CONSTRUCTION MANAGERS MANUAL

1

Page 2: Nabil  Fahoum                        February 2013

Construction Manager’s Manual

2

Page 3: Nabil  Fahoum                        February 2013

Program Management Procedures

3

1000Administrative3000Procurement4000Engineering5000Construction6000Quality Assurance7000Program Controls

Page 4: Nabil  Fahoum                        February 2013

Revised Form A-26 Bridge Rehabilitation Report

4

Page 5: Nabil  Fahoum                        February 2013

Quality Assurance (QA)Quality Control (QC)

The Contractor is responsible for the quality control of their Work.

The CM verifies compliance with QA/QC requirements to ensure that all components of the Contractor’s work conform to the plans, specifications, applicable standards and other requirements of the contract.

5

Page 6: Nabil  Fahoum                        February 2013

Daily Activity Report, Daily Report & Field Book

6

Daily Activity ReportForm A-1B Daily Report

Form A-1

Field Book

Page 7: Nabil  Fahoum                        February 2013

Punch List

7

A list prepared by the CM of outstanding work items and/or work items not complete in conformance with the contract.

Form A-45 PL Punch List Template.

Page 8: Nabil  Fahoum                        February 2013

Project Walkthroughs

8

• General Project Overview• Prior to Substantial Completion• Punch List Available to Attendees• Contract vs. Extra Work Items

Pre-Final WalkthroughWalkthrough attendees:• CM• Tollway Maintenance• Tollway PM• Tollway GEC• Tollway User Departments• Contractor (Optional)

Page 9: Nabil  Fahoum                        February 2013

Project Walkthroughs

9

Completed Punch List

Final Walkthrough

Page 10: Nabil  Fahoum                        February 2013

Final Punch List

10

Form A-45 PL Punch List Template.

Punch List Items Which Are Closed

Physically Completed

Documentation Provided To Indicate Why No Further Action Was Required By Contractor

Page 11: Nabil  Fahoum                        February 2013

Warranties

11

Page 12: Nabil  Fahoum                        February 2013

Reference Documentation

12

Tollway Website Documents

http://www.illinoistollway.com/doing-business/construction-engineering

Page 13: Nabil  Fahoum                        February 2013

Documentation Matrix For Construction

13

Page 14: Nabil  Fahoum                        February 2013

Questions ?

E-Mail: [email protected]

14