14
MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN MoEDAL at IP8 Infrastructure TimePix Deployment Access & Safety General Conditions MoEDAL Collaboration Meeting 21 June 2012 1 D.LACARRERE 23 Feb. 2012 @ IP8

MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN MoEDAL at IP8 Infrastructure TimePix Deployment Access & Safety General Conditions MoEDAL

Embed Size (px)

Citation preview

Page 1: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 1

MoEDAL MoUEDMS No 1225437

Issues from LHCb & CERN

MoEDAL at IP8 Infrastructure TimePix Deployment Access & Safety General Conditions

MoEDAL Collaboration Meeting 21 June 2012

23 Feb. 2012

@IP8

Page 2: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 2

UX85 Area - LHCb & MoEDAL

MoEDAL Collaboration Meeting 21 June 2012

UX85A

IP8

ACCESS LARGEEQUIPMENT

PX SHAFT

RADIATION SHIELD

UX85C

Emergency exit Flashing lights + sirens

Oxygen Deficit Hazard (ODH)

ACCESSPERSONNEL

PZ SHAFT

Access - CheckingPersonnel & Materials

FIG. 1

MoEDALAREA (RB84)

UX85B

Emergency ways

TOWARDSATLAS

TOWARDSCMS

ACCESSPERSONNELPM SHAFT

Page 3: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 3

LHCb Vertex Locator (Velo)

MoEDAL Collaboration Meeting 21 June 2012

VELO RICH1 TT

POINT 1 (ATLAS)IP8

12 Dec. 2011Fig.2 : LHCb VELO-RICH1-TT – Side View (from C Side)

LHC Beam axis

POINT 5 (CMS)

BEAM 2BEAM 2

Page 4: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 4MoEDAL Collaboration Meeting 21 June 2012

BEAM 1

BEAM 2

LHCb VELO

IP8

MoEDAL

Fig. 3

LHCb RICH1

C SIDE

A SIDE

MoEDAL around LHCb Velo

Page 5: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 5MoEDAL Collaboration Meeting 21 June 2012

Fig.4 : VELO – Side & Top views (from A side)

First MoEDAL modules installedin front of the IP8 at C side

12 Dec. 2011

MoEDAL modules around Velo

Page 6: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 6MoEDAL Collaboration Meeting 21 June 2012

23 Feb. 2012

Fig. 5

Test Modules ( ~ 80 m2) at Pit 8

23 Feb. 2012

Page 7: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 7MoEDAL Collaboration Meeting 21 June 2012

Infrastructure – Support from CERN

UNDERGROUND (UX85A & UX85B)• Installation of MoEDAL (modules + sensors) around VELO (UX85B).• Installation of TIMEPIX Electronics (LV, PC, network) in D2 (UX85A).• Cabling from UX85B up to UX85A (roughly 80 m).• Scaffoldings for accessing to upper parts.• Buffer areas for exposed NDT stacks before shipping to Bologna• Radiation traceability of items using LHCb procedure & data base

(proposal : MoEDAL is considered as a sub-system of LHCb detector) => great simplification (code bars, existing database,….)

• Standard Services & Facilities (network, safety equipments,…..)

SURFACE• Mechanical Workshop Support at Pit 8• Electronics Pool (Meyrin site).• EDMS for engineering documents and reports….• Office (1 or 2 ) at Pit 8 (to be discussed)• Area for storage – 1 container (4 x 3 x 2.6 m3) at Pit 8.

Page 8: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 8

Fig. 6 : Schematic view of the route for cabling TimePix sensors

MoEDAL areaMediPix sensors

MoEDAL PC , LV& network

(D2)

A

Route A-B roughly 80 m

MoEDAL Collaboration Meeting 21 June 2012

TimePix Deployment

B

UX85 AREA

Page 9: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 9MoEDAL Collaboration Meeting 21 June 2012

Access Requirements

• MoEDAL Personnel will follow (of course) the CERN & LHCb access procedures in force.

• No access before getting the green light from the CERN (DGS/RP or LHCb) Radioprotection Experts (RPE) during short technical stops and long shunt-downs of the LHC Machine.

• All the MoEDAL installation or maintenance activities will be prepared in advance and scheduled in agreement with the LHCb Operation & Maintenance activities, in particular with the VELO & RICH1 activities. The co-activities are not recommended due to the tight working space in that area (RB84 area) => IMPACT DOCUMENTS

• For working at the ceiling, the vacuum beam-pipe should be at the atmospheric pressure (Neon filled), in particular for the 1st complete deployment and later for removing exposed NDT detectors.

The VELO vessel should be protected using appropriate plastic foils (in agreement with the VELO Team) + appropriate scaffoldings required.

Page 10: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 10MoEDAL Collaboration Meeting 21 June 2012

• Flammability : The rules on the use of MoEDAL’s plastic NTDs at Point 8 are detailed in the TIS (IS41 document). A SC/GS-GC derogation request for the use of the non-metallic materials not conforming to the safety instructions IS41, was submitted by MoEDAL to the CERN Safety Commission (SC) in 2008. Request was approved (edms no : 893563 - 28 May 2008).

• Metallic materials used for the holders and the housings of the NTDs must be non-magnetic materials (Aluminium) and/or Stainless Steel for such as inserts & screws.

• Handling of exposed Modules : for removing the slightly radioactive components from the detector area, MoEDAL will adopt & endorse the LHCb procedures (including traceability of the items). Then, the Uni. of Bologna/INFN & CERN protocols will be followed for the shipping, receiving and tracking of all MoEDAL detector modules shipped to Bologna.

Safety

Page 11: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 11MoEDAL Collaboration Meeting 21 June 2012

General Conditions - Reminder

• GENERAL CONDITIONS applicable to Experiments performed at CERN. Experiments require approval by the CERN Research Board & the Director – General after consideration of written proposals submitted to the appropriate experiments committees (*).

DOCUMENT (in brief)• SCOPE OF APPLICATION• PARTIES & THEIR REPRESENTATION• BASIC DOCUMENTS GOVERNING THE EXECUTION OF EXPERIMENT• ORGANISATION OF THE COLLABORATION• CERN’s OBLIGATIONS AS HOST LABORATORY• OBLIGATIONS OF THE COLLABORATING INSTITUTIONS• INTELLECTUAL PROPERTY• FINAL PROVISIONS

(*) details, please refer to the original document – General Conditions applicable to Experiments at CERN (20 February 2008 – 12 pages).

Page 12: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 12MoEDAL Collaboration Meeting 21 June 2012

Summary• MoEDAL Experiment is designed to search for the magnetic

monopoles & the highly ionizing particles at the LHC IP 8. It is a passive detector, relatively small (25x10 m2) attached on the walls, modular array, relatively quick to install and to replace modules, however appropriate scaffoldings will be needed to reach the upper parts of the walls and the ceiling inside the VELO area.

• No major interferences with the LHCb sub-detectors (VELO & RICH1) and the LHC Vacuum activities during the shunt-downs are expected, except maybe 2-3 weeks for 1st complete deployment.

• In order to avoid co-activities in the RB84 area, high priority will be given to the LHCb VELO and RICH1 maintenance activities. Access to MoEDAL will be always given with the LHCb agreement.

• For M&O, a detailed planning of the LHCb & MoEDAL shunt-down activities will be mandatory in order to manage & share access and priorities in a common agreement with LHCb & MoEDAL.

• MoEDAL is already on the road. We need to continue discussion with LHCb Collaboration about the evolution of MoEDAL detector.

Page 13: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 13MoEDAL Collaboration Meeting 21 June 2012

Appendix

Page 14: MoEDAL MoU EDMS No 1225437 Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL

D.LACARRERE 14MoEDAL Collaboration Meeting 21 June 2012