Mountain Division Tie Replacement
Project
Rail Project Evaluation Request – February 2009
1. Contact Information
Dale King Alan Hardy
Superintendent Assistant Superintendent
Tacoma Rail Tacoma Rail
2601 SR 509 North Frontage Road 2601 SR 509 North Frontage Road
Tacoma, WA 98421 Tacoma, WA 98421
Phone: (253) 502-8894 Phone: (253) 502-8896
Fax: (253) 922-9088 Fax: (253) 922-9088
[email protected] [email protected]
2. Project Description
This project seeks funds to replace approximately one third of existing cross ties between McKenna
(MP 29.0C) and Chehalis (MP 61.0C). This project is needed to improve safety and reliability of the
line. This is done by raising the track classification from its current Excepted status to Class II,
thereby allowing for increased train speeds and safe rail operations.
As rail volumes increase, the use of this southern route will be essential in keeping costs down.
Longer, heavier trains would be able to interchange with the mainline railroads at Blakeslee Junction
rather than having to interchange in Tacoma and be broken up in order to traverse the large grade to
Frederickson.
Due to Tacoma Rail being a cost of service railroad, costs associated with the tie replacement
program would be directly allocated to benefitting customers.
Project Schedule
Project Milestone Month/Year
Complete project definition March 2009
Begin preliminary engineering NA
Complete environmental documentation NA
Complete right-of-way certification (may include acquisition) NA
Start construction January 2010
Construction complete and project functionally operational June 2010
Page 2
3. Project Cost
Design
Engineering
Right of
Way
Construction
Engineering
Construction
Other
Construction
Contract Total
Estimated
Project Cost $4,220,460
Committed Local
Funds
Additional Local
Funds Requested
Other Committed
Funds
WSDOT Funds
Requested $4,220,460
4. Proposed Funding
Funding Source Public or Private Cash or In-Kind Amount Percentage
Local – Port/Rail District
Local – Other
Railroad Public
WSDOT Public $4,220,460 100%
Other
Total $4,220,460 100%
5. Yearly Maintenance
Annual maintenance following the rehabilitation is estimated at $80,000 for track inspection, weed
control and other general maintenance expenses associated with the project scope.
6. Reduced Road Impacts
Rehabilitation of these tracks within the classification yard of Tacoma Rail’s Tidelands Division
would help keep rail rates competitive with truck rates.
7. Shipper Benefits and Reduced Costs
As rail volumes increase, the use of this southern route will be essential in keeping costs down.
Longer, heavier trains would be able to interchange with the mainline railroads at Blakeslee Junction
rather than having to interchange in Tacoma and be broken up in order to traverse the large grade to
Frederickson.
Due to Tacoma Rail being a cost of service railroad, costs associated with the tie replacement
program would be directly allocated to benefitting customers.
8. Safety Improvements
Page 3
This project is needed to improve safety and reliability of the line. This is done by raising the track
classification from its current Excepted status to Class II, thereby allowing for increased train speeds
and safe rail operations.
9. Urgent Need
Not applicable when taking into account the provisions of the application.
10. Tax from Industrial Development
Being part of the City of Tacoma, Tacoma Rail doesn’t pay property taxes. However, Tacoma Rail
does pay the City of Tacoma’s Gross Earnings Tax at 8 percent and Washington State’s Utility and
Business Tax at 1.5 percent.
11. Reducing System Wide Rail Delays
The 32 mile route from McKenna to Chehalis allows for an additional route from the BNSF mainline
to the Port of Tacoma area. As volumes grow, this route would allow for northbound traffic to
circumvent the need to go through Tacoma. This route is key in supporting the ultimate growth
potential of the Mountain Division. As trains become larger and heavier, it will become increasingly
difficult and time consuming to traverse the large grade between Tacoma and Frederickson.
12. Preservation of Rail Line
Not applicable when taking into account the provisions of the application.
13. Environmental Impacts
None anticipated since no in-water work is identified.
o Are there wetlands or streams on or near your project site? If yes, how close is your project site to
those wetlands or streams?
o No.
o Has your project site been evaluated for archaeological or historic resources? If yes, please
submit the cultural resources report.
o No.
o What animals, birds, and plants are present on your project site (those species that would be
considered endangered, threatened, or monitored by state or federal agencies)?
o None.
o Have you completed the State Environmental Policy Act (SEPA) process? If yes, please submit a
copy of the documentation.
o No.
o What federal, state, and local permits will be needed for your project?
o None.
Page 4
14. Geographical Balance and Support for Regional Economies
According to the information provided at the website located at:
http://www.workforceexplorer.com/article.asp?articleId=8098&PAGEID=&SUBID=
Lewis County is listed as economically distressed. Pierce and Thurston Counties are not listed as
economically distressed by the Washington State Department of Community, Trade and Economic
Development (CTED).
15. Economic Development Benefits
Shipper savings:
Tacoma Rail is a cost of service provider of rail service. Costs directly incurred are ultimately paid
by its customers. A list of customers is provided in Attachment A.
16. Project Business Plan
Management profile:
Dale King is the railroad’s Superintendent having joined the organization in December 2008. He
began his career with the Central Railroad Company of New Jersey in 1974 and continued with
its successor Conrail. Dale joined Burlington Northern Railroad in 1983 and held several
positions in its operations and marketing departments. He moved to Willamette Industries in 1995
and following its acquisition by Weyerhaeuser in 2002 was named Director of Rail Services. In
that role Dale was responsible for Weyerhaeuser’s rail operations in North America which
included the management of five short line railroads. He holds a Bachelor of Science degree in
Transportation from Arizona State University, an MBA from Indiana University and is a certified
member of the American Society of Transportation & Logistics.
Alan Hardy is the railroad's Assistant Superintendant and has worked for Tacoma Rail since
August of 2004. Before coming to Tacoma Rail, Mr. Hardy worked 9 years for the nation's
largest and the world's 2nd largest railroad track equipment manufacturer and contract services
company as supervisor and manager assigned to the Union Pacific and Burlington Northern Santa
Fe railroads in large scale construction and maintenance contracts. Before that he worked for a
very successful short line railroad owned by and serving a Fortune 500 paper company in
Northwest Florida. He held the positions of Signal Maintainer, Assistant Roadmaster and
Roadmaster during his 21 year career there. Mr. Hardy graduated from Wallace Community
College in Dothan, Alabama with a two year technical degree in electronics. Mr. Hardy has
completed a variety of railroad related courses and seminars and has been a member of the
American Railway Engineering and Maintenance-of-Way Association since 1982.
Marketing plan:
This project is to support to economic viability of the existing rail infrastructure and the
customers that are supported by it. All customers, listed on Attachment A, will benefit from the
Page 5
proposed project. The Puyallup River Bridge is located in Tacoma, just North of Freighthouse
Square. It provides the primary route to and from all of the Mountain Division customers.
Operations plan:
Current service levels consist of two days per week. Daily service will be provided in the future
when railcar volumes justify it.
Tacoma Rail’s Safety Manual (Attachment E), details the emergency contacts, training and safety
plan. Track maintenance is done to FRA standards according to the required track classification.
Financial plan:
Tacoma Rail, TMBL, is a 100 percent self supported railroad. Tacoma Rail is municipally owned
and has a cost of service approach to rates. Therefore, final rates will be based on agreed upon
services and volumes. Annual Financial reports for 2005, 2006 and 2007 are included as
Attachment D.
Further information about Tacoma
Rail’s finances through the second
quarter of 2008:
Tacoma Rail is reporting an
operating income of $1,894,000 at
the end of the third quarter of 2008
compared to an operating income of
$2,214,000 for the same period a
year earlier. Operating revenues
increased 2.3%, or $324,000, along
with an increase of 5.4%, or
$645,000 in operating expenses for
the first nine months of 2008 compared to the same period of 2007.
Year-to-date operating revenues were $14,515,000, compared to $14,192,000 a year ago.
Revenues from all switching activities combined decreased $185,000, primarily due to the
reduced traffic through the Port that partially offset by the climbing commercial line hauls.
0
3
6
9
12
15
3rd Qtr 08 2nd Qtr 08 1st Qtr 08 YTD 2008 YTD 2007
$ in
mil
lio
ns
OPERATING REVENUES & EXPENSES
Revenues Expenses
Page 6
In contrast to the decrease in switching revenues, demurrage and other operating revenues were
higher by $509,000 when compared to the first three quarters of 2007. This increase was mainly
attributable to a higher demurrage revenues
that partially counteracted by a drop in
locomotive servicing revenues.
During the third quarter of 2008, switching
activity from intermodal line hauls decreased
2,130 cars compared to the same period in
2007. In contrast, switching activities in
commercial line hauls, Capital Division line
hauls and miscellaneous line hauls were up
126 cars, 104 cars and 232 cars, respectively.
Year-to-date total operating expense
increased to $12,622,000 in the first three
quarters of 2008, from $11,977,000 a year
earlier. The increase of $645,000 reflects a
combined result of an increase of $251,000 in salaries and wages, an increase of $502,000 in
supplies and expenses and a decrease of $120,000 in depreciation.
The 5.2% increase in salaries and wages was attributable to the general cost of living adjustment,
the renewed union labor contracts, the retroactive payouts, and the increased labor requirements
to switch commercial traffic relative to intermodal traffic.
In the first nine months of 2008, Tacoma Rail purchased 274,000 gallons, or 38.9% less diesel
fuel than 2007. Although there was savings in fuel cost due to the reduction in locomotive
servicing, this saving was surpassed by the increases in repair and maintenance cost, car hire
expense and advertising expense which result in a 7.9% increase in supplies and expenses.
Tacoma Rail's current ratios at the end of the third quarter of 2008 and 2007 were 5.8:1.0 and
4.4:1.0, respectively. At June 30, 2008, Tacoma Rail’s current ratio stood at 6.1:1.0. A measure
of 2.0:1.0 is often set as a goal for this ratio.
17. Additional Comments
0
5
10
15
20
25
30
3rd Qtr 2nd Qtr 1st Qtr
# o
f C
ars
SWITCHING ACTIVITY(000's omitted)
2008 2007
Page 7
ATTACHMENT A
CUSTOMER AND SHIPPER LIST
Page 8
Shipper Name Plant Address City State Zip Phone
BOEING COMMERCIAL AIRPLANE GRP 6002 184th St. E. Puyallup WA 98373 FARWEST FABRICATION 5521 184TH ST. E. Puyallup WA 98375 253-847-2800
HARDIE BUILDING PRODUCTS 18200 50th Ave. E. Tacoma WA 98446 253.847.8700
HARRIS REBAR 401 Alexander Ave. Bldg. #326 Tacoma WA 98421 253-272-4227
MACMILLAN-PIPER FREDERICKSON 18727 38th Ave. E. Tacoma WA 98466 253.875.3555
MEDALLION FOODS 18420 50th St, E Tacoma WA 98446 253.846.2600
PN BEST 5501 184th St. E. Puyallup WA 98375 425.882.1000
TACOMA STEEL 701 East 64th St. Tacoma WA 98404 253-272-2266
US OIL REFINING 3001 Marshall Ave. Tacoma WA 98421 253-383-1651
Railroad Name Address City State Zip
UNION PACIFIC RAILROAD 1400 Douglas Street Omaha NE 68179 BNSF RAILROAD 2650 Lou Menk Drive Fort Worth TX 76131
Page 9
ATTACHMENT B
PROJECT MAP
Page 10
Page 11
ATTACHMENT C
PROJECT COST ESTIMATE
Page 12
ATTACHMENT D
ANNUAL FINANCIAL REPORTS
CITY OF TACOMA
DEPARTMENT OF PUBLIC WORKS
TACOMA RAIL MOUNTAIN DIVISION
ANNUAL 2007
FINANCIAL REPORT
CITY OF TACOMA, WASHINGTON DEPARTMENT OF PUBLIC WORKS
TACOMA RAIL MOUNTAIN DIVISION
(TACOMA EASTERN RAILROAD)
TABLE OF CONTENTS Note: These financial statements are interim, unaudited reports prepared primarily for the use of management. Not all transactions reported in these statements have been recorded on the full accrual basis of accounting or in accordance with generally accepted accounting principles. COMPARATIVE BALANCE SHEET ................................................ 2 – 3 STATEMENT OF REVENUES, EXPENSES AND CHANGES IN NET ASSETS ................................................ 4 – 5 STATEMENTS OF CASH FLOWS.................................................... 6 – 7 SUPPLEMENTAL DATA ................................................................. 9 - 12
CITY OF TACOMA. WASHINGTON DEPARTMENT OF PUBLIC WORKS
TACOMA RAIL MOUNTAIN DIVISION
COMPARATIVE BALANCE S H E E T S . DECEMBER 31. 2 0 0 7 AND DECEMBER 31. 2 0 0 6
ASSETS 2007 2006
FIXED
Land . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Building . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Other Improvements . . . . . . . . . . . . . . . . . . . . . . . . . Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Construction in Progress . . . . . . . . . . . . . . . . . . . Total . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Provision for Depreciation . . . . . . . . . . . . . . . . . Net Fixed Assets . . . . . . . . . . . . . . . . . . . . . . . . .
CURRENT AND ACCRUED ASSETS
Current Fund Cash & Pooled Investments . . . . . 1.496. 039 1.205. 633
Debt Service Fund Cash . . . . . . . . . . . . . . . . . . . . . 203. 114 212. 990 Accounts Receivable . . . . . . . . . . . . . . . . . . . . . . . . 548. 674 345. 193
Other Receivables . . . . . . . . . . . . . . . . . . . . . . . . . . 26. 163 -
Interdivision Receivable . . . . . . . . . . . . . . . . . . - 9. 264
Total Current and Accrued Assets . . . . . . . . . 2.273. 990 1.773. 080
TOTAL ASSETS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $18.232. 944 $14.318. 699
NET ASSETS AND LIABILITIES
NET ASSETS
Invested in Capital Assets. Net of Related Debt
Unrestricted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Total Net Assets . . . . . . . . . . . . . . . . . . . . . . . . .
LONG-TERM LIABILITIES
Interfund Loan Payable . . . . . . . . . . . . . . . . . . . . . 2004 Line of Credit . . . . . . . . . . . . . . . . . . . . . . . . 2007 Junior Lien Revenue Bond . . . . . . . . . . . . . . Total Long-Term Liabilities . . . . . . . . . . . . . .
CURRENT AND ACCRUED LIABILITIES
Accounts & Notes Payable . . . . . . . . . . . . . . . . . . . Wages Payable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Deposits Payable . . . . . . . . . . . . . . . . . . . . . . . . . . . Taxes Payable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Current Portion of Long Term Debt . . . . . . . . . . . Interest Payable . . . . . . . . . . . . . . . . . . . . . . . . . . . Interdivision Payable . Various . . . . . . . . . . . . Total Current and Accrued Liabilities . . . .
TOTAL NET ASSETS AND LIABILITIES . . . . . . . . .
CITY OF TACOMA. WASHINGTON DEPARTMENT OF PUBLiC WORKS
TACOMA M I L MOTmTAIN DIVISION
STATEYZSTS OF REVENUE. EXPENSES AND CHANGES IN NET ASSETS
DECEMBER 31. 2007 AND DECEMBER 31. 2006
DECEMBER DECEMBER
2007 2006
OPERATING REVENUES
Switching Revenues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $106. 909 $88. 871
Demurrage and Other Operating Revenues . . . . . . . . . . 17. 909 16. 581
. . . . . . . . . . . . . . . . . . . . Total Operating Revenues 124. 818 105. 452
OPERATING EXPENSES
MAINTENANCE OF WAY AND STRUCTURES
. . . . . . . . . . . . . . . . . . . . . . . . . . Salaries and Wages
Supplies and Expense . . . . . . . . . . . . . . . . . . . . . . . . MECHALVI CAL
Supplies and Expense . . . . . . . . . . . . . . . . . . . . . . . . TRANSPORTATION
Salaries and Wages . . . . . . . . . . . . . . . . . . . . . . . . . . Supplies and Expense . . . . . . . . . . . . . . . . . . . . . . . .
ADMINISTRATION LVD GSNERAL EXPENSE
. . . . . . . . . . . . . . . . . . . . . . . . . . Salaries and Wages
Supplies and Expense . . . . . . . . . . . . . . . . . . . . . . . . TAXES . STATE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . DEPRECIATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Total Operating Expenses . . . . . . . . . . . . . . . . . . . .
OPERATING LOSS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (210. 215) (136. 5473
NON-OPERATING REVENUES (EXPENSES)
Interest Income . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. 174 4. 029
Other Kon-Operating Revenues . . . . . . . . . . . . . . . . . . 300. 318 128. 308
Interest Expense . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (13. 495) (11. 079)
Net Non-Operating Revenues . . . . . . . . . . . . . . . . . . 287. 997 121. 258
Net Income (Loss) Before Capltal Contributions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . and Transfers 77. '782 (15. 289)
Capltal Contributions and Transfers
Grants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26. 163
Transfers In . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
NET INCOME (LOSS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $103. 945 ($15. 289)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TOTAL NET ASSZTS . JANUARY 1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TOTAL NET ASSETS . DECEMBZR 31
YEAR TO DATE
DECEMBER 31; DECEMBER 31, 2007/2006 PERCENT
2007 2006 VrARI ANCE CHANGE
CITY OF TACOMA. WASHINGTON DEPARTMENT OF PUBLIC WORKS
TACOMA RAIL MOUNTAIN DIVISION
STATEMENTS OF CASH FLOWS
YEAR ENDED DECEMBER 31. 2007 2006
CASH FLOWS FROM OPERATING ACTIVITIES
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . Cash from Customers $1.238. 761 $1.178. 895
. . . . . . . . . . . . . . . . . . . . . . . . . . Cash Paid to Suppliers (1. 525. 560) (1.538. 717)
. . . . . . . . . . . . . . . . . . . . . . . . . . Cash Paid to Employees (782. 572) (863. 983)
Taxes Paid . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (30. 872) (38. 238) Net Cash Used in Operating Activities . . . . . . . . . (1.100. 243) (1.262. 043)
CASH FLOWS FROM CAPITAL AND RELATED FINANCING ACTIVITIES
Capital Expenditures. Net . . . . . . . . . . . . . . . . . . . . . . . Principal Payments on Long-Term Debt . . . . . . . . . . . . Interest Paid. Net of AFUDC . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . Proceeds from Sale of Long-Term Debt Transfers from Other Funds . . . . . . . . . . . . . . . . . . . . . . Proceeds from Capital Contributions . . . . . . . . . . . . . Proceeds from Leased Property . . . . . . . . . . . . . . . . . . . Net Cash Provided by Capital and Related Financing Activities . . . . . . . . . . . . .
CASH FLOWS FROM INVESTING ACTIVITIES Interest on Investments . . . . . . . . . . . . . . . . . . . . . . . . . 20. 983 8. 891 Net Cash Provided by Investing Activities . . . . . 20. 983 8. 891
Net Increase in Cash and Equity in Pooled Investments . . . . . . . . . . . . . . . . . . . . . 280. 530 1.265. 587
Cash & Equity in Pooled Investments at January 1 . . 1.418. 623 153. 036
Cash & Equity in Pooled Investments at December 31 $1.699. I53 $1.418. 623
YEAR ENDED DECEMBER 31.
Reconciliation of Operating Income to Net Cash Provided by Operating Activities:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Operating Loss
Adjustments to Reconcile Operating Income to Net Cash Provided by Operating Activities: Depreciation and Amortization . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . Accounts Receivable Receivable from Affiliates . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . Materials and Supplies . . . . . . . . . . . . . . . . . . . . . . . Taxes and Other Payables
Salaries. Wages and Frinqe Benefits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Payables to Affiliates
. . . . . . . . . . . . . . . . . . . . . . . . . . . Total Adjustments
Net Cash Used in Operating Activities . . . . . . . . . . . . .
Supplemental Data
- 9 -
OPERATING REVENUESYear to Date - December 2007 ($1,402,978)
Demurrage & Other35%
Switching65%
OPERATING REVENUESYear to Date - December 2006 ($1,020,367)
Switching84%
Demurrage & Other16%
- 10 -
OPERATING EXPENSESYear to Date - December 2007 ($2,730,239)
Administration9%
Others13%
Way & Structures28%
Transportation48%
Mechanical2%
OPERATING EXPENSESYear to Date - December 2006 ($2,835,075)
Mechanical3%
Transportation50%
Way & Structures22%
Others12%
Administration13%
- 11 -
SWITCHING ACTIVITYYear to Date December 2007 (4,037 cars)
Lumber3%
Alumina3%
Steel1%
Food Products85%
Aerospace5%
Other1%
Pipelines2%
SWITCHING ACTIVITYYear to Date December 2006 (2,823 cars)
Lumber16%
Alumina4%
Steel2%
Food Products43%
Aerospace6%
Gravel 9%
Other1%
Pipelines18%
Heavy Equipment1%
CITY OF TACOMA
DEPARTMENT OF PUBLIC WORKS
TACOMA RAIL MOUNTAIN DIVISION
ANNUAL 2006
FINANCIAL REPORT
CITY OF TACOMA, WASHINGTON DEPARTMENT OF PUBLIC WORKS
TACOMA RAIL MOUNTAIN DIVISION
(TACOMA EASTERN RAILROAD)
TABLE OF CONTENTS Note: These financial statements are interim, unaudited reports prepared primarily for the use of management. Not all transactions reported in these statements have been recorded on the full accrual basis of accounting or in accordance with generally accepted accounting principles. COMPARATIVE BALANCE SHEET ................................................ 2 – 3 STATEMENT OF REVENUES, EXPENSES AND CHANGES IN NET ASSETS ................................................ 3 – 4 STATEMENTS OF CASH FLOWS.................................................... 5 – 6 SUPPLEMENTAL DATA ................................................................. 8 - 11
ASSETS 2006 2005
FIXED Land ....................................... $1,361,104 $1,361,104 Building ................................... 366,750 366,750 Other Improvements ......................... 10,658,000 10,657,804 Equipment .................................. 754,869 754,869 Construction in Progress ................... 1,710,303 959,679 Total .................................... 14,851,026 14,100,206 Provision for Depreciation ................. (2,305,407) (1,987,467) Net Fixed Assets ......................... 12,545,619 12,112,739
CURRENT AND ACCRUED ASSETS Current Fund Cash & Pooled Investments ..... 1,205,633 153,036 Debt Service Fund Cash ..................... 212,990 - Accounts Receivable ........................ 345,193 509,731 Other Receivables .......................... - 17,952 Interdivision Receivable .................. 9,264 1,254 Total Current and Accrued Assets ......... 1,773,080 681,973
TOTAL ASSETS ............................. $14,318,699 $12,794,712
COMPARATIVE BALANCE SHEETS - DECEMBER 31, 2006 AND DECEMBER 31, 2005
CITY OF TACOMA, WASHINGTONDEPARTMENT OF PUBLIC WORKS
TACOMA RAIL MOUNTAIN DIVISION
- 1 -
NET ASSETS AND LIABILITIES 2006 2005
NET ASSETS Invested in Capital Assets, Net of Related Debt $7,995,619 $9,662,739 Unrestricted ............................... (803,621) (2,002,451) Total Net Assets ......................... 7,191,998 7,660,288 LONG-TERM LIABILITIES Interfund Loan Payable ..................... 4,550,000 2,450,000 2004 Line of Credit ........................ 1,283,333 2,200,000 Total Long-Term Liabilities .............. 5,833,333 4,650,000 CURRENT AND ACCRUED LIABILITIES Accounts & Notes Payable ................... 343,431 421,918 Wages Payable .............................. 307 304 Deposits Payable ........................... 22,000 20,000 Taxes Payable .............................. 4,421 8,610 Current Portion of Long Term Debt........... 733,333 - Interest Payable ........................... 31,007 33,592 Interdivision Payable - Various ............ 158,869 - Total Current and Accrued Liabilities .... 1,293,368 484,424
TOTAL NET ASSETS AND LIABILITIES ......... $14,318,699 $12,794,712
- 2 -
DECEMBER DECEMBER2006 2005
OPERATING REVENUES Switching Revenues .............................. $88,871 $170,607 Demurrage and Other Operating Revenues .......... 16,581 2,624 Total Operating Revenues .................... 105,452 173,231
OPERATING EXPENSES MAINTENANCE OF WAY AND STRUCTURES Salaries and Wages .......................... 14,937 35,588 Supplies and Expense ........................ 34,461 41,173 MECHANICAL Supplies and Expense ........................ 2,482 30,363 TRANSPORTATION Salaries and Wages .......................... 42,702 68,116 Supplies and Expense ........................ 85,321 39,562 ADMINISTRATION AND GENERAL EXPENSE Salaries and Wages .......................... 2,002 16,151 Supplies and Expense ........................ 31,195 (41,728) TAXES - STATE ................................. 2,404 6,466 DEPRECIATION .................................. 26,495 19,512 Total Operating Expenses .................... 241,999 215,203
OPERATING LOSS ................................... (136,547) (41,972)
NON-OPERATING REVENUES (EXPENSES) Interest Income ............................... 4,029 475 Other Non-Operating Revenues .................. 128,308 171,167 Interest Expense .............................. (11,079) (17,400) Total Non-Operating Revenues ................ 121,258 154,242
Net Income (Loss) Before Capital Contributions and Transfers ................................... (15,289) 112,270
Capital Contributions and Transfers Grants ........................................ - 78,475 Other Contributions in Aid Construction ....... - - Transfers In .................................. - -
NET INCOME (LOSS) ................................ ($15,289) $190,745
TOTAL NET ASSETS - JANUARY 1 ........................................................
TOTAL NET ASSETS - DECEMBER 31 .......................................................
CITY OF TACOMA, WASHINGTON
DECEMBER 31, 2006 AND DECEMBER 31, 2005STATEMENTS OF REVENUE, EXPENSES AND CHANGES IN NET ASSETS
TACOMA RAIL MOUNTAIN DIVISIONDEPARTMENT OF PUBLIC WORKS
- 3 -
DECEMBER 31, DECEMBER 31, 2006/2005 PERCENT2006 2005 VARIANCE CHANGE
$859,992 $1,143,190 ($283,198) -24.8%160,375 150,019 10,356 6.9%
1,020,367 1,293,209 (272,842) -21.1%
265,397 337,720 (72,323) -21.4%346,015 378,090 (32,075) -8.5%
74,770 166,357 (91,587) -55.1%
566,354 804,246 (237,892) -29.6%867,127 879,062 (11,935) -1.4%
32,235 42,029 (9,794) -23.3%331,187 367,977 (36,790) -10.0%34,049 34,253 (204) -0.6%
317,941 262,260 55,681 21.2%2,835,075 3,271,994 (436,919) -13.4%
(1,814,708) (1,978,785) 164,077 8.3%
8,891 2,634 6,257 - 673,801 580,552 93,249 16.1%
(155,815) (79,834) (75,981) 95.2%526,877 503,352 23,525 4.7%
(1,287,831) (1,475,433) 187,602 12.7%
689,848 1,960,872 (1,271,024) -64.8%- 196,105 (196,105) -
129,693 247,178 (117,485) -47.5%
(468,290) 928,722 (1,397,012) -
7,660,288 6,731,566
$7,191,998 $7,660,288
YEAR TO DATE
- 4 -
CITY OF TACOMA, WASHINGTON
STATEMENT OF CASH FLOWS
DECEMBER 31, 2006CASH FLOWS FROM OPERATING ACTIVITIES Cash from Customers ............................. $1,178,895 Cash Paid to Suppliers .......................... (1,538,717) Cash Paid to Employees .......................... (863,983) Taxes Paid ...................................... (38,238) Net Cash Used in Operating Activities ......... (1,262,043)
CASH FLOWS FROM CAPITAL AND RELATED FINANCING ACTIVITIES Capital Expenditures, Net ....................... (750,821) Principal Payments on Long-Term Debt ............ (183,334) Interest Paid, Net of AFUDC ..................... (158,400) Proceeds from Sale of Long-Term Debt ............ 2,100,000 Transfers from Other Funds ...................... 129,693 Proceeds from Capital Contributions ............. 707,800 Proceeds from Leased Property ................... 673,801 Net Cash Provided by Capital and Related Financing Activities ............. 2,518,739
CASH FLOWS FROM INVESTING ACTIVITIES Interest on Investments ......................... 8,891 Net Cash Provided by Investing Activities ..... 8,891 Net Increase in Cash and Equity in Pooled Investments ..................... 1,265,587
Cash & Equity in Pooled Investments at January 1 .. 153,036
Cash & Equity in Pooled Investments at December 31 $1,418,623
DEPARTMENT OF PUBLIC WORKSTACOMA RAIL MOUNTAIN DIVISION
YEAR ENDED
- 5 -
DECEMBER 31, 2006Reconciliation of Operating Income to Net Cash Provided by Operating Activities:
Operating Loss..................................... ($1,814,708)
Adjustments to Reconcile Operating Income to Net Cash Provided by Operating Activities: Depreciation and Amortization .................. 317,941 Accounts Receivable ............................ 164,538 Receivable from Affiliates ..................... (8,010) Materials and Supplies ......................... (78,487) Taxes and Other Payables ....................... (2,189) Salaries, Wages and Fringe Benefits ............ 3 Payables to Affiliates ......................... 158,869 Total Adjustments ........................... 552,665 Net Cash Used in Operating Activities ............. ($1,262,043)
YEAR ENDED
- 6 -
Supplemental Data
- 8 -
- 9 -
OPERATING REVENUESYear to Date - December 2006 ($1,020,367)
Demurrage & Other16%
Switching84%
OPERATING REVENUESYear to Date - December 2005 ($1,293,209)
Switching88%
Demurrage & Other12%
- 10 -
OPERATING EXPENSESYear to Date - December 2006 ($2,835,075)
Administration13%
Others12%
Way & Structures22%
Transportation50%
Mechanical3%
OPERATING EXPENSESYear to Date - December 2005 ($3,271,994)
Mechanical5%
Transportation51%
Way & Structures22%
Others9%
Administration13%
- 11 -
SWITCHING ACTIVITYYear to Date December 2006 (2,823 cars)
Heavy Equipment1%
Lumber16%
Alumina4%
Steel2%
Food Products43%
Aerospace6%
Gravel 9%
Other1%
Pipelines18%
SWITCHING ACTIVITYYear to Date December 2005 (3,092 cars)
Lumber23%
Alumina4%
Steel6%
Food Products5%
Aerospace3%
Gravel 57%
Other1%
Pipelines1%
Page 13
ATTACHMENT E
SAFETY MANUAL
SAFETY MANUAL
Rev 11 – Sept, 07
CONTENTS
Element 1. Daily Crew Input .............................................................................................................2
Element 2. Pre-shift Safety Briefings ................................................................................................3
Element 3. Quarterly Employee Safety Meetings ..............................................................................4
Element 4. Safety Training Program .................................................................................................5
Element 5. Business Unit Roles .........................................................................................................6
Element 6. New RULES Book ..........................................................................................................8
Element 7. Bulletins and General Orders ..........................................................................................9
Element 8. Operational Testing (49 CFR 217.9) ...............................................................................10
Element 9. Operating Rules Program of Instruction (49 CFR 217.11) .............................................11
Element 10 Locomotive Engineer Certification Program (49 CFR 240) ..........................................12
Element 11. Vehicle Safety Pre-trip ..................................................................................................13
Element 12. Railroad Security Plan ...................................................................................................14
Element 13. Accident/Incident Analysis ............................................................................................15
2
Element: #1
Description: Daily Crew Input
Purpose: Make available methods for Switch Crews to report unsafe conditions, maintenance issues,
questions regarding communication notices, mechanical defects, etc.
Implementation:
Time Report –Switch crew Supervisors report on the daily Time Report any of the above issues.
This information is passed on to the on duty Operations Supervisor for assessment and
assignment to the proper person for correction, insertion in the Safety Issues Database, and added
to the daily status report which is posted as information for all employees.
Pre-shift Safety Briefing Form – is filled out by the Duty Yardmaster to include all reports of the
above conditions. This information is handled for correction in the same manner as the Daily
Time Report above.
Daily Locomotive Inspection Report – All locomotive engineers, upon completion of each shift,
must report and document the condition of the locomotive used. This must include all known
defects or malfunctions. The condition of the brakes, sanders, and air pressure must be noted.
This information is used by the Mechanical Department to correct the deficiencies noted and the
report complies with the F.R.A. requirement of daily locomotive inspections.
Motor Vehicle Trouble Report - Crews will do a daily Safety Inspection of the vehicle being
used and fill out the “Vehicle Inspection” report A comments area is also provided to report any
vehicle defects.
Verbal & Radio Communication –All safety conditions that require immediate correction must
be reported by the crews as soon as possible to the On Duty Yardmaster, using the radio or in
person, as well as through the appropriate written communication.
Measurement:
Database entry and assignment of all Safety issues submitted w/printout posted on Bulletin
boards
filing of all Pre-shift Safety Briefing Sign-in sheets
3
Element: #2
Description: Pre-shift Safety Briefings
Purpose: Pre-shift Safety Briefings are a means of making sure that all members of each crew
understand the work that is to be performed during this shift or time period and any conditions that need
to have special attention or caution during the shift.
Implementation: Pre-shift Safety Briefings are conducted by the Duty Yardmaster and/or the Duty
Operations Supervisor at the beginning of each Crew's shift. The Roadmaster conducts Pre-shift Safety
Briefings with the Section Crew and Mechanical Department. Pre-shift Safety Briefings are to be
documented.
Measurement:
Database entry and assignment of all Safety issues submitted w/printout posted on Bulletin
boards
filing of all Pre-shift Safety Briefing Sign-in sheets
4
Element: #3
Description: Quarterly Employee Safety Meetings
Purpose: Ensure that all employees are aware of safety record, current safety concerns, and education
training programs planned for next quarter.
Implementation: At least once each quarter (3 months) meetings will be held with all employees
(may require 3 separate meetings to allow shift workers to attend) with a primary focus on safe
operations.
The agenda for each meeting may be:
1. YTD Safety statistics for Tacoma Rail as compared to national averages.
2. Specific review of any accidents/incidents in last 3 months with focus on preventative
measures.
3. Addressing any present Safety concerns of any employees
4. Review of all Safety items that had been turned in and current status of remediation.
5. Questions or concerns from attending employees.
6. Reminder of most recent Safety Bulletins issued for Tidelands and Mountain Division for
clarification and understanding.
Measurement:
1. Copies of agendas and statistics
2. Employee sign-ins on attendance sheet
5
Element: #4
Description: Safety Training Program
Purpose: To provide ongoing Safety training in order to impart specific new skills, to continuously
improve safety awareness by reinforcing good safety practices, and to comply with the Federal
requirements for employee training.
Implementation: Schedule mandatory cross training for all employees in the switch operator craft to
learn the Yardmaster and Locomotive Engineer crafts. Training is scheduled and made available for
every employee on First Aid/CPR, basic fire fighting, HAZMAT, hearing protection, proper body
mechanics, skills enhancement and refresher training is scheduled and made available on: locomotive
and train control.
Measurement: Training programs are scheduled for the required time and all employees are properly
scheduled for attendance.
6
Element: #5
Description: Business Unit Roles
Purpose: Tacoma Rail will provide safe, reliable and efficient rail transportation solutions to support
the continued economic development of Tacoma and the Puget Sound.
1) SAFETY Support Mission: The Safety Business Unit exists to meet the needs of our customers by providing our employees with
clear expectations for SAFE work practices, the training needed to maximize their qualifications, and to
outline the desired performance leading to outstanding customer service.
Managers: TJ Shilley (Supervisor of Operations) – SAFETY Manager
Paula Henry (Superintendent) – SAFETY Program Director
Alan Hardy (Assistant Superintendent) - SAFETY Program Assistant Director
Support Staff: Alan Matheson (Roadmaster) – SAFETY Support, Mechanical & Construction Dept.
Ed Cornish (Supervisor of Operations) - SAFETY Support, Operations & Testing
Tim Flood (Supervisor of Operations) - SAFETY Support, Operations & Testing
Leslie Whiteman (Supervisor of Operations) - SAFETY Support, Operations & Testing
Dan McCabe (Supervisor of Operations) - SAFETY Support, Finance & Technology
Lori Daniels (Supervisor of Operations) - SAFETY Support, HR & Administrative Services
Phil Hogman (Supervisor of Operations) – SAFETY Support, Mechanical Dept.
Amy Brand - SAFETY Support, Records Management
2) NETWORK OPERATIONS Support Mission: Tacoma Rail’s Network Operations exists to meet the needs of our customers and provide safe, reliable
and economic rail service. To achieve these goals we must train and test our employee’s to meet and/or
exceed the requirements of the Consolidated Operating and SAFETY Book and Federal Railroad
Administration standards set forth by CFR 49. Furthermore, we must meet with our customers to ensure
our support is meeting with there changing needs.
Managers: Ed Cornish, Supervisor of Operations – Operations, Crew testing & Customer Support, SAFETY
Support
Tim Flood, Supervisor of Operation - Operations, Crew testing & Customer Support, SAFETY Support
Leslie Whiteman, Supervisor of Operation - Operations, Crew testing & Customer Support, SAFETY
Support
7
Support Staff: Yardmaster
Yard Clerk
Locomotive Engineer
Switch Supervisor
Switch Operator
3) HUMAN RESOURCES & SUPPORT SERVICES Support Mission: Tacoma Rail’s Human Resources & Support Services Business Unit exists to assist our employees in
developing and maintaining a qualified, effective and diverse workforce.
Manager: Lori Daniels, Supervisor of Operations
Support Staff: Lena Bentley, Administrative Assistant
Amy Brand, Administrative Assistant
Lyn White, Administrative Secretary
4) FINANCE &TECHNOLOGY Support Mission: To provide timely and accurate information and accounting regarding customers railcars, and to
maintain and update technology processes to increase efficiency and communications throughout
Tacoma Rail and our customers.
Manager: Dan McCabe, Supervisor of Operations – Finance & Technology support, improvement and integration.
Support Staff: Harlem Baclay, Administrative Assistant
Jim Clark, Administrative Services Manager
Janene Franklin, Administrative Services Manager
8
Element: #6
Description: RULES Book
Purpose: Provide written instruction for all employees as the basis for a Safe work environment and
the adherence to national railroad operating standards (General Code of Operating Rules). The Rules
Book provides a single point reference for training, retraining and enforcement of procedures and
policies to insure a safe and efficient operation.
Implementation: As needed a bound handbook will be produced and distributed to each employee.
Employees will have training and written tests on a bi-annual basis to demonstrate their knowledge and
understanding of the rules for safe and efficient operating practices.
Measurements:
Publication of the Rules Handbook
Receipts from each employee acknowledging receipt of current Rules Handbook.
All employees successfully tested in the prescribed time frame
Copies and scores of biennial tests entered in the testing database.
9
Element: #7
Description: Bulletins & General Orders
Purpose: Bulletins and General Orders supplement the RULES book, and are the published additions,
corrections, and/or clarifications of the RULES or pertain to a temporary situation.
Implementation: Posted in Crew Room, lunchroom, tower, and administration office, all employees
are required to review and understand postings prior to beginning work at the start of shift. The
appropriate supervisor must inform all employees of any Safety Bulletin that is relevant, posted after any
employee has started work.
Measurements:
verify monthly that all postings are properly organized at each location.
latest Safety Bulletins (Tidelands, Mountain, and Capital Divisions) are reviewed daily by
Yardmaster w/crews at Pre-shift Safety briefings
10
Element: #8
Description: Operational Testing (49 CFR 217.9)
Purpose: To verify that employees are performing their duties in a safe and efficient manner and in
compliance with Tacoma Rail RULES and procedures.
Implementation: All supervisors will perform the required amount of Operational Tests as outlined
in the Field Testing Manual. Tests will be conducted at random times and days each month with the
results recorded in the Testing Database.
Measurements:
Required quantity of quality tests are performed each month.
Data from tests is recorded as prescribed.
All failures are handled for training and correction by specified time.
11
Element: #9
Description: Operating Rules Program of Instruction (49 CFR 217.11)
Purpose: To ensure that all employees whose activities are governed by the Operating RULES,
understand the RULES
Implementation: Each employee is given a complete copy of the RULES and signs for their copy.
Prior to administering the biannual written examinations, review sessions are held with employees and
focuses on questions most often missed in previous examination or rules that were ignored in recent
accidents/incidents.
Measurements:
New employees must pass the examination prior to operating in other than a student
capacity. The original of the examination answer sheet is keep as a company record in
each employees file.
12
Element: #10
Description: Locomotive Engineer Certification Program (49 CFR 240)
Purpose: To ensure that only qualified persons operate a locomotive or train for Tacoma Rail
Implementation: Tacoma Rail’s Locomotive Engineer Certification Program is based on a
submittal to the FRA (Federal Railway Administration) and approval by that agency. The program
consists of training requirements for employees first certified to operate locomotives, vision and hearing
tests, written examinations, annual performance reviews of certified Locomotive Engineers and
re-certification of all Locomotive Engineers every three years.
Measurements: Every certified Locomotive Engineer will have a file with check lists and
documentation showing satisfactory completion of all program elements.
13
Element: #11
Description: Vehicle Safety Pre-trip Program
Purpose: To ensure employees have Safe and properly operating motor vehicles to aid in performing
their duties
Implementation: Crews will do a daily Safety Inspection of the vehicle being used and fill out the
“Vehicle Inspection” report form at the completion of each shift. Forms will note the vehicle number
and a check list of operating parts. A comments area is also provided to report any vehicle defects. Any
Vehicle Inspections reporting defects are turned in to the Shop Attendant for disposition. (Memorandum
dated 2/06/03) “Motor Vehicle Trouble Reports” are also provided so that any vehicle defects can be
reported.
Measurements: Vehicle defects reported, are recorded in the “Safety Issues Database” and include
the vehicle number, the date of the defect, the disposition of the defect, and date repaired if applicable.
14
Element: #12
Description: Tacoma Rail Emergency Preparedness/Security Plan
Purpose: Emergency Preparedness Document- To serve as a guide for Tacoma Rail for responding to
major emergencies.
Railroad Security Plan – to follow the guidelines as set forth in the Code of Federal Regs, 49
Part 172.802
Implementation: It is Tacoma Rail's policy to respond in a safe and expeditious manner to prevent
loss of life and property and to continue service to our customers. We will also support and assist other
agencies during emergency situations to hasten recovery and reduce hazards to the public. Tacoma Rail
Staff, material, and equipment will be available for the common effort of all agencies. Jurisdiction and
responsive control will be under the direction of responsible elected official.
Measurements: Have a Tacoma Rail Emergency Preparedness & Security Plan and any updates
approved by the FRA and in place.
15
Element: #13
Description: Accident/Incident Analysis
Purpose: To ascertain the root cause of each Accident/Incident in order to eliminate the conditions or
actions that were the cause and prevent a repetition of a similar Accident/Incident.
Implementation: All Accidents/Incidents are to be reported as soon as possible by the appropriate
person to the on duty Operations Supervisor. Each incident must be investigated in person by the
Operations Supervisor with on the spot interviews, measurements, and photographs as soon as possible
after occurrence. Each incident is to be documented and analyzed to determine root cause and all
contributing causes. Recommendations are to be developed and implemented in order to prevent
reoccurrence.
Measurements: All accident/incident analysis and recommendations are to be added to the
appropriate database to determine overall trends and the rate of reduction of Accidents/Incidents.