N962J STATUS REPORT CESSNA - ASO n962j status report 550 (citation ii) n962j,sn 550-0453 cessna

  • View
    0

  • Download
    0

Embed Size (px)

Text of N962J STATUS REPORT CESSNA - ASO n962j status report 550 (citation ii) n962j,sn 550-0453 cessna

  • N962J STATUS REPORT CESSNA

    jmares@traxxall.comJerimiah MaresAnalyst:

    General Categories: RVSM,EMM,FAR 91,FAA Cost:

    9,768.55+Man Hrs:

    705+

    Owner:

    Operator:

    Lone Star Lodge & Marina

    Lone Star Lodge & Marina Airframe 550 (Citation II) 550-0453 26-Jun-2020 10,114.6 Hrs 9,489 Ldg

    Eng 1 JT15D-4 PCE-70282 26-Jun-2020 9,707.3 Hrs 7,670 Enc

    Eng 2 JT15D-4 PCE-71477 26-Jun-2020 5,665.3 Hrs 5,209 Enc

    Task No Description Categories Time

    SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining

    ▼ 1 - --

    SL550-01-01 Miscellaneous - Correction of Installed Equipment List RE (-) Recommended

    1 A/F Mos

    Hrs

    Ldg

    ▼ 2 - *Reserved for Airline Use

    SL550-02-01 Miscellaneous - Year 2000 Readiness Disclosure T (A/R) Informational

    2 A/F Mos

    Hrs

    Ldg

    SL550-02-02 Miscellaneous - Cessna CD-ROM Technical Library T (A/R) Informational

    2 A/F Mos

    Hrs

    Ldg

    ▼ 3 - *Reserved for Airline Use

    CIL-03-01 Supplemental Type Certificate (STC) T (A/R) Informational

    3 A/F

    Eff: 03-Jun-2013

    Mos

    Hrs

    Ldg

    SB550-03-02 Certification Requirements - US to Spanish Conversion RE (-) Optional

    3 A/F Mos

    Hrs

    Ldg

    SB550-03-03 Certification Requirements - Certification for Operation at 45,000ft RE (-) Recommended

    3 A/F Mos

    Hrs

    Ldg

    SB550-03-04 Certification Requirements - Republic of Ireland to United Kingdom Conversion RE (-) Optional

    3 A/F Mos

    Hrs

    Ldg

    SB550-03-05 Foreign Certification Placard Installation RE (-) Optional

    3 A/F Mos

    Hrs

    Ldg

    SL550-03-01 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 31-Oct-1984

    Mos

    Hrs

    Ldg

    1/403 Generated: 10-Jul-2020 4:51 PM

    [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance

  • Owner/Operator: Lone Star Lodge & Marina

    Lone Star Lodge & Marina

    N962J STATUS REPORT 550 (Citation II) N962J,SN 550-0453

    CESSNA

    Task No Description Categories Time

    SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining

    SL550-03-01-R01 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 15-Feb-1985

    Mos

    Hrs

    Ldg

    SL550-03-01-R02 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 31-Jul-1986

    Mos

    Hrs

    Ldg

    SL550-03-01-R03 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 24-Jul-1987

    Mos

    Hrs

    Ldg

    SL550-03-01-R04 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 09-Oct-1987

    Mos

    Hrs

    Ldg

    SL550-03-01-R05 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 01-Apr-1992

    Mos

    Hrs

    Ldg

    SL550-03-01-R06 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 03-Apr-1994

    Mos

    Hrs

    Ldg

    SL550-03-01-R07 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 06-Jun-1994

    Mos

    Hrs

    Ldg

    SL550-03-01-R08 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 23-Jun-1995

    Mos

    Hrs

    Ldg

    SL550-03-01-R09 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 20-Jun-1997

    Mos

    Hrs

    Ldg

    SL550-03-01-R10 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 12-May-1999

    Mos

    Hrs

    Ldg

    SL550-03-01-R11 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 12-Aug-2002

    Mos

    Hrs

    Ldg

    SL550-03-01-R12 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 01-Apr-2004

    Mos

    Hrs

    Ldg

    2/403 Generated: 10-Jul-2020 4:51 PM

    [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance

  • Owner/Operator: Lone Star Lodge & Marina

    Lone Star Lodge & Marina

    N962J STATUS REPORT 550 (Citation II) N962J,SN 550-0453

    CESSNA

    Task No Description Categories Time

    SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining

    SL550-03-01-R13 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 31-Oct-2007

    Mos

    Hrs

    Ldg

    SL550-03-01-R14 Model 550 Citation II and Bravo FAA Single Pilot Exemption RE (-) Informational

    3 A/F

    Eff: 10-Sep-2008

    Mos

    Hrs

    Ldg

    SL550-03-01-R15 Model 550 Citation II and Bravo FAA Single Pilot Exemption T (A/R) Informational

    3 A/F

    Eff: 26-Oct-2009

    Mos

    Hrs

    Ldg

    SL550-03-02 Supplemental Type Certificate (STC) - CANCELLED RE (-) Informational

    3 A/F Mos

    Hrs

    Ldg

    SL550-03-02-R01 Supplemental Type Certificate (STC) - CANCELLED RE (-) Informational

    3 A/F Mos

    Hrs

    Ldg

    ▼ 5 - TIME LIMITS/MAINTENANCE CHECKS

    051220S Inspect Air Data Display Unit STAR FAR 91.411 ADDU Check RE Custom Task

    5 A/F Left

    9D-80130-16

    26255

    Mos 27-Feb-2020 12 28-Feb-2021 7.8 Months

    Hrs 10,111.8

    Ldg 9,487

    051220S Inspect Air Data Display Unit STAR FAR 91.411 ADDU Check RE Custom Task

    5 A/F Right

    9D-80130-16

    26245

    Mos 27-Feb-2020 12 28-Feb-2021 7.8 Months

    Hrs 10,111.8

    Ldg 9,487

    051233 Gill Battery Capacity Inspection RE

    5 A/F

    7638-44

    G02980706

    (UPDATE NOTE: installed new gill 7638-44 s/n G03057070 )

    Mos 27-Nov-2019 12 30-Nov-2020 4.8 Months

    Hrs 10,107 800 10,907 792.4 Hrs

    Ldg 9,484

    05-JT15D-001 Engine Minor Inspection RE ≈18-May-2021

    5 ENG1

    (Tol. Adjustment: -52d, 30 Hrs)

    Mos 27-Nov-2019 24 -/+30d 31-Oct-2021 1.3 Years (+30 Days)

    Hrs 9,699.7 300 -/+10% 10,029.7 322.4 Hrs (+30)

    Enc 7,667

    05-JT15D-001 Engine Minor Inspection RE ≈18-May-2021

    5 ENG2

    (Tol. Adjustment: -52d, 30 Hrs)

    Mos 27-Nov-2019 24 -/+30d 31-Oct-2021 1.3 Years (+30 Days)

    Hrs 5,657.7 300 -/+10% 5,987.7 322.4 Hrs (+30)

    Enc 5,206

    5-12-01 Phase 01 Inspection RE Continuous Inspection Program ≈18-Apr-2021

    5 A/F

    (SOURCE: Model 550 MM)

    Mos 27-Nov-2019 24 +2m 30-Nov-2021 1.4 Years (+61 Days)

    Hrs 10,107 300 +30 10,407 292.4 Hrs (+30)

    Ldg 9,484

    3/403 Generated: 10-Jul-2020 4:51 PM

    [ ]: Manual entry, (): Package, ≠: Masked Due, ≈: Estimated, Δ: Deficient, OVD: Overdue, Tol: Tolerance

  • Owner/Operator: Lone Star Lodge & Marina

    Lone Star Lodge & Marina

    N962J STATUS REPORT 550 (Citation II) N962J,SN 550-0453

    CESSNA

    Task No Description Categories Time

    SEQ PN/SN MOC Note or Component Condition TSNI TSOI TSRI TSI CW REQ TOL DUE Remaining

    5-12-02 Phase 02 Inspection RE Continuous Inspection Program ≈18-Apr-2021

    5 A/F

    (SOURCE: Model 550 MM)

    Mos 27-Nov-2019 24 +2m 30-Nov-2021 1.4 Years (+61 Days)

    Hrs 10,107 300 +30 10,407 292.4 Hrs (+30)

    Ldg 9,484

    5-12-03 Phase 03 Inspection RE Continuous Inspection Program ≈18-Apr-2021

    5 A/F

    (SOURCE: Model 550 MM)

    Mos 27-Nov-2019 24 +2m 30-Nov-2021 1.4 Years (+61 Days)

    Hrs 10,107 300 +30 10,407 292.4 Hrs (+30)

    Ldg 9,484

    5-12-04 Phase 04 Inspection RE Continuous Inspection Program ≈18-Apr-2021

    5 A/F

    (SOURCE: Model 550 MM)

    Mos 27-Nov-2019 24 +2m 30-Nov-2021 1.4 Years (+61 Days)

    Hrs 10,107 300 +30 10,407 292.4 Hrs (+30)

    Ldg 9,484

    5-12-05 Phase 05 Inspection RE Continuous Inspection Program

    5 A/F

    (Tol. Adjustment: -174d) (SOURCE: Model 550 MM)

    Mos 27-Mar-2019 36 +2m 31-Oct-2021 1.3 Years (+61 Days)

    Hrs 10,080.2 1,200 +100 11,280.2 1,165.6 Hrs (+100)

    Ldg 9,466

    5-12-06 Phase 06 Inspection RE (N/A) Continuous Inspection Program

    5 A/F

    (SOURCE: Model 550 MM) (NOTE: Recommended every 14 days for operators who routinely operate or base their airplane in areas

    subject to saltwater or other corrosion effects.)

    Mos

    Hrs

    Ldg

    5-12-07 Phase 07 Inspection RE (N/A) Continuous Inspection Program

    5 A/F

    (SOURCE: Model 550 MM)

    Mos

    Hrs

    Ldg

    5-12-08 Phase 08 Inspection (Not Used) RE (N/A) Continuous Inspection Program

    5 A/F

    (SOURCE: Model 550 MM) (NOTE: Every 400 hours, +50 or -50 hours, or 12 calendar months, whichever occurs first. (Not Used))

    Mos

    Hrs

    Ldg

    5-12-10 Phase 10 Inspection RE (N/A) Continuous Inspection Program

    5 A/F

    (SOURCE: Model 550 MM)

    Mos

    Hrs

    Ldg

    5-12-11 Phase 11