21
Actual FTY (2011-12) % on IHC Parameters Revenue Ideal IHC Actual IHC recovered #DIV/0! % Recovery COST #DIV/0! Depreciation #DIV/0! RTA, Road tax & insurance - #DIV/0! Owning Cost Total #DIV/0! Staff expenses #DIV/0! Labour expenses #DIV/0! Spares #DIV/0! Oil & consumbales #DIV/0! Agency repairs - #DIV/0! O&M Cost Total - #DIV/0! Total Cost - #DIV/0! Gross Margin - Overheads as % of revenue - PBIT - Net Earnings (PBIT - T) AWC ANFA - ANFE #DIV/0! ROCE - #DIV/0! Cost of Capital - #DIV/0! EVA P&M BU F

MRM Template

Embed Size (px)

Citation preview

Page 1: MRM Template

Actual FTY

(2011-12)% on IHC Parameters

Revenue

Ideal IHC

Actual IHC recovered

#DIV/0! % Recovery

COST

#DIV/0! Depreciation

#DIV/0! RTA, Road tax & insurance

- #DIV/0! Owning Cost Total

#DIV/0! Staff expenses

#DIV/0! Labour expenses

#DIV/0! Spares

#DIV/0! Oil & consumbales

#DIV/0! Agency repairs

- #DIV/0! O&M Cost Total

- #DIV/0! Total Cost

- #DIV/0! Gross Margin

- Overheads as % of revenue

- PBIT

- Net Earnings (PBIT - T)

AWC

ANFA

- ANFE

#DIV/0! ROCE

- #DIV/0! Cost of Capital

- #DIV/0! EVA

P&M BU Financials

Page 2: MRM Template

Actual FTY

(2012-13)% on IHC

Budget FTY

(2013 - 14)% on IHC

#DIV/0! #DIV/0!

#DIV/0! #DIV/0!

#DIV/0! #DIV/0!

- #DIV/0! - #DIV/0!

#DIV/0! #DIV/0!

#DIV/0! #DIV/0!

#DIV/0! #DIV/0!

#DIV/0! #DIV/0!

#DIV/0! #DIV/0!

- #DIV/0! - #DIV/0!

- #DIV/0! - #DIV/0!

- #DIV/0! - #DIV/0!

- -

- -

- -

- -

#DIV/0! #DIV/0!

- #DIV/0! - #DIV/0!

- #DIV/0! - #DIV/0!

P&M BU Financials

Page 3: MRM Template

Remarks (Remarks need not display in PPT)

As per Plant Master

Actual IHC recovered as per CP

IHC recovered minus total cost

3% on IHC recovered for FY

Gross margin minus overheads

Consider Tax @ 33.99%

Avergage Spares Stock

Average of monthwise bookvalue

AWC + ANFA

13.25% (on ANFA)

Net earnings minus Cost of capital

Budget detail should be same as projected in previous MRM

Page 4: MRM Template

ASSET TURNOVER RATIO

Job Name Job Code BUJOB SALES

(YTD)

ANFA

(Own Assets)

ANFA

(Hired

assets)

ATR

(OWN)

Godrej Palm Grove LE100580 P&M

Data from Apr 12 - Mar 13

Values in Crore

ATR to be annualized

Page 5: MRM Template

ASSET TURNOVER RATIO

ATR

(INCL HIRED

ASSETS)

BUJOB SALES

(YTD)

ANFA

(Own

Assets)

ANFA

(Hired

assets)

ATR

(OWN)

ATR

(INCL

HIRED

ASSETS)

Airport

IT&IS

H&L

RBU

Factory

Page 6: MRM Template

Values in Crores

Month Ideal IHC Actual IHC % Recovery

Apr' 12 - Mar' 13

Break-up of Under Recovery

Reasons Percentage % (average)

Assets in Transit 3

Assets not commissioned 6

Breakdown at Sites 8

Not Loaded 19

Surplus 20

Disposal 44

Total 100

IHC Recovery Pattern (Apr' 12 - Mar' 13)

PLEASE SHOW ONLY PIE CHART IN PPT. BELOW BREAK-UP IS ONLY FOR MAKING THE PIE CHART

CCs Cars / Not Available (Dispatched)

3% Assets not commissioned

6%

Breakdown at Sites 8%

Not Loaded 19%

Surplus 20%

Disposal 44%

Page 7: MRM Template

REPAIR BUDGET 2012-13Cluster:

Equipment Budget (13-14) Budget (12-13) Spent Actual (12-13)

Tower Crane

Batching Plant

Concrete Pump

Mobile Boom Placer

Stationary Boom Placer

Passenger Hoist

Power Generators

Transit Mixers

(Any other major category may be included)

Other Major

Values in Lakhs

It has to show only the major refurbishments planned / done

Page 8: MRM Template

Sl.

NoAssetcode

Batching Plant

Make & ModelProject(s) M/C Months used

Site

Productivity

(Cum / Hr)

Concrete

Produced

(Cum)

Total Cost Cost / Cum

1 1326-719-9 Stetter CP30 Godrej Palm Grove #DIV/0!

2

3

4

5

6

7

8

9

10

11

12

13

Concrete Production Cost

Page 9: MRM Template

Sl.

NoProject

No of Transit Mixers

used

Concrete Qty

Transported

(Cum)

Concrete

Transported /

Per month per

TM

Total Cost Cost / Cum

1 Godrej Palm Grove (Total M/C months / 12) #VALUE! #DIV/0!

2

3

4

5

6

7

8

9

10

11

12

13

Concrete Transport Cost

Page 10: MRM Template

Sl.

NoAssetcode Pump Make & Model Project M/C Months used

Site Productivity

(Cum / Hr)

Concrete

Pumped

(Cum)

Total Cost Cost / Cum

1 Putzmeister & 1405-D Godrej Palm Grove #DIV/0!

2

3

4

5

6

7

8

9

10

11

12

13

Concrete Pumping Cost

Page 11: MRM Template

Sl.

NoAssetcode Make & Model Project M/C Months used

Site

Productivity

(Cum / Hr)

Concrete

Pumped

Cum

Placed

(Cum)

Total Cost Cost / Cum

1 #DIV/0!

2

3

4

5

6

7

8

9

10

11

12

13

Concrete Placing Cost (Mobile Boom placer)

Page 12: MRM Template

Sl.

NoAssetcode Make & Model Project M/C Months used

Concrete

Placed

(Cum)

Total Cost Cost / Cum

1 #DIV/0!

2

3

4

5

6

7

8

9

10

11

12

13

Concrete Placing Cost (Stationary Boom placer)

Page 13: MRM Template

Sl.

NoProject BU

Internal P&M

Cost to Project

External P&M Cost

for Project

Fuel /

Power

Cost

Total P&M Cost Job SaleP&M Cost on

Job Sale

1 Godrej Palm Grove P&M 0 #DIV/0!

2

3

4

5

6

7

8

9

10

11

12

13

Project P&M Cost

Page 14: MRM Template

Covenanted

Executive

Supervisory

Technical

Technical (SES)

Trainees

0 Total 0 0

2011-12 IHC Recovered 2012-13IHC / total staff

months

(exclude

Trainees)

ROTE (On IHC) (Per staff per month)

IHC / total

staff months

(exclude

Trainees)1:04 Foreman Vs Engineer ratio 1:05

Operator

Driver

Mechanic

Electrician

Helper

Other Technicians

Specialized workmen (Show no of departmental workmen kept for erection activities & other technical services)

Total

2011-12 IHC Recovered 2012-13

IHC / Total

workmen

months

ROLE (On IHC) (per workmen per

month)

IHC / Total

workmen

months

Workmen

Strength Mar'

12

Workmen

Workmen

Strength

Mar'13

Man Power Detail

Staff Strength

Mar' 12Staff

Staff

Strength

Mar' 13

Additional

Requirement

FTY (13-14)

Additional

Requirement

FTY (13-14)

Page 15: MRM Template
Page 16: MRM Template

0

0

0

0

0

0

0

2013-14IHC / total staff

months

(exclude

Trainees)

0

0

0

0

0

0

(Show no of departmental workmen kept for erection activities & other technical services)

0

2013-14

IHC / Total

workmen

months

Workmen

Strength Mar'

14

Man Power Detail

Staff Strength

Mar' 14

Page 17: MRM Template
Page 18: MRM Template

Initiatives & Mechanization

Implementation of Skid Steer Loader for Piling at site level using Auger attachment.

CLUSTER:-

Note:

The various initiatives (pl be specific) made by Cluster office / sites for

Improving the site P&M performance & Mechanization drives initiated /

implemented

Page 19: MRM Template

Major Achievements

CLUSTER:-

Purpose:

To know significant achievements of each region and identify few of

them for implementing in other regions.

Page 20: MRM Template

Sl. No. Program NameIntra / Inter

ClusterDuration (Days)

Total 0

Sl. No. Program Name / TypeIntra / Inter

ClusterDuration (Days)

Total 0

Note

Show the training plan for the FY 2012-13

Minimum 10 programs per cluster must be planned

Non Calender P&M Training Plan (2013 - 14)

Non Calender P&M Training Conducted (2012 - 13)

Page 21: MRM Template

Faculty Members

Location

(Cluster / Site

Name)

No of

Participants

Attended

0

Faculty Members

(Internal / External)

Location

(Cluster / Site

Name)

No of

Participants

Planned

0

Non Calender P&M Training Plan (2013 - 14)

Non Calender P&M Training Conducted (2012 - 13)