1 Mount Laura Conservation Reserve Works August 2009 to May 2010. Introduction “During high intensity short duration storm events sandy clays on hill slopes and within watercourses in the Whyalla region are prone to various forms of natural erosion over time. Factors such as high usage of tracks coupled with improper driving techniques eg. wheel spin and bogging, exacerbate and trigger new forms of erosion events in terrain not naturally prone to erosion. Directly linked to erosion is the infestation and spread of weeds which favour disturbed ground and seed can be transported over considerable distances during peak storm events and deposited in sediment on the flood plain. Erosion of tracks will be addressed [by such methods as] track closure and rationalisation by a variety of methods including: backfilling with rubble, multiple diversion drains and contour ripping / banking. Large erosion heads in old BHP diversion drains will be rehabilitated with corrective battering followed by armouring with A34 geotextile overlain with graded rip rap. Upstream and downstream sections of eroded drains adjacent to rehabilitated erosion heads will be protected by energy dissipating structures (grade control structures) constructed of graded rip rap over A34 geo textile. These works will be supervised by Larry Bebbington who is a practicing erosion control contractor (International Erosion Control Association - IECA) who has successfully implemented these techniques in other areas for various agencies. As the old diversion drains are no longer required by Onesteel wherever possible they will be breached and rehabilitated to reduce the amount of run off collected and discharged into downstream environs. [An old BHP retention dam and two old quarries] will be cleaned of silt and utilised to reduce the amount of stormwater run- off entering urban environments downstream along McBryde Tce. Due to the scale of the area and erosion problems erosion control requirements will be assessed and prioritised based on parameters such as: likelihood of accelerated upslope migration, downstream / downslope issues associated with environment and infrastructure and danger to workers and community members utilising area. Following assessment and prioritisation procedures erosion works will be scheduled into a works program budget over the following 5 years.” Bebbington, L. 2007. City of Whyalla Mount Laura Conservation Reserve Native Vegetation Management Plan. p.21

Mount Laura Conservation Reserve Works August 2009 … · Mount Laura Conservation Reserve Works August 2009 to ... who has successfully implemented these techniques in other areas

Embed Size (px)

Citation preview

1

Mount Laura Conservation Reserve Works August 2009 to May 2010. Introduction “During high intensity short duration storm events sandy clays on hill slopes and within watercourses in the Whyalla region are prone to various forms of natural erosion over time. Factors such as high usage of tracks coupled with improper driving techniques eg. wheel spin and bogging, exacerbate and trigger new forms of erosion events in terrain not naturally prone to erosion. Directly linked to erosion is the infestation and spread of weeds which favour disturbed ground and seed can be transported over considerable distances during peak storm events and deposited in sediment on the flood plain. Erosion of tracks will be addressed [by such methods as] track closure and rationalisation by a variety of methods including: backfilling with rubble, multiple diversion drains and contour ripping / banking. Large erosion heads in old BHP diversion drains will be rehabilitated with corrective battering followed by armouring with A34 geotextile overlain with graded rip rap. Upstream and downstream sections of eroded drains adjacent to rehabilitated erosion heads will be protected by energy dissipating structures (grade control structures) constructed of graded rip rap over A34 geo textile. These works will be supervised by Larry Bebbington who is a practicing erosion control contractor (International Erosion Control Association - IECA) who has successfully implemented these techniques in other areas for various agencies. As the old diversion drains are no longer required by Onesteel wherever possible they will be breached and rehabilitated to reduce the amount of run off collected and discharged into downstream environs. [An old BHP retention dam and two old quarries] will be cleaned of silt and utilised to reduce the amount of stormwater run-off entering urban environments downstream along McBryde Tce. Due to the scale of the area and erosion problems erosion control requirements will be assessed and prioritised based on parameters such as: likelihood of accelerated upslope migration, downstream / downslope issues associated with environment and infrastructure and danger to workers and community members utilising area. Following assessment and prioritisation procedures erosion works will be scheduled into a works program budget over the following 5 years.” Bebbington, L. 2007. City of Whyalla Mount Laura Conservation Reserve Native Vegetation Management Plan. p.21

2

Above is a map of the area we developed to stop water rushing down established 4WD tracks, washing them out as they go. This map shows where rock piles are strategically dumped to reduce flow velocity of water down the tracks (that are acting as drains), and redirecting it back down the slope as it once did before the establishment of the tracks. This water can now be collected in the newly cleaned out dam, where the fauna of the area can get the benefits of it, rather than the water flowing through the drains under Iron Knob road, and into the residential areas on the other side of McBryde Terrace. This work began in August 2009, working in the area as mapped out in the previous map.

3

The above picture shows the old BHP storage dam.

The above picture shows the same dam cleaned out, with armoured spillways leading into and out of it.

4

The picture above shows the Dams new armoured spill way.

5

Picture above shows the 4WD track that used to run into the dam, ripped.

Picture above shows water that used to run down this track, which acts as a drain during heavy rainfall, will now pond behind these piles of ballast, and finally ‘bleed out’ into the surrounding vegetation.

6

7

Work at Mt Laura resumed in the first week of May 2010. The big problem was getting trucks to the various worksites, carrying the material required for the various erosion and track closure jobs that are required to be carried out. Due to limited budgets, and council staff availability, contractors were also utilised to get materials in quickly and cost effectively. Once on site, it was determined at a tool box meeting that we should: Complete a Job Safety Analysis (JSA), and everybody sign it. Those present included : - Sam Bourne Supervising Council Officer

- Larry Bebbington Contracted Works Overseer - Des Dunstall Excavator and Tipper driver - Les Wilkinson Grader

As works began to proceed, it was clear that a water truck was required to reduce dust levels, and to help with compacting the soil in the tracks and new banks. A decision was made to control fugitive dust and aid in soil compaction requirements. Council’s water truck was used once the driver had completed a site induction. All work team members were required to wear wide brimmed hats, safety glasses, high visibility vests, and type 1 safety boots. All vehicle flashing lights were also required to be operational while vehicles were entering, working and leaving the site. Initial works included repairing and making safe a section of the track that we will be able to utilise to cart material and machinery into, and around the reserve safely. Works required included drain rehabilitation and where to divert water. As well as track rationalisation, including the compaction of bull dust. There is a potential to divert this water into two ‘Borrow Pits’ located just outside the Heritage Area, to provide water and habitat for the Reserves fauna.

8

Photo above shows where the works were concentrated in May 2010. Sites are marked with a cross. The main aim of the works in May 2010 was to make a safe section of the track through the Conservation Reserve, to allow for the safe passage of civil construction equipment, to fix the issues of erosion and track rationalisation that are required in the reserve.

9

The photo above shows the first section of track that needs attention. Because it’s so badly eroded, people have stopped using this track, and made a new one next to it. Unfortunately, this situation is repeated all too often in the Conservation reserve.

Above is the same section of track, after rehabilitation. Rocks have been strategically placed to stop any further use of this track, confining authorised users to the new track.

10

Above is a picture of an excavator with a rock screening bucket attached. The work of this excavator was essential to provide us with graded 400mm – 700mm rock that’s required for the erosion control work. This rock will from now on be referred to as ‘Rip Rap’.

The above picture shows the piles of rip rap ready for loading to be transported to the work site.

11

This was dusty work. With the help of Council’s water truck, we were able to control dust levels, as well as compact the soil in the tracks as we drove over them, leaving them less prone to future erosion.

The above picture shows how important water is in preparing this dirt mound for compaction, before it was covered in A34 geotextile, and a final layer of ballast (40mm – 60mm) rock. This procedure ensures a permanent solution to the above erosion issue, leaving us free to move on to the next problem area when works are next scheduled to occur.

12

Pictured above is a drain being armoured with geotextile and rip rap.

13

Above and below shows a before and after of the track and drain rehabilitation work. While this work can be time consuming and expensive at times, if done properly, it will provide a permanent solution to the initial problem, that will only get worse and increasingly dangerous if left untreated.

14

2.4

– A

ctio

n Ti

met

able

s A

CTI

ON

Se

ason

al

Tim

ing

YE

AR

1 2

3 4

5

Ong

oing

Pu

blic

Aw

aren

ess

Imm

edia

tely

fo

llow

ing

appr

oval

from

N

VC

x x

x x

x U

pdat

es w

ill b

e av

aila

ble

on th

e C

ity o

f Why

alla

web

site

an

d on

goin

g m

edia

rele

ase

of e

vent

s w

ill b

e re

leas

ed in

th

e lo

cal m

edia

. Com

mun

ity in

volv

emen

t in

mon

itorin

g an

d sm

all s

cale

man

agem

ent p

rogr

ams

will

be

ongo

ing.

M

OU

’s

x

MO

U’s

for m

ajor

use

rs s

uch

as th

e W

hyal

la 4

WD

Clu

b In

c w

ill b

e ra

tifie

d an

d im

plem

ente

d im

med

iate

ly fo

llow

ing

appr

oval

s fro

m th

e N

VC

. Com

mun

ity g

roup

s su

ch a

s or

ient

eer g

roup

s w

ill b

e in

corp

orat

ed u

nder

the

user

per

mit

syst

em a

nd fo

rmal

MO

U’s

to a

less

er d

egre

e.

Trac

k C

losu

re /

Rep

air

Spr

ing

Sum

mer

x

x x

x x

Trac

k cl

osur

e w

ill c

omm

ence

follo

win

g th

e ra

tifyi

ng o

f the

H

A a

nd c

omm

unity

aw

aren

ess

cam

paig

ns. T

rack

re

habi

litat

ion

will

com

men

ce in

200

8 (b

udge

t dep

enda

nt)

and

will

be

ongo

ing

but r

educ

ing

over

follo

win

g 5

year

s.

Pest

Pla

nt &

Ani

mal

W

inte

r S

prin

g x

x x

x x

Initi

al a

sses

smen

ts a

nd m

appi

ng o

f wee

ds.

Impl

emen

tatio

n of

wee

d co

ntro

l stra

tegi

es li

nked

to

exis

ting

prog

ram

s. W

eed

cont

rol w

ill b

e on

goin

g. C

at /

Fox

trapp

ing

impl

emen

ted

in S

umm

er 2

007

– on

goin

g. R

abbi

t co

ntro

l pro

gram

s im

plem

ente

d an

d on

goin

g as

opp

ortu

ne

dist

ribut

ion

map

ping

com

pile

d.

Eros

ion

Con

trol

S

prin

g S

umm

er

x x

x x

x E

rosi

on c

ontro

l ass

essm

ents

and

prio

ritis

atio

n w

ill b

e im

plem

ente

d in

200

8 fo

llow

ing

ratif

ying

of H

A. P

riorit

ised

er

osio

n co

ntro

l will

be

impl

emen

ted

late

200

8 an

d re

duci

ng o

ver n

ext 5

yea

rs.

Mon

itorin

g &

R

evie

w

Cha

nge

of

seas

ons

x 4

x x

x x

x M

onito

ring

will

com

men

ce fo

llow

ing

iden

tific

atio

n of

site

s an

d in

stal

latio

n of

pho

to p

oint

s. M

onito

red

site

s w

ill b

e en

tere

d in

to d

ata

base

for c

ompl

ianc

e re

porti

ng.

Rep

ortin

g to

NVC

x x

x x

x A

nnua

l

16

2.5

AC

TIO

N

Plan

t / R

ates

H

ours

Sub-

Tota

l C

ontr

acto

r Su

perv

isio

n TO

TAL

SCH

EDU

LE

Hou

rs

S-To

tal

Sign

age

100

sign

s @

$50

ea

50

00

10

0 S

teel

pos

ts @

$5

0ea

50

00

1st

Yea

r – im

med

iate

ly

follo

win

g pu

blic

ann

ounc

emen

t of

con

serv

atio

n re

serv

e

Ere

ctin

g w

ith B

obca

t @

$65

/hr

16

1040

8

680

1104

0

680

1172

0

Tr

ack

Clo

sure

A

cces

s B

arrie

rs

15

00

1st

yea

r – fo

llow

ing

notif

icat

ion

Bob

cat @

$65

/hr

24

1560

8

680

Rip

ping

trac

ks –

4.5

t ex

cava

tor @

$86

/hr

150

12,9

00

1st

& 2

cnd y

ear –

mai

nten

ance

th

erea

fter

Ero

sion

repa

irs –

4.5

t ex

cava

tor @

$86

/hr

150

12,9

00

1st

& 2

cnd y

ear-

mai

nten

ance

th

erea

fter

Rub

ble

200t

@15

.50

31

00

100

8500

31

960

91

80

4114

0

Rip

ping

and

ben

chin

g hi

ll tra

cks

and

gully

tra

cks

to d

iver

t run

off

acro

ss s

lope

into

ve

geta

tion

and

to

rest

rict a

cces

s

St

orm

wat

er

Ret

entio

n 25

t exc

avat

or @

$1

37.5

0 /h

r 32

44

00

1st

& 2

cnd ye

ar –

mai

nten

ance

3rd

yea

r 10

0t 6

00/9

00m

m

rock

at $

21/t

plus

ca

rtage

24

41

16

1360

6841

1360

82

01

Util

ise

and

enla

rge

exis

ting

dam

s to

pon

d w

ater

, re

duce

ve

loci

ties

and

volu

mes

en

terin

g do

wns

tream

ur

ban

envi

rons

Cos

t Est

imat

es /

Sche

dule

s fo

r Mt L

aura

Con

serv

atio

n A

rea

Man

agem

ent –

2008

-201

3

17

AC

TIO

N

Plan

t / R

ates

H

ours

Sub-

Tota

l C

ontr

acto

r Su

perv

isio

n TO

TAL

SCH

EDU

LE

Eros

ion

Hea

ds

H

ours

S-

TOTA

L

A

34 G

eote

xtile

– 1

0 ro

lls @

$600

ea

+ fre

ight

$7

000

100t

600

/900

gra

ded

rock

+ $

341

carta

ge

12

600

(61 )

25t e

xcav

ator

@

$137

.50/

hr

60

8250

60

51

00

1st &

2cn

d ye

ar b

udge

ts d

ue to

se

dim

enta

tion

dow

nstre

am,

mig

ratio

n of

ero

sion

hea

ds

upsl

ope,

saf

ety

issu

es w

ith

unde

rcut

road

s ad

jace

nt to

dr

ains

. 3rd

yea

r on

addi

tiona

l gr

ade

cont

rol s

truct

ures

.

27

850

51

00

32,9

50

Larg

e ac

tive

eros

ion

head

s ar

e ca

usin

g se

rious

pro

blem

s in

so

me

of th

e ol

d B

HP

dr

aina

ge c

hann

els.

U

p to

61 E

. Hea

ds w

ill ne

ed re

habi

litat

ion.

W

ork

incl

udes

in

stal

latio

n of

gra

de

cont

rol s

truct

ures

up

stre

am/d

owns

tream

.

Wee

d C

ontr

ol

A

ppro

ved

herb

icid

es

50

0

Kna

psac

k sp

raye

r

250

Lock

able

tool

box,

G

love

s, W

eed

bags

, ha

nd to

ols

15

00

To b

e ca

rrie

d ou

t by

coun

cil

rang

er fr

om y

ear 1

– o

ngoi

ng

on a

min

imum

bas

is o

f 8 h

rs /

wee

k du

ring

peak

gro

win

g pe

riods

(5 m

nths

/ ye

ar).

16

0

Dom

inan

t wee

d pr

oble

ms

are:

Car

rion

Flow

er, P

rickl

y P

ear,

Sal

vatio

n Ja

ne, O

nion

W

eed.

2250

22

50

Pe

st A

nim

als

10 c

at /

Fox

traps

@

$200

ea

20

00

1st y

ear –

ong

oing

wag

es a

nd

baits

onl

y

20

00

2000

Pre

dom

inat

ely

Fox

and

Fera

l Cat

con

trol

usin

g ca

ge tr

aps

unde

r su

perv

isio

n of

C o

f W

Env

ironm

ent U

nit s

taff.

TOTA

L $9

8,26

1gst

incl

.

18