Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Mt Lindsay Tin/Tungsten Project
PAGE 3
Presentation Disclaimer
Forward Looking Statements■ This presentation may contain certain forward looking statements and projections regarding:
- estimated, resources and reserves;
- planned production and operating costs profiles;
- planned capital requirements; and
- planned strategies and corporate objectives.
■ Such forward looking statements/projections are estimates for discussion purposes only and should not be relied upon. Theyare not guarantees of future performance and involve known and unknown risks, uncertainties and other factors many ofwhich are beyond the control of Venture Minerals Limited. The forward looking statements/projections are inherentlyuncertain and may therefore differ materially from results ultimately achieved.
■ Venture Minerals Limited does not make any representations and provides no warranties concerning the accuracy of theprojections, and disclaims any obligation to update or revise any forward looking statements/projects based on newinformation, future events or otherwise except to the extent required by applicable laws.
■ The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on informationcompiled by Mr Andrew Radonjic, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr AndrewRadonjic is a full-time employee of the company. Mr Andrew Radonjic has sufficient experience which is relevant to the style ofmineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a CompetentPerson as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and OreReserves’. Mr Andrew Radonjic consents to the inclusion in the report of the matters based on his information in the form andcontext in which it appears.
PAGE 3
North West Tasmania
King Island (Tungsten)
Mt Bischoff (Tin)Metals X & Yunnan Tin
Cleveland (Tin)Ex-Aberfoyle
Avebury (Nickel)China Min Metals Corp.
Rosebery (Cu, Pb, Zn)China Min Metals Corp.
Fast Factso World class
mineral field
o +$13 billion of Tin/Tungsten mined
o World Players in Sn / WO3- China Min Metals
- Yunnan Tin
Savage River (Fe)Jiangsu Shagang 47%
Renison Bell (Tin)Metals X & Yunnan Tin
Mt Lindsay Tin-Tungsten DepositReserves of 14Mt @ 0.6%SnEq
Riley Hematite DSO DepositReserves of 2Mt @57%Fe
Livingstone Hematite DSO DepositReserves of 2Mt @57%Fe
PAGE 3
Venture Minerals
Highlights
Completed a BFS on the Mt Lindsay Tin/Tungsten Deposit -one of the worlds largest and most advanced new tin projects
Based on a 1.75Mtpa open pit operation the project delivered a 9 year mine life
Reduced Commodity Risk through the diversified production of co-products; 2,500tpa of tin & 1,600tpa of tungsten (trioxide)
C1 Cash Costs on a co-product basis (incl. Fe & Cu by-product credits) A$11,228/t of tin metal in concentrate
Received both off-take and financing interest from the US, Japan, China & Europe
PAGE 3
Mt Lindsay Tin Tungsten Deposit
PAGE 3
Geological Setting
PAGE 3
PAGE 3
Resource Upgrade
Lower Cut (Tin
equiv)`Category Tonnes
Tin Equiv. Grade
Tin GradeTungsten
Grade (WO3)Copper Grade
(WO3)Contained Tin Metal
(tonnes)
Contained Tin/ Tungsten Metal
(tonnes)
0.20%
M & I 25Mt 0.5% 0.2% 0.1% 0.1% 49,000 72,000
Inferred 20Mt 0.4% 0.2% 0.1% 0.1% 32,000 41,000
Total 45Mt 0.4% 0.2% 0.1% 0.1% 81,000 113,000
0.45%
M & I 9.5Mt 0.8% 0.3% 0.2% 0.1% 26,000 44,000
Inferred 3.9Mt 0.6% 0.3% 0.1% 0.1% 12,000 17,000
Total 13Mt 0.7% 0.3% 0.2% 0.1% 38,000 61,000
Category TonnesTin Equiv.
GradeTin Grade
Tungsten Grade (WO3)
Copper Grade (WO3)
Contained Tin Metal (tonnes)
Contained Tin/ Tungsten Metal (tonnes)
Proved 6.4Mt 0.7% 0.2% 0.2% 0.1% 14,000 23,000
Probable 7.3Mt 0.5% 0.2% 0.1% 0.1% 16,000 23,000
Total 14Mt 0.6% 0.2% 0.1% 0.1% 30,000 46,000
Maiden Reserve
PAGE 3
Slide 9
PAGE 3
Bankable Feasibility Study - 2012
Mt LindsayTin/Tungsten Project
Bankable Feasibility Study(November 2012)
Maiden Reserve (including 6.4mt @ 0.7% tin equivalent)
14mt
Revenue Life of Mine A$1,435m
Net Cash Life of Mine A$554m
NPV8 A$143m
Project Life 9 years
Internal Rate of Return 21%
Peak Net Annual Revenue A$110m
Capital Costs(including a 35% plant capacity upgrade to 1.75mtpa)
A$198m
Commodity Prices & Exchange Rate used for BFS
Tin US$23,800/t
Tungsten US$392/mtu
Magnetite (reference price Fe 62%) US$125/t Copper US$8,000/t Exchange Rate USD/AUD = $0.90
PAGE 3
High Priority Drill Targets
Waterhouse
No.1 Skarn
No. 2 Skarn
Main Skarn
High-Grade MacDonald
Tin Zone
High-Grade
Tungsten Zone
New Tin
Discovery
Combined Resources - Mt Lindsay Deposit(0.20% cut-off) 45Mt @ 0.4% Tin (Sn) equiv.
(0.45% cut-off) 13Mt @ 0.7% Tin (Sn) Equiv.
PAGE 3
High Priority Drill Targets
PAGE 3
Regional Drill Targets
Combined Measured/Indicated/Inferred
* Resources
Mt Lindsay Deposit13Mt @ 0.7% Sn equiv. (0.45%% Cut-off)
Reserves14Mt @ 0.6% Sn Equiv.
Riley DSO Deposit
Big Wilson discovery hole
intersects
17.4m @ 2% Sn inclu. 4m @
5.6% Sn
Webbs Creek
9m @ 0.6% Sn Equiv.
32 strike kms of
skarn targets
Savage River Mine
Magnetite Mine
producing at
2.5Mtpa
PAGE 3
14
High Grade mineralisation of
17.4m @ 2% Tin including
4m @ 5.6% Tin
47m of Tin
mineralisation
Big Wilson Discovery Hole Cross-Section
PAGE 3
15
Big Wilson Soil Anomaly
17.4m @ 2.1% SnEq 10m @ 1.0% SnEq
21m @ 0.5% SnEq
PAGE 3
16
Regional Drill Targets
Combined Measured/Indicated/Inferred
* Resources
Mt Lindsay Deposit13Mt @ 0.7% Sn equiv. (0.45%% Cut-off)
Reserves14Mt @ 0.6% Sn Equiv.
Riley DSO Deposit
Big Wilson discovery hole intersects
17.4m @ 2% Sn inclu. 4m @
5.6% Sn
Mt Ramsay1.3km Sn-W soil
anomalyWebbs Creek
9m @ 0.6% Sn Equiv.
32 strike kms of
skarn targets
Savage River Mine
Magnetite Mine
producing at
2.5Mtpa
PAGE 3
Mt Ramsay
15.7m @ 0.18% Sn
PAGE 3
Regional Drill Targets
Combined Measured/Indicated/Inferred
* Resources
Mt Lindsay Deposit13Mt @ 0.7% Sn equiv. (0.45%% Cut-off)
Reserves14Mt @ 0.6% Sn Equiv.
Riley DSO Deposit
Big Wilson discovery hole intersects
17.4m @ 2% Sn inclu. 4m @ 5.6% Sn
Mt Ramsay1.3km Sn-W soil
anomalyWebbs Creek
9m @ 0.6% Sn Equiv.
32 strike kms of
skarn targets
Inset Map - newly
discovered
Tin Targets
Savage River Mine
Magnetite Mine
producing at
2.5Mtpa
PAGE 3
Regional Drill Targets
Mt Lindsay Tin-Tungsten Deposit13Mt @ 0.7% Sn equiv. (0.45%% Cut-off)*
Meredith Granite
Livingstone Skarn
Reward Skarn Main SkarnNo.2 Skarn
RW020 2m @ 1.1% Tin
Newly
Discovered
Tin Targets
PAGE 3
Regional Drill Targets
Inset Map - newly
discovered
Tin Targets
PAGE 3
Venture Minerals
Conclusions
BFS now completed on the Mt Lindsay Tin/Tungsten Deposit -one of the worlds largest and most advanced new tin projects
Mt Lindsay boasts over 9 year mine life, generating $550m net cash LOM (2012 BFS)
Continuing do discover a multitude of new targets
Extensive land package containing +30 strike km of skarntargets
“Strategically Positioned For Production”
for up-to-date information please visit our website
www.ventureminerals.com.au