheAct.

Regulation10(3)(d)(i):Abilitytoprocessapplicationsforbuildingconsent.

Performanceindicators:

8. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(buildingrelatedprocessingonly).

Guidanceforassessorsandcandidates:

4. Knowledgeareasmayinclude,butarenotlimitedto:

a. NZS123604,NZS3602,NZS3640andNZS4229astheyrelatetotwostoreyresidentialconstruction.Understandshowtodeterminecompliancerequirementsforcorrosionzones,groundbearing,piles,footings,foundations,reinforcing,concretestrength,fillandcompaction,bracingdemandanddesign,subfloorframing,wallframing,roofstructures,timbertreatment,loadpaths,fixingsandconnections,underlayandwraps,claddingsystems,internalliningsanddurability

b. B1,B1/VM1–generalunderstandingofhowthisVerificationMethodandreferencedStandardsareusedforstructuraldesign,B1/VM4–asitrelatestofoundationdesign,B1/AS1–asitrelatestotheStandardsanditemsraisedinitem4aabove,B1/AS2andB1/AS2–astheyrelatetobarrierconstruction

c. B2andB2/AS1astheyrelatetothistypeofbuildingwork(eg,5,15and50yeardurabilityrequirementofnominatedbuildingelements)

d. compliancewithC1.Understandsmanufacturerrequirementsforinstallationoffreestandingandin-builtsolidfuelheatingappliances.Understandscleanairrequirementsandcanassesscompliancerequirementsfor:applianceclearances,hearth,insulationbarrier,shielding,restraints,flueheights,flashings,finishesandfurnishings,ventilationandassociatedprescribedelectricalwork(ifapplicable)

e. identifyissuesrelatingtotheAcceptableSolutionforfirecomplianceforthistypeofbuildingworkbyidentifyingthedesignsequencereferredtoinC/AS1Part1

f. canapplycommonlyusedfireratingsystemsforwallsbuiltincloseproximityofboundariesandachievingcompliancewithClauseC3andC/AS1SpreadofFire

g. C4andC/AS1astheyapplytostructuralfireratedelementsforcarports,garagesandhouseholdunits

h. accessibility,toenablesafeandeasymovementofpeopleasrequiredbyD1andD1/AS1(eg,steps,handrails,non-slipprovisions,andunderstandssafestairconstructionandthedefinitionsofprivateandsecondaryprivatestairs)

i. E2andE2/AS1forcomplexjunctions,flashingrequirementsforbuildingsequaltoorlessthantwostoreysandthathaveariskmatrixscorelessthanorequalto12.Illustratesagoodtechnicalknowledgeinrelationtothedifferenttypesofcladdingsystemswithinthisriskrange.Canassessretainingwallsandsub-soildrainageusingtheAcceptableSolution.Understandsandisabletoevaluatecommonlyusedalternativesolutioncladdingsystems(suchasfibre-cementbevel-backweatherboards)

j. internalmoisturemanagementwithinbuildingsasrequiredbyE3andE3/AS1(eg,understandsventilation,temperature,thermalresistance,condensation,impervioussurfacesforfloorandwalllinings)

k. hazardousagentsorcontaminantsonsiteasrequiredbyF1andF1/AS1andknowshowtoreadaPIMandcheckhazardfilesintheabsenceofaPIM

l. F2andF2/AS1usingNZS4223:Part3,andisabletoassessthecomplianceofglazedbarriersandidentifytherequiredlocationsforsafetyglass

12AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 83: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 71

competency – resIdentIal 2

m.requirementsforsafeguardingpeoplefromfallingasrequiredbyF4andF4/AS1(eg,barrierconstruction,correlationbetweenB1,B2andF4,SEDBarriers,B2implicationsandswimmingpoolfencingrequirements)

n. sitehazardidentificationandunderstandscompliancerequirementsformanagingthesehazardsinaccordancewithF5andF5/AS1

o. F7,inparticulartheplacementandinstallationofdomesticsmokedetectorsasrequiredbyF7/AS1

p. G1andG1/AS1forlocation,sizingandnumberofsanitaryfixturesq. G2andG2/AS1forspatiallaunderingrequirements.r. spatial,hygiene,storageandpreparationrequirementsforcookingandfoodasrequired

byG3andG3/AS1(eg,impervioussurfaces,foodstorageandrefrigeration)s. naturalandmechanicalventilationrequirementsfordomesticbuildingsasrequired

byG4andG4/AS1(eg,5%floorarea/windowratio,sizingofnaturalventingforoccupiedspaces)

t. naturallightandvisualawarenessasrequiredbyG7andG7/AS1(eg,10%floorarea/ratioforvisualawareness)

u. artificiallightingtoenablesafemovementasrequiredbyG8andG8/AS1(eg,accessroutesandminimumluxlevels)

v. requirementsforcertifyingcompliancewithelectricityprovisionsasrequiredbyG9,G9/AS1andsections19and94(3)oftheAct

w. requirementsforcertifyingcompliancewithgasasanenergysourceasrequiredbyG11,G11/AS1andsections19and94(3)oftheAct

x. requirementsforassessingenergyefficiencyfordomesticdwellingsasrequiredbyH1andH1/AS1(ceilings,walls,windows/doors,hotwateretc)

y. NZS4229concretebasementconstruction(eg,BgradeandCgrademasonryrequirementsandmasonryretainingwalls)

z. canidentifyandplaninspectionrequirementsnecessarytoconfirmcomplianceforthislevelofbuildingwork

aa.canmentorand/orprovidetechnicaloversighttoothersassessingBuildingCodecomplianceforresidential(competency)1typebuildingwork

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

9. Processesbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(plumbinganddrainagerelatedprocessingonly).

Guidanceforassessorsandcandidates:

5. Knowledgeareasmayinclude,butarenotlimitedto:

a. requirementsforprotectingpeopleandotherpropertyfromadverseeffectsofsurfacewaterasrequiredbyE1andE1/AS1–(minimumfloorheights,design,constructionandconveyanceofstormwatercatchments)

b. launderingandspatialrequirementstosatisfyG2andG2/AS1c. requirementsforspecificationandinstallationofdomesticwatersuppliesasrequired

byG12andG12/AS1(potablewaterrequirements,hotwatersupplysystems,venting/valving/restraint)

d. requirementsforprovisionofsanitaryfixturesandappliancesandforconveyingfoulwatertodrainagesystemsasrequiredbyG13,G13/AS1andAS/NZS3500Part2astheyrelatetotwostoreyconstruction(systemdesignprinciples–avoidodour,designloading,falls,venting,materials,connections,accessandmaintenance,andimposedloads)

e. identificationofinspectionrequirementsnecessarytoconfirmcomplianceforthislevelofbuildingwork

f. canmentorand/orprovidetechnicaloversighttoothersassessingBuildingCodecomplianceforresidential(competency)1typebuildingwork.

Page 84: NBCA Competency Assessment System

72 natIonal bca competency assessment system june 2010

competency – resIdentIal 2

Regulation10(3)(d)(ii):Abilitytoinspectbuildingwork.

Performanceindicators:

10.InspectbuildingworkrelatingtofoundationtypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforresidential2.

Guidanceforassessorsandcandidates:

6. Knowledgeareasforinspectionsmayinclude,butarenotlimitedto:

a. demonstratedabilitytoreadandinterpretplansandspecificationsb. useoftechnicalequipment(eg,moisturemeters,cameras,thermometers)andadministrative

resources(checklists,copiesoftechnicalinformationeg,NZS3604)toestablishcompliancec. NZS133604,NZS3602,NZS3640,NZS3622,NZS4229andtheComplianceDocuments

astheyrelatetoresidentialconstruction;andinparticular:

Foundations

• requirementsforcorrosionzones–concretestrengthrequirements(differentzonesanddifferentfoundationtypes),fixingmaterials

• groundbearing–determinationmethods,fillandcompactionrequirements• pilefoundations–types(includingbracingtypes),sizesanddimensions(groundclearance,

maximumheights,foundationdepthsetc),siting,fixingsfordifferentpiletypes,treatmentandidentification,howbracingiscalculatedforsubfloors,pointloadpiles

• concretefoundations(includesconcretemasonry)–reinforcing(lapsandsize),reinforcingtype(identificationofdeformedandround,hightensileornormal,meshandmeshsupport),pipepenetrations,pointloadpads,bondbeams,washouts‘A’,‘B’and‘C’grademasonry

• concreteslabs–reinforcing(laps,size,supplementaryreinforcingrequirements,cover),controljointandslabsizelimitations,pipepenetrations,thicknessandthickeningsofslab,DPM

• certificaterequirementsincludingproducerstatements,geotechnicalreports,compactioncertificates,concretedockets

11.InspectbuildingworkrelatingtoprelinetypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforresidential2buildings.

Preline

• timberfloorsystems• framingandtrussrequirements–size,spanandspacing,timbergradeandtreatment,

loadpaths,moisturecontent,fixingsandconnections,trussdesignandlayoutinformation,penetrations,bracingsystems,includingdiaphragmceilingsandfixings

• claddingrequirements–underlays/wraps,windbarriersandrigidairbarriers,fixings,penetrationsandflashings,junctions,silltapes,airseals,cavitysystems,directfixsystems,penetrations,brickveneerrequirements,mixedcladdingsystems

• membraneroofanddeckrequirementsincludingsubstrates,penetrations,fallandoverflows• fireratedboundarywallsandbuildingcomponents–installationrequirements,

includingisolation,insulation,penetrations,fixings• insulationinstallation–type,rating,installationrequirements(referNZS4246

EnergyEfficiency–InstallingInsulationinResidentialDwellings)

12.InspectbuildingworkrelatingtofinaltypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforresidential2buildings.

Final

• accesstobuilding–subfloorandceiling,steps,stairsinstallation–tread,riser,handrails,barriers,non-slipprovisions

• internalliningsandsurfaces,includingimpervioussurfacerequirements,waterproofmembranes,watersplashareas

• smokedetectors–placementandlocation• ventilation–mechanicalandnatural• fireratedboundarywallsandotherbuildingcomponents• glazingrequirements,safetyglassidentification,locations• finishedgroundlevelandgroundclearancestocladdingsandfloorlevels• thirdpartyverificationeg,producerstatements,energyworkcertificates• swimmingpoolfencinginstallation,gates,fenceheights,sizes,openingsetc

d. canfollowmanufacturerrequirementsforinstallationoffreestandingandin-builtsolidfuelheatingappliances,requirementsfor:applianceclearances,hearth,insulationbarrier,shielding,restraints,flueheights,flashings,finishesandfurnishings,ventilationandassociatedprescribedelectricalwork(ifapplicable)

e. identificationandmanagementofriskfromhazardousagentsorcontaminantsonsitef. isabletoidentifywhenexternaltechnicalassistanceisrequiredandcanoutsource

workfortechnicalreviewwhenrequired.

13AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 85: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 73

competency – resIdentIal 2

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

13.Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(plumbinganddrainagerelatedprocessingonly).

14.InspectbuildingworktoestablishwhethercompliancewiththeNewZealandBuildingCode(plumbinganddrainagerelatedinspectionsonly)hasbeenachievedforresidential2buildings.

Guidanceforassessorsandcandidates:

7. AgoodworkingknowledgeofAS/NZS3500,G12/AS1andAS2,G13/AS1andAS2,E1/AS1,E2/AS1(pipepenetrations,deckdrainageetc),E3/AS1andH1/AS1astheyrelatetoresidentialconstruction;andinparticular:

Foundations

• pipematerial,gradients,size,bedding,backfill,protection,insulation,accesspoints,jointingandsleeving,testing,supports,changesofdirection,conveyancetoapprovedoutfalls,bridging

• HWreliefdrainanddischargeoutlet,drainaccesspoints,amendmentstoplansandspecifications

Preline

• pipematerials,thermalmovement,sizing,compatibility,insulation,testing,penetrationsthroughenvelope,roofflashings,soilstacks(graded),elevateddrainageprinciples,wastepipes,ventingsystems

• hotwater/coldwaterexpansionreliefdraindischargeoutfallpoint• hotwatersupply:

a. mains,lowpressure,wetback,solarb. tanksupply–structuralsupport/safetray/overflow/seismicrestraintc. solaranditsstructuralsupportandpenetrationsd. wetback,openventingofHWCexhauste. networkutilitycoldwatersupplyconnectionsf. floorwaste

• drainage

g. maintenanceofwatertrapseals–floorwastegullies/gullytraps,sewersurchargegullyh. venting(openorairadmittancevalves)i. pipeinspectionpoints,protectionincludingpipetrenchandfoundations,materials,

jointing,bedding,outfall,testingj. septictank/sewer(NUO)/othersoakagesystemSWk. rainwatertanksupply(potable)/overflowwithinconsentedproperty/pump/gravity

(airlocks)

Final

a. HWCseismicrestraint,hotandcoldwater–valves,temperingdevice,coldwaterexpansionrelief,tundish,safetray

b. HWCwatersupplytemperaturechecks(personalhygiene,legionella)c. wetback/HWCheightabovewoodburner,flowandreturnpipeinsulation,

exhaustvent–pipepenetrationflashingd. solarreliefvalvedischargeposition–structuralsupport–position–pipeinsulation,

installationsameasbuildingconsent–penetrationsflashede. testsanitaryfixtures’trapsealretention,f. equipotentialbondingg. gullydish/gratingheight,wastepipeconnectionstogullyriserorgullydish,

surfacewateringressh. pipepenetrationswatertighti. maindrainventj. drainageas-builtplan–amendmentstoplans/specificationsk. swimmingpoolbackflowpreventionl. canidentifyboundaryfirewallsanddeterminecomplianceforpipepenetrations.

Regulation10(3)(d)(iii):Abilitytocertifybuildingwork.

Performanceindicators:

15.Canissuecertification(buildingconsentorcodecompliancecertificate)forthisresidential2buildingwork.

Guidanceforassessorsandcandidates:

8. Knowledgeareasmayinclude,butarenotlimitedto:

a. candidatecancompileandreviewinformationreceivedduringtheprocessingofabuildingconsentorinformationreceivedduringtheinspections/constructionprocessanddetermineandrecordtheoutcometoissue,suspend,requestfurtherinformationand/orrefusetoissueabuildingconsentorcodecompliancecertificate(withintheirauthority)forresidential2buildingwork.

Page 86: NBCA Competency Assessment System

74 natIonal bca competency assessment system june 2010

competency – resIdentIal 2

Regulation10(3)(e):Abilitytocommunicatewithinternalandexternalpersons.

Performanceindicators:

16.Communicateswithinternalandexternalcustomers.

17.Canusephone,email,internetandfax.

18.Demonstratesgoodactivelistening,questioningandassertivenessskillsindealingwithday-to-daytasksandresponsibilities.

Guidanceforassessorsandcandidates:

9. Knowledgeareasmayinclude,butarenotlimitedto:

a. correctlypreparessimpleletters,memosandshortreportsunderreviewofseniorstaffb. isconfidentandhasagoodunderstandingofbuildingrelatedsubject-matterwhendealing

withcustomersandcolleaguesc. communicateseffectivelywithotherteammembers,consentapplicantsandmembers

ofthepublicd. accuratelyinputswrittendataoninternalforms,checklists,fieldinspectionrecordsetc;

andcompletesprescribedformsinaccordancewiththeBuildingFormsRegulations2004.

Regulation10(3)(f):Abilitytocomplywiththebuildingconsentauthority’spolicies,proceduresandsystems

Performanceindicators:

19.Observesthebuildingconsentauthority’spolicies,proceduresandsystemsforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

10.Knowledgeareasmayinclude,butarenotlimitedto:

a. accuratelyandcarefullyfollowsestablishedproceduresforcompletingworktasks.

Page 87: NBCA Competency Assessment System

Co

mp

et

en

Cy

Lev

eL –

Re

sid

en

tia

L 3

CompetenCy LeveL – ResidentiaL 3

Competency level – residential 3 75

Page 88: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 75

Competencylevel–residential3

competency – resIdentIal 3

Detacheddwellings(SH)orotherdwellings(SR)thatarelessthanorequaltothreestoreysbutlimitedtoverticalplanefireseparationanddirectegresstotheoutside.E2/AS1riskscoreof13–20(levelalsoincludesspecificallydesignedresidentialcladdingsystems,components,detailingandjunctionswhereariskmatrixscoreofgreaterthan20hasbeencalculated).

Regulation10(3)(a):14

Understandingthephilosophiesandprinciplesofbuildingdesignandconstruction.

Performanceindicators:

1. Comprehendsandhassatisfactoryknowledgeofsections3,4and5oftheBuildingAct2004.

2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesandconstructionsequencingforthislevelofbuildingwork.

Guidanceforassessorsandcandidates:

1. Knowledgeareasmayinclude,butarenotlimitedto:

a. thepurposeoftheBuildingAct2004(theAct)b. TAs’functions,dutiesandpowersundertheAct,particularlyastheyrelatetohouseholdunitsc. candiscussthehierarchyofNewZealandbuildinglegislationandthevariouscompliance

pathsprovidedforundertheActd. candiscussbuildingdesign,constructiontechniquesandsequencingofbuildingwork

asitrelatestothiscompetencylevel.

NotethisinformationiscoveredinSections2.1,2.2,2.3,3.0,3.1,3.2,3.3,3.5,3.6and3.7ofthePrefacetotheBuildingCodeHandbook.15

Regulation10(3)(b):Understandingandknowledgeofbuildingproductsandmethods.

Performanceindicators:

3. Comprehendsandhassatisfactoryknowledgeofproprietarysystemsandbuildingproductsforthislevelofbuildingwork.

4. Demonstratestheabilitytoresearch,analyseandassessbuildingmethodsandproductsassociatedwiththislevelofbuildingwork.

Guidanceforassessorsandcandidates:

2. Knowledgeareasmayinclude,butarenotlimitedto:

a. commonlyusedbuildingmaterialsandsystems(eg,pre-nailedtrussandframes,conventionalcladdingandflashingandbracingsystems)forthislevelofbuildingwork

b. productliterature,testingandVerificationMethods,appraisalsandproducerstatements.

Regulation10(3)(c):KnowledgeandskillinapplyingtheAct,theBuildingCode,andanyotherapplicableregulationsundertheAct.

Performanceindicators:

5. ComprehendsandcanapplyknowledgeoftheapplicationoftheAct.

6. ComprehendsandcanapplyknowledgeoftherolesandresponsibilitiesofaBCAandTA.

7. ComprehendsandcanapplyknowledgeofthelinkageandinterfacebetweentheResourceManagementAct1991andtheBuildingAct2004.

Guidanceforassessorsandcandidates:

3. Demonstratesknowledgeandskillinapplying:

a. thebuildingcontrolframework16b. theBuildingAct2004c. purposed. principlese. applicationf. theNewZealandBuildingCodeg. compliancepathsh. producerstatementsi. theDepartmentofBuildingandHousingj. territorialauthoritiesk. buildingconsentauthoritiesl. projectinformationmemorandam.buildingconsents

14Building(AccreditationofBuildingConsentAuthorities)Regulations2006.15AComplianceDocumentpreparedbytheDepartmentofBuildingandHousing.Availableat:http://www.dbh.govt.nz/UserFiles/File/

Publications/Building/Compliance-documents/building-code-handbook.pdf16Guidanceonitemsa.-q.isprovidedintheBuildingCodeHandbook.

Page 89: NBCA Competency Assessment System

76 natIonal bca competency assessment system june 2010

competency – resIdentIal 3

n. codecompliancecertificateso. certificatesofacceptancep. noticestofixq. candefinetheterm‘naturalhazard’r. assessmentcriteriaforalterationstoexistingbuildingsinaccordancewithsection112

oftheActs. demonstratesanunderstandingoftypeofnationalmultipleusebuildingapprovals

(MultiProof)thatfallwithinthescopeofthiscompetencylevelt. ifinspecting,understandstheMinorVariationsRegulationsandunderstandstheprocess

forformalamendmentstobuildingconsentsu. understandsbuildinglegislationinparticularsections7–9oftheActandClauseA2

interpretationoftheNewZealandBuildingCodev. section37requirementsandhowtoidentifyRMAanddistrictplanrequirementsw. theprovisionforinspectionsbyaBCAasdescribedinsection90oftheActx. ifinspecting,theprovisionsoninspectingandrequirementsforenteringlandin

accordancewithsections222–228oftheAct.

Regulation10(3)(d)(i):Abilitytoprocessapplicationsforbuildingconsent.

Performanceindicators:

8. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(buildingrelatedprocessingonly).

9. Demonstratesanunderstandingoftypeofnationalmultipleusebuildingapprovals(Multiproof)thatfallwithinthescopeofthiscompetencylevel.

Guidanceforassessorsandcandidates:

4. Knowledgeareasmayinclude,butarenotlimitedto:

a. NZS173604,NZS3602,NZS3640andNZS4229astheyrelatetothreestoreyresidentialconstruction.Understandshowtodeterminecompliancerequirementsforcorrosionzones,groundbearing,piles,footings,foundations,reinforcing,concretestrength,fillandcompaction,bracingdemandanddesign,subfloorframing,wallframing,roofstructures,timbertreatment,loadpaths,fixingsandconnections,underlayandwraps,claddingsystems,internalliningsanddurability

b. B1,B1/VM1–higherlevelunderstandingofhowthisVerificationMethodandreferencedStandardsareusedforstructuraldesign,B1/VM4–asitrelatestofoundationdesign,B1/AS1–asitrelatestotheStandardsanditemsraisedinitem4aaboveandB1/AS2–asitrelatestobarrierconstruction

c. B2,B2/VM1andB2/AS1astheyrelateto5,15and50yeardurabilityrequirementsofnominatedbuildingelements

d. NZS4229concretebasementconstruction(eg,BgradeandCgrademasonryrequirementsandmasonryretainingwalls)

e. compliancewithC1.Understandsmanufacturerrequirementsforinstallationoffreestandingandin-builtsolidfuelheatingappliances.Understandscleanairrequirementsandcanassesscompliancerequirementsfor:applianceclearances,hearth,insulationbarrier,shielding,restraints,flueheights,flashings,finishesandfurnishings,ventilationandassociatedprescribedelectricalwork(ifapplicable)

f. canapplycommonlyusedfireratingsystemsforwallsbuiltincloseproximitytoboundariesandseparatingresidentialhouseholdunitsachievingcompliancewithclausesC2andC3;andC/AS1SpreadofFire

g. C4andC/AS1astheyapplytostructuralfireratedelementsforcarports,garagesandseparationofresidentialhouseholdunits

h. accessibilitytoenablesafeandeasymovementofpeopleasrequiredbyD1,D1/AS1andD2/AS2(eg,steps,handrails,non-slipprovisions,andunderstandssafestairconstructionandthedefinitionsofprivateandsecondaryprivatestairs,andliftsifrelevant

i. canapplyweathertightnessprinciplesandknowledgetoassesscompliancewithE2ExternalMoistureanddemonstratesexcellentworkingknowledgeofE2/AS1andE2/VM1andcanidentifythedifferencesbetweentheAcceptableSolutionandspecificdesign(eg,complexjunctions,flashingrequirements,technicalknowledgeofcladdingsystems,ventedcavitysystems).Isabletoassessspecificallydesignedcladdingsystems(outsidethescopeandlimitationsofE2/AS1)

j. internalmoisturemanagementwithinbuildingsasrequiredbyE3andE3/AS1(eg,understandsventilation,temperature,thermalresistance,condensation,impervioussurfacesforfloorandwalllinings)

k. hazardousagentsorcontaminantsonsiteasrequiredbyF1andF1/AS1andknowshowtoreadaPIMandcheckhazardfilesintheabsenceofaPIM

17AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 90: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 77

competency – resIdentIal 3

l. F2andF2/AS1usingNZS4223:Part3,andisabletoassessthecomplianceofglazedbarriersandidentifytherequiredlocationsforsafetyglass

m.requirementsforsafeguardingpeoplefromfallingasrequiredbyF4andF4/AS1(eg,barrierconstruction,correlationbetweenB1,B2andF4,SEDBarriers,B2implicationsandswimmingpoolfencingrequirements)

n. sitehazardsidentificationandunderstandscompliancerequirementsformanagingtheseinaccordancewithF5andF5/AS1

o. F7,inparticulartheplacementandinstallationofdomesticsmokedetectorsasrequiredbyF7/AS1

p. G1andG1/AS1forlocation,sizingandnumberofsanitaryfixturesq. G2andG2/AS1forspatiallaunderingrequirements.r. spatial,hygiene,storageandpreparationrequirementsforcookingandfoodasrequired

byG3andG3/AS1(eg,impervioussurfaces,foodstorage,cookingandrefrigeration)s. naturalandmechanicalventilationrequirementsfordomesticbuildingsasrequiredbyG4

andG4/AS1(eg,5%floorarea/windowratio,sizingofnaturalventingforoccupiedspaces)t. candefineSTCandIICandassesscommonlyusedsolutionstodeterminecompliance

withG6andG6/AS1AirborneandImpactSoundbetweenoccupanciesandexhibitsanunderstandingoftheinterfacebetweenC3andG6,particularlyinrelationtopenetrationstofireandsoundratedareas

u. naturallightandvisualawarenessasrequiredbyG7andG7/AS1(eg,10%floorarea/ratioforvisualawareness)

v. artificiallightingtoenablesafemovementasrequiredbyG8andG8/AS1(eg,accessroutesandminimumluxlevels)

w. requirementsforcertifyingcompliancewithelectricityprovisionsasrequiredbyG9,G9/AS1andsection19oftheAct.

x. requirementsforcertifyingcompliancewithgasasanenergysourceasrequiredbyG11,G11/AS1andsection19oftheAct

y. requirementsforassessingenergyefficiencyfordomesticdwellingsasrequiredbyH1,H1/AS1andH1/VM1.GoodworkingknowledgeofNZS4218,NZS4305andtheBRANZHouseInsulationGuide(ceilings,walls,windows/doors,hotwateretc)

z. canidentifyinspectionrequirementsnecessarytoconfirmcomplianceforthislevelofbuildingwork

aa.hasastrongcomprehensionoftheirindividuallimitationsandthewiderBCA’sinternaltechnicalcapability.Isabletoidentifywhenexternaltechnicalassistanceisrequiredandcanoutsourceworkfortechnicalreviewwhenrequired.

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

10.Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(plumbinganddrainagerelatedprocessingonly).

Guidanceforassessorsandcandidates:

5. Knowledgeareasmayinclude,butarenotlimitedto:

a. requirementsforprotectingpeopleandotherpropertyfromadverseeffectsofsurfacewaterasrequiredbyE1,E1/VM1andE1/AS1(minimumfloorheights,design,constructionandconveyanceofstormwatercatchment)

b. spatiallaunderingrequirementstosatisfyG2andG2/AS1c. requirementsforspecificationandinstallationofdomesticwatersuppliesasrequired

byG12andG12/AS1(potablewaterrequirements,hotwatersupplysystems,venting/valving/restraint)

d. requirementsforprovisionofsanitaryfixturesandappliancesandforconveyingfoulwatertodrainagesystemsasrequiredbyG13,G13/AS1andAS/NZS3500Part2astheyrelatetothreestoreyconstruction(systemdesignprinciples–avoidodour,designloading,falls,venting,materials,connections,accessandmaintenanceandimposedloads)

e. canidentifyfirewallsanddetermineacompliancepathforplumbinganddrainagepipingpenetratingthesewalls

f. canassess/explainsoilstacksystemsinaccordancewithG13/AS1andAS/NZS3500.2g. identificationofinspectionrequirementsnecessarytoconfirmcomplianceforthislevel

ofbuildingworkh. canmentorand/orprovidetechnicaloversighttoothersassessingBuildingCode

complianceforresidential(competency)1and2typebuildingwork.

Page 91: NBCA Competency Assessment System

78 natIonal bca competency assessment system june 2010

competency – resIdentIal 3

Regulation10(3)(d)(ii):Abilitytoinspectbuildingwork.

Performanceindicators:

11.InspectbuildingworkrelatingtofoundationtypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforresidential3buildings.

Guidanceforassessorsandcandidates:

6. Knowledgeareasforinspectionsmayinclude,butarenotlimitedto:

a. demonstratedabilitytoreadandinterpretplansandspecificationsb. useoftechnicalequipment(eg,moisturemeters,cameras,thermometersetc)

andadministrativeresources(checklists,copiesoftechnicalinformationeg,NZS3604)toestablishcompliance

c. NZS183604,NZS3602,NZS3640,NZS3622,NZS4229andtheComplianceDocumentsastheyrelatetoresidentialconstruction;andinparticular:

Foundations

• requirementsforcorrosionzones–concretestrengthrequirements(differentzonesanddifferentfoundationtypes),fixingmaterials.

• groundbearing–determinationmethods,fillandcompactionrequirements• pilefoundations–types(includingbracingtypes),sizesanddimensions(ground

clearance,maxheights,foundationdepthsetc),siting,fixingsfordifferentpiletypes,treatmentandidentification,howbracingiscalculatedforsubfloors,pointloadpiles

• concretefoundations(includesconcretemasonry)–reinforcing(lapsandsize),reinforcingtype(identificationofdeformedandround,hightensileornormal,meshandmeshsupport),pipepenetrations,pointloadpads,bondbeams,washouts‘A’,‘B’and‘C’grademasonry

• concreteslabs–reinforcing(laps,size,supplementaryreinforcingrequirements,cover),controljointandslabsizelimitations,pipepenetrations,thicknessandthickeningsofslab,DPM

• certificaterequirementsincludingproducerstatements,geotechnicalreports,compactioncertificates,concretedockets

12.InspectbuildingworkrelatingtoprelinetypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforresidential3buildings.

Preline

• timberfloorsystems• framingandtrussrequirements–sizespanandspacing,timbergradeandtreatment,

loadpaths,moisturecontent,fixingsandconnections,trussdesignandlayoutinformation,penetrations,bracingsystems,includingdiaphragmceilingsandfixings

• claddingrequirements–underlays/wraps,windbarriersandrigidairbarriers,fixings,penetrationsandflashings,complexjunctions,silltapes,airseals,cavitysystems,directfixsystems,penetrations,brickveneerrequirements,mixedcladdingsystems,compartmentalisationofcavitysystemsovertwostoreys

• membraneroofanddeckrequirementsincludingsubstrates,penetrations,fallandoverflows

• soundandfireratedwallsandbuildingcomponents–installationrequirements,includingisolation,insulation,penetrations,fixings

• insulationinstallation–type,rating,installationrequirements(refertoNZS4246EnergyEfficiency–InstallingInsulationinResidentialDwellings)

13.InspectbuildingworkrelatingtofinaltypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforresidential3buildings.

Final

• accesstobuilding–subfloorandceiling,steps,stairsinstallation–tread,riser,handrails,barriersnon-slipprovisions

• internalliningsandsurfaces,includingimpervioussurfacerequirements,waterproofmembranes,watersplashareas

• smokedetectorsplacementandlocation• ventilation–mechanicalandnatural• fireratedwallsandotherbuildingcomponents• assessmentofairbornesound(STC)• glazingrequirements,safetyglassidentification,locations• finishedgroundlevelandgroundclearancestocladdingsandfloorlevels• thirdpartyverification(eg,producerstatements,energyworkcertificates)• swimmingpoolfencinginstallation,gates,fenceheights,sizes,openingsetc

18AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 92: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 79

competency – resIdentIal 3

d. canfollowmanufacturerrequirementsforinstallationoffreestandingandin-builtsolidfuelheatingappliances,requirementsforapplianceclearances,hearth,insulationbarrier,shielding,restraints,flueheights,flashings,finishesandfurnishings,ventilationandassociatedprescribedelectricalwork(ifapplicable)

e. identificationandmanagementofriskfromhazardousagentsorcontaminantsonsitef. isabletoidentifywhenexternaltechnicalassistanceisrequiredandcanoutsourcework

fortechnicalreviewwhenrequired.

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

14.InspectbuildingworktoestablishwhethercompliancewiththeNewZealandBuildingCode(plumbinganddrainagerelatedinspectionsonly)hasbeenachievedforresidential3buildings.

Guidanceforassessorsandcandidates:

7. AgoodworkingknowledgeofAS/NZS3500,G12/AS1andAS2,G13/AS1andAS2,E1/AS1,E2/AS1(pipepenetrations,deckdrainageetc)E3/AS1,G1/AS1andH1/AS1astheyrelatetoresidentialconstruction;andinparticular:

Foundations

• pipematerial,gradients,size,bedding,backfill,protection,insulation,accesspoints,jointingandsleeving,testing,supports,changesofdirection,conveyancetoapprovedoutfalls,bridging

• HWreliefdrainanddischargeoutlet,drainaccesspoints,amendmentstoplansandspecifications

Preline

• pipematerials,thermalmovement,sizing,compatibility,insulation,testing,penetrationsthroughenvelope,roofflashings,soilstacks(graded),elevateddrainageprinciples,wastepipes,ventingsystems

• hotwater/coldwaterexpansionreliefdraindischargeoutfallpoint• hotwatersupply:

− mains,lowpressure,wetback,solar− tanksupply–structuralsupport/safetray/overflow/seismicrestraint− solar–structuralsupport–penetrations− wetback–openventingofHWCexhaust− networkutilitycoldwatersupplyconnections− floorwaste

• drainage

− maintenanceofwatertrapseals–floorwastegullies/gullytraps,sewersurchargegully− venting(openorairadmittancevalves)− pipeinspectionpoints,protectionincludingpipetrenchandfoundations,materials,

jointing,bedding,outfall,testing− septictank/sewer(NUO)/othersoakagesystemSW

• rainwatertanksupply(potable)/overflowwithinconsentedproperty/pump/gravity(airlocks)

Final

• HWCseismicrestraint,hotandcoldwater–valves,temperingdevice,coldwaterexpansionrelief,tundish,safetray

• HWCwatersupplytemperaturechecks(personalhygiene,legionella)• wetback/HWCheightabovewoodburner,flowandreturnpipeinsulation,

exhaustvent–pipepenetrationflashing• solarreliefvalvedischargeposition–structuralsupport–position–pipeinsulation,

installationsameasbuildingconsent–penetrationsflashed• testsanitaryfixturestrapsealretention• equipotentialbonding• gullydish/gratingheight,wastepipeconnectionstogullyriserorgullydish,

surfacewateringress• pipepenetrationswatertight• maindrainvent• drainageas-builtplan–amendmentstoplans/specifications• swimmingpoolbackflowprevention• canidentifyfirewallsanddetermineacompliancepathforplumbinganddrainage

pipingpenetratingwalls.

Page 93: NBCA Competency Assessment System

80 natIonal bca competency assessment system june 2010

competency – resIdentIal 3

Regulation10(3)(d)(iii):Abilitytocertifybuildingwork.

Performanceindicators:

15.Canissuecertification(buildingconsentorcodecompliancecertificate)forthisresidential3buildingwork.

Guidanceforassessorsandcandidates:

8. Knowledgeareasmayinclude,butarenotlimitedto:

a. candidatecancompileandreviewinformationreceivedduringtheprocessingofabuildingconsentorinformationreceivedduringtheinspections/constructionprocessanddetermineandrecordtheoutcometoissue,suspend,requestfurtherinformationand/orrefusetoissueabuildingconsentorcodecompliancecertificate(withintheirauthority)forresidential3buildingwork.

Regulation10(3)(e):Abilitytocommunicatewithinternalandexternalpersons.

Performanceindicators:

16.Communicateswithinternalandexternalcustomers.

17.Canusephone,email,internetandfax.

18.Demonstratesgoodactivelistening,questioningandassertivenessskillsindealingwithday-to-daytasksandresponsibilities.

Guidanceforassessorsandcandidates:

9. Knowledgeareasmayinclude,butarenotlimitedto:

a. correctlypreparesletters,memosandshortreportsb. appearsconfidentandhasagoodunderstandingofbuildingrelatedsubject-matter

whendealingwithcustomersandcolleaguesc. communicateseffectivelywithotherteammembers,consentapplicantsandmembers

ofthepublicd. accuratelyinputswrittendataoninternalforms,processingchecklistsandelectronic

databases,andcompletesprescribedformsinaccordancewiththeBuildingFormsRegulations2004.

Regulation10(3)(f):Abilitytocomplywiththebuildingconsentauthority’spolicies,proceduresandsystems.

Performanceindicators:

19.Observesthebuildingconsentauthority’spolicies,proceduresandsystemsforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

10.Knowledgeareasmayinclude,butarenotlimitedto:

a. accuratelyandcarefullyfollowsestablishedproceduresforcompletingworktasks.

Page 94: NBCA Competency Assessment System

Co

mp

et

en

Cy

Lev

eL –

Co

mm

er

Cia

L 1

CompetenCy LeveL – CommerCiaL 1

Competency level – commercial 1 81

Page 95: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 81

Competencylevel–commercial1

competency – commercIal 1

Commercial,industrialandcommunalnon-residentialbuildingsandtheirassociatedoutbuildingsandancillarybuildingsequaltoorlessthantwostoreysandanoccupancyloadofequaltoorlessthan100people.

Regulation10(3)(a)19:Understandingthephilosophiesandprinciplesofbuildingdesignandconstruction.

Performanceindicators:

1. Comprehendsandhassatisfactoryknowledgeofsections3,4and5oftheBuildingAct2004.

2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesandconstructionsequencingforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

1. Knowledgeareasmayinclude,butarenotlimitedto:

a. thepurposeoftheBuildingAct2004(theAct)b. TAs’functions,dutiesandpowersundertheAct,particularlyastheyrelatetocommercial,

industrialandnon-residentialbuildingworkc. candiscussthehierarchyofNewZealandbuildinglegislationandthevariouscompliance

pathsprovidedforundertheActd. candiscussbuildingdesign,constructiontechniquesandsequencingofbuildingwork

asitsrelatestothiscompetencylevel.

NotethisinformationiscoveredinSections2.1,2.2,2.3,3.0,3.1,3.2,3.3,3.5,3.6and3.7ofthePrefacetotheBuildingCodeHandbook.20

Regulation10(3)(b):Understandingandknowledgeofbuildingproductsandmethods.

Performanceindicators:

3. Comprehendsandhassatisfactoryknowledgeofproprietarysystemsandbuildingproductsforthistypeofbuildingwork.

4. Demonstratestheabilitytoresearch,analyseandassessbuildingmethodsandproductsassociatedwiththistypeofbuildingwork.

Guidanceforassessorsandcandidates:

2. Knowledgeareasmayinclude,butarenotlimitedto:

a. commonlyusedbuildingmaterialsandsystems(eg,pre-nailedtrussandframes,conventionalcommercialcladdingandflashingsystems)

b. productliterature,testingandVerificationMethods,appraisalsandproducerstatementsc. portalframe,tilt-slab,commonbracing,firerating,soundratingsystems.

19Building(AccreditationofBuildingConsentAuthorities)Regulations2006.20AComplianceDocumentpreparedbytheDepartmentofBuildingandHousing.Availableat:http://www.dbh.govt.nz/UserFiles/File/

Publications/Building/Compliance-documents/building-code-handbook.pdf

Page 96: NBCA Competency Assessment System

82 natIonal bca competency assessment system june 2010

competency – commercIal 1

Regulation10(3)(c):KnowledgeandskillinapplyingtheAct,theBuildingCode,andanyotherapplicableregulationsundertheAct.

Performanceindicators:

5. ComprehendsandcanapplyknowledgeoftheapplicationoftheBuildingAct2004.

6. ComprehendsandcanapplyknowledgeoftherolesandresponsibilitiesofaBCAandTA.

7. ComprehendsandcanapplyknowledgeofthelinkageandinterfacebetweentheResourceManagementAct1991andtheBuildingAct2004.

Guidanceforassessorsandcandidates:

3. Demonstratesknowledgeandskillinapplying:

a. thebuildingcontrolframework21

b. theBuildingAct2004c. purposed. principlese. applicationf. theNewZealandBuildingCodeg. compliancepathsh. producerstatementsi. theDepartmentofBuildingandHousingj. territorialauthoritiesk. buildingconsentauthoritiesl. projectinformationmemorandam.buildingconsentsn. codecompliancecertificateso. certificateofacceptancep. complianceschedulesq. buildingwarrantoffitnessr. certificatesforpublicuses. candefinetheterm‘naturalhazard’andcandescribetherequirementsforgranting

orrefusingtograntbuildingconsentsonlandthatissubjecttoanaturalhazardt. candescribethelegislativeprocessforbuildingovertwoormoreallotments

(eg,sections75and76oftheAct)u. canassessalterationstoexistingbuildingsinaccordancewithsection112oftheActv. hasaworkingknowledgeofwaiversandmodificationsandprovidesanoverview

ofhowaTAgrantsawaiverormodificationoftheBuildingCodew. canexplainhowtheclassifiedusesandthechangetheuseprovisionsareusedinthelegislationx. canexplainandinterpretbuildinglegislationanddemonstratesthoroughunderstanding

ofsections7–9oftheActandClauseA2InterpretationoftheNewZealandBuildingCodey. NZS4211andthelimitsontheapplicationoftheBuildingCodeforindustrialand

commercialbuildingsz. demonstratesaclearknowledgeoftheprovisionforaccessandfacilitiesforpeople

withdisabilitiesinaccordancewithsections117–120andSchedule2oftheActaa.hasknowledgeoftheHazardousSubstancesandNewOrganismsActandtheprocesses

tofollowbb.demonstratesknowledgeoftheFireServiceAct1975,sections21A–21I,andtheFire

SafetyandEvacuationofBuildingsRegulations2006cc.canapplyDRUrequirementsinaccordancewiththeGazettenoticeinsection26oftheActdd.canapplyknowledgeofspecifiedsystemsandcomplianceschedulerequirementsin

accordancewithsections100–111oftheBuildingAct2004ee.understandsowners’requirementsinrelationtobuildingwarrantsoffitnessinaccordance

withsections108–111oftheActff. candemonstrateknowledgeofchangeofuserequirementsinaccordancewith

sections114–115oftheActandtheBuilding(SpecifiedSystems,ChangetheUse,andEarthquake-proneBuildings)Regulations2005

gg.understandsrequirementstoissueanoticetofixinaccordancewithsections163–168oftheActandtheBCA’spoliciesandprocedures(withintheirauthority)

hh.candemonstrateanunderstandingofthedeterminationsprocessinaccordancewithsection176–190oftheAct

ii. candemonstrateanunderstandingofcertificatesforpublicuseandwheretheyarerequiredinaccordancewithsections362A–363CoftheAct

jj. ifinspecting,understandstheMinorVariationsRegulationsandunderstandstheprocessforformalamendmentstobuildingconsents

kk.theprovisionforinspectionsbyaBCAasdescribedinsection90oftheActll. ifinspecting,theprovisionsoninspectingandrequirementsforenteringlandin

accordancewithsections222–228oftheAct.

21Guidanceonitemsa.-risprovidedintheBuildingCodeHandbook.

Page 97: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 83

competency – commercIal 1

Regulation10(3)(d)(i):Abilitytoprocessapplicationsforbuildingconsent.

Performanceindicators:

8. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(buildingrelatedprocessingonly).

Guidanceforassessorsandcandidates:

4. Knowledgeareasmayinclude,butarenotlimitedto:

a. NZS223604,NZS3602,NZS3640,NZS4229andAS/NZS1170astheyrelatetotwostoreycommercialconstruction.Understandshowtodeterminecompliancerequirementsforcorrosionzones,groundbearing,piles,footings,Foundations,reinforcing,concretestrength,fillandcompaction,bracingdemandanddesign,subfloorframing,wallframing,roofstructures,timbertreatment,loadpaths,fixingsandconnections,underlayandwraps,claddingsystems,internalliningsanddurability

b. B1,B1/VM1–excellentunderstandingofhowthisVerificationMethodandreferencedStandardsareusedforstructuraldesign,B1/VM4–asitrelatestofoundationdesign,B1/AS1–asitrelatestothestandardsanditemsraisedinitem4.aabove

c. B2,B2/VM1andB2/AS1astheyrelateto5,15and50yeardurabilityrequirementofnominatedbuildingelements

d. canassessbuilding‘importancelevels’inrelationtodifferentbuildingtypesandtherelevantriskanalysisofthesebuildingsasisidentifiedinAS/NZS1170

e. canidentifyissuesrelatingtotheAcceptableSolutionforfirecomplianceforthistypeofbuildingworkbyidentifyingthedesignsequencereferredtoinC/AS1Part1

f. canapplycommonlyusedfireratingsystemsforwallsbuiltincloseproximitytoboundariesandseparatingresidentialhouseholdunitsandothertenanciesachievingcompliancewithclausesC2andC3;andC/AS1SpreadofFire

g. C4andC/AS1astheyapplytostructuralelementsofhouseholdunitsandotherbuildingswithinthescopeofthiscompetency

h. canassessaccessibilitytoenablesafeandeasymovementofpeopleasrequiredbyD1,D1/VM1andD1/AS1(eg,steps,handrails,ramps,non-slipprovisions,andunderstandssafestairgeometryandconstruction)

i. canassessmechanicalinstallationsforD2,D2/AS1,D2/AS2andD2/AS3,NZS4332,EN81Part1and2(passengerandservicelifts)

j. canapplyweathertightnessprinciplesandknowledgetoassesscompliancewithE2ExternalMoistureandcanidentifythedifferencesbetweentheAcceptableSolutionandspecificdesign(eg,complexjunctions,flashingrequirements,technicalknowledgeofcladdingsystems,ventedcavitysystems).Isabletoassessspecificallydesignedcladdingsystems(outsidethescopeandlimitationsofE2/AS1)

k. internalmoisturemanagementwithinbuildingsasrequiredbyE3andE3/AS1(eg,understandsventilation,temperature,thermalresistance,condensation,impervioussurfacesforfloorandwalllinings)

l. hazardousagentsorcontaminantsonsiteasrequiredbyF1andF1/AS1andknowshowtoreadaPIMandcheckhazardfilesintheabsenceofaPIM

m.F2andF2/AS1usingNZS4223:Part3,andisabletoassessthecomplianceofglazedbarriersandidentifytherequiredlocationsforsafetyglass,manifestationofglassetcforcommercialbuildings.Understandsandisabletoassessthehealthandsafetyrequirementsforasbestosandotherhazardousbuildingmaterials

n. F3,F3/VM1(interfacewithHSNOActandstorageofhazardoussubstancesinbuildings)andF3/AS1(depotconstruction,buildingscomponent-doors,windowsventingofgasstorageetc)andunderstandstheinterfacebetweenG4(asspecifiedsystems)andF8

o. requirementsforsafeguardingpeoplefromfallingasrequiredbyF4andF4/AS1(barrierconstruction,barrierheightandthecorrelationbetweenB1,B2andF4,SEDBarriers,B2implications)

p. sitesafetyrequirements–candeterminesitehazardsandunderstandscompliancerequirementsformanagingtheseinaccordancewithF5andF5/AS1

q. F6,F6/VM1(acceptableluminanceinbuildings)andF6/AS1(lightingforemergencies)andunderstandstheinterfacewithF8(asspecifiedsystems)

r. F7andF7/AS1andhasahigherlevelofunderstandingofNZS4512(firealarmsystemsinbuildings)andNZS4541(automaticfiresprinklersystems)

s. F8andF8/AS1(luminance,signlayout,size,proportions,colours,wordingetc)andunderstandstheinterfacewithF6(asspecifiedsystems)

t. G1andG1/AS1forlocation,sizingandnumberofsanitaryfixturesu. G2andG2/AS1forspatiallaunderingrequirementsv. G3andG3/AS1(eg,impervioussurfaces,foodstorage,cookingandrefrigeration)

22AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 98: NBCA Competency Assessment System

84 natIonal bca competency assessment system june 2010

competency – commercIal 1

w. naturalandmechanicalventilationrequirementsforcommercialbuildingsasrequiredbyG4andG4/AS1.Canassesscompliancepathwaysformechanicalinstallationsforaccessforthistypeofbuildingwork(eg,producerstatements,peerreviewinaccordancewiththeBCA’spoliciesandprocedures)

x. G5andG5/AS1requirementsforaccessibilityheating,listeningsystemsandtemperaturecontrolforcertainbuildingtypes

y. candefineSTCandIICandassesscommonlyusedsolutionstodeterminecompliancewithG6andG6/AS1AirborneandImpactSoundbetweenoccupancies;andexhibitsanunderstandingoftheinterfacebetweenC3andG6,particularlyinrelationtopenetrationstofireandsoundratedareas

z. canassessnaturallightandvisualawarenessasrequiredbyG7andG7/AS1aa.requirementsforprovidingartificiallightingtoenablesafemovementasrequired

byG8andG8/AS1(eg,accessroutesandminimumluxlevels)bb.requirementsforcertifyingcompliancewithelectricityprovisionsasrequiredbyG9,

G9/AS1andsections19and94(3)oftheActcc.understandsrequirementsforprotectingpeoplefromextremetemperaturesorhazardous

substancesassociatedwithbuildingservicesinaccordancewithG10PipedServicesorprovidesacompliancepathwaytodeterminecompliance(eg,producerstatement,peerreviewinaccordancewiththeBCA’spoliciesandprocedures)

dd.requirementsforcertifyingcompliancewithgasasanenergysourceasrequiredbyG11,G11/AS1andsection19and94(3)oftheAct

ee.understandstherequirementstostoresolidwasteforthistypeofbuildingworkinaccordancewithG15SolidWaste

ff. requirementsforassessingenergyefficiencyforcommercialbuildingsasrequiredbyH1,H1/AS1andH1/VM1.GoodworkingknowledgeofNZS4243

gg.canidentifyinspectionrequirementsnecessarytoconfirmcomplianceforthislevelofbuildingwork

hh.cancompileaccuratecompliancescheduleinformationthatmeetstherequirementsofsection103oftheAct

ii. hasastrongcomprehensionoftheirindividuallimitationsandthewiderBCA’sinternaltechnicalcapability.Isabletoidentifywhenexternaltechnicalassistanceisrequiredforalternativesolutionsandcanoutsourceworkfortechnicalreviewwhenrequired.

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

9. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(plumbinganddrainagerelatedprocessingonly).

Guidanceforassessorsandcandidates:

5. Knowledgeareasmayinclude,butarenotlimitedto:

a. requirementsforprotectingpeopleandotherpropertyfromadverseeffectsofsurfacewaterasrequiredbyE1,E1/VM1andE1/AS1(minimumfloorheights,design,constructionandconveyanceofstormwatercatchment)

b. canassesscompliancewithG1andG1/AS1forlocation,sizingandnumberofsanitaryfixtures

c. launderingandspatialrequirementstosatisfyG2andG2/AS1d. understandsrequirementsforprotectingpeoplefromextremetemperaturesorhazardous

substancesassociatedwithbuildingservicesinaccordancewithG10PipedServicesorprovideacompliancepathwaytodeterminecompliance(eg,producerstatement,peerreviewinaccordancewiththeBCA’spoliciesandprocedures)

e. understandsrequirementsforspecificationandinstallationofcommercialwatersuppliesasrequiredbyG12,G12/VM1andG12/AS1forthistypeofconstruction(identifyingnon-potablewaterpipesandoutlets,temperaturerequirements,crossconnectionhazardsandbackflowprotectiondevices)

f. requirementsforprovisionofsanitaryfixturesandappliancesandforconveyingfoulwatertodrainagesystemsasrequiredbyG13,G13/AS,G13/AS2,G13/VM1andAS/NZS3500Part2astheyrelatetotwostoreycommercialconstruction(systemdesignprinciples–avoidodour,designloading,falls,venting,materials,connections,accessandmaintenanceandimposedloads)

g. identificationofinspectionrequirementsnecessarytoconfirmcomplianceforthislevelofbuildingwork

h. canidentifyfirewallsanddetermineacompliancepathforplumbinganddrainagepipingpenetratingthesewalls

i. canexplainandcompetentlydemonstrateinspectionproceduresforstacksystems.UnderstandsrequirementsforprovisionofgreasetrapsinaccordancewithG13/AS2

f. canidentifyinspectionrequirementsnecessarytoconfirmcomplianceforthislevelofplumbinganddrainagework.

Page 99: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 85

competency – commercIal 1

Regulation10(3)(d)(ii):Abilitytoinspectbuildingwork.

Performanceindicators:

10.InspectbuildingworkrelatingtofoundationtypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforcommercial1buildings.

11.InspectbuildingworkrelatingtoprelinetypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforcommercial1buildings.

Guidanceforassessorsandcandidates:

6. Knowledgeareasforinspectionsmayinclude,butarenotlimitedto:

a. demonstratedabilitytoreadandinterpretplansandspecificationsb. useoftechnicalequipment(eg,moisturemeters,cameras,thermometers)andadministrative

resources(checklists,copiesoftechnicalinformationeg,NZS3604)toestablishcompliance.c. NZS233604,NZS3602,NZS3640,NZS3622,NZS4229andtheComplianceDocuments

astheyrelatetocommercialconstruction;andinparticular:

Foundations

• requirementsforcorrosionzones–concretestrengthrequirements(differentzonesanddifferentfoundationtypes),fixingmaterials

• groundbearing–determinationmethods,fillandcompactionrequirements• pilefoundations–types(includingbracingtypes),sizesanddimensions

(groundclearance,maximumheights,foundationdepthsetc),siting,fixingsfordifferentpiletypes,treatmentandidentification,howbracingiscalculatedforsubfloors,pointloadpiles

• concretefoundations(includesconcretemasonry)–reinforcing(lapsandsize),reinforcingtype(identificationofdeformedandround,hightensileornormal,meshandmeshsupport),pipepenetrations,pointloadpads,bondbeams,washouts‘A’,‘B’and‘C’grademasonry

• concreteslabs–reinforcing(laps,size,supplementaryreinforcingrequirements,cover),controljointandslabsizelimitations,pipepenetrations,thicknessandthickeningsofslab,DPM

• certificaterequirementsincludingproducerstatements,geotechnicalreports,compactioncertificates,concretedockets

Preline

• timberfloorsystems• framingandtrussrequirements–sizespanandspacing,timbergradeandtreatment,

loadpaths,moisturecontent,fixingsandconnections,trussdesignandlayoutinformation,penetrations,bracingsystems,includingdiaphragmceilingsandfixings

• claddingrequirements–underlays/wraps,windbarriersandrigidairbarriers,fixings,penetrationsandflashings,complexjunctions,silltapes,airseals,cavitysystems,directfixsystems,penetrations,brickveneerrequirements,mixedcladdingsystems,compartmentalisationofcavitysystemsovertwostoreys

• membraneroofanddeckrequirementsincludingsubstrates,penetrations,fallandoverflows• accessandfacilitiesforpeoplewithdisabilitiesincludingfixingrequirements

(handrails),sizes,dimensionsandlengthsandaccessibilityincludinggradients• soundandfireratedwallsandbuildingcomponents–installationrequirements,

includingisolation,insulation,penetrations,fixings• firetreatments(eg,intumescentcoatingsandseals)• insulationinstallation–type,rating,installationrequirements(refertoNZS4246

EnergyEfficiency–InstallingInsulationinResidentialDwellings)

12.InspectbuildingworkrelatingtofinaltypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforcommercial1buildings.

Final

• accesstobuilding–steps(andisolatedsteps),stairs,laddersandramps–installation,tread,riser,handrails,non-slipprovisions,accessiblecarparksandavoidanceofconflictwithvehiclesandassociatedsignage

• accessiblerequirementsincludinglocationsanddimensionsoffixture,fittingsandcountersandspatialrequirementsofareas

• internalliningsandsurfaces,includingimpervioussurfacerequirements,waterproofmembranes,watersplashareas

• smokedetectors–placementandlocation• ventilation–mechanicalandnatural• fireratedwallsandotherbuildingcomponents• assessmentofairbornesound(STC)• glazingrequirements,safetyglassidentification,locations,• finishedgroundlevelandgroundclearancestocladdingsandfloorlevels• knowledgeandIdentificationofspecifiedsystemsincludingidentificationof

installation,commissioningandcertificationrequirementsforspecifiedsystems• thirdpartyverification(eg,producerstatements,energyworkcertificates)

23AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 100: NBCA Competency Assessment System

86 natIonal bca competency assessment system june 2010

competency – commercIal 1

d. canfollowmanufacturerrequirementsforinstallationoffreestandingandin-builtsolidfuelheatingappliances,requirementsfor:applianceclearances,hearth,insulationbarrier,shielding,restraints,flueheights,flashings,finishesandfurnishings,ventilationandassociatedprescribedelectricalwork(ifapplicable)

e. identificationandmanagementofriskfromhazardousagentsorcontaminantsonsitef. canidentifywhenexternaltechnicalassistanceisrequiredandcanoutsourcework

fortechnicalreviewwhenrequired.

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

13.InspectbuildingworktoestablishwhethercompliancewiththeNewZealandBuildingCode(plumbinganddrainagerelatedinspectionsonly)hasbeenachievedforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

7. AgoodworkingknowledgeofAS/NZS3500,G12/AS1andAS2,G13/AS1andAS2,E1/AS1,E2/AS1(pipepenetrations,deckdrainageetc),E3/AS1,G1/AS1,H1/AS1astheyrelatetoresidentialconstruction;andinparticular:

Foundations

• pipematerial,gradients,size,bedding,backfill,protection,insulation,accesspoints,jointingandsleeving,testing,supports,changesofdirection,conveyancetoapprovedoutfalls,bridging

• HWreliefdrainanddischargeoutlet,drainaccesspoints,amendmentstoplansandspecifications

Preline

• pipematerials,thermalmovement,sizing,compatibility,insulation,testing,penetrationsthroughenvelope,roofflashings,soilstacks(graded),elevateddrainageprinciples,wastepipes,ventingsystems

• hotwater/coldwaterexpansionreliefdraindischargeoutfallpoint• hotwatersupply:

− mains,lowpressure,wetback,solar− tanksupply–structuralsupport/safetray/overflow/seismicrestraint− solar–structuralsupport–penetrations− wetback–openventingofHWCexhaust− networkutilitycoldwatersupplyconnections− floorwaste

• drainage:

− maintenanceofwatertrapseals–floorwastegullies/gullytraps,sewersurchargegully− venting(openorairadmittancevalves)− pipeinspectionpoints,protectionincludingpipetrenchandfoundations,materials,

jointing,bedding,outfall,testing− septictank/sewer(NUO)/other/soakagesystemSW− greasetrapsandseparators

Final

• HWCseismicrestraint,hotandcoldwater–valves,temperingdevice,coldwaterexpansionrelief,tundish,safetray

• HWCwatersupplytemperaturechecks(personalhygiene,legionella)• wetback/HWCheightabovewoodburner,flowandreturnpipeinsulation,exhaustvent

–pipepenetrationflashing• solarreliefvalvedischargeposition–structuralsupport–position–pipeinsulation,

installationsameasbuildingconsent–penetrationsflashed• testsanitaryfixturestrapsealretention• equipotentialbonding• gullydish/gratingheight,wastepipeconnectionstogullyriserorgullydish,

surfacewateringress• pipepenetrationswatertight• maindrainvent• drainageas-builtplan–amendmentstoplans/specifications• swimmingpoolbackflowprevention• canidentifyfirewallsanddetermineacompliancepathforplumbinganddrainage

pipingpenetratingwalls.

Page 101: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 87

competency – commercIal 1

Regulation10(3)(d)(iii):Abilitytocertifybuildingwork.

Performanceindicators:

14.Canissuecertification(buildingconsentorcodecompliancecertificate)forthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

8. Knowledgeareasmayinclude,butarenotlimitedto:

a. candidatecancompileandreviewinformationreceivedduringtheprocessingofabuildingconsentorinformationreceivedduringtheinspections/constructionprocessanddetermineandrecordtheoutcometoissue,suspend,requestfurtherinformationand/orrefusetoissueabuildingconsentorcodecompliancecertificate(withintheirauthority)forcommercial1buildingwork.

Regulation10(3)(e):Abilitytocommunicatewithinternalandexternalpeople.

Performanceindicators:

15.Communicateswithinternalandexternalcustomers.

16.Canusephone,email,internetandfax.

17.Demonstratesgoodactivelistening,questioningandassertivenessskillsindealingwithday-to-daytasksandresponsibilities.

Guidanceforassessorsandcandidates:

9. Knowledgeareasmayinclude,butarenotlimitedto:

e. correctlypreparesletters,memosandshortreportsunderreviewofseniorstafff. appearsconfidentandhasagoodunderstandingofbuilding-relatedsubjectmatter

whendealingwithcustomersandcolleaguesg. communicateseffectivelywithotherteammembers,consentapplicantsandother

membersofthepublich. accuratelyinputswritten/electronicdataoninternalforms,checklists,databasesetc;

andcompletesprescribedformsinaccordancewiththeBuildingFormsRegulations2004.

Regulation10(3)(f):Abilitytocomplywiththebuildingconsentauthority’spolicies,proceduresandsystems

Performanceindicators:

18.Observesthebuildingconsentauthority’spolicies,proceduresandsystemsforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

10.Knowledgeareasmayinclude,butarenotlimitedto:

b. anabilitytoaccuratelyandcarefullyfollowestablishedproceduresforcompletingworktasks.

Page 102: NBCA Competency Assessment System

88 natIonal bca competency assessment system june 2010

Page 103: NBCA Competency Assessment System

Co

mp

et

en

Cy

Lev

eL –

Co

mm

er

Cia

L 2

CompetenCy LeveL – CommerCiaL 2

Competency level – commercial 2 89

Page 104: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 89

Competencylevel–commercial2

competency – commercIal 2

Commercial,industrial,communalresidentialandcommunalnon-residentialbuildingsequaltoorlessthanfourstoreysandanoccupancyloadofequaltoorlessthan500peopleorpurposegroups(SC)or(SD)singlestorey.

Regulation10(3)(a):24

Understandingthephilosophiesandprinciplesofbuildingdesignandconstruction.

Performanceindicators:

1. Comprehendsandhassatisfactorycanapplyknowledgeofsections3,4and5oftheBuildingAct2004.

2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesandconstructionsequencingforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

1. Knowledgeareasmayinclude,butarenotlimitedto:

a. thepurposeoftheBuildingAct2004(theAct)b. TAs’functions,dutiesandpowersundertheAct,particularlyastheyrelatetocommercial,

industrialandnon-residentialbuildingworkc. candiscussthehierarchyofNewZealandbuildinglegislationandthevariouscompliance

pathsprovidedforundertheActd. candiscussbuildingdesign,constructiontechniquesandsequencingofbuildingwork

asitsrelatestothiscompetencylevel.

NotethisinformationiscoveredinSections2.1,2.2,2.3,3.0,3.1,3.2,3.3,3.5,3.6and3.7ofthePrefacetotheBuildingCodeHandbook.25

Regulation10(3)(b):Understandingandknowledgeofbuildingproductsandmethods.

Performanceindicators:

3. Comprehendsandhassatisfactoryknowledgeofproprietarysystemsandbuildingproductsforthistypeofbuildingwork.

4. Demonstratestheabilitytoresearch,analyseandassessbuildingmethodsandproductsassociatedwiththistypeofbuildingwork.

Guidanceforassessorsandcandidates:

2. Knowledgeareasmayinclude,butarenotlimitedto:

a. commonlyusedbuildingmaterialsandsystems(egpre-nailedtrussandframes,conventionalandunconventionalcommercialcladdingandflashingsystems)

b. productliterature,testingandVerificationMethods,appraisalsandproducerstatementsc. portalframe,pre-stressedandpre-castconcrete,tilt-slab,commonbracing,firerating,

andsoundratingsystems.

Regulation10(3)(c):KnowledgeandskillinapplyingtheAct,theBuildingCode,andanyotherapplicableregulationsundertheAct.

Performanceindicators:

5. ComprehendsandcanapplyknowledgeoftheapplicationoftheAct.

6. ComprehendsandcanapplyknowledgeoftherolesandresponsibilitiesofaBCAandTA.

7. ComprehendsandcanapplyknowledgeofthelinkageandinterfacebetweentheResourceManagementAct1991andtheBuildingAct2004.

Guidanceforassessorsandcandidates:

3. Demonstratesknowledgeandskillinapplying:

a. thebuildingcontrolframework26b. theBuildingAct2004c. purposed. principlese. applicationf. theNewZealandBuildingCodeg. compliancepathsh. producerstatementsi. theDepartmentofBuildingandHousingj. territorialauthoritiesk. buildingconsentauthoritiesl. projectinformationmemorandam.buildingconsents

24Building(AccreditationofBuildingConsentAuthorities)Regulations2006.25AComplianceDocumentpreparedbytheDepartmentofBuildingandHousing.Availableat:http://www.dbh.govt.nz/UserFiles/File

Publications/Building/Compliance-documents/building-code-handbook.pdf26Guidanceonitemsa.-risprovidedintheBuildingCodeHandbook.

Page 105: NBCA Competency Assessment System

90 natIonal bca competency assessment system june 2010

competency – commercIal 2

n. codecompliancecertificateso. certificateofacceptancep. complianceschedulesq. buildingwarrantoffitnessr. certificatesforpublicuses. candefinetheterm‘naturalhazard’andcandescribetherequirementsforgranting

orrefusingtograntbuildingconsentsonlandthatissubjecttoanaturalhazardt. candescribethelegislativeprocessforbuildingovertwoormoreallotments

(eg,75(1)(b)andsection76oftheAct)u. canassessalterationstoexistingbuildingsinaccordancewithsection112oftheActv. hasaworkingknowledgeofwaiversandmodificationsandprovideanoverview

ofhowaTAgrantsawaiverormodificationoftheBuildingCodew. canexplainhowtheclassifiedusesandthechangetheuseprovisionsareused

inthelegislationx. canexplainandinterpretbuildinglegislationanddemonstratesthoroughunderstanding

ofsections7–9oftheActandClauseA2InterpretationoftheNewZealandBuildingCodey. candiscussaccessandfacilitiesforpeoplewithdisabilitiesrequirementsoftheBuilding

CodeandthelimitsontheapplicationoftheBuildingCodeforindustrialandcommercialbuildings.HasanexcellentworkingknowledgeofNZS4211

z. demonstratesaclearknowledgeoftheprovisionforaccessandfacilitiesforpeoplewithdisabilitiesinaccordancewithsections117–120andSchedule2oftheAct

aa.hasknowledgeoftheHSNOActandtheprocessesforcompliancewithF3,F3/VM1,F3/AS1andG14/VM1

bb.demonstratesknowledgeoftheFireServiceAct1975,sections21A–21I,andtheFireSafetyandEvacuationofBuildingsRegulations2006

cc.canapplyDRUrequirementsinaccordancewiththeGazettenoticeinsection26oftheAct

dd.canapplyknowledgeofspecifiedsystemsandcomplianceschedulerequirementsinaccordancewithsections100–111oftheBuildingAct2004

ee.hashigherlevelofunderstandingwithregardtocompliancescheduleandspecifiedsystemstechnicalconsiderations(asisdiscussedintheComplianceScheduleHandbook)

ff. understandsowner’srequirementsinrelationtobuildingwarrantsoffitnessinaccordancewithsections108–111oftheAct

gg.candemonstrateknowledgeofchangeofuserequirementsinaccordancewithsections114–15oftheActandtheBuilding(Specifiedsystems,ChangetheUse,andEarthquake-proneBuildings)Regulations2005

hh.understandsrequirementstoissueanoticetofixinaccordancewithsections163–168oftheActandtheBCA’spoliciesandprocedures(withintheirauthority)

ii. candemonstrateanunderstandingofthedeterminationsprocessinaccordancewithsections176–190oftheAct

jj. candemonstrateanunderstandingofcertificatesforpublicuseandwheretheyarerequiredinaccordancewithsections362A–363CoftheAct

kk.ifinspecting,understandstheMinorVariationsRegulationsandunderstandstheprocessforformalamendmentstobuildingconsents

ll. theprovisionforinspectionsbyaBCAasdescribedinsection90oftheActmm.ifinspecting,theprovisionsoninspectingandrequirementsforenteringlandin

accordancewithsections222–228oftheAct.

Page 106: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 91

competency – commercIal 2

Regulation10(3)(d)(i):Abilitytoprocessapplicationsforbuildingconsent.

Performanceindicators:

8. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(buildingrelatedprocessingonly).

Guidanceforassessorsandcandidates:

4. Knowledgeareasmayinclude,butarenotlimitedto:

a. NZS273604,NZS3602,NZS3640,NZS4229andAS/NZS1170astheyrelatetofourstoreycommercialconstruction.Understandshowtodeterminecompliancerequirementsforcorrosionzones,groundbearing,piles,footings,foundations,reinforcing,concretestrength,fillandcompaction,bracingdemandanddesign,subfloorframing,wallframing,roofstructures,timbertreatment,loadpaths,fixingsandconnections,underlayandwraps,claddingsystems,internalliningsanddurability

b. B1,B1/VM1–excellentunderstandingofhowthisVerificationMethodandreferencedStandardsareusedforstructuraldesignB1/VM4–asitrelatestofoundationdesign,B1/AS1–asitrelatestotheStandardsanditemsraisedinitem4.aabove

c. B2,B2/VM1andB2/AS1astheyrelatetothistypeofbuildingwork(eg,5,15and50yeardurabilityrequirementofnominatedbuildingelements)

d. canassessbuilding‘importancelevels’inrelationtodifferentbuildingtypesandtherelevantriskanalysisofthesebuildingsasidentifiedinAS/NZS1170

e. canidentifyissuesrelatingtotheAcceptableSolutionforfirecomplianceforthistypeofbuildingworkbyidentifyingthedesignsequencereferredtoinC/AS1Part1

f. canapplycommonlyusedfireratingsystemsforwallsbuiltincloseproximitytoboundariesandseparatingresidentialhouseholdunitsandothertenanciesachievingcompliancewithclausesC2andC3;andC/AS1

g. C4andC/AS1astheyapplytostructuralelementsforbuildingworkwithinthescopeofthiscompetencylevel

h. canrecogniseandunderstandstheimplicationsoffiredesignsthatdonotusetheAcceptableSolutionasameansofcompliancewiththeBuildingCode

i. canassessaccessibilitytoenablesafeandeasymovementofpeopleasrequiredbyD1,D1/VM1–slipresistanceforwalkingsurfacesandD1/AS1(eg,steps,handrails,non-slipprovisions,andunderstandssafestairconstructionandthedefinitionsofprivateandsecondaryprivatestairs.HasthoroughunderstandingofNZS4121(codeofpracticefordesignforaccessanduseofbuildingsbypersonswithdisabilities)

j. canassessmechanicalinstallationsforD2,D2/AS1,D2/AS2andD2/AS3NZS4332,EN81Part1and2,EN115(passengerlifts,escalatorsandmovingwalks)

k. canapplyweathertightnessprinciplesandknowledgetoassesscompliancewithE2ExternalMoisture.Understandstheprinciplesofspecificdesign,E2/VM1;andhasahigherlevelofunderstandingwithregardtocomplexjunctions,flashingdetailing,windactionandloadingonbuildings,soundtechnicalknowledgeofstructuralcladdingandcavitysystemsandrainscreens.Isabletoassessspecificallydesignedcladdingsystems,curtainwallsandbuildingfacades

l. internalmoisturemanagementwithinbuildingsasrequiredbyE3andE3/AS1(eg,understandsventilation,temperature,thermalresistance,condensation,impervioussurfacesforfloorandwalllinings)

m.hazardousagentsorcontaminantsonsiteasrequiredbyF1,F1/VM1andF1/AS1andknowshowtoreadaPIMandcheckhazardfilesintheabsenceofaPIM

n. F2andF2/AS1usingNZS4223:Part3,andisabletoassessthecomplianceofglazedbarriersandidentifytherequiredlocationsforsafetyglass,manifestationofglassetcforcommercialbuildings.Understandsandisabletoassessthehealthandsafetyrequirementsforasbestosandotherhazardousbuildingmaterials

o. F3,F3/VM1(interfacewithHSNOActandstorageofhazardoussubstancesinbuildings)andF3/AS1(depotconstruction,buildingscomponent-doors,windowsventingofgasstorageetc)andunderstandstheinterfacebetweenG4(asspecifiedsystems)andF8

p. requirementsforsafeguardingpersonsfromfallingasrequiredbyF4andF4/AS1(barrierconstruction,barrierheightandthecorrelationbetweenB1,B2andF4,SEDBarriersincludingB2implicationsforstructuralfixingsandotherelements)

q. sitesafetyrequirementscandeterminesitehazardsandunderstandscompliancerequirementsformanagingtheseinaccordancewithF5andF5/AS1.UnderstandstheinterfacebetweenB1andF5forsafegantryconstructionastheyrelatetomediumandlargescalebuildingprojects

r. F6,F6/VM1(acceptableluminanceinbuildings)andF6/AS1(lightingforemergencies)andunderstandstheinterfacewithF8(asspecifiedsystems)

s. F7andF7/AS1andhasahigherlevelunderstandingofNZS4512(firealarmsystemsinbuildings)andNZS4541(automaticfiresprinklersystems)

27AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 107: NBCA Competency Assessment System

92 natIonal bca competency assessment system june 2010

competency – commercIal 2

t. F8andF8/AS1(luminance,signlayout,size,proportions,colours,wordingetc)andunderstandstheinterfacewithF6(asspecifiedsystems)

u. G1andG1/AS1forlocation,sizingandnumberofsanitaryfixturesv. canassesscompliancewithG2andG2/AS1forspatiallaunderingrequirementsw. spatial,hygiene,storageandpreparationrequirementsforcookingandG3andG3/AS1

(eg,impervioussurfaces,foodstorage,spatial,hygiene,storageandpreparationrequirementsforcookingandrefrigeration)

x. naturalandmechanicalventilationrequirementsforcommercialbuildingsasrequiredbyG4,G4/VM1andG4/AS1.Canassesscompliancepathwaysformechanicalinstallationsforaccessforthistypeofbuildingwork(eg,producerstatements,peerreviewinaccordancewiththeBCA’spoliciesandprocedures)

y. G5andG5/AS1requirementsforaccessibilityheating,listeningsystemsandtemperaturecontrolforcertainbuildingtypes

z. candefineSTCandIICandassesscommonlyusedandalternativesolutionstodeterminecompliancewithG6,G6/VM1andG6/AS1AirborneandImpactSoundbetweenoccupancies.ExhibitsanexcellentunderstandingoftheinterfacebetweenC3andG6,particularlyinrelationtopenetrationstofireandsoundratedareas

aa.canassessnaturallightandvisualawarenessasrequiredbyG7,G7/VM1andG7/AS1bb.requirementsforprovidingartificiallightingtoenablesafemovementasrequiredby

G8andG8/AS1(eg,accessroutesandminimumluxlevels)cc.requirementsforcertifyingcompliancewithelectricityprovisionsasrequiredby

G9,G9/AS1andsections19and94(3)oftheActdd.requirementsforcertifyingcompliancewithgasasanenergysourceasrequiredby

G11,G11/AS1andsections19and94(3)oftheActee.understandstherequirementsforstorage,accessandtemperaturecontrolofsolidwaste

forthistypeofbuildingworkinaccordancewithG15andG15/AS1SolidWasteff. requirementsforassessingenergyefficiencyasrequiredbyH1,H1/AS1andH1/VM1.

GoodworkingknowledgeofNZS4243andmodellingmethodusedtoachievecompliancegg.canidentifyinspectionrequirementsnecessarytoconfirmcomplianceforthislevelof

buildingworkhh.cancompileaccuratecompliancescheduleinformationthatmeetstherequirements

ofsection103oftheActii. hasastrongcomprehensionoftheirindividuallimitationsandthewiderBCA’sinternaltechnical

capability.Isabletoidentifywhenexternaltechnicalassistanceisrequiredforcomplexalternativesolutionassessmentandcanoutsourceworkfortechnicalreviewwhenrequired

jj. canassess,engage,andmanagetherequirementtoobtainexpertopinion,advice,peerreviewandwhoshouldprovidethisforthistypeofconstruction.Understandstherequirementforthird-partyverification,observationofbuildingelementsbyexpertssuchascharteredprofessionalengineersandaccreditedinspectionbodiesetc

kk.canmentorand/orprovidetechnicaloversighttoothersassessingBuildingCodecomplianceforcommercial(competency)1typebuildingwork.

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

9. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(plumbinganddrainagerelatedprocessingonly).

Guidanceforassessorsandcandidates:

5. Knowledgeareasmayinclude,butarenotlimitedto:

a. requirementsforprotectingpeopleandotherpropertyfromadverseeffectsofsurfacewaterasrequiredbyE1,E1/VM1andE1/AS1–(minimumfloorheights,design,constructionandconveyanceofstormwatercatchments)

b. launderingandspatialrequirementstosatisfyG2andG2/AS1c. understandsrequirementsforprotectingpeoplefromextremetemperaturesorhazardous

substancesassociatedwithbuildingservicesinaccordancewithG10,G10/VM1andG10/AS1PipedServicesorprovidesacompliancepathwaytodeterminecompliance(eg,producerstatement,peerreviewinaccordancewiththeBCA’spoliciesandprocedures)

d. understandsrequirementsforspecificationandinstallationofcommercialwatersuppliesasrequiredbyG12,G12/VM1andG12/AS1forthistypeofconstruction(identifyingnon-potablewaterpipesandoutlets,temperaturerequirements,crossconnectionhazardsandbackflowpreventiondevices)

e. requirementsforprovisionofsanitaryfixturesandappliancesandforconveyingfoulwatertodrainagesystemsasrequiredbyG13,G13/AS1,G13/AS2,G13/VM1andAS/NZS3500Part2astheyrelatetocommercialconstruction(systemdesignprinciples–avoidodour,designloading,falls,venting,materials,connections,accessandmaintenance,andimposedloads)

Page 108: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 93

competency – commercIal 2

f. canexplainandcompetentlydemonstrateinspectionproceduresforstacksystems.UnderstandsrequirementsforprovisionofgreasetrapsinaccordancewithG13/AS2

g. collection,storage,treatmentanddisposalofindustrialliquidwasteinaccordancewithG14,G14/VM1andG14/AS1.Understandsthetreatmentanddisposalmethodsillustratedinfigure1ofG14/VM1

h. identificationofinspectionrequirementsnecessarytoconfirmcomplianceforthislevelofbuildingwork

i. canidentifyfirewallsanddetermineacompliancepathforplumbinganddrainagepipingpenetratingthesewalls

j. canidentifyinspectionrequirementsnecessarytoconfirmcomplianceforthislevelofplumbinganddrainagework

k. canassess,engage,andmanagetherequirementtoobtainexpertopinion,adviceandpeer-reviewforspecificallydesignedbuildingelementsforthislevel

l. canmentorand/orprovidetechnicaloversighttoothersassessingBuildingCodecomplianceforcommercial(competency)1typebuildings

Regulation10(3)(d)(ii):Abilitytoinspectbuildingwork.

Performanceindicators:

10.InspectbuildingworkrelatingtofoundationtypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforcommercial2buildings.

Guidanceforassessorsandcandidates:

6. Knowledgeareasforinspectionsmayinclude,butarenotlimitedto:

a. demonstratedabilitytoreadandinterpretplansandspecificationsb. useoftechnicalequipment(eg,moisturemeters,cameras,thermometersetc)and

administrativeresources(checklists,copiesoftechnicalinformationeg,NZS3604)toestablishcompliance.

c. NZS283604,NZS3602,NZS3640,NZS3622,NZS4229andtheComplianceDocumentsastheyrelatetoresidentialconstruction;andinparticular:

Foundations

• requirementsforcorrosionzones–concretestrengthrequirements(differentzonesanddifferentfoundationtypes),fixingmaterials

• groundbearing–determinationmethods,fillandcompactionrequirements• pilefoundations–types(includingbracingtypes),sizesanddimensions(ground

clearance,maxheights,foundationdepthsetc),siting,fixingsfordifferentpiletypes,treatmentandidentification,howbracingiscalculatedforsubfloors,pointloadpiles

• concretefoundations(includesconcretemasonry)–reinforcing(lapsandsize),reinforcingtype(identificationofdeformedandround,hightensileornormal,meshandmeshsupport),pipepenetrations,pointloadpads,bondbeams,washouts‘A’,‘B’and‘C’grademasonry

• concreteslabs–reinforcing(laps,size,supplementaryreinforcingrequirements,cover),controljointandslabsizelimitations,pipepenetrations,thicknessandthickeningsofslab,DPM

• certificaterequirementsincludingproducerstatements,geotechnicalreports,compactioncertificates,concretedockets.

11.InspectbuildingworkrelatingtoprelinetypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforcommercial2buildings.

Preline

• timbermidfloorsystems• framingandtrussrequirementssizespanandspacing,timbergradeandtreatment,

loadpaths,moisturecontent,fixingsandconnections,trussdesignandlayoutinformation,penetrations,bracingsystems,includingdiaphragmceilingsandfixings

• claddingrequirements–underlays/wraps,windbarriersandrigidairbarriers,fixings,penetrationsandflashings,complexjunctions,silltapes,airseals,cavitysystems,directfixsystems,penetrations,brickveneerrequirements,mixedcladdingsystems,compartmentalisationofcavitysystemsovertwostories

• membraneroofanddeckrequirementsincludingsubstrates,penetrations,fallandoverflows• accessandfacilitiesforpeoplewithdisabilitiesincludingfixingrequirements

(handrails),sizes,dimensionsandlengthsandaccessibilityincludinggradients• soundandfireratedwallsandbuildingcomponents–installationrequirements,

includingisolation,insulation,penetrations,fixings• firetreatments(eg,intumescentcoatingsandseals)• insulationinstallation–type,rating,installationrequirements(refertoNZS4246

EnergyEfficiency–InstallingInsulationinResidentialDwellings).

28AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 109: NBCA Competency Assessment System

94 natIonal bca competency assessment system june 2010

competency – commercIal 2

12.InspectbuildingworkrelatingtofinaltypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforcommercial2buildings.

Final

• accesstobuilding–steps(andisolatedsteps),stairs,laddersandramps–installation,tread,riser,handrails,non-slipprovisions,accessiblecarparksandavoidanceofconflictwithvehiclesandassociatedsignage

• liftandescalatorinstallationcertificationrequirementsandassociatedsignage• accessiblerequirementsincludinglocationsanddimensionsoffixture,fittingsand

countersandspatialrequirementsofareas• internalliningsandsurfaces,includingimpervioussurfacerequirements,

waterproofmembranes,watersplashareas• smokedetectorsplacementandlocation• ventilation–mechanicalandnatural• rireratedwallsandotherbuildingcomponents• assessmentofairbornesound(STC)• glazingrequirements,safetyglassidentification,locations• finishedgroundlevelandgroundclearancestocladdingsandfloorlevels• knowledgeandidentificationofspecifiedsystemsincludingidentificationof

installation,commissioningandcertificationrequirementsforspecifiedsystems• thirdpartyverification(eg,producerstatements,energyworkcertificates)

d. canfollowmanufacturerrequirementsforinstallationoffreestandingandin-builtsolidfuelheatingappliances,requirementsfor:applianceclearances,hearth,insulationbarrier,shielding,restraints,flueheights,flashings,finishesandfurnishings,ventilationandassociatedprescribedelectricalwork(ifapplicable)

e. identificationandmanagementofriskfromhazardousagentsorcontaminantsonsitef. canidentifywhenexternaltechnicalassistanceisrequiredandcanoutsourceworkfor

technicalreviewwhenrequired.

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

13.Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(plumbinganddrainagerelatedprocessingonly).

14.InspectbuildingworktoestablishifcompliancewiththeNewZealandBuildingCode(plumbinganddrainagerelatedinspectionsonly).

Guidanceforassessorsandcandidates:

7. AgoodworkingknowledgeofAS/NZS3500,G12/AS1andAS2,G13/AS1andAS2,E1/AS1,E2/AS1(pipepenetrations,deckdrainageetc),E3/AS1,G1/AS1,H1/AS1astheyrelatetoresidentialconstruction;andinparticular:

Foundations

• pipematerial,gradients,size,bedding,backfill,protection,insulation,accesspoints,jointingandsleeving,testing,supports,changesofdirection,conveyancetoapprovedoutfalls,bridging

• HWreliefdrainanddischargeoutlet,drainaccesspoints,amendmentstoplansandspecifications.

Preline

• pipematerials,thermalmovement,sizing,compatibility,insulation,testing,penetrationsthroughenvelope,roofflashings,soilstacks(graded),elevateddrainageprinciples,wastepipes,ventingsystems

• hotwater/coldwaterexpansionreliefdraindischargeoutfallpoint• hotwatersupply:

− mains,lowpressure,wetback,solar− tanksupply–structuralsupport/safetray/overflow/seismicrestraint− solar–structuralsupport–penetrations− wetback–openventingofHWCexhaust− networkutilitycoldwatersupplyconnections− floorwaste

• Drainage

− maintenanceofwatertrapseals–floorwastegullies/gullytraps,sewersurchargegully− venting(openorairadmittancevalves)− pipeinspectionpoints,protectionincludingpipetrenchandfoundations,materials,

jointing,bedding,outfall,testing− septictank/sewer(NUO)/other/soakagesystemSW− greasetrapsandseparators

Page 110: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 95

competency – commercIal 2

Final

• HWCseismicrestraint,hotandcoldwater–valves,temperingdevice,coldwaterexpansionrelief,tundish,safetray,

• HWCwatersupplytemperaturechecks(personalhygiene,legionella)• wetback/HWCheightabovewoodburner,flowandreturnpipeinsulation,

exhaustvent–pipepenetrationflashing• solarreliefvalvedischargeposition–structuralsupport–position–pipeinsulation,

installationsameasbuildingconsent–penetrationsflashed• testsanitaryfixturestrapsealretention• equipotentialbonding• gullydish/gratingheight,wastepipeconnectionstogullyriserorgullydish,

surfacewateringress• pipepenetrationswatertight• maindrainvent• drainageas-builtplan–amendmentstoplans/specifications• swimmingpoolbackflowprevention• canidentifyfirewallsanddetermineacompliancepathforplumbinganddrainage

pipingpenetratingwalls.

Regulation10(3)(d)(iii):Abilitytocertifybuildingwork.

Performanceindicators:

15.Canissuecertification(buildingconsentorcodecompliancecertificate)forthiscommercial2buildingwork.

Guidanceforassessorsandcandidates:

8. Knowledgeareasmayinclude,butarenotlimitedto:

a. candidatecancompileandreviewinformationreceivedduringtheprocessingofabuildingconsentorinformationreceivedduringtheinspections/constructionprocessanddetermineandrecordtheoutcometoissue,suspend,requestfurtherinformationand/orrefusetoissueabuildingconsentorcodecompliancecertificate(withintheirauthority)forcommercial2buildingwork.

Regulation10(3)(e):Abilitytocommunicatewithinternalandexternalpeople.

Performanceindicators:

16.Communicateswithinternalandexternalcustomers.

17.Canusephone,email,internetandfax.

18.Demonstratesgoodactivelistening,questioningandassertivenessskillsindealingwithday-to-daytasksandresponsibilities.

Guidanceforassessorsandcandidates:

9. Knowledgeareasmayinclude,butarenotlimitedto:

a. correctlypreparesletters,memosandreportsforseniorstaffb. appearsconfidentandhasagoodunderstandingofbuildingrelatedsubjectmatter

whendealingwithcustomersandcolleaguesc. communicateseffectivelywithotherteammembers,consentapplicantsandother

membersofthepublicd. accuratelyinputwritten/electronicdataoninternalforms,checklists,fieldinspection

recordsetc;andcompletesprescribedformsinaccordancewiththeBuildingFormsRegulations2004

e. hastheabilitytoadministrativelymanagelargeamountsofinformationandresolveproblemsthroughclearandopenlinesofcommunication

f. hastheabilityandnecessaryskilltocommunicateatahighlevelwithbuildingsectorprofessionalsandothertechnicalareaswithintheBCAandTA

g.canaccuratelyinterpretbuildingconsentcorrespondenceandisabletocompileaccurate,clearandreadablewrittenresponsessuchasrequestsforfurtherinformationornoticestofixetc

h. canclearlyarticulatefindingsandprovidefeedbacktofellowstaffmembers,thepublicandbuildingsectorprofessionals

i. presentsaconvincingandrationalargumentinsupportofdecisionsmade.

Regulation10(3)(f):Abilitytocomplywiththebuildingconsentauthority’spolicies,proceduresandsystems

Performanceindicators:

19.Observesthebuildingconsentauthority’spolicies,proceduresandsystemsforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

10.Knowledgeareasmayinclude,butarenotlimitedto:

a. accuratelyandcarefullyfollowsestablishedproceduresforcompletingworktasks.

Page 111: NBCA Competency Assessment System

96 natIonal bca competency assessment system june 2010

Page 112: NBCA Competency Assessment System

Co

mp

et

en

Cy

Lev

eL –

Co

mm

er

Cia

L 3

CompetenCy LeveL – CommerCiaL 3

Competency level – commercial 3 97

Page 113: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 97

Competencylevel–commercial3

competency – commercIal 3

Allusesofbuildingsthatareoverfourstoreyshigh,orcontainover500occupantsorpurposegroups(SC)or(SD)greaterthanasinglestorey.

Regulation10(3)(a):29

Understandingthephilosophiesandprinciplesofbuildingdesignandconstruction.

Performanceindicators:

1. Comprehendsandhassatisfactoryknowledgeofsections3,4and5oftheBuildingAct2004.

2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesandconstructionsequencingforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

1. Knowledgeareasmayinclude,butarenotlimitedto:

a. thepurposeoftheBuildingAct2004(theAct)b. TAs’functions,dutiesandpowersundertheAct,particularlyastheyrelatetocommercial,

industrialandnon-residentialbuildingworkc. candiscussthehierarchyofNewZealandbuildinglegislationandthevariouscompliance

pathsprovidedforundertheActd. candiscussbuildingdesign,constructiontechniquesandsequencingofbuildingwork

asitsrelatestothiscompetencylevel.

NotethisinformationiscoveredinSections2.1,2.2,2.3,3.0,3.1,3.2,3.3,3.5,3.6and3.7ofthePrefacetotheBuildingCodeHandbook.30

Regulation10(3)(b):Understandingandknowledgeofbuildingproductsandmethods.

Performanceindicators:

3. Comprehendsandhassatisfactoryknowledgeofproprietarysystemsandbuildingproductsforthistypeofbuildingwork.

4. Demonstratestheabilitytoresearch,analyseandassessbuildingmethodsandproductsassociatedwiththistypeofbuildingwork.

Guidanceforassessorsandcandidates:

2. Knowledgeareasmayinclude,butarenotlimitedto:

a. commonlyusedbuildingmaterialsandsystems(eg,pre-nailedandtrussframes,laminatedstructures,conventionalandunconventionalcommercialcladdingandflashingsystems)

b. productliterature,testingandVerificationMethods,appraisalsandproducerstatementsc. portalframe,pre-stressedandpre-castconcrete,tilt-slab,commonbracing,firerating

andsoundratingsystemsd. assessmentofcomplexdesignmethodsincludingunconventionalengineeredsolutions.

Regulation10(3)(c):KnowledgeandskillinapplyingtheAct,theBuildingCode,andanyotherapplicableregulationsundertheAct.

Performanceindicators:

5. ComprehendsandcanapplyknowledgeoftheapplicationoftheAct.

6. ComprehendsandcanapplyknowledgeoftherolesandresponsibilitiesofaBCAandTA.

7. ComprehendsandcanapplyknowledgeofthelinkageandinterfacebetweentheResourceManagementAct1991andtheBuildingAct2004.

Guidanceforassessorsandcandidates:

3. Demonstratesknowledgeandskillinapplying:

a. thebuildingcontrolframework31b. theBuildingAct2004c. purposed. principlese. applicationf. theNewZealandBuildingCodeg. compliancepathsh. producerstatementsi. theDepartmentofBuildingandHousingj. territorialauthoritiesk. buildingconsentauthoritiesl. projectinformationmemoranda

29Building(AccreditationofBuildingConsentAuthorities)Regulations2006.30AComplianceDocumentpreparedbytheDepartmentofBuildingandHousing.Availableat:http://www.dbh.govt.nz/UserFiles/File/

Publications/Building/Compliance-documents/building-code-handbook.pdf31Guidanceonitemsa.-risprovidedintheBuildingCodeHandbook.

Page 114: NBCA Competency Assessment System

98 natIonal bca competency assessment system june 2010

competency – commercIal 3

m.buildingconsentsn. codecompliancecertificateso. certificateofacceptancep. complianceschedulesq. buildingwarrantoffitnessr. certificatesforpublicuses. candefinetheterm‘naturalhazard’andcandescribetherequirementsforgranting

orrefusingtograntbuildingconsentsonlandthatissubjecttoanaturalhazardt. candescribethelegislativeprocessforbuildingovertwoormoreallotments

(eg,sections75(1)(b)and76oftheAct)u. canassessalterationstoexistingbuildingsinaccordancewithsection112oftheActv. hasaworkingknowledgeofwaiversandmodificationsandprovideanoverview

ofhowaTAgrantsawaiverormodificationoftheBuildingCodew. canexplainhowtheclassifiedusesandthechangetheuseprovisionsareused

inthelegislationx. canexplainandinterpretbuildinglegislationanddemonstratesthoroughunderstanding

ofsections7–9oftheActandClauseA2InterpretationoftheNewZealandBuildingCodey. candiscussaccessandfacilitiesforpeoplewithdisabilitiesrequirementsoftheBuilding

CodeandthelimitsontheapplicationoftheBuildingCodeforindustrialandcommercialbuildings.HasanexcellentworkingknowledgeofNZS4211

z. demonstratesaclearknowledgeoftheprovisionforaccessandfacilitiesinbuildingsforpeoplewithdisabilitiesinaccordancewithsections117–120andSchedule2oftheAct

aa.hasknowledgeoftheHSNOActandtheprocessesforcompliancewithF3,F3/VM1,F3/AS1andG14/VM1

bb.demonstratesknowledgeoftheFireServiceAct1975,sections21A–21I,andtheFireSafetyandEvacuationofBuildingsRegulations2006

cc.canapplyDRUrequirementsinaccordancewiththeGazettenoticeinsection26oftheAct

dd.canapplyknowledgeofspecifiedsystemsandcomplianceschedulerequirementsinaccordancewithsections100–111oftheBuildingAct2004

ee.hashigherlevelofunderstandingwithregardtocompliancescheduleandspecifiedsystemstechnicalconsiderations(asisdiscussedinthecomplianceschedulehandbook)

ff. understandsowners’requirementsinrelationtobuildingwarrantsoffitnessinaccordancewithsections108–111oftheAct

gg.candemonstrateknowledgeofchangeofuserequirementsinaccordancewithsections114–115oftheActandtheBuilding(SpecifiedSystems,ChangetheUse,andEarthquake-proneBuildings)Regulations2005

hh.understandsrequirementstoissueanoticetofixinaccordancewithsections163–168oftheActandtheBCA’spoliciesandprocedures(withintheirauthority)

ii. candemonstrateanunderstandingofthedeterminationsprocessinaccordancewithsections176–190oftheAct

jj. candemonstrateanunderstandingofcertificatesforpublicuseandwheretheyarerequiredinaccordancewithsections362A–363CoftheAct

kk.ifinspecting,understandstheMinorVariationsRegulationsandunderstandstheprocessforformalamendmentstobuildingconsents

ll. theprovisionforinspectionsbyaBCAasdescribedinsection90oftheActmm.ifinspecting,theprovisionsoninspectingandrequirementsforenteringlandin

accordancewithsections222–228oftheAct.

Page 115: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 99

competency – commercIal 3

Regulation10(3)(d)(i):Abilitytoprocessapplicationsforbuildingconsent.

Performanceindicators:

8. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(buildingrelatedprocessingonly).

Guidanceforassessorsandcandidates:

4. Knowledgeareasmayinclude,butarenotlimitedto:

a. NZS323604,NZS3602,NZS3640,NZS4229andAS/NZS1170astheyrelatetofourstorey(andover)commercialconstruction.Understandshowtodeterminecompliancerequirementsforcorrosionzones,groundbearing,piles,footings,foundations,reinforcing,concretestrength,fillandcompaction,bracingdemandanddesign,subfloorframing,wallframing,roofstructures,timbertreatment,loadpaths,fixingsandconnections,underlayandwraps,rigidairbarriers,claddingsystems,internalliningsanddurability.

b. B1,B1/VM1–excellentunderstandingofhowthisVerificationMethodandreferencedStandardsareusedforstructuraldesign,B1/VM4–asitrelatestofoundationdesign,B1/AS1–asitrelatestotheStandardsanditemsraisedinitem4aabove.

c. B2,B2/VM1andB2/AS1astheyrelatetothistypeofbuildingwork(eg,5,15and50yeardurabilityrequirementofnominatedbuildingelements)

d. canassessbuilding‘importancelevels’inrelationtodifferentbuildingtypesandtherelevantriskanalysisofthesebuildingsasisidentifiedinAS/NZS1170

e. canidentifyissuesrelatingtotheAcceptableSolutionforfirecomplianceforthistypeofbuildingworkbyidentifyingthedesignsequencereferredtoinC/AS1Part1

f. canapplycommonlyusedfireratingsystemsforwallsbuiltincloseproximitytoboundariesandseparatingresidentialhouseholdunitsandothertenanciesachievingcompliancewithclausesC2andC3;andC/AS1

g. C4andC/AS1astheyapplytostructuralelementsforbuildingworkwithinthescopeofthiscompetencylevel.

h. canrecogniseandunderstandstheimplicationsoffiredesignsthatdonotusetheAcceptableSolutionasameansofcompliancewiththeBuildingCode

i. canassessaccessibilitytoenablesafeandeasymovementofpeopleasrequiredbyD1,D1/VM1–slipresistanceforwalkingsurfacesandD1/AS1(eg,steps,handrails,non-slipprovisions,andunderstandssafestairconstructionandthedefinitionsofprivateandsecondaryprivatestairs.HasthoroughunderstandingofNZS4121(codeofpracticefordesignforaccessanduseofbuildingsbypersonswithdisabilities)

j. canassessmechanicalinstallationsforD2,D2/AS1,D2/AS2andD2/AS3,NZS4332,EN81parts1and2,EN115(passengerlifts,escalatorsandmovingwalks)

k. canapplyweathertightnessprinciplesandknowledgetoassesscompliancewithE2ExternalMoisture.Understandstheprinciplesofspecificdesign,E2/VM1;andhasahigherlevelofunderstandingwithregardto(complexjunctions,flashingdetailing,windactionandloadingonbuildings,soundtechnicalknowledgeofstructuralcladdingandcavitysystemsandrainscreens).Canassessspecificallydesignedcladdingsystems,curtainwallsandbuildingfacades

l. internalmoisturemanagementwithinbuildingsasrequiredbyE3andE3/AS1(eg,understandsventilation,temperature,thermalresistance,condensation,impervioussurfacesforfloorandwalllinings)

m.hazardousagentsorcontaminantsonsiteasrequiredbyF1,F1/VM1andF1/AS1andknowshowtoreadaPIMandcheckhazardfilesintheabsenceofaPIM

n. F2andF2/AS1usingNZS4223:Part3,andcanassessthecomplianceofglazedbarriersandidentifytherequiredlocationsforsafetyglass,manifestationofglassetcforcommercialbuildings.Understandsandcanassessthehealthandsafetyrequirementsforasbestosandotherhazardousbuildingmaterials

o. F3,F3/VM1(interfacewithHSNOActandstorageofhazardoussubstancesinbuildings)andF3/AS1(depotconstruction,buildingscomponent-doors,windowsventingofgasstorageetc)andunderstandstheinterfacebetweenG4(asspecifiedsystems)andF8

p. understandsrequirementsforsafeguardingpeoplefromfallingasrequiredbyF4andF4/AS1(barrierconstruction,barrierheightandthecorrelationbetweenB1,B2andF4,SEDBarriersincludingB2implicationsforstructuralfixingsandotherelements)

q. candeterminesitehazardsandunderstandscompliancerequirementsformanagingtheseinaccordancewithF5andF5/AS1.UnderstandstheinterfacebetweenB1andF5forsafegantryconstruction

r. F6,F6/VM1(acceptableluminanceinbuildings)andF6/AS1(lightingforemergencies)andunderstandstheinterfacewithF8(asspecifiedsystems)

s. F7andF7/AS1andhasahigherlevelunderstandingofNZS4512(firealarmsystemsinbuildings)andNZS4541(automaticfiresprinklersystems).

t. F8andF8/AS1(luminance,signlayout,size,proportions,colours,wordingetc)andunderstandstheinterfacewithF6(asspecifiedsystems)

32AllreferencestoStandardsaretothecurrentcitedversionofthequotedStandard(eg,NZS3604:1999).

Page 116: NBCA Competency Assessment System

100 natIonal bca competency assessment system june 2010

competency – commercIal 3

u. canassesscompliancewithG2andG2/AS1forspatiallaunderingrequirementsv. spatial,hygiene,storageandpreparationrequirementsforcookingandG3andG3/AS1

(eg,impervioussurfaces,foodstorage,spatial,hygiene,storageandpreparationrequirementsforcookingandrefrigeration)

w. naturalandmechanicalventilationrequirementsfordomesticbuildingsasrequiredbyG4,G4/VM1andG4/AS1.Canassesscompliancepathwaysformechanicalinstallationsforaccessforthistypeofbuildingwork(eg,producerstatements,peerreviewinaccordancewiththeBCA’spoliciesandprocedures)

x. G5andG5/AS1requirementsforaccessibilityheating,listeningsystemsandtemperaturecontrolforcertainbuildingtypes

y. candefineSTCandIICandassesscommonlyusedandalternativesolutionstodeterminecompliancewithG6,G6/VM1andG6/AS1AirborneandImpactSoundbetweenoccupancies;andexhibitsanexcellentunderstandingoftheinterfacebetweenC3andG6,particularlyinrelationtopenetrationstofireandsoundratedareas

z. canassessnaturallightandvisualawarenessasrequiredbyG7,G7/VM1andG7/AS1aa.requirementsforprovidingartificiallightingtoenablesafemovementasrequiredby

G8andG8/AS1bb.requirementsforcertifyingcompliancewithelectricityprovisionsasrequiredbyG9,

G9/AS1andsections19and94(3)oftheActcc.requirementsforcertifyingcompliancewithgasasanenergysourceasrequired

byG11,G11/AS1andsections19and94(3)oftheActdd.understandstherequirementstostoresolidwasteforthistypeofbuildingwork

inaccordancewithG15SolidWasteee.requirementsforassessingenergyefficiencyasrequiredbyH1,H1/AS1andH1/VM1.

GoodworkingknowledgeofNZS4243andmodellingmethodusedtoachievecomplianceff. canidentifyinspectionrequirementsnecessarytoconfirmcomplianceforthislevelof

buildingworkgg.cancompileaccuratecompliancescheduleinformationthatmeetstherequirements

ofsection103oftheActhh.hasastrongcomprehensionoftheirindividuallimitationsandthewiderBCA’sinternal

technicalcapability.Isabletoidentifywhenexternaltechnicalassistanceisrequiredforacomplexalternativesolutionassessmentandcanoutsourceworkfortechnicalreviewwhenrequired

ii. canassess,engageandmanagetherequirementtoobtainexpertopinion,advice,peerreviewandwhoshouldprovidethisforthistypeofconstruction.Understandstherequirementforthird-partyverification,observationofbuildingelementsbyexpertssuchascharteredprofessionalengineersandaccreditedinspectionbodiesetc

jj. canmentorand/orprovidetechnicaloversighttoothersassessingBuildingCodecomplianceforcommercial(competency)1and2typebuildingwork.

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

9. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(plumbinganddrainagerelatedprocessingonly).

Guidanceforassessorsandcandidates:

5. Knowledgeareasmayinclude,butarenotlimitedto:

a. requirementsforprotectingpeopleandotherpropertyfromadverseeffectsofsurfacewaterasrequiredbyE1andE1/AS1(minimumfloorheights,design,constructionandconveyanceofstormwatercatchment)

b. launderingandspatialrequirementstosatisfyG2andG2/AS1c. canassesscompliancewithG1andG1/AS1forlocation,sizingandnumberofsanitaryfixturesd. understandsrequirementsforprotectingpeoplefromextremetemperaturesorhazardous

substancesassociatedwithbuildingservicesinaccordancewithG10,G10/VM1andG10/AS1PipedServicesorprovidesacompliancepathwaytodeterminecompliance(eg,producerstatement,peerreviewinaccordancewiththeBCA’spoliciesandprocedures)

e. understandsrequirementsforspecificationandinstallationofcommercialwatersuppliesasrequiredbyG12,G12/VM1andG12/AS1forthistypeofconstruction(identifyingnon-potablewaterpipesandoutlets,temperaturerequirements,crossconnectionhazardsandbackflowprotectiondevices)

f. requirementsforprovisionofsanitaryfixturesandappliancesandforconveyingfoulwatertodrainagesystemsasrequiredbyG13,G13/AS1,G13/AS2,G13/VM1andAS/NZS3500Part2astheyrelatetocommercialconstruction(systemdesignprinciples–avoidodour,designloading,falls,venting,materials,connections,accessandmaintenanceandimposedloads)

Page 117: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 101

competency – commercIal 3

g. collection,storage,treatmentanddisposalofindustrialliquidwasteinaccordancewithG14,G14/VM1andG14/AS1.Understandsthetreatmentanddisposalmethodsillustratedinfigure1ofG14/VM1)

h. canexplainandcompetentlydemonstrateinspectionproceduresforstacksystems.UnderstandsrequirementsforprovisionofgreasetrapsinaccordancewithG13/AS2

i. identificationofinspectionrequirementsnecessarytoconfirmcomplianceforthislevelofbuildingwork

j. canexplaininspectionproceduresforeachinspectiontypecoveredinthiscompetencyk. canidentifyfirewallsanddetermineacompliancepathforplumbinganddrainagepiping

penetratingthesewallsl. canidentifyinspectionrequirementsnecessarytoconfirmcomplianceforthislevel

ofplumbinganddrainageworkm.canexplaincompetentlydemonstrateinspectionproceduresforeachplumbing

anddrainageinspectiontypen. canassess,engage,andmanagetherequirementtoobtainexpertopinion,advice

andpeerreviewforspecificallydesignedbuildingelementsforthislevelofbuildingworko. canmentorand/orprovidetechnicaloversighttoothersassessingBuildingCode

complianceforcommercial(competency)1and2typebuildingwork.

Regulation10(3)(d)(ii):Abilitytoinspectbuildingwork.

Performanceindicators:

10.InspectbuildingworkrelatingtofoundationtypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforcommercial3buildings.

Guidanceforassessorsandcandidates:

6. Knowledgeareasforinspectionsmayinclude,butarenotlimitedto:

a. canreadandinterpretcomplexplansandspecificationsb. theuseofStandardsusedinthedesignofcommercialbuildingssuchasAS/NZS1170

andtheComplianceDocumentsastheyrelatetocommercial/industrialconstruction;andinparticular:

Foundations

• requirementsforcorrosionzones–concretestrengthrequirements(differentzonesanddifferentfoundationtypes),fixingmaterials

• groundbearing–determinationmethods,fillandcompactionandgeotechnicalrequirements• commonfoundationsystemsincludingraft,drivenpiles,boredpilesshearwalling,

pointloads,loadpaths,reinforcing(lapsandsize),reinforcingtype(identificationofdeformedandround,hightensileornormal,meshandmeshsupport),pipepenetrations,bondbeams,washouts,tankingrequirements,seismicdesignconsiderations

• concreteslabs–reinforcing(laps,size,supplementaryreinforcingrequirements,cover),controljointandslabsizelimitations,pipepenetrations,thicknessandthickeningsofslab,DPM

• certificaterequirementsincludingproducerstatements(PS4Inspectionrequirements),geotechnicalreports,compactioncertificates,concretedockets.

11.InspectbuildingworkrelatingtoprelinetypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforcommercial3buildings.

Preline

• timberandconcretemidfloorsystems• framingandtrussrequirementssizespanandspacing,timbergradeandtreatment,

loadpaths,moisturecontent,fixingsandconnections,trussdesignandlayoutinformation,penetrations,bracingsystemsandfixingsincludingfixingofpanels

• accessandfacilitiesforpeoplewithdisabilitiesincludingfixingrequirements(handrails),sizes,dimensionsandlengthsandaccessibilityincludinggradients

• impervioussurfaces,membraneareas,accidentaloverflow,wallandfloorsurfaces• ventilationducting,penetrations,firedampers• claddingrequirements–underlays/wraps,windbarriersandrigidairbarriers,fixings,

penetrationsandflashings,junctions,silltapes,airsealsetc,cavitysystems,curtainwalls,structuralandfireratedcladdingsystems,rainscreens,penetrations,masonryblockwork

• membraneroofanddeckrequirementsincludingsubstrates,penetrations,fall,overflow• soundandfireratedwallsandbuildingcomponents–installationrequirements

includingisolation,insulation,penetrations,fixings• insulationinstallation–type,rating,thermalandfireresistance,thermalbridging,

installationrequirements• firetreatments(eg,intumescentcoatingsandseals)• certificationrequirementsincludingproducerstatements,PS4inspectionrequirements,

commissioningcertificates,concretedocketsandotherthirdpartyverifications.

Page 118: NBCA Competency Assessment System

102 natIonal bca competency assessment system june 2010

competency – commercIal 3

12.InspectbuildingworkrelatingtofinaltypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforcommercial3buildings.

Final

• Firesafety:

− surfacefinishes,smokedevelopmentandspreadofflamerequirements− meansofescape–traveldistancesescaperoutes,finalexits,visibility,signage− fireandsmokeseparationsandpenetrations,collars,sealants,dampers,

doorsanddoorhardware

• Accesstoandwithinthebuilding:

− steps(andisolatedsteps),stairs,laddersandramps–installation–tread,riser,handrails,non-slipprovisions,

− liftsandescalators–accessibility,commissioningrequirements− accessiblecarparksandavoidanceofconflictwithvehicles− signage

• Moisture:

− finishedgroundlevelandgroundclearancestocladdings(ifapplicable)andfloorlevels− awarenessofcompletionrequirementsforcladdingsystems(eg,protective

coatingsystems)− flashingofpenetrations(roofandcladdingsystems)− internalliningsandsurfacesincluding,impervioussurfacerequirements,

waterproofmembranes,watersplashareas− accidentaloverflowrequirementstoprotectotherproperty

• Safetyofusers:

− identificationandmanagementofriskfromhazardousagentsorcontaminantsonsite

− glazingrequirements,safetyglassidentification,locationsandmanifestationrequirements,

− safetyfromfalling–barriers,changeoflevels,roofaccess,barrierconstruction,compatibilityofbarrierswithintendedusesofareas,windowrestrictors

• Servicesandfacilities:

− accessiblerequirementsincludinglocationsanddimensionsoffixtures,fittingsandcountersandspatialrequirementsofareas

− internalliningsandsurfacesincluding,impervioussurfacerequirements,waterproofmembranes,watersplashareasthatrelatetokitchens,laundries,bathrooms(orotherspaceswheresanitaryfixturearelocated)andsolidwastedisposalareas

− ventilation–mechanicalandnaturalforodours,gassesormoisture− assessmentofairbornesound(IICandSTC)− assessmentoflightinginaccessroutesandcommonspaces− knowledgeofuseofenergyworkcertificatestodemonstratecompliance

withG9ElectricityandG11GasasanEnergySource− knowledgeofcertificationrequirementsforpipedservicesG10

• Specifiedsystems:

− knowledgeandidentificationofspecifiedsystems− identificationofinstallation,commissioningandcertificationrequirements

forspecifiedsystems− interconnectivityofspecifiedsystemssuchasrequirementforactivation

ofautomaticdoorsonactivationofanalarm

c. canidentifywhenexternaltechnicalassistanceisrequiredandcanoutsourceworkfortechnicalreviewwhenrequired.

Page 119: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 103

competency – commercIal 3

Performanceindicatorsrequiredforplumbinganddrainagecompliance:

13.InspectbuildingworktoestablishwhethercompliancewiththeNewZealandBuildingCode(plumbinganddrainagerelatedinspectionsonly)hasbeenachievedforcommercial3buildings.

Guidanceforassessorsandcandidates:

7. AgoodworkingknowledgeofAS/NZS3500,G12/AS1andAS2,G13/AS1andAS2,E1/AS1,E2/AS1(pipepenetrations,deckdrainageetc),E3/AS1,G1/AS1,H1/AS1astheyrelatetocommercialconstruction;andinparticular:

Foundations

• pipematerial,gradients,size,bedding,backfill,protection,insulation,accesspoints,jointingandsleeving,testing,supports,changesofdirection,conveyancetoapprovedoutfalls,bridging

• HWreliefdrainanddischargeoutlet,drainaccesspoints,amendmentstoplansandspecifications.

Preline

• pipematerials,thermalmovement,sizing,compatibility,insulation,testing,penetrationsthroughenvelope,roofflashings,soilstacks(graded),elevateddrainageprinciples,wastepipes,ventingsystems

• hotwater/coldwaterexpansionreliefdraindischargeoutfallpoint.• hotwatersupply:

− mains,lowpressure,wetback,solar− tanksupply–structuralsupport/safetray/overflow/seismicrestraint− solaranditsstructuralsupportandpenetrations− networkutilitycoldwatersupplyconnections,backflowpreventionsystems− floorwasterequirements

Drainage

• maintenanceofwatertrapseals–floorwastegullies/gullytraps,sewersurchargegully• venting(openorairadmittancevalves)• pipeinspectionpoints,protectionincludingpipetrenchandfoundations,materials,

jointing,bedding,outfall,testing• onsitedisposalsystems/sewer(NUO)/soakagesystemstormwater• rainwatertanksupply(potable)/overflowwithinconsentedproperty/pump/gravity

(airlocks)

Final

• HWCseismicrestraint,hotandcoldwater–valves,temperingdevice,coldwaterexpansionrelief,tundish,safetray

• HWCwatersupplytemperaturechecks(personalhygiene,legionella)• solarreliefvalvedischargepositionanditsstructuralsupport,position,pipeinsulation,

andpenetrationsrequirements• testsanitaryfixturestrapsealretention• equipotentialbonding• gullydish/gratingheight,wastepipeconnectionstogullyriserorgullydish,

surfacewateringress• pipepenetrationswatertight• maindrainvent• drainageas-builtplan–amendmentstoplans/specifications• backflowpreventionrequirementsandtesting• canidentifyfirewallsanddetermineacompliancepathforplumbinganddrainage

pipingpenetratingthesewalls.

Regulation10(3)(d)(iii):Abilitytocertifybuildingwork.

Performanceindicators:

14.Canissuecertification(buildingconsentorcodecompliancecertificate)forthiscommercial3buildingwork.

Guidanceforassessorsandcandidates:

8. Knowledgeareasmayinclude,butarenotlimitedto:

a. candidatecancompileandreviewinformationreceivedduringtheprocessingofabuildingconsentorinformationreceivedduringtheinspections/constructionprocessanddetermineandrecordtheoutcometoissue,suspend,requestfurtherinformationand/orrefusetoissueabuildingconsentorcodecompliancecertificate(withintheirauthority)forcommercial3buildingwork.

Page 120: NBCA Competency Assessment System

104 natIonal bca competency assessment system june 2010

competency – commercIal 3

Regulation10(3)(e):Abilitytocommunicatewithinternalandexternalpeople.

Performanceindicators:

15.Communicateswithinternalandexternalcustomers.

16.Canusephone,email,internetandfax.

17.Demonstratesgoodactivelistening,questioningandassertivenessskillsindealingwithday-to-daytasksandresponsibilities.

Guidanceforassessorsandcandidates:

9. Knowledgeareasmayinclude,butarenotlimitedto:

a. correctlypreparessophisticatedletters,memosandreportsandcheckstheworkofothers

b. isconfidentandhasagoodunderstandingofbuildingrelatedsubjectmatterwhendealingwithcustomersandcolleagues

c. communicateseffectivelywithotherteammembers,consentapplicantsandothermembersofthepublic

d. accuratelyinputwritten/electronicdataoninternalforms,checklists,fieldinspectionrecordsetcandcompletesprescribedformsinaccordancewiththeBuildingFormsRegulations2004

e. hastheabilitytoadministrativelymanagelargeamountsofinformationandresolveproblemsthroughclearandopenlinesofcommunication

f. hastheabilityandnecessaryskilltocommunicateatahighlevelwithbuildingsectorprofessionalsandothertechnicalareaswithintheBCAandTA

g. canaccuratelyinterpretbuildingconsentcorrespondenceincludingpeerreviewreportsandothersupportingevidenceandisabletocompileaccurate,clearandreadablewrittenresponsessuchasrequestsforfurtherinformationornoticestofixetc

h. isabletoclearlyarticulatefindingsandprovidefeedbacktofellowstaffmembers,thepublicandbuildingsectorprofessionals

i. presentsaconvincingandrationalargumentinsupportofdecisionsmade.

Regulation10(3)(f):Abilitytocomplywiththebuildingconsentauthority’spolicies,proceduresandsystems.

Performanceindicators:

18.Observesthebuildingconsentauthority’spolicies,proceduresandsystemsforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

10.Knowledgeareasmayinclude,butarenotlimitedto:

a. accuratelyandcarefullyfollowsestablishedproceduresforcompletingworktasks.

Page 121: NBCA Competency Assessment System

Ap

pe

nd

ix 2

: Co

mp

et

en

Cy

A

ss

es

so

r s

pe

CifiC

At

ion

s

Appendix 2 : CompetenCy Assessor speCifiCAtions

Competency assessor specifications 105

Page 122: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 105

Appendix2:CompetencyAssessorSpecifications

competency assessor specIfIcatIon

Anassessorneedstobeapersontrainedinassessmenttheoryandpracticeandwithappropriatetechnicalbuildingcontrolskills,knowledgeandexpertisetoundertakeanassessment.

Anassessormusthaveappropriateexperienceinthebuildingcontrolsector.

Assessorrequirements:

1. Hasappropriateexperienceinthebuildingcontrolsector.

Guidanceforassessorcandidates:

1. Examplesinclude,butarenotlimitedto:

a. minimumoffiveyears’experienceinthebuildingcontrolsectorb. isateamleader,manageroraseniorspecialistorseniorconsultantworkinginthe

buildingcontrolsectorc. hascurrentexperienceofmakingregulatorybuildingcontroldecisionsd. hasparticipatedinBCAaccreditationactivitiesandaudits(withinaBCAorfor

InternationalAccreditationNewZealandasatechnicalexpert)e. hasintimateknowledgeandunderstandingoftheBCA’sbuildingcontrolpolicies

andprocedures.

Anassessormusthavecurrentandcomprehensivetechnicalandlegislativeknowledgeandunderstanding.

Assessorrequirements:

2. Keepsuptodateonlegislativeandregulatorychanges.

3. Knowstheirtechnicallimitations,andworkswithinthese.

4. Hascomprehensivetechnicalknowledgeinrelationtoprocessingbuildingconsentapplicationsandinspectingbuildingwork.

5. Hascomprehensivetechnicalknowledgeinrelationtoissuinglegislativeapprovalsandnotices(eg,CCCs,NTF).

6. HasundertakenassessortrainingontheNationalCompetencyAssessmentSystem.

Guidanceforassessorcandidates:

2. Examplesinclude,butarenotlimitedto:

a. isawareofrelevantandcurrentguidanceprovidedbytheDepartmentofBuildingandHousing

b. providestechnicalleadershipwithinaBCAc. hasundertakenbothbuildingconsentprocessingandinspectionofbuildingworkd. hasissuedlegislativeformsandnoticessuchasnoticestofix,buildingconsents,

codecompliancecertificatese. understandshowtheNationalBCACompetencyAssessmentSystem’scompetency

specificationsworkandwheretheywouldfitf. seeksassistancewhenoutsidetheirlimitations.

Anassessormusthavecredibilityandexperienceinundertakingassessment.

Assessorrequirements:

7. Hascredibilitywithcandidates,peersandmanagement.

8. Hastheskill,knowledge,andabilitytoassessacandidate’sevidenceintheworkplaceusingassessmentguidesandstandards.

Guidanceforassessorcandidates:

3. Examplesinclude,butarenotlimitedto:

a. isawareofrelevantandcurrentguidanceprovidedbytheDepartmentofBuildingandHousing

b. hasexcellentworkingrelationshipswithpeoplewithintheorganisationandisregardedastechnicallycompetentbypeers

c. hastheabilitytoperformassessmentswithoutbiasorconflictofinterestd. hasundertakencompetencyassessmentsinthepaste. acknowledgestheirowntechnicallimitationsandrecognizeswhenadditionaltechnical

expertiseisrequiredf. canmakeajudgmentwhetherthecandidateiscompetentg. cankeeprecordsandmakesureperformanceindicatorrequirementsarefulfilledh. hasgenuineinterestintrainingandassessment.

Page 123: NBCA Competency Assessment System

106 natIonal bca competency assessment system june 2010

competency assessor specIfIcatIon

Anassessormusthaveexcellentcommunicationskills.

Assessorrequirements:

9. Communicateswellwithinternalandexternalpeople.

10.Demonstratesgoodactivelistening,questioningandassertivenessskillsindealingwithday-to-daytasksandresponsibilities.

Guidanceforassessorcandidates:

4. Examplesinclude,butarenotlimitedto:

a. cancommunicatewellwithallinvolvedinassessmentb. appearsconfidentandhasagoodunderstandingofbuildingrelatedsubjectmatter

whendealingwithcandidatesandbuildingsectorprofessionalsc. canclarifyandpresentinformationinasuccinctandmeaningfulmannerd. isabletoconsistentlyproduceaccuratewrittenreportsinrelationtocandidate

assessmente. hasgoodanalyticalskillsandisabletoevaluateevidencef. isabletoclearlyarticulatefindingsandprovidefeedbacktocandidateswhenrequiredg. hasexperienceundertakinginterviewsorassessmentsandrecordedappropriateoutcomes.h. presentsaconvincingandrationalargumentinsupportofdecisionsmadei. isabletoprovideinstructiontopeopleontechnicalmatters(teaching/mentoring).

Wheretheassessordoesnothavetherequiredleveloftechnicalexpertiseinaspecialistareatoassessacandidate’sevidence,theassessorshouldreferthistoanexpertinthatparticulararea.Forexample,anexpertoncommercialplumbinganddrainageaspectsmaybecalledupontoexamineacandidate’splumbinganddrainageevidenceandprovideadvicetotheassessor.

Fortheeffectivenessofthissystem,competencyassessorsmustmeettheassessorrequirementslistedinitems1–10above.ForsomeBCAsthismayrequireoutsourcingassessmentservices/engagingexternalcompetencyassessors.

Page 124: NBCA Competency Assessment System

Ap

pe

nd

ix 3

: Te

mp

lA

Te

s

Appendix 3 : TemplATes

Assessment plan 108

Candidate evidence form – processing 112

Candidate evidence form – inspection 114

Skills matrix 116

Page 125: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 107

Appendix3:Templates

natIonal competency assessment framework

Note:ElectronicWordversionsoftheseformsareavailablefromtheDepartment’sConsentAuthorityCapabilityandPerformanceGroup.

Assessmentplan108

Candidateevidenceform:processing112

Candidateevidenceform:inspection114

Skillsmatrix116

Page 126: NBCA Competency Assessment System

108 natIonal bca competency assessment system june 2010

part 1: assessment plan assessor completes this plan and agrees evidence requirements and dates with candidate.

Personalassessmentplanfor:

Assessmenttype:Newcandidate

Reviewofexistingemployee (Note:Ifthisisacompetencyreviewjustnotewhathas changedsincethelastassessment)

TransitionfromanotherBCAsystem

Levelchange

Competencylevelassessed:

Assessmentincludes(tickrelevantarea/s):

Plumbinganddrainage

Building

Processing

Inspections

Specialist:………………….…….............................................................................................................................................…………….

Candidate’sworkexperience

Candidate’squalifications

Relevanttrainingcompleted

Page 127: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 109

part 1: assessment plan assessor completes this plan and agrees evidence requirements and dates with candidate.

Evidencerequired Comments Daterequired

Completedprocessingsheets/plans/specifications/internalaudit/recordsetc.

Quizresults

Trainingcourseevaluation

Copyofqualifications

Completedinspectionrecords

Witnessingofwork

Other(pleasespecify)

Specialrequirements(listanycompetencyscopelimitations):

...................................................................................................................................................................................

...................................................................................................................................................................................

...................................................................................................................................................................................

Agreement:

Assessor: ..........................................................................................................Date:.......................................... (signature)

Candidate: ..........................................................................................................Date:.......................................... (signature)

Page 128: NBCA Competency Assessment System

110 natIonal bca competency assessment system june 2010

part 2 : reasons for decIsIons

Regulation Performanceindicator Performanceindicatorsweremetby:

Regulation10(3)(a):

Understandingthephilosophiesandprinciplesofbuildingdesignandconstruction.

1. Comprehendsandhassatisfactoryknowledgeofsections3,4and5oftheBuildingAct2004.

2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesandconstructionsequencingforthistypeofbuildingwork.

Regulation10(3)(b):

Understandingandknowledgeofbuildingproductsandmethods.

3. Comprehendsandhassatisfactoryknowledgeofproprietarysystemsandbuildingproductsforthistypeofbuildingwork.

4. Demonstratestheabilitytoresearch,analyseandassessbuildingmethodsandproductsassociatedwiththistypeofbuildingwork.

Regulation10(3)(c):

KnowledgeandskillinapplyingtheAct,theBuildingCode,andanyotherapplicableregulationsundertheAct.

5. ComprehendsandcanapplyknowledgeoftheapplicationoftheAct.

6. ComprehendsandcanapplyknowledgeoftherolesandresponsibilitiesofaBCAandTA.

7. ComprehendsandcanapplyknowledgeofthelinkageandinterfacebetweentheResourceManagementAct1991andtheBuildingAct2004.

Regulation10(3)(d)(i):

Abilitytoprocessapplicationsforbuildingconsent.

8. Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(buildingrelatedprocessingonly).

9. Demonstratesanunderstandingofthetypeofnationalmultipleusebuildingapprovals(MultiProof)thatfallwithinthescopeofthiscompetencylevel.

10.Processbuildingconsentapplications(plansandspecifications)toestablishcompliancewiththeNewZealandBuildingCodeforthistypeofbuildingwork(plumbinganddrainagerelatedprocessingonly).

Regulation10(3)(d)(ii):

Abilitytoinspectbuildingwork.

11.InspectbuildingworkrelatingtofoundationtypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforthislevel.

12.InspectbuildingworkrelatingtoprelinetypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforthislevel.

13.InspectbuildingworkrelatingtofinaltypeinspectionstoestablishwhethercompliancewiththeNewZealandBuildingCode(buildingonly)hasbeenachievedforthislevel.

14.InspectbuildingworktoestablishwhethercompliancewiththeNewZealandBuildingCode(plumbinganddrainagerelatedinspectionsonly)hasbeenachievedforthislevel.

Page 129: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 111

part 2 : reasons for decIsIons

Regulation10(3)(d)(iii):

Abilitytoabilitytocertifybuildingwork.

15.Issueabuildingconsentforthistypeofbuildingwork.

16.Issueacodecompliancecertificateforthistypeofbuildingwork.

Regulation10(3)(e):

Abilitytocommunicatewithinternalandexternalpeople.

17.Communicateswithinternalandexternalpeople.

18.Canusephone,email,internetandfax.

19.Demonstratesgoodactivelistening,questioningandassertivenessskillsindealingwithday-to-daytasksandresponsibilities.

Regulation10(3)(f):

Abilitytocomplywiththebuildingconsentauthority’spolicies,proceduresandsystems.

20.Observesthebuildingconsentauthority’spolicies,proceduresandsystemsforthistypeofbuildingwork.

part 3 : outcome of assessment

Outcomestatement(andconditionsifapplicable):

Agreement:

Assessor: ..........................................................................................................Date:.......................................... (signature)

Candidate: ..........................................................................................................Date:.......................................... (signature)

Page 130: NBCA Competency Assessment System

112 natIonal bca competency assessment system june 2010

natIonal competency assessment system: candIdate evIdence form – processIng to be completed by the candidate.

Candidatename:Date:

Levelofcompetencybeingassessed:

Agreedbuildingconsentnumber/addressofbuildingbeingusedforassessment:

Briefdescriptionofbuildingprojectbeingusedforassessment:

Describeinyourownwordswhatyouconsiderisimportantinrelationtothefollowingaspectsofyourbuildingproject.

2. Site/landthatbuildingisbeingbuilton:

3. Foundations:

4. Structureofthebuildingfromfoundation/slabup:

5. Buildingenvelope(claddings):

6. Firesafety:

7. Services:

8. Interiorfinishes:

Page 131: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 113

natIonal competency assessment system: candIdate evIdence form – processIng to be completed by the candidate.

Describeinyourownwordstheareasofthebuildingthatyouconsiderarisk:

Why?

Werethereanyalternativesolutionsusedinthisbuilding?Ifso,pleasedescribeinyourownwordswhattheywereandhowyouassessedthem:

Inyourownwordspleasedescribeanylegislativerequirementsyouneededtoconsiderwhenprocessingthebuildingconsentapplication:

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant.

Page 132: NBCA Competency Assessment System

114 natIonal bca competency assessment system june 2010

natIonal competency assessment system: candIdate evIdence form – InspectIon to be completed by the candidate.

Candidatename:Date:

Levelofcompetencybeingassessed:

Agreedbuildingconsentnumber/addressofbuildingbeingassessed:

Whattypeofworkistheinspectionrelatingto(tickrelevantwork)?

Building

Plumbinganddrainage

Whattypeofinspectionisbeingassessed(tickrelevantwork)?

Foundation

Preline

Final

Briefdescriptionofbuildingprojectbeingusedforassessment:

Briefdescriptionofinspectionbeingundertakenforassessment:

Describeinyourownwordswhatyouconsiderisimportantinrelationtothefollowingrelevantaspectsofyourbuildinginspection:

1. Site/landthatbuildingisbeingbuiltoninrelationtotheinspection:

2. Structureanddurabilityinrelationtotheinspection:

3. Buildingenvelope(claddings)inrelationtotheinspection:

4. Firesafetyaspectsofthebuildinginrelationtotheinspection:

5. Servicesandassociatedsystemsinrelationtotheinspection:

6. Interiorfinishesinrelationtotheinspection:

Page 133: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 115

natIonal competency assessment system: candIdate evIdence form – InspectIon to be completed by the candidate.

Describeinyourownwordstheareasofthebuildingyouconsiderariskinrelationtoyourinspection:

Why?

Inyourownwordspleasedescribeanylegislativerequirementsyouneededtoconsiderwheninspectingthisbuildingwork:

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant.

Page 134: NBCA Competency Assessment System

116 natIonal bca competency assessment system june 2010

skIlls matrIx

competency levels (processIng)

Residential1 Residential2 Residential3 Commercial1 Commercial2 Commercial3

Pro

cess

ing

Competent

Developing

Cer

tifi

cati

on

Competent

Developing

competency levels ( InspectIons)

Residential1 Residential2 Residential3 Commercial1 Commercial2 Commercial3

Foun

dat

ion

s

Competent

Developing

Pre

line

Competent

Developing

Fin

al

Competent

Developing

Cer

tifi

cati

on

Competent

Developing

Appendix4:Residentialand

Page 135: NBCA Competency Assessment System

Ap

pe

nd

ix 4

: WO

RK

A

LLOC

AT

iOn

FLOW

Ch

AR

Ts

Appendix 4 : WORK ALLOCATiOn FLOWChARTs

Residential and commercial categorisation flowcharts 117

Page 136: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 117

Appendix4:Residentialandcommercialcategorisationflowcharts

Residentialandcommercialflowchartshavebeendesignedtohelpcategoriseworkforallocationtostaff.Theflowchartsareself-explanatoryandhavebeendesignedforusebytechnicallycompetentadministrationstaff.Whereajobcannotbecategorisedusingtheflowchart,adecisionneedstobemadebasedonthesortofcompetenciesrequiredtoundertakethework.Thedecision,reasonsforthedecisionandtheoutcomeofthedecisionneedtoberecorded.Thiscouldbeassimpleasafilenoteonthebuildingconsentprocessingchecksheet.Copiesoftheflowchartsappearoverthefollowingpages.

Page 137: NBCA Competency Assessment System

118 natIonal bca competency assessment system june 2010

re

sId

en

tIa

l f

lo

wc

ha

rt

G

oto

Com

mer

cial

Fl

owC

hart

Ist

heb

uild

ing

SR

or

SH

(re

side

ntia

l)?

YE

S

Isit

ar

esid

entia

lanc

illar

y

oro

utbu

ildin

g?

NO

Ist

her

isk

scor

e#

6?

NO

YE

SIs

the

bui

ldin

g#

1st

orey

?

NO

YE

SIs

the

bui

ldin

gS

R?

YE

S

NO

RE

S1

YE

S

Ist

heb

uild

ing

# 2

stor

eys?

NO

YE

SIs

the

ris

ksc

ore

# 12

?

NO

YE

S

RE

S2

Ist

heb

uild

ing

# 3

stor

eys?

YE

S

RE

S3

Isfi

res

epar

atio

n

limite

dto

ve

rtic

alp

lane

?

NO

NO

YE

S

NO

Page 138: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 119

Com

mer

cial

1

Isth

ebu

ildin

gco

mm

erci

al/

indu

stria

l/com

mun

alo

rnon

-resi

dent

ial

ora

nou

tbui

ldin

g?

NO

YE

SIs

the

bui

ldin

g

# 2

stor

eys?

NO

YE

SIs

the

bui

ldin

gde

sign

ed

for

# 10

0pe

ople

?

NO

YE

S

Com

mer

cial

2

Ist

heb

uild

ing

#

4st

orey

s?Y

ES

Ist

heb

uild

ing

desi

gned

fo

r#

50

0pe

ople

?

NO

YE

S

Com

mer

cial

3

Ist

heb

uild

ing

orp

art

of

the

buid

ling

SR

or

SH

?

NO

Ist

heb

uild

ing

asi

ngle

sto

rey?

NO

co

mm

er

cIa

l f

lo

wc

ha

rt

NO

YE

S

Page 139: NBCA Competency Assessment System

120 natIonal bca competency assessment system june 2010

Page 140: NBCA Competency Assessment System

Ap

pe

nd

ix 5

: B

CA

po

liCy

An

d p

ro

Ce

du

re

s

Appendix 5 : Building Consent Authority poliCy And proCedures

Building consent authority policy and procedures 121

Page 141: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 121

Appendix5:BCApolicyandprocedures

BCAs should cut and paste this policy and procedures (Word version available from the Department) into their documented system to replace their existing competency assessment procedure.

competency assessment of technIcal staff

policy

Itisthepolicyof(nameofBCA)toassessthecompetencyofstaffusingmethodsthatensurereliabledecisionsoncompetenceforthepurposeofensuringthatworkisalwayscarriedoutbyindividualswithappropriateknowledge,understandingandskills,asrequiredbyRegulation10.

Itisthepolicyof(nameofBCA)tousetheNationalBCACompetencyAssessmentSystembecause,inadditiontomeetingtheprecedingpolicystatement,itprovidesnationalconsistency,andportabilityofcompetencyassessmentsbetweenBCAsusingthesystem.

roles and responsibilities

1. BuildingControlManager:

• ToensurethattheBCA’sfunctionsrelatingtoprocessingapplicationsforbuildingconsent,inspectingbuildingworkbeingundertakenandcertifyingbuildingworkisdonebycompetentpeople.

2. Assessor/TechnicalLeader/ClusterGroupCompetencyAssessmentManager:

• Toensurethatcompetencyassessmentoftechnicalstaffisundertakeninarobustandefficientmannerinaccordancewiththispolicyandprocedure.

procedures

1. Plancompetenceassessment2. Gatherevidence3. Assessevidence4. Makedecisionsbasedondocumentedevidence5. Recordcompetencyassessmentoutcomes

TheseproceduresshallbeundertakeninaccordancewiththeassessmentprocessoutlinedintheNationalBCACompetencyassessmentSystem.

references

NATIONALBCACOMPETENCYASSESSMENTSYSTEM:

• ThisisguidanceprovidedbytheDepartmentofBuildingandHousing.

ASSESSORTRAININGMATERIALANDWORKSHOPS:

• TrainingprovidedtopeoplewishingtobecomeassessorsundertheNationalBCACompetencyAssessmentSystem.

Page 142: NBCA Competency Assessment System

122 natIonal bca competency assessment system june 2010

Page 143: NBCA Competency Assessment System

Ap

pe

nd

ix 6

: cA

nd

idA

te

in

for

mA

tio

n pA

ck

Appendix 6 : cAndidAte informAtion pAck – prepArAtion for ASSeSSment of competence

Candidate Information Pack 123

Page 144: NBCA Competency Assessment System

CandidateInformationPackPreparationforAssessmentundertheNationalBCACompetencyAssessmentSystem

June2010

Page 145: NBCA Competency Assessment System

124 natIonal bca competency assessment system june 2010

Contents

IntroductIon 124

system framework 125NationalLevels125Residential1,2and3126Commercial1,2and3127

competency specIfIcatIons 128

assessment process 129

candIdate evIdence 130Candidateevidenceform:processing133Candidateevidenceform:inspection137

candIdate checklIst 141

IntroductIon

ThisdocumenthasbeendevelopedbytheDepartmentofBuildingandHousingtohelpbuildingconsentauthorities(BCAs)inassessingtheirstaff’scompetencetomeetthelegislativerequirementsforcompetencywhenperformingbuildingcontrolfunctions,asrequiredundertheBuilding(AccreditationofBuildingConsentAuthorities)Regulations2006.Thisguidanceisspecificallyprovidedforbuildingofficialsand(administrativestaffwhoperformtechnicalbuildingcontrolfunctions)whoarebeingassessedforcompetenceundertheNationalBCACompetencyAssessmentSystem.33ForthepurposesoftheNationalSystem,abuildingofficialwhoisbeingassessedisreferredtoasa‘candidate’.Underthissystem,the‘assessor’isthepersonwhoisresponsibleforevaluatingandconfirmingacandidate’scompetency.Thisdocumentseekstoprovidecandidateswiththeappropriatelevelofinformationsotheycanpreparesuitableevidenceinsupportoftheircompetence.UnlikehistoricalBCAcompetencysystemmodelsorassessmentmethods,theNationalSystemrequiresthatthecandidateactivelyparticipatesandcontributesthroughoutthecompetencyassessmentprocess.

33TheNationalBCACompetencyAssessmentSystemhasbeendevelopedtosatisfyRegulations9,10and11oftheBuilding(AccreditationofBuildingConsentAuthorities)Regulations2006.ThisCandidateInformationPackisasupplementtotheoverallsystemguide.CandidatesinterestedinareviewingtheNationalSysteminitsentiretyshouldrefertothefollowthislink:http://www.dbh.govt.nz/pub-bca-accreditation

Page 146: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 125

SystemFramework

Thenationalcompetencyassessmentsystemismadeupofsixcompetencylevelswithperformanceindicatorsandassessorguidanceoninterpretingtheindicators,andasuiteofassessmenttoolsincludingassessmentplans,evidencegatheringtemplates,skillsmatricesforrecordingtheoutcomeofassessments,andcategorisationflowchartstohelpallocatework.

natIonal levels

Thenewnationalcompetencylevelshavebeengroupedintoresidentialandcommercialbuildingwork.Therearethreeresidentiallevelsandthreecommerciallevels.Theheaderblockineachofthetablesoverthefollowingpagesprovidesanoutlineofthegeneralscopeandlimitationsforthebuildingworkineachofthesixlevels.Photosareprovidedtofurtherillustratethetypicaltypesofbuildingscapturedbyeachofthelevels.

Figure1belowillustratesthecompetencysystem’sframework,startingwiththelegislativerequirementsthroughtothetoolsofassessment.

fIgure 1

Building(Accreditation

ofBuildingConsent

Authorities)Regulations2006

(Regulation10)

CompetencylevelsResidential1–3Commercial1–3

Performanceindicatorsforeachcompetencylevel

Assessmentplan

Candidateevidenceforms

(inspectionandprocessing)

Skillsmatrix Categorisationflowcharts

lawc

om

peten

cy specifi

cation

sto

ols

Page 147: NBCA Competency Assessment System

126 natIonal bca competency assessment system june 2010

new natIonal competency levels

Residential1

Residentialoutbuildingsandancillarybuildings–asdefinedbytheBuildingRegulations1992.Detacheddwellings(SH)designedtoacommonStandard(eg,NZS3604,NZS4229)thataresinglestoreyandhaveanE2/AS1riskmatrixscorelessthanorequalto6.

SimpleonestoreyresidentialdwellingwithanE2/AS1riskscoreof3

SimpleonestoreyresidentialdwellingwithanE2/AS1riskscoreof6

SimpleonestoreyresidentialdwellingwithanE2/AS1riskscoreof4

Residential2

Detacheddwellings(SH)designedtoacommonStandard(eg,NZS3604,NZS4229)thatarelessthanorequaltotwostoreysandhaveanE2/AS1riskmatrixscorelessthanorequalto12.

Twostorey(SH)residentialdwellingwithanE2/AS1riskscoreof9

Twostorey(SH)residentialdwellingwithanE2/AS1riskscoreof12

Twostorey(SH)residentialdwellingwithanE2/AS1riskscoreof11(decknotoverlivingarea)

Residential3

Detacheddwellings(SH)orotherdwellings(SR)thatarelessthanorequaltothreestoreysbutlimitedtoverticalplanefireseparationanddirectegresstotheoutside.E2/AS1riskmatrixscoreof13–20.34

Twostorey(SR)residentialdwellingwithanE2/AS1riskscoreof17(verticalplanefireseparationonly)

Threestorey(SH)residentialdwellingwithanE2/AS1riskscoreof19

Threestorey(SR)residentialdwellingwithanE2/AS1riskscoreof15(verticalplanefireseparationonly)

34Thislevelalsoincludesspecificallydesignedresidentialcladdingsystems,components,detailingandjunctionsandwhereariskmatrixscoreofgreaterthan20hasbeencalculated.

Page 148: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 127

new natIonal competency levels

Commercial1

Commercial,industrialandcommunalnon-residentialbuildingsandtheirassociatedoutbuildingsandancillarybuildingsequaltoorlessthantwostoreysandanoccupancyloadofequaltoorlessthan100peopleorSRorSAresidentialbuildingsuptotwostoreysandwithhorizontalfireseparation.

Onestoreycommercialbuildingwithlessthan100occupants

Onestoreycommercialbuildingwithlessthan100occupants

Twostoreymotelwithlessthan100occupants

Commercial2

Commercial,industrial,communalresidentialandcommunalnon-residentialbuildingsequaltoorlessthanfourstoreyandanoccupancyloadofequaltoorlessthan500peopleorSCorSDthataresinglestorey.

Twostoreymovietheatrewithlessthan500occupants

Fourstoreycommercialbuildingwithlessthan500occupants

Fourstoreycommercialbuildingwithmixed-use(SR)and(CL)

Commercial3

Allusesofbuildingsthatareoverfourstoreyshigh,orcontainover500occupantsorSCorSDgreaterthansinglestorey.

High-risebuildinginexcessoffourstoreys High-risebuildinginexcessoffourstoreysandwithmorethan500occupants

Commercial/publicbuildinginexcessoffourstoreysandwithmorethan500occupants

Page 149: NBCA Competency Assessment System

128 natIonal bca competency assessment system june 2010

Competencyspecifications

ThecompetencyspecificationsusedintheNationalBCACompetencyAssessmentSystemhavebeendevelopedtoprovidetheassessorandcandidatewithadetailedspecificationofknowledgeandskillsthatarerequiredforapersontobecompetentataparticularlevel.

Therearesixcompetencyspecifications,oneforeachofthenewnationalcompetencylevels(Residential1–3andCommercial1–3).

Figure2belowshowshowcompetencyspecificationsarestructuredandwhatareasofknowledgeareconsideredmandatory.

Thecandidateshouldfamiliarisethemselveswiththeperformanceindicatorsandassessorguidancecontainedintheirrelevantcompetencyspecifications.Yourassessorshouldprovideyouwiththecompetencyspecificationsthatrelatetothelevel(s)youarebeingassessedagainstwiththisinformationpack,alternativelyyoucanviewtheapplicablecompetencylevelsonlineontheDepartment’swebsiteat:http://www.dbh.govt.nz/pub-bca-accreditation

Theperformanceindicatorsandassessorandcandidateguidanceforinspectionshavebeengroupedaroundthegenericinspectionareasoffoundation,prelineandfinal.Theterms‘foundation’,‘preline’and‘final’havebeenusedtogroupinspectionsthatBCAscommonlyundertake.Whenprovidingevidence,candidatesshouldchoosemoretechnicalinspectionsthatfallwithinthegroupsof‘foundations’,‘preline’or‘final’.TablesthatshowyourBCA’sinspectionsshouldbeavailablefromyourassessor.

fIgure 2

competency – resIdentIal 1

OutbuildingsandancillarybuildingsasdefinedbytheBuildingRegulations1992astheyapplytoResidential.Detacheddwellings(SH)designedtoacommonStandard(eg,NZS3604,NZS4229)thataresinglestoreyandhaveanE2/AS1riskmatrixscorelessthanorequalto6.

Regulation10(3)(a):4

Understandingthephilosophiesandprinciplesofbuildingdesignandconstruction.

Performanceindicators:

1. Comprehendsandhassatisfactoryknowledgeofsections3,4and5oftheBuildingAct2004.

2. Comprehendsandhassatisfactoryknowledgeofdesignandconstructiontechniquesandconstructionsequencingforthistypeofbuildingwork.

Guidanceforassessorsandcandidates:

1. Knowledgeareasmayinclude,butarenotlimitedto:

a. thepurposeoftheBuildingAct2004(theAct)

b. TA’sfunctions,dutiesandpowersundertheAct,particularlyastheyrelatetohouseholdunits

c. candiscussthehierarchyofNewZealandbuildinglegislationandthevariouscompliancepathsprovidedforundertheAct

d. candiscussbuildingdesign,constructiontechniquesandsequencingofbuildingworkasitrelatestothiscompetencylevel.

NotethisinformationiscoveredinSections2.1,2.2,2.3,3.0,3.1,3.2,3.3,3.5,3.6and3.7ofthePrefacetotheBuildingCodeHandbook.

Ineachcompetencyspecificationthissegmentprovidesadescriptionofthebuildingtypeandscope,andplacesspecificlimitationsonthetypesofbuildingworkthatcanbeprocessedorinspectedforthislevel.

ThissegmentoutlineswhichspecificregulationoftheBuilding(AccreditationofBuildingConsentAuthorities)Regulations2006arebeingassessed.

Thesearemandatoryrequirementswhichmustbeachievedtodemonstratecompetence.

Thissectionprovidesguidanceandsubjectmatterforassessorsandcandidatestoconsider.Itisnotintendedtobeexhaustive,butprovidesforthecorerangeofknowledgeineachcompetencylevel.

Page 150: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 129

Assessmentprocess

fIve step process to usIng the assessment system

Candidateinput

Candidatemeetswithassessorandgainsagreementon:

• competencylevel(s)tobeassessed

• evidencerequiredtoundertakeformalassessmentofcompetence

• methodofassessment

Note:refertopages130–131ofthisguideforthetypesofevidenceyoumaywishtosubmitinordertodemonstrateyourcompetence.

Candidategathersagreedevidencewithintimeframestipulatedinstep1.

Candidateattendsassessmentandisassessed.

Noactionrequiredbycandidate.

Candidateagreeswithoutcomefromtheassessorandsignspart3oftheassessmentplan.

Ifcandidatedoesnotagreeoutcomeofassessment:

• seekclarification• requestreviewof

assessment.

Assessorplansanddocumentsassessmentusingassessmentplan

Evidencemayinclude:

•completedandassessedtraining• relevantqualifications• relevantworkexperience• recordsfrominternalaudits• witnessingofindividual’swork

Evidencemayinclude:

•completedandassessedtraining• relevantqualifications• relevantworkexperience• recordsfrominternalaudits• witnessingofindividual’swork

Evidencemayinclude:

•completedandassessedtraining• relevantqualifications• relevantworkexperience• recordsfrominternalaudits• witnessingofindividual’swork

Assessormeetswithcandidateandagreestotheevidence

tobecollectedandtheassessmentplan

Candidatecompletescandidateevidenceformandgathers

supportingevidence

Candidateshouldhaveclearunderstandingofthe

evidencerequirementsfromtheassessmentplanandthecompetencyspecificationstothelevelbeingassessed

Assessorreviewevidenceprovidedbythecandidateand

decideswhetheraprofessionalconversationisrequired

Assessmentdecisionsarerecordedinpart2of

assessmentplan.Thesecanincludereferencestobuilding

consent,documentation,procedures,internalauditsorotherinformationused

forassessments

1

ASSESSMENTPLANNINGAND

AGREEMENT

Outcomeofassessmentisrecordedinpart3of

theassessmentplanandifrequiredtheorganisation’s

skillsmatrixisupdated

2

EVIDENCEOBTAINEDBYCANDIDATE

3

ASSESSMENTUNDERTAKEN

4

ASSESSMENTDECISIONS

MADE

5

OUTCOMEOFASSESSMENT

RECORDED

Page 151: NBCA Competency Assessment System

130 natIonal bca competency assessment system june 2010

Candidateevidence

Thepurposeofthispartofthedocumentistohelpyouidentifyandprovideevidencetodemonstrateyourcompetence.Yourassessorshouldscheduleatimewithyoutomeetanddiscusstheassessmentprocess(refertostep1onpage129).

Arangeofevidencecanbeusedtodemonstratecompetency.Thetablebelowprovidesexamplesofevidencetypeswhichmaybeused.

source of evIdence guIdance notes – possIble examples that could be used to help assess competency

Self-assessmentagainstcompetencyspecification

• Self-assessmentbytheemployeeagainstthecompetenciestobeassessed• Employeerecogniseswhenworkisoutsidetheirability• Employeerecogniseswhenpeerreviewisrequired• Employeeidentifiesstrengths,knowledgeandskillsgaps• Employeeidentifiestrainingneeds

Workexperienceandexamplesofcompletedwork

• Overviewofworkhistoryandrelevantexperienceinthebuildingindustry• Buildingconsentdocumentationtheemployeehasprocessedandapprovedorrejected• Inspectionsundertakenbytheemployee,includingtheirinspectionrecords,lettersorreports

written,noticestheyhaveissued,follow-upactionstaken• Complianceschedules–reviewofcompliancescheduleassessmentsandidentification

ofinspection,maintenanceandreportingprocedures• Codecompliancecertificatesissued–checklistscompletedandanyothermaterialsupporting

thedecisionstheemployeehasmade(eg,photos)• Otherwrittendocumentationorreportstheyhaveauthored(includingletterstostakeholders,

internalmemos,noticestofix,trainingorpublishedarticles)

Writtenstatementsorreferencesfrompeersortechnicallyskilledobservers

• Thiscouldincludestatementsfromindividualswithproventechnicalskillsandexpertise,suchasmanagers,teamleaders,engineersorotherprofessionalcolleagueswhoareeitherinternalorexternaltotheorganisation.Thesestatementsshouldconfirmthattheyhaveobservedtheemployee’sworkdirectly

• Suchreferencesorstatementsshouldnotethedatesandtimeperiodinquestion,thecapabilityandprofessionalcapacityoftheobserver,thecontextoftheworkinquestion,andanyotherrelevantinformation

Directobservationorshadowingoftheemployeeonthejob

• Casualdailymonitoringofemployee’sperformance• Howtheemployeeperformsduringsitevisits,vettingapplications,processingbuilding

consents,carryingoutfieldinspections,issuingcodecompliancecertificatesornoticestofixandperformingadministrativetasks.

• Howtheemployeecommunicateswithstakeholders(verbalandwritten)• Howtheemployeehandlesanyinstancesordeviationsfromtheapprovedplansandfollows

uponoutstandingissues• Internalauditsandtheirresults

Organisationalrecords • Previouscompetencyassessmentsandperformancereviewsthatconsiderthekeycompetenciesoftheemployee

• Trainingandcontinuingprofessionaldevelopmentrecords• Anycomplimentsorpositivefeedbackreceivedfromthestakeholders• Recordsofanycomplaintsmadeagainsttheemployeeinquestionandtheoutcomes

ofanyinvestigationsarisingfromthese

Evidenceofsuccessfulcompletionofcoursesthatincludeprojectsorcompetency-basedassessment

• Technicalcourses(eg,fire,accessibility,weathertightnesscompliance)• Buildingcontrolscourses(eg,BRANZ,BOINZ,DBH)• Inductiontraining• Informationtechnologytrainingandcourses• Traininginqualityassurancesystemsandauditing

Page 152: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 131

source of evIdence guIdance notes – possIble examples that could be used to help assess competency

Shortcourses

• DBH,BRANZLtd,StandardsNewZealandorBOINZseminarsandcourses• Buildingconsentauthorityinductionorin-housetrainingcourses• Manufacturers’ortradedemonstrations• In-housetrainingonspecificareassuchasbuildingterminology,legislation,NZS3604• TraininginuseoftheBCA‘ssystemsandprocessesandequipment(eg,computertraining,

traininginuseofmoisturemeter,digitalcamera,accreditation-relatedtraining)

Qualificationsthatmayhaverelevancetobuildingcontrol

Thefollowingqualificationsandcoursesmayalsoberelevantinsupportingacompetencyassessment.

BachelorDegrees

• Architecture• Engineering(mechanical,civil,structural,fire,geotechnical,etc)• EnvironmentalScience/health• BuildingScience/buildingtechnology• Constructionmanagement• QuantitySurveying

Diplomasandcertificates

• Nationaldiplomainbuildingcontrolsurveying(mediumandlargebuildings)• Nationaldiplomainbuildingcontrolsurveying(smallbuildings)• Nationaldiplomasinarchitecturaldesign,quantitysurveying,etc• NewZealandCertificateinBuilding,NewZealandCertificateinDrafting,NewZealand

CertificateinEngineering(thesewerereplacedbytheNewZealandQualificationsAuthorityandregisterednationaldiplomasdescribedabove)

• Constructionmanagement(Unitec,WelTec,etc)• Trade,advancedtradeincarpentry• NationalCertificateinCarpentry

Factorstoconsiderwhenassessingtherelevanceofqualificationsandcourses

• Whenitwascompleted• Whatfurthertrainingtheindividualhasdonetostaycurrentintheirareaofexpertise• Whethertheindustryandknowledgerequirementshavechangedsincethequalification

wasobtainedand,ifso,whetherthequalificationortrainingisrelevantintoday’senvironment

Whattypeofcourseitwas,ensuringthatitinvolvedanassessmentortest(eg,exam,completionofaprojectorproductionofanoutput)

Othermaterialtheyhaveproduced

• Papersdevelopedandpresentedatindustryworkshops,conferencesorseminars• Papersdevelopedfortrainingpurposes• Checklistsorproceduresdeveloped• Articleswrittenorpublished

Professionalandindustryaffiliations

• Voluntarymemberships(eg,BOINZ,RegisteredMasterBuilders,CertifiedBuildersAssociation,NewZealandInstituteofRegisteredBuildingSurveyors)

• Industryparticipation(committeemember,officeholder,attendingconferences,etc)• Attendingconferencesortradeshows

TheassessmentprocessdescribedintheNationalBCACompetencyAssessmentSystemisacollaborativeprocessbetweenthecandidateandtheassessor.Previously,competencyassessmenttendedtobeaprocessthatwas‘doneto’acandidateratherthanthecandidateworkingwiththeassessortoestablishtheircompetence.

Page 153: NBCA Competency Assessment System

132 natIonal bca competency assessment system june 2010

TheNationalBCACompetencyAssessmentSystemhasprovidedmorefocusonthecandidatethanpreviouscompetencyassessmentsystems,whichrequiresthecandidateto:

• familiarisethemselveswiththecompetencyspecificationsandhowtomeettheperformanceindicatorsforeachlevelapplicabletothem

• keeppersonalrecordsofinterestingprojects,unusualsituations,workedexamplesandtheirrecordedoutcomessothatthecandidatecanusethemtosupporttheircompetencyassessment

• makedecisionsandagreementswiththeassessoronwhatwillbesuppliedforthecandidate’sassessmentofcompetency

• physicallyobtain,recordandpresenttheevidenceofcompetencetotheassessor• takegreaterresponsibilityfordrivingandcontributingtothecompetencyassessment.

TheNationalBCACompetencyAssessmentSystemalsoacknowledgesthatcandidateshavedifferingstrengthsandweaknesseswhenitcomestopresentingevidenceofcompetence;forexample,someprocessingstafftendtobemorecomfortableatprovidingwrittenreports/casestudies/portfoliosofworkwhereassomeinspectionstafftendtobemorepracticalandprefertoshowandtell(forexample,accompanyinganinspectoronsiteandhavingadiscussionwhilehe/sheundertakesinspections).

Thepurposeofthecandidateevidenceformistohelpthecandidaterecordinformationinawaythatisusefultothemandtheassessor.Theformcontainsaseriesofpromptsandquestionstoassistthecandidate.Thecandidateevidenceformsaretobefilledoutbythecandidateandshouldincluderelevantsupportinginformation/evidencethattheybelievehelpsthemdemonstratecompetence.Ifthecandidatefeelsthatheorshecannotexpressthemselveswellinwritingtheyshouldbepreparedtohaveaprofessionalconversationabouttheiragreedbuildingprojectsontheaspectshighlightedinthisform.Candidatesshouldalsosupplyrelevantplans,specifications,photosinspectionrecordsetc.andtalktothese.Theassessormayalsowishtoaccompanyandobserveacandidatewhiletheyundertaketheirwork.Thisiscalledwitnessingorobservationandisapowerfulwayofestablishingcompetence.

Evidenceformtemplateshavebeendevelopedforprocessingandinspectionsforresidentialandcommercialwork.Itisimportanttonotethatthecandidateevidenceformsaredesignedtoextractthe‘bigticket’ormajorcompliancedecisions35acandidateconsidersduringtheirprocessingofplansandspecificationsand/orthecandidateskeyinspectiondecisions.Itisnotintendedtobeanexhaustivelistthatitemiseshowbuildingcompliancehasbeenachievedforeverything;ratheritisintendedtoextractthemostsignificantbuildingcomplianceconsiderationsofaparticularproject.Forthisreasonitisimportanttoidentifyandagreeonprojectsthatwillbestdemonstrateyourcompetenceatitsupperlevel.

Itisenvisagedacandidatewillkeeparecordofinteresting/technicallycomplexprojectsthattheyhaveworkedon,projectswhichcanbeusedlatertodemonstratetheircompetence.Candidatesmaychoosetocompleteacandidateevidenceformwhiletheyareactivelyprocessingorinspectingbuildingwork.Thisisviewedasanoptimumtimetorecordsuchevidenceasitiswhentechnicalevaluationisbeingundertakenanditisfreshinthecandidate’smind.

Workedexamplesofcompletedinspectionandprocessingcandidateevidenceformsforcommercial2typebuildingworkareprovidedonthefollowingpagestohelpillustratehowthispartoftheprocessshouldwork.(Note:templatesofthecandidateevidenceformsareavailableat:http://www.dbh.govt.nz/pub-bca-accreditation)AdditionalworkedexamplesarealsoavailableintheNationalBCACompetencyAssessmentSystemGuide,andcanalsobeaccessedonthiswebsite.

35InspectionrecordsandprocessingchecklistscanbeappendedtothecandidateevidenceformtodemonstratetheBCO’sassessmentofthosecompliancemattersnotcoveredspecificallyinthecandidateevidenceform(eg,CodeclauseslikeF4,F5,G7,G8,H1etc)wheretheseaspectsarenotconsideredtobesomeofthemajorcomplianceconsiderations.

Page 154: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 133

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

Candidatename:Mr Richter ScaleDate:22.04.2010

Levelofcompetencybeingassessed:Commercial 2

Agreedbuildingconsentnumber/addressofbuildingbeingusedforassessment:

BC 123/20108 Seismic Close

brief description of building project being used for assessment:

TheBuilding

The building consists of a single storey portal-framed structure that is founded on a reinforced concrete foundation. Lower level external walls consist of pre-cast concrete panels to a height of 2.5 metres with long-run profi led metal sheet cladding fi xed to steel framing above. Offi ce areas are clad with fi bre cement-based sheet on a drained cavity. The roof is clad with long-run metal sheet. The roof design incorporates a small building-plant area, which will house the building’s air-conditioning system. Internally the building is divided into two large open retail spaces, a warehouse with goods stacked in proprietary racking systems (higher than 3 metres) and a drive-through timber yard area. Two small mezzanine areas are provided for staff offi ces, bathrooms, lunch and meeting rooms.

Buildingparticulars

Building use: Commercial, crowd activity (CM)- crowd mediumOccupancy: 250 people Highest fi re hazard category (FHC): 4 Square metres: 950m2

Specifiedsystems

The applicant listed the following specifi ed systems on the form 2 building consent application:

• Automatic sprinkler system• Emergency warning system • Emergency lighting system• Mechanical ventilation (air-conditioning) • Backfl ow prevention• Means of escape (fi nal exits, fi re separations and signage)

describe in your own words what you consider is important in relation to the following aspects of your building project.

8.Site/landthatbuildingisbeingbuilton:

The site includes the following special features.

a. GIS mapping indicates the site is located within a specifi c design wind zone. The design engineer confi rmed this view by calculating the site’s wind speed to be 56 m/sec (designated specifi c engineered design (SED)). Structural design, loading calculations and material selection have all taken the sites relative wind loading into consideration.

b. The geotechnical report has identifi ed the site as generally having good ultimate soil bearing capacity; however a small portion of poor quality soil has been identifi ed at the southeastern end of the site. This localised area of poor ground requires specifi c strengthening attention to ensure the building platform can support the load-path from the super structure; consequently a condition has been added to the building consent under section 90 of the Building Act 2004 for third party verifi cation (PS4 monitoring) of this building work as we do not have the specifi c in-house competency to undertake such monitoring or soil testing. The design engineer responsible for observation work is well known to the BCA and is a practising CPEng.

c. The site is rural and is in zone 2 as defi ned in NZ S 3604:1999, indicating building elements are unlikely to be affected by accelerated atmospheric corrosion from wind blown salt laden air and the like.

d. The site has no easements, encumbrances, consent notices etc listed on the certifi cate of title. So no specifi c limitations/design modifi cations are necessary in this regard. Council records also indicate that the site does not have any land related issues such as hazards, contamination or heritage status etc.

e. A surveyor has been involved in defi ning the allotment’s boundaries, so boundary clearances etc should be relatively easy to establish on site.

EXAMPLEThe applicant listed the following specifi ed systems on the form 2 building consent application:

EXAMPLEThe applicant listed the following specifi ed systems on the form 2 building consent application:

Mechanical ventilation (air-conditioning) EXAMPLE Mechanical ventilation (air-conditioning)

Means of escape (fi nal exits, fi re separations and signage)EXAMPLE

Means of escape (fi nal exits, fi re separations and signage)

Page 155: NBCA Competency Assessment System

134 natIonal bca competency assessment system june 2010

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

9. Foundations:

Basis for design: AS/NZ S 1170:2002, B1/VM1 and B1/VM4

The building’s foundation is fully engineered and will be monitored at specifi ed times during construction (some specifi c soil testing is required to confi rm design assumptions made regarding poor soil quality at the southeastern end of the site).

The slabs’ DPM is well detailed on plan and within the specifi cation and meets the E2 performance requirements.

Perimeter pre-cast concrete panels are to be welded to base plates that are to be tied into the slab.

Other aspects of the foundation design were considered standard for this type of building work eg concrete strength, ground clearances, shrinkage control joist, steel size, steel cover and lap, DPM etc.

Some services are to be run within the slab, but this is covered in item 6 below.

10.Structureofthebuildingfromfoundation/slabup:

Basis for design: AS/NZ S 1170:2002, B1/VM1

The building’s structural frame/skeleton consists of steel portals and steel horizontal girts that are clad with long-run metal sheet cladding. Pre-cast panels extend 2.5 metres above fl oor level around the perimeter of the slab.

Plans and specifi cations for the project indicate the building structure (roof) is to support the weight of some large air-conditioning units. The air-conditioning units do not feature in any of the design engineer’s sketches and it is unclear if she is aware of the additional super-imposed load associated with these units (a phone call was made to the engineer to confi rm that the design had accounted for the additional loading imposed by these units). The engineer confi rms these units were not included on the plan version she was provided with. As a result the roof loading is recalculated and the units are moved to a more suitable location (amended plans were requested and provided). Fixing details were also requested for securing the units through the roof cladding in order to satisfy clause E2.

11.Buildingenvelope(claddings):

Basis for design: E2/VM1 and E2/AS1 modifi ed and used as an alternative solution for Building Code compliance.

The building is outside the scope and limitations of E2/AS1; however the designer has chosen to use some design principles and fi gures within the Acceptable Solution to prove compliance with clause E2. Given that the site is located in an SED wind zone and the designer has provided junction details that were unconventional it was decided to get the design peer-reviewed by an independent expert. The design was peer-reviewed by a recognised weathertightness expert who confi rms that the building meets clause E.2.3.2. The designer also provides in-service history of a similar building design that is subject to the equivalent wind pressure. A combination of in-service history and expert opinion confi rms the design meets clause E2 of the NZ BC on reasonable grounds.

12.Firesafety:

Basis for design: C/AS1

Active systems included: Basis for compliance

Automatic sprinkler system NZ S 4541:2007

Emergency warning system F7/AS1 NZ S 4512:2003

Emergency lighting system F6/AS1 AS/NZ S 2293:1995

Passive systems included:

Means of escape (fi nal exits, fi re separations and signage) C/AS1

The building is located at least 20 metres away from any boundaries and no other buildings are in close proximity, so spread of fi re beyond the building is unlikely.

The applicant provided a fi re report that used the Compliance Documents Acceptable Solution C/AS1 to illustrate compliance with the NZ BC. In line with our BCA’s policies and procedures our lead technical person for the C-Docs (John de-blaze) peer-reviewed the fi re report and associated plans. The internal review confi rmed my fi ndings and agreed the documents met the requirements of C/AS1 and the NZBC.

EXAMPLE

EXAMPLEadditional super-imposed load associated with these units (a phone call was made to the engineer to confi rm that the design had

EXAMPLEadditional super-imposed load associated with these units (a phone call was made to the engineer to confi rm that the design had accounted for the additional loading imposed by these units). The engineer confi rms these units were not included on the plan

EXAMPLEaccounted for the additional loading imposed by these units). The engineer confi rms these units were not included on the plan version she was provided with. As a result the roof loading is recalculated and the units are moved to a more suitable location

EXAMPLEversion she was provided with. As a result the roof loading is recalculated and the units are moved to a more suitable location (amended plans were requested and provided). Fixing details were also requested for securing the units through the roof cladding

EXAMPLE(amended plans were requested and provided). Fixing details were also requested for securing the units through the roof cladding

Basis for design: E2/VM1 and E2/AS1 modifi ed and used as an alternative solution for Building Code compliance.

EXAMPLEBasis for design: E2/VM1 and E2/AS1 modifi ed and used as an alternative solution for Building Code compliance.

The building is outside the scope and limitations of E2/AS1; however the designer has chosen to use some design principles and fi gures

EXAMPLEThe building is outside the scope and limitations of E2/AS1; however the designer has chosen to use some design principles and fi gures

EXAMPLE

within the Acceptable Solution to prove compliance with clause E2. Given that the site is located in an SED wind zone and the designer EXAMPLE

within the Acceptable Solution to prove compliance with clause E2. Given that the site is located in an SED wind zone and the designer has provided junction details that were unconventional it was decided to get the design peer-reviewed by an independent expert. EXAMPLE

has provided junction details that were unconventional it was decided to get the design peer-reviewed by an independent expert. The design was peer-reviewed by a recognised weathertightness expert who confi rms that the building meets clause E.2.3.2.

EXAMPLE

The design was peer-reviewed by a recognised weathertightness expert who confi rms that the building meets clause E.2.3.2.

Page 156: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 135

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

13.Services:

General All services penetrations were checked to have adequate protection (eg fi re collars, structural support, not compromising sound rated walls etc).

P&DDrainage and plumbing services for clauses (E1, G1, G2, G10, G12 and G13) were assessed by the BCA’s technical person (S Bend). A small issue was identifi ed regarding pipe falls for sanitary services in the slab (pipe falls within the slab were not adequately detailed on plan). S Bend contacted the designer and the appropriate falls were entered on the relevant drawings. Other P and D matters were found to comply with NZ BC.

Prescribed gas and electrical workCovered by an energy work certifi cate (providing a copy of these certifi cates is a condition of the building consent).

Specifi ed systemsIn accordance with section 7 of the Building Act the designer provided a list of the specifi ed systems to be installed in the building and the proposed procedures for inspection and maintenance of those systems. A schematic plan was also appended to this information to help with on site inspection and system identifi cation purposes.

Third-party commissioning certifi cates are required for the installation of the alarm and sprinkler systems (providing this verifi cation/certifi cation were made on condition of the issued building consent).

14.Interiorfinishes:

Spread of fi reFire resistance ratings and surface fi nishes were assessed and peer-reviewed as part of the fi re safety assessment. These items were found to meet the NZ BC.

Slip resistance The designer elected to use materials that met the slip resistance requirements detailed in D1/AS1 (eg, friction coeffi cient of not less than 0.4).

MoistureWet area fl oor and wall services were well detailed within the design documents and generally used E3/AS1 as means of compliance, albeit with a few minor alternative solutions (the design of a level access accessible shower was deemed beyond the scope of the acceptable solution as it used a sheet membrane on fl oor and wall surfaces; however, the design was found to be well detailed and deemed to meet the requirements of E3).

Describeinyourownwordstheareasofthebuildingthatyouconsiderarisk:

• Foundation – the geotechnical report identifi ed areas where poor soil quality was present.• Structural – building plant located on roof (air-conditioning units) • Building envelope – potential for water ingress and alternative solution offered as a means of compliance • Services – penetrations through fi re rated walls, specifi ed systems – correct design standards and inspection and maintenance

requirements. Pipe services in slab did identify falls/gradient.

Why?:

• Foundation – potential for localised building failure due to poor ground conditions. • Structural – potential for building failure due to an unsupported point-load that was not addressed during the design phase.• Building envelope alternative solution offered by applicant was viewed as potential area of weathertightness risk (peer-review requested

to support proposed design).• Services – penetrations through fi re walls create the potential to compromise fi re resistance.

EXAMPLEFire resistance ratings and surface fi nishes were assessed and peer-reviewed as part of the fi re safety assessment. These items were found

EXAMPLEFire resistance ratings and surface fi nishes were assessed and peer-reviewed as part of the fi re safety assessment. These items were found

The designer elected to use materials that met the slip resistance requirements detailed in D1/AS1 (eg, friction coeffi cient of not

EXAMPLEThe designer elected to use materials that met the slip resistance requirements detailed in D1/AS1 (eg, friction coeffi cient of not

Wet area fl oor and wall services were well detailed within the design documents and generally used E3/AS1 as means of compliance, EXAMPLEWet area fl oor and wall services were well detailed within the design documents and generally used E3/AS1 as means of compliance, EXAMPLE

albeit with a few minor alternative solutions (the design of a level access accessible shower was deemed beyond the scope of the acceptable EXAMPLE

albeit with a few minor alternative solutions (the design of a level access accessible shower was deemed beyond the scope of the acceptable solution as it used a sheet membrane on fl oor and wall surfaces; however, the design was found to be well detailed and deemed to meet EXAMPLE

solution as it used a sheet membrane on fl oor and wall surfaces; however, the design was found to be well detailed and deemed to meet

Page 157: NBCA Competency Assessment System

136 natIonal bca competency assessment system june 2010

natIonal competency assessment system: candIdate evIdence form – processIngto be completed by the candidate.

Werethereanyalternativesolutionsusedinthisbuilding?Ifso,pleasedescribeinyourownwordswhattheywereandhowyouassessedthem:

E2: Cladding system. Use of expert opinion and in-service history of a similar product or building method confi rmed compliance with NZBC.

E3: Accessible shower. Design outside the scope of E3/AS1, but the designer included supporting evidence and testing of product/method used. The shower was assessed against E3’s requirements and was deemed to meet the Building Code.

Inyourownwords,pleasedescribeanylegislativerequirementsyouneededtoconsiderwhenprocessingthebuildingconsentapplication:

• The Building Act 2004, in particular– Sections 17 – all work must comply with NZ BC, 19 – different methods of meeting the NZ BC (eg, Compliance Documents,

product certs, determination etc), 46-51 – processing a building consent, statutory timeframes, NZ FS requirements (is defi ned as relevant building in section 21A of Fire Services Act 1975). 100-105 – compliance schedule considerations as specifi ed systems are being installed as part of the proposed building work. 118 – access and facilities for people with disabilities as the building falls within Schedule 2 of the Building Act 2004

• The Building Regulations, in particular – The Building Regulations 1992 (Schedule 1 the Building Code)– Building (Forms) Regulations 2004

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant.

Building Consent BC 123/2010• Building consent BC 123/2010 plans and specifi cations, particularly:

− Records of conversation with engineer about extra roof loading− Requests for further information− Fire report− Alternative solution cladding (details A04, A06,A020 and pages 57–68 of the specifi cations)− Accessible shower details (page A05 and specifi cation pages 72–73)

• Alternative solution processing sheet (cladding and accessible shower)• Producer statement acceptance records

EXAMPLENote:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobe

EXAMPLENote:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobe

Building consent BC 123/2010 plans and specifi cations, particularly:

EXAMPLEBuilding consent BC 123/2010 plans and specifi cations, particularly:Records of conversation with engineer about extra roof loading

EXAMPLERecords of conversation with engineer about extra roof loading

Alternative solution cladding (details A04, A06,A020 and pages 57–68 of the specifi cations)

EXAMPLEAlternative solution cladding (details A04, A06,A020 and pages 57–68 of the specifi cations)Accessible shower details (page A05 and specifi cation pages 72–73)

EXAMPLEAccessible shower details (page A05 and specifi cation pages 72–73)

Alternative solution processing sheet (cladding and accessible shower)EXAMPLEAlternative solution processing sheet (cladding and accessible shower)EXAMPLE

EXAMPLE

Producer statement acceptance recordsEXAMPLE

Producer statement acceptance records

Page 158: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 137

natIonal competency assessment: candIdate evIdence form – InspectIonto be completed by the candidate.

Candidatename:Mr Richter ScaleDate:17.05.2010

Levelofcompetencybeingassessed:Commercial 2

Agreedbuildingconsentnumber/addressofbuildingbeingassessed:

BC 123/20108 Seismic Close

Whattypeofworkistheinspectionrelatingto(tickrelevantwork)?

Building

Plumbinganddrainage

Whattypeofinspectionisbeingassessed(tickrelevantwork)?

Foundation

Preline

Final

Briefdescriptionofbuildingprojectbeingusedforassessment:

The building consists of a single-storey, portal-framed structure that is founded on a reinforced concrete foundation. Lower level external walls consist of pre-cast concrete panels to a height of 2.5 metres with long-run profi led metal sheet cladding fi xed to steel framing above. Offi ce areas are clad with fi bre cement-based sheet on a drained cavity. The roof is clad with long-run metal sheet. The roof design incorporates a small building-plant area, which will house the building’s air-conditioning system. Internally the building is divided into two large open retail spaces, a warehouse with goods stacked in proprietary racking systems (higher than 3 metres) and a drive-through timber yard area. Two small mezzanine areas are provided for staff offi ces, bathrooms, lunch and meeting rooms.

Buildingparticulars

Building use: Commercial, crowd activity (CM) – crowd mediumOccupancy: 250 peopleHighest fi re hazard category (FHC): 4 Square meterage: 950m2

Briefdescriptionofinspectionbeingundertakenforassessment:

Final inspection for commercial level 2 type building work.

Objective: ensuring the building work has been carried out in accordance with building consent – plans and specifi cations and any amendments, minor variations undertaken during the project and meets the NZ BC requirements.

A review of the consent fi le was undertaken before visiting the site to familiarise myself with the status of the project and identify if there were any outstanding compliance matters.

The project manager responsible for managing the development asked that he be present during the inspection. This was agreed to as it was felt it would be benefi cial should any queries arise about technical matters.

A separate fi nal inspection covering P&D compliance is to be undertaken.

Describeinyourownwordswhatyouconsiderisimportantinrelationtothefollowingrelevantaspectsofyourbuildinginspection:

7. Site/landthatbuildingisbeingbuiltoninrelationtotheinspection:

• As the site is located in a specifi c design wind zone (subject to higher than normal wind pressures) and has some unconventional cladding design details have been used. I will place particular emphasis on inspecting these aspects as it is important to ensure the building’s external envelope has been completed in accordance with plans and specifi cations.

• The site’s geotechnical report identifi ed specifi c requirements for certain areas of the site. As a consequence the project manager has agreed to provide copies of the engineer’s inspection notes and a (PS4) to confi rm the building work undertaken meets the Building Code (means of compliance: Verifi cation Methods cited in the Compliance Document for B1).

EXAMPLEThe roof design incorporates a small building-plant area, which will house the building’s air-conditioning system. Internally the building

EXAMPLEThe roof design incorporates a small building-plant area, which will house the building’s air-conditioning system. Internally the building is divided into two large open retail spaces, a warehouse with goods stacked in proprietary racking systems (higher than 3 metres)

EXAMPLEis divided into two large open retail spaces, a warehouse with goods stacked in proprietary racking systems (higher than 3 metres) and a drive-through timber yard area. Two small mezzanine areas are provided for staff offi ces, bathrooms, lunch and meeting rooms.

EXAMPLEand a drive-through timber yard area. Two small mezzanine areas are provided for staff offi ces, bathrooms, lunch and meeting rooms.

Building use: Commercial, crowd activity (CM) – crowd medium

EXAMPLEBuilding use: Commercial, crowd activity (CM) – crowd medium

Highest fi re hazard category (FHC): 4

EXAMPLEHighest fi re hazard category (FHC): 4

Briefdescriptionofinspectionbeingundertakenforassessment:EXAMPLE

Briefdescriptionofinspectionbeingundertakenforassessment:

Final inspection for commercial level 2 type building work. EXAMPLE

Final inspection for commercial level 2 type building work.

Page 159: NBCA Competency Assessment System

138 natIonal bca competency assessment system june 2010

natIonal competency assessment: candIdate evIdence form – InspectIonto be completed by the candidate.

8. Structureanddurabilityinrelationtotheinspection:

• As noted above the engineer’s inspection notes and (PS4) are to be provided during the inspection to confi rm compliance in relation to structural matters conditioned on the building consent.

• A visual inspection of completed work was undertaken to ensure visible fi xings, ties, bracing etc are in place and are compliant. This was not done to redress items already inspected during preline/postline inspections. It was simply undertaken as general observation of the building’s overall structural compliance.

• I inspected the building for any evidence of structural movement, settlement, subsidence, warping, compression etc that would raise concern and may require additional investigation. No such issues were evident.

• A visual inspection of external/internal materials and coatings was undertaken to ensure these items met the plans and specifi cations and the Building Code, in particular clauses B1, E2 and B2.

9. Buildingenvelope(claddings)inrelationtotheinspection:

• I ensured the external envelope had been completed in accordance with building consent (plans and specs). As the building work includes alternative solutions used as a means of compliance, more emphasis was placed on the inspection of unconventional details, such as junction fl ashings between different cladding types. As an additional precaution, internal moisture level readings were taken on internal lined wall surfaces to provide additional support for the end compliance decision.

• I visually checked exposed fl ashings, membranes, cavity vents and drainage and kept an eye out for any un-consented attachments to the building envelope.

10.Firesafetyaspectsofthebuildinginrelationtotheinspection:

• A full walk-through inspection was undertaken to ensure the nominated means of escape was compliant and penetrations to fi re walls were sealed and made good.

• Life-safety systems (specifi ed systems) were confi rmed to be operational. Third-party verifi cation/certifi cation and commissioning information was provided to confi rm the fi re alarm and sprinkler had been installed in accordance with specifi ed NZ Standards (eg, NZ S 4512:2003 for the alarm system).

11.Servicesandassociatedsystemsinrelationtotheinspection:

• P&D inspection is to be undertaken by a BCO with the appropriate P&D competencies (not part of this inspection).• The fi nal inspection revealed that the following specifi ed systems had not been identifi ed during the processing stage of the building

consent. The owner had failed to identify the following specifi ed systems within their application for building consent – smoke control system for removing smoke and a CO detection device for early warning of gas leakage. Both specifi ed systems were located within the car park area of the building (refer to attached photos 1 and 2 for details of these specifi ed systems). Further information was requested regarding the installation, performance, inspection and procedural requirements of these specifi ed systems. Note: The fi nal inspection was failed as a result of this fi nding.

• The project manager was informed of the areas of non-compliance (non-consented building work) and was provided with an inspection report that outlined what was required to resolve these matters (amended plans and specifi cations, and performance, maintenance and reporting procedures for each specifi ed system). The project manager acknowledged the importance of getting these matters resolved and forwarded the information required, which in turn was added to the compliance schedule.

12.Interiorfinishesinrelationtotheinspection:

• Inspection of these elements was undertaken during the inspection of means of escape (in item 4). This included a visual check of fl oor, wall and ceiling fi nishes and fi xtures and fi ttings to ensure they comply with the plans and in particular the fi re report.

138 natIonal bca competency assessment system june 2010

EXAMPLE

EXAMPLEA full walk-through inspection was undertaken to ensure the nominated means of escape was compliant and penetrations to fi re

EXAMPLEA full walk-through inspection was undertaken to ensure the nominated means of escape was compliant and penetrations to fi re

Life-safety systems (specifi ed systems) were confi rmed to be operational. Third-party verifi cation/certifi cation and commissioning

EXAMPLELife-safety systems (specifi ed systems) were confi rmed to be operational. Third-party verifi cation/certifi cation and commissioning information was provided to confi rm the fi re alarm and sprinkler had been installed in accordance with specifi ed NZ Standards

EXAMPLEinformation was provided to confi rm the fi re alarm and sprinkler had been installed in accordance with specifi ed NZ Standards

11.Servicesandassociatedsystemsinrelationtotheinspection:

EXAMPLE11.Servicesandassociatedsystemsinrelationtotheinspection:

P&D inspection is to be undertaken by a BCO with the appropriate P&D competencies (not part of this inspection).

EXAMPLEP&D inspection is to be undertaken by a BCO with the appropriate P&D competencies (not part of this inspection).The fi nal inspection revealed that the following specifi ed systems had not been identifi ed during the processing stage of the building EXAMPLE

The fi nal inspection revealed that the following specifi ed systems had not been identifi ed during the processing stage of the building EXAMPLE

consent. The owner had failed to identify the following specifi ed systems within their application for building consent – smoke EXAMPLE

consent. The owner had failed to identify the following specifi ed systems within their application for building consent – smoke control system for removing smoke and a CO detection device for early warning of gas leakage. Both specifi ed systems were located

EXAMPLE

control system for removing smoke and a CO detection device for early warning of gas leakage. Both specifi ed systems were located

Page 160: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 139

natIonal competency assessment: candIdate evIdence form – InspectIonto be completed by the candidate.

Describeinyourownwordstheareasofthebuildingwhatyouconsiderariskareainrelationtoyourinspection:

• Foundation – the geotechnical report identifi ed areas where poor soil quality where present (potential risk of structural failure).• Structural – building plant located on roof (air-condition units creating a superimposed /point-load.) • Building envelope – potential for water ingress as an alternative solution had been offered as a means of compliance• Services – penetrations through fi re rated walls, specifi ed systems- correct design standards and inspection and maintenance

requirements. Pipe services in slab did identify fall/pipe gradients. • Specifi ed systems installed, but not identifi ed within the consented documents. Amended plans and specifi cations required prior

to issuing the CCC.

Why?:

• Foundation – potential for localised building failure due to poor ground conditions. • Structural – super-imposed load to roof could create issues if not correctly designed and/or installed.• Building envelope – the alternative solution offered by the applicant was viewed as potential area of weathertightness risk.

Unconventional design means checking of building envelope is very thorough. • Services – penetrations through fi re walls create the potential to compromise fi re resistance. • Specifi ed systems that are not picked up during a building consent will not end up on the buildings compliance schedule

and will consequently not get inspected and maintained over the life of the building.

Inyourownwordspleasedescribeanylegislativerequirementsyouneededtoconsiderwheninspectingthisbuildingwork:

The Building Act 2004, in particular:

• Section 17 all building work must comply with the Building Code.• Sections 100–105 – compliance schedule considerations as specifi ed systems are being installed as part of the proposed building work• In relation to BCA accreditation regulations the requirement to follow the inspections procedures of the BCA.• The Building Regulations, in particular• The Building Regulations 1992 (Schedule 1 the Building Code)• Building (Forms) Regulations 2004• Building (Accreditation of Building Consent Authorities) Regulations 2006.

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant.

Building Consent BC 123/2010• Building consent BC 123/2010 plans and specifi cations, particularly: − Compliance schedule − Fire report − Completed fi nal inspection checklist and inspection notes • Attached photos and notes on missing specifi ed systems

EXAMPLE

EXAMPLESections 100–105 – compliance schedule considerations as specifi ed systems are being installed as part of the proposed building work

EXAMPLESections 100–105 – compliance schedule considerations as specifi ed systems are being installed as part of the proposed building workIn relation to BCA accreditation regulations the requirement to follow the inspections procedures of the BCA.

EXAMPLEIn relation to BCA accreditation regulations the requirement to follow the inspections procedures of the BCA.

The Building Regulations 1992 (Schedule 1 the Building Code)

EXAMPLEThe Building Regulations 1992 (Schedule 1 the Building Code)

Building (Accreditation of Building Consent Authorities) Regulations 2006.

EXAMPLEBuilding (Accreditation of Building Consent Authorities) Regulations 2006.

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.EXAMPLE

Listwhatfurtherevidenceyouhaveeitherattachedorreferredtointhisform.EXAMPLE

Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobeEXAMPLE

Note:YoudonotneedtoduplicatedocumentsthatarestoredelsewhereintheBCA’ssystem,butthesedoneedtobereferenced.Documentsthatyoudoattachorreferenceneedtoberelevant.EXAMPLE

referenced.Documentsthatyoudoattachorreferenceneedtoberelevant.

Page 161: NBCA Competency Assessment System

natIonal competency assessment system: example of photographic evidence provided by candidate for discussion during assessment process

1. Photo of smoke control system in the car park area. Not listed as a specifi ed system on the building consent and/or picked up during processing of the building consent.

2. Photo of CO (carbon monoxide gas detector) early warning device. Not listed as a specifi ed system on the building consent and/or picked up during processing of the building consent.

140 natIonal bca competency assessment system june 2010

EXAMPLE

EXAMPLE

EXAMPLE

EXAMPLE

Page 162: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 141

Candidatechecklist

preparIng for your fIrst meetIng wIth the Tickboxcompetency assessor oncecompleted

1.Ihavereadthroughthecandidateguidancepack.

2.Ihavereadthecompetencyspecification/sthatrelatestotheworkthatIdoandunderstandtheperformanceindicatorsthatIneedtomeet.

3.IhavereviewedrecordsofmyworkoverthepastyearthatIhavekept relatingtointerestingprojectsorunusualsituationsthatmighthelpdemonstratemycompetence.

makIng sure you provIde the rIght evIdence for competency assessment.

4. Evidencehasbeencollectedinaccordancewiththeagreementwith myassessorandmyassessmentplan.

5.Mycandidateevidenceformshavebeencompletedinfull.

6. Ihavebeenspecificandattachedorreferencedinmycandidateevidence formsonlyrelevantinformationtosupportmycompetence.

7. Ihaveprovidedorspecificallyreferredtoexistingrecordstosupport mycompetencyassessment(eg,internalaudits/reviewsortrainingrecordsetc,alsorefertosuggestedevidenceonpages130–131ofthisdocument).

Page 163: NBCA Competency Assessment System

142 natIonal bca competency assessment system june 2010

Page 164: NBCA Competency Assessment System

Ap

pe

nd

ix 7:

Glo

ss

Ar

y o

f Te

rm

s

Appendix 7: GlossAry of Terms

Glossary of terms 143

Page 165: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 143

Appendix7: Glossaryofterms

These definitions are a summary only. For full definitions please refer to the Building Act 2004 and associated regulations.

natIonal competency assessment glossary of terms

Sourcekey:

BA04BCHBCD(VM/AS)BrDBH

BuildingAct2004BuildingCodehandbookComplianceDocumentandrelevantVerificationMethodoracceptablesolutionApplicableBuildingRegulationsDepartmentofBuildingandHousing

Definition Source

AcceptableSolution:AsolutionthatmustbeacceptedascomplyingwiththeBuildingCode. BA04

Alternativesolutions:AsolutionthatcomplieswiththeBuildingCodebutisnotpartofaComplianceDocument. BCHB

Ancillary:Appliestoabuildingorusenotforhumanhabitationandwhichmaybeexemptedfromsomeamenityprovisions,butwhichisrequiredtocomplywithstructuralandsafety-relatedaspectsofthebuildingcode.Examples:abridge,derrick,fence,free-standingoutdoorfireplace,jetty,mast,path,platform,pylon,retainingwall,tank,tunnelordam.

Br

Assessment:Determiningtheextenttowhichanindividualreachesthedesiredlevelofcompetenceinskill,knowledge,andabilitytoapplyknowledge.

DBH

Assessmentplan:Aplandrawnupbytheassessorandagreedwiththecandidateandwhichidentifiestheevidencerequiredtobeprovidedbythecandidateforassessment.

DBH

Assessor:Apersontrainedinassessmenttheoryandpracticeandwithappropriatetechnicalskillstoundertakeanassessment.

DBH

BCA(BuildingConsentAuthority):Accreditedorganisationperformingbuildingcontrolserviceswhosenameisenteredintheregisterreferredtoinsection273(1)(a)oftheBuildingAct2004.

BA04

Buildingwarrantsoffitness:Thewarrantoffitnessanownerofabuildingmustsupplytoaterritorialauthorityundersection108oftheBuildingAct2004.

BCHB

Buildingwork:(a)meanswork—(i)for,orinconnectionwith,theconstruction,alteration,demolition,orremovalofabuilding;and(ii)onanallotmentthatislikelytoaffecttheextenttowhichanexistingbuildingonthatallotmentcomplieswiththeBuildingCode;and(b)includessitework;and(c)includesdesignwork(relatingtobuildingwork)thatisdesignworkofakinddeclaredbytheGovernor-GeneralbyOrderinCounciltoberestrictedbuildingworkforthepurposesofthisAct;and(d)inPart4,oftheBuildingAct2004,andthedefinitioninthissectionof‘supervise,’alsoincludesdesignwork(relatingtobuildingwork)ofakinddeclaredbytheGovernor-GeneralbyOrderinCounciltobebuildingworkforthepurposesofPart4oftheBuildingAct2004.

BA04

Candidate:Thepersonbeingassessed,normallyabuildingofficial(consentprocessororinspector)oradministratorswheretheyundertakeatechnicalbuildingcontrolfunction(eg,vetconsentapplications).

DBH

Changeofuse:Forthepurposesofsections114and115oftheBuildingAct2004,changetheuse,inrelationtoabuilding,meanstochangetheuse(determinedinaccordancewithregulation6)ofallorapartofthebuildingfromoneuse(theolduse)toanother(thenewuse)andwiththeresultthattherequirementsforcompliancewiththeBuildingCodeinrelationtothenewuseareadditionalto,ormoreonerousthan,therequirementsforcompliancewiththeBuildingCodeinrelationtotheolduse.

Br

Classifieduse:ForthepurposesoftheBuildingCodebuildingsareclassifiedaccordingtotype,undersevencategories.AbuildingwithagivenclassifiedusemayhaveoneormoreintendedusesasdefinedintheAct.

Br

Commercial:Appliestoabuildingoruseinwhichanynaturalresources,goods,servicesormoneyareeitherdeveloped,sold,exchangedorstored.Examples:anamusementpark,auctionroom,bank,carpark,cateringfacility,coffeebar,computercentre,firestation,funeralparlour,hairdresser,library,office(commercialorgovernment),policestation,postoffice,publiclaundry,radiostation,restaurant,servicestation,shop,showroom,storagefacility,televisionstationortransportterminal.

Br

Page 166: NBCA Competency Assessment System

144 natIonal bca competency assessment system june 2010

natIonal competency assessment glossary of terms

Communalnon-residential:Appliestoabuildingorusebeingameetingplaceforpeoplewherecareandserviceisprovidedbypeopleotherthantheprincipalusers.Therearetwotypes:AssemblyServiceappliestoabuildingorusewherelimitedcareandserviceisprovided.Examples:achurch,cinema,clubroom,hall,museum,publicswimmingpool,stadium,theatre,orwharerunanga(theassemblyhouse).AssemblyCareappliestoabuildingorusewherealargedegreeofcareandserviceisprovided.Examples:anearlychildhoodcentre,college,daycareinstitution.

Br

Competence/Competency:Abilitytoapplyknowledgeandskillsattherequiredstandardandindefinedcontext. DBH

Complianceschedule:Acomplianceschedulerequiredundersection100oftheBuildingAct2004. BA04

ComplianceScheduleHandbook:AComplianceDocumentproducedbytheDepartmentofBuildingandHousing. DBH

Detacheddwellings:Appliestoabuildingorusewhereagroupofpeopleliveasasinglehouseholdorfamily.Examples:aholidaycottage,boardinghouseaccommodatingfewerthan6people,dwellingorhut.

Br

Determination:AdeterminationmadebytheChiefExecutiveundersubpart1ofPart3oftheBuildingAct2004. BA04

DRU(DesignReviewUnit):TheDRU’sroleistoprovideadviceonthemeansofescapeandtheneedsofpersonswhoareauthorisedbylawtoenterthebuildingtoundertakefirefighting.Thisisoutlinedinsection47oftheBuildingAct2004.

DBH

Earthquake-pronebuilding:Forthepurposesofsection122oftheAct(meaningofearthquake-pronebuilding),moderateearthquakemeans,inrelationtoabuilding,anearthquakethatwouldgenerateshakingatthesiteofthebuildingthatisofthesamedurationas,butthatisone-thirdasstrongas,theearthquakeshaking(determinedbynormalmeasuresofacceleration,velocity,anddisplacement)thatwouldbeusedtodesignanewbuildingatthatsite.

Br

Evidenceform:Atemplateusedtohelpcandidatesdocumentevidenceinawaywhichisusefulfortheassessorandwhichprovidesdocumentaryevidenceofcompetence.

DBH

Householdunit:(a)meansabuildingorgroupofbuildings,orpartofabuildingorgroupofbuildings,thatis–(i)used,orintendedtobeused,onlyormainlyforresidentialpurposes;and(ii)occupied,orintendedtobeoccupied,exclusivelyasthehomeorresidenceofnotmorethan1household;but(b)doesnotincludeahostel,boardinghouse,orotherspecialisedaccommodation.

BA04

HSNO/Hazardoussubstance:(a)Anyhazardoussubstanceasdefinedinsection2oftheHazardoussubstancesandNewOrganismsAct1996;and(b)Anyinfectiousorradioactivesubstancethatmayimpairhuman,animal,orplanthealth:Section2oftheHazardoussubstancesandNewOrganismsAct1996states:‘Hazardoussubstance’means,unlessexpresslyprovidedotherwisebyregulations,anysubstance—(a)Withoneormoreofthefollowingintrinsicproperties:(i)Explosiveness:(ii)Flammability:(iii)Acapacitytooxidise(iv)Corrosiveness:(v)Toxicity(includingchronictoxicity(vi)Ecotoxicity,withorwithoutbioaccumulation;or(b)Whichoncontactwithairorwater(otherthanairorwaterwherethetemperatureorpressurehasbeenartificiallyincreasedordecreased)generatesasubstancewithanyoneormoreofthepropertiesspecifiedinparagraph(a)ofthisdefinition.

FireServiceAct1975andHSNOAct1996

InternationalAccreditationNewZealand(IANZ):Accreditationbodyofthetestinglaboratoryregisteringcouncil,anautonomousCrownentityestablishedbythetestingLaboratoryRegistrationCouncilAct1972,responsibleforaccreditingBCAstotheBuilding(AccreditationofBCAs)Regulations2006.

DBH

IIC(Impactinsulationclass):AsinglenumberratingderivedfrommeasuredCodevaluesofnormalizedimpactsoundpressurelevelsinaccordancewithMethodASTME492,AnnexA1,LaboratoryMeasurementofImpactSoundTransmissionThroughFloor-CeilingAssembliesUsingtheTappingMachine.Itprovidesanestimateoftheimpactsoundinsulatingperformanceofafloor-ceilingassembly.

BCHB

Importancelevels:The‘importancelevel’ofastructureisrelatedtotheconsequencesoffailureandisreflectedintheacceptance(explicitorimplicit)oftheprobabilityofexceedingalimitstate.

AS/NZS1170

Industrial:Appliestoabuildingorusewherepeopleusematerialandphysicaleffortto:(a)extractorconvertnaturalresources,(b)producegoodsorenergyfromnaturalorconvertedresources,(c)repairgoods,or(d)storegoods(ensuingfromtheindustrialprocess).Examples:anagriculturalbuilding,agriculturalprocessingfacility,aircrafthanger,factory,powerstation,sewagetreatmentworks,warehouseorutility.

Br

Licensedbuildingpractitioner(LBP):Abuildingpractitionerwhosenameis,forthetimebeing,enteredintheregisterestablishedandmaintainedundersection298(1).

DBH

MultiProof:AstatementbytheDepartmentofBuildingandHousingthataspecificsetofbuildingplansandspecificationscomplieswiththeNewZealandBuildingCode.

DBH

Page 167: NBCA Competency Assessment System

natIonal bca competency assessment system june 2010 145

natIonal competency assessment glossary of terms

Naturalhazard:Hasthemeaninggiventoitbysection71oftheBuildingAct2004.Section71(3)states:‘(3)Inthissectionandsections72to74,naturalhazardmeansanyofthefollowing:(a)erosion(includingcoastalerosion,bankerosion,andsheeterosion):(b)fallingdebris(includingsoil,rock,snow,andice):(c)subsidence:(d)inundation(includingflooding,overlandflow,stormsurge,tidaleffects,andponding):(e)slippage’

BA04

Occupant/occupancyload:Thegreatestnumberofpeoplelikelytooccupyaparticularspacewithinabuilding.Itisdeterminedby:(a)Multiplyingthenumberofpeopleperm²(occupantdensity)fortheactivitybeingundertaken,bythetotalfloorarea,or(b)Forsleepingareas,countingthenumberofbeds,or(c)Forfixedseatingareas,countingthenumberofseats.

BCHB

Outbuildings:Appliestoabuildingorusewhichmaybeincludedwithineachclassifiedusebutarenotintendedforhumanhabitation,andareaccessorytotheprincipaluseofassociatedbuildings.Examples:acarport,farmbuilding,garage,greenhouse,machineryroom,privateswimmingpool,publictoilet,orshed.

BA04

Performanceindicators:Mandatoryrequirementswhichmustbeachievedtodemonstratecompetenceatagivenlevel.

DBH

Prescribedelectricalwork:Hasthemeaninggiventoitbysection2(1)oftheElectricityAct1992. BA04

PIM(Projectinformationmemorandum):Refertosections31–39oftheBuildingAct. BA04

Professionalconversation:Atypeofstructuredinterviewwiththeaimofclarifyingorconfirminglevelsofknowledge. DBH

Purposegroup:Theclassificationofspaceswithinabuildingaccordingtotheactivityforwhichthespacesareused. Br

Riskmatrix:Atablethatallowsthecalculationofariskscorebytheallocationandsummingofscoresforarangeofdesignandlocationfactorsapplyingtoaspecificbuildingdesign.

E2/AS1

SC(Sleepingcare):Spacesinwhichpeopleareprovidedwithspecialcareortreatmentrequiredbecauseofage,ormentalorphysicallimitations.Forexample,hospitals,orcareinstitutionsfortheaged,children,orpeoplewithdisabilities.

Br

SD(Sleepingdetention):Spacesinwhichpeoplearedetainedorphysicallyrestrained.Forexample,careinstitutionsfortheagedorchildrenandwithphysicalrestraintordetention,hospitalswithphysicalrestraintorwithdetentionquarters,detentionquartersinpolicestations,prisons.

Br

SH(Sleepingsinglehome):Detacheddwellingswherepeopleliveasasinglehouseholdorfamily,includingattachedself-containedspacessuchasgrannyflatswhenoccupiedbyamemberofthesamefamily,andgarages(whetherdetachedorpartofthesamebuilding)ifprimarilyforstorageoftheoccupants’vehicles,tools,andgardenimplements

Br

Specifiedsystems:(a)Asystemorfeaturethat—(i)iscontainedinabuilding;and(ii)contributestotheproperfunctioningofthebuilding(forexample,anautomaticsprinklersystem);And(iii)isdeclaredbytheGovernor-General,byOrderinCouncil,tobeaspecifiedsystemforthepurposesofthisAct;and(b)includesacablecar.

BA04

STC(Soundtransmissionclass):AsinglenumberratingderivedfrommeasuredvaluesoftransmissionlossinaccordancewithclassificationASTME413,DeterminationofSoundtransmissionclass.Itprovidesanestimateoftheperformanceofapartitionincertaincommonsoundinsulationsituations.

CD/G6/VM1/AS1

Storey:Theportionofthebuildingincludedbetweentheuppersurfaceofanyfloorandtheuppersurfaceofthefloornextabove,exceptthatthetopmoststoreyshallbethatportionofabuildingincludedbetweentheuppersurfaceofthetopmostfloor,andtheceilingorroofabove.

NZS3604

SR(Sleepingresidential):Attachedandmulti-unitresidentialdwellings,includinghouseholdunitsattachedtospacesordwellingswiththesameorotheruses,suchascaretakers’flats,andresidentialaccommodationaboveashop.

Br

TA(Territorialauthority):AcitycouncilordistrictcouncilnamedinPart2ofSchedule2oftheLocalGovernmentAct2002;and—(a)inrelationtolandwithinthedistrictofaterritorialauthority,orabuildingonorproposedtobebuiltonanysuchland,meansthatterritorialauthority;and(b)inrelationtoanypartofacoastalmarinearea(withinthemeaningoftheResourceManagementAct1991)thatisnotwithinthedistrictofaterritorialauthority,orabuildingonorproposedtobebuiltonanysuchpart,meanstheterritorialauthoritywhosedistrictisadjacenttothatpart.

BA04

VerificationMethod:AmethodbywhichcompliancewiththeBuildingCodemaybeverified. BA04

Weathertightness/Weathertight:Termsusedtodescribetheresistanceofabuildingtotheweather.Weathertightnessisastatewherewaterispreventedfromenteringandaccumulatingbehindthecladdinginamountsthatcancauseunduedampnessordamagetothebuildingelements.

DBH

Page 168: NBCA Competency Assessment System

146 natIonal bca competency assessment system june 2010

Page 169: NBCA Competency Assessment System

Published in June 2010 byDepartment of Building and HousingPO Box 10-729 Wellington, New Zealand

This document is also available on the Department’s website: www.dbh.govt.nz

You can copy all or some of this document only if you are using it for education or public information, and you say it came from us. You cannot copy any of this document in any way for commercial use, and you cannot keep it in a retrieval system unless you ask us first.

ISBN: 978-0-478-34340-3 (document)ISBN: 978-0-478-34341-0 (website)