Monday, Feb. 23 rd p. 182, 183

Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

Embed Size (px)

Citation preview

Page 1: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

Monday, Feb. 23rd p. 182, 183

Page 2: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

Monday, Feb. 23rd

1822/23/15 Mon.L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif. intervals along the RC track using a timer and the equation S = d/t.DO NOW: Our goal today is to find the speed of the RC car at 9 points on the track. What info do we need? How can we do this? Through diagramming and explanation, make a plan.…………………………..Reflection: Did I make and write down a plan as to how we could gather the speed data? Did I participate with my classmates to find time data and calculate it to speed? Did I write my data down in a table on my right side?

183Title: Finding Speed on the RCDiagram of Set-Up:

Procedure:

……………………………………..Data:

SNB Checks due today!

Page 3: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

Roller Coaster final project

• 1 • 2 5

• 3 4 6• 7 8 9

Analysis 1 2 3 4 5 6 7 8 9Forces

diagramSpeed

m/sEnergy graph and

explanation

In order to complete this class chart, what more do we have to do?

Page 4: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

2nd period plan

• Plan 1: We can time 1-2, 2-3, 3-4, etc.

• Plan2: We can have a timer at each station and find avg. speed.

• Plan 3: We could measure the whole thing and divide into 9 parts.

• Plan 4: Have 2 timers at each section, find avg. time and then use that for avg. speed.

• Plan 5: Have 2 people find the avg. speed at each section.

Page 5: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

3rd period plan

• Plan 1: We can apply added force to get car going

• Plan 2: Measure with a tape ruler each section (1-2, 2-3, 3-4, etc.)

• Plan 3: Get a few people in the first section (1-2) and assign a timer and have that person get time every time the RC car goes by (trials??)

• Plan 4: Make sure that each section is the same distance.

• Plan 5: Find an average of the trials.

Page 6: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

4th period plan

• Plan1: Measure the track at each interval. Time the car in each interval and also in the entire track. Maybe measure the height of the RC track (for PE calculation??)

• Plan2: Figure out the measurements. Then make a diagram and procedure and start out to test your trials. Making a prediction?? Find average time. Find avg. speed using S = d (of each interval) / time.

• Plan3:

Page 7: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

5th period plan

• Plan 1: Have timers and calculators.

• Plan 2: Assign timers and calculators a section (1-2, 2-3, 3-4, etc.)

• Plan 3: Measure the distance of each section.

• Plan 4: Need distance and time. Use timers and length. Need distance between each point and time for each section. Use S = d/t afterwards for avg. speed of each section.

• Plan 5: …

Page 8: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

Procedure

• How to find distance data:• 1. How do we gather distance data? Measure each section (1-2, 2-3, etc.) with

measuring tool. Record.

• How to find time data:• 1. Gather materials.• 2. Assemble people into their teams and into their sections.• 3. How do we start our 1st trial? Put the car on starting point (1) and push car down

the track.• 4. How do we gather data as the car is moving down the track? Use timers to start

time when car enters into the zone and stop it when the car exits the zone. Report times to calculator who will calculate average time.

• 5. How do we make sure everyone has the necessary information? Everyone write down their data.

• 6. Repeat steps ____ -____ ____ times. Repeat steps 3-5 2 times.• 7. Report data to Ms. Kim.• 8. Students will calculate S = d/t.

Page 9: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

• 1. Gather data.• 2. Assemble people into their teams and into their sections.• 3. RC car gets pushed down the track.• 4. Gather time data for each interval – ex: start timer at section 1 and

stop when car’s at section 2.• 5. Check to see that everyone got time (or else need to do trial again).

Report times to calculator; calculator calculates average time. Everyone records in SNB. • 6. Repeat steps 3-5 2 times.• 7. Report data to Ms. Kim.• 8. Students will calculate S = d/t for each section.

Page 10: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

• Data Table: How do we organize our data table to include the following?

• Info to organize:• 1. 8 sections of track• 2. 3 time trials• 3. distance of each section• 4. average time• 5. average speed of each section

Page 11: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9

d 0.66 m 0.42 m 0.33 m 0.33 m 0.35 m 0.44 m 0.46 m 0.37 m

T1

T2

T3

Avg. timeAvg.

speed

Page 12: Monday, Feb. 23 rd p. 182, 183. Monday, Feb. 23 rd 182 2/23/15 Mon. L.T.: I can collaboratively plan and find the avg. speed of the RC car traveling dif

Speed data on RC1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9

d

t

Avg. speed of section

Is this table ready to use as is? If not, change it to fit our data collecting needs…