103
INTRODUCTION TO RBI & API 580 RBI Training Course Module 01

Module 01 - RBI Introduction

Embed Size (px)

DESCRIPTION

RBI & API 580 Introduction

Citation preview

  • INTRODUCTION TO RBI& API 580

    RBI Training CourseModule 01

  • Scope of the Training

    Introduction to RBI RBI Methodology Theory + with hands on exercises Likelihood calculation Consequence calculation

    Case Study with the RBI software: refinery unit Data preparation Screening analysis Detailed analysis

  • Agenda

    Start End

    1 09:00 12:3012:30 13:30

    2 13:30 15:003 15:00 17:00

    4 09:00 10:305 10:30 12:30

    12:30 13:306 13:30 17:00

    7 09:00 11:008 11:00 12:30

    12:30 13:308 13:30 17:00

    9 09:00 11:0010 11:00 12:0011 12:00 12:30

    12:30 13:3012 Other Features 13:30 16:00

    Lunch

    Plant inspection plans Creating inspection plans from the RBI guidelines.Reporting features / information output Extracting information from software

    Model creation and data entry issues.Detailed analysis - Data entry

    Day 1Introductions - Installations, Introduction to RBI

    Detailed analysis - Data entry

    Day 4

    Lunch

    Project Start up and Data Organization. Inventory groups and Corr circuits

    Module

    Other limit statesDay 2

    Consequence theory and exercises

    RBI Training Program. Breaks assumed during the day but not shown. Timing approximate.

    Item Objectives

    Lunch

    Likelihood theory 2

    Likelihood theory 3 Other likelihood models

    Thinning: calculation principles and inspection updatingLikelihood theory 1

    Other features

    Establishing criteria and using the IP tool Inspection Planning using risk criteria

    Consequence theory

    Model creation and data entry issues.Screening Analysis Introduction Using the screening tool

    Lunch

    Day 3

  • INTRODUCTIONS(Name, Organisationtype of work, why interested in RBI,English )

  • Presentation Topics - This Session

    RBI History API StandardsGeneral IntroductionThe benefits of RBIWhat RBI isHow RBI fits within existing plant systemsImplementing RBISome case studies

  • RBI History

    Probabilistic risk analysis techniques Started in the nuclear industry (1970s)

    Quantitative risk assessment (QRA) in the Process Industries Canvey Island and the Rijnmond Report (1980s)

    Software tools for QRA Eg DNV-Technica develops SAFETI and PHAST risk assessment

    tools (1980s)ASME RBI principles overview document in 1991 API develops Risk Based Inspection Methodology (1990s) DNV main API sub-contractror API Base Resource Document 581 (2000) API RBI software API RP 580 (2002)

  • RBI History

    DNV develops ORBIT Onshore 1997-now Some Reasons:

    Need for a RBI software for all onshore installations API 581 focuses on refineries

    Improved consequence calculations with PHAST linkEnhancements in likelihood calculation

    ORBIT uses equations for limit state implementationNeed for a robust software architecture & professional software development and maintenance

    ORBIT is consistent with the API 580 RBI standard ORBIT and API 581 share philosophy/technology

    API RBI development by Equity Eng. (2002-now)API RP 581 Update (2008)API RP 580 Update (2009)

  • API Inspection and FFS Standards

    Existing RBI & FFS documents

    API750

    API510

    API570

    API653

    API - BRD P 581RISK BASEDINSPECTION

    MPCFITNESS FOR

    SERVICE

    RBIAPI RP 581

    FFSAPI RP 579

    WorkingDocuments

    Research & referenceDocuments

    NewDocuments

    ASME

    RBI API RP 580

  • Presentation Topics - This Session

    RBI HistoryGeneral IntroductionThe benefits of RBIWhat RBI isHow RBI fits within existing plant systemsImplementing RBISome case studies

  • A Typical Plant

    Loading facilities

    Processing to give added value.

    Storage and export

  • Typical Operating Objectives

    Operate safely and profitably Maintain high availability and throughput. Minimize shut downs. Extending shut down intervals Prevent/reduce leaks.

  • Class question?

    What are the typical plant objectives here?

  • Typical Plant Issues

    Challenges Old Plants Large, complex units Integrated Feed Systems Many degradation mechanisms Raw material price

  • PROCESS CORROSION- Continuously degrading integrity

  • Corrosion Principles

    Corrosion rate is measured as weight loss per unit area and is expressed in mils per year (mpy) or mm/y.Corrosion Rates can be affected by: Passivity forming protective surface films (including

    corrosion inhibitors, paints and coatings) Oxygen content Flow velocity/rates Temperature pH effects (Low and High) Contaminants/intermediates

  • Some Corrosives Found In The Process Industry

    WaterOxygenNaphthenic AcidPolythionic AcidChloridesCarbon DioxideAmmoniaCyanides

    DepositsHydrogen ChlorideSulfuric AcidHydrogenPhenolsDimer and TrimeracidsOther

  • Low Temperature Corrosion

    Below 500F (

  • Low Temperature Corrosion

    From Process chemicalsFrom Process contaminantsNot caused by clean hydrocarbonsCaused by inorganic compounds such as water, hydrogen sulphide, hydrogen chloride, sulphuric acid, salts, etc.

  • High Temperature Corrosion

    Above 500F (>260C)No water presentResult of a reaction between metal and process ions (such as oxygen O-, sulphur S, etc.)

  • High Temperature Corrosion

    Important due to serious consequencesHigh temperatures usually involve high pressures.Dependent on the nature of the scale formed General thinning Localized thinning (pitting) Inter-granular attack Mixed phase flowMetallurgical changes

  • Situations Leading To Deterioration

    Normal operation, upset, startup /shutdown conditionsMaterial/Environment condition interactionsMany combinations of corrosive process streams and temperature/pressure conditions.In the absence of corrosion, mechanical and metallurgical deterioration can occur.Weather effects .

  • Forms Of The Damage

    General loss due to general or localized corrosionPitting attackStress Corrosion Cracking (SCC)Metallurgical ChangesMechanical damageHigh Temperature Hydrogen Attack (HTHA)

    Damage types occur with specific combinations of materials and environmental/ operating conditions

  • SOHIC in soft base metal. Stress-Oriented Hydrogen Induced Cracking

    In contrast to general corrosion, SCC is very hard to detect visually even when it has progressed to an extreme condition.

    Stress Corrosion Cracking Detection

  • Types of Stress Corrosion Cracking

    Chloride stress corrosion cracking (Cl-)NitratesCaustic stress cracking (NaOH)Polythionic acid stress corrosion crackingAmmonia stress corrosion cracking (NH4)Hydrogen effects (in steel)Sulfide stress corrosion cracking SSC, hydrogen induced cracking HIC, stress oriented hydrogen induced cracking SOHICHydrogen cyanide HCNOthers

  • High Temperature Hydrogen Attack (HTHA)

    Carbon and low alloys steels exposed to hydrogen above 430F (221C)Hydrogen Partial pressure above 200 psi (>14 bar)Dissociation of molecular hydrogen to atomic hydrogen

    H2 -> 2 H+Atomic hydrogen permeation into the steelReaction of atomic hydrogen with carbon in steelFormation of methane at discontinuitiesAPI 941 recommended for new installation

  • Longitudinal Weld

    Magnification: 500x Etch: 2% Nital

    High Temperature Hydrogen Attack

  • Metallurgical And Environmental Failures

    Temper embrittlementLiquid metal embrittlementCarburizationMetal dustingDecarburizationSelective leaching

    Grain growthGraphitizationHardeningSensitizationSigma phase885 F embrittlement

  • Mechanical Failures

    Over pressurizationBrittle fractureCreepStress ruptureThermal shockThermal fatigue

    Incorrect or defective materialsMechanical fatigueCorrosion fatigueCavitation damageMechanical damageOverloading

  • Conclusions

    There are many causes of equipment failures in the process industry.Many are common and well documented.Other, less common deterioration mechanisms are not well documented.Deterioration is the result of metal and environment/ operating conditions combinations.These combinations vary somewhat in different process units.Detection and characterization of the different forms is a challenging and critical activity.

  • Tools exist to assist to assess the severity of corrosion or determine the appropriate materials of construction For Example:

  • NaOH Chart

  • These Tools Are Generally Used By Experienced Corrosion Engineers.

    They can also be implemented in software as corrosion evaluation supplements

  • Determining Equipment Integrity

    Requires information about the level of degradation:

    Monitoring (Fluid corrosivity) and Inspection (Wall condition)

  • MONITORING POSSIBILITIES

    Monitoring Fluid Composition/Quality

    Pressure, Temperature, pHContaminants when relevant

    Fluid corrosivityCorrosion probes (e.g. Weight loss, electrical resistance, linear polarization)

    Function of protective systems e.g. inhibitor injection

    Inspection: Pressure boundary condition checks, e.g. Visual examination Thickness measurements Other checks

  • Non Destructive Examination

    - Inspection

  • Selecting Inspection method. Factors to consider

    Type of defect General metal loss Localized metal loss Pitting Cracks Metallurgical changes

    Location of defect On the outside wall of an item The inside wall Within the body of the wall Associated with a weld

  • Selecting Inspection method. Factors to consider:

    Material of construction Magnetic Non magnetic Operating at high temperatures Insulated

    Equipment geometry: May be hard to access May require extensive activity e.g. scaffolding,

    entry preparations, to perform the inspectionMany considerations when determining how to inspect.Also, need to justify the need for inspection.

  • NDE MethodsAmerican Society for Nondestructive Testing (ASNT)

    Acoustic Emission Testing (AE) VolumetricEddy Current Testing (ET) Surface/ VolumetricInfrared/Thermal Testing (IR) SurfaceLeak Testing (LT)Magnetic Particle Testing (MPT) SurfaceNeutron Radiographic Testing (NR) VolumetricPenetrant Testing (PT) SurfaceRadiographic Testing (RT) VolumetricUltrasonic Testing (UT) VolumetricVisual Testing (VT) SurfaceMagnetic Flux Leakage (MFL)

  • Penetrant Testing

    Penetrant solution is applied to the surface of a pre-cleaned component. The liquid is pulled into surface-breaking defects by capillary action. Excess penetrant material is carefully cleaned from the surface. A developer is applied to pull the trapped penetrant back to the surface The penetrant spreads out and forms an indication. The indication is much easier to see than the actual defect.

  • Magnetic Particle Testing

    A magnetic field is established in a component made from ferromagnetic material. The magnetic lines of force or flux travel through the material, and exit and reenter the material at the poles. Defects such as cracks or voids are filled with air that cannot support as much flux, and force some of the flux outside of the part. Magnetic particles distributed over the component will be attracted to areas of flux leakage and produce a visible indication.

  • Radiography Testing

    X-rays are used to produce images of objects using film or other detector that is sensitive to radiation. The test object is placed between the radiation source and the detector. The thickness and the density of the material that X-rays must penetrate affect the amount of radiation reaching the detector.This variation in radiation produces an image on the detector that shows the internal features of the test object.

  • Ultrasonic TestingHigh frequency sound waves are sent into a material by use of a transducer. The sound waves travel through the material and are received by the same transducer or a second transducer. The amount of energy transmitted or received, and the time the energy is received are analyzed to determine the presence and locations of flaws. Changes in material thickness, and changes in material properties can also be measured.

  • Ultrasonic Principles

    Straight Beam(Longitudinal Wave)

    Angle Beam(Shear Wave)

  • Ultrasonic Presentations

    TOP VIEW(C-SCAN)

    END VIEW(B-SCAN)

    SIDE VIEW(D-SCAN)A-SCAN

  • Risk Based Inspection

  • Presentation Topics

    General IntroductionThe benefits of RBIWhat RBI isHow RBI fits within existing plant systemsImplementing RBISome case studies

  • The Value of RBIWhat is the first duty of Business?

    The first duty of business is to survive, and the guidingprinciple of business economics is not the maximisation of profit - it is the avoidance of loss.

    Peter Drucker

  • The Key Benefits of an RBI Study

    Identify the high risk itemsUnderstand the risk drivers and develop mitigation plansFocussed inspection plans which: Increase safety and reduce risk Help to improve reliability Often results in cost benefits due to:

    Reduced turnaround time and/orA reduction in the number of items to be inspectedThe associated maintenance costs e.g access arrangements

    Normally an overall reduction in risk and cost savings from the inspection activity.

  • Presentation Topics

    General IntroductionThe benefits of RBIWhat RBI isHow RBI fits within existing plant systemsImplementing RBISome case studies

  • What Is RBI?

    A method/process for prioritizing equipment for inspection based on risk.It determines the risk associated with the operation of specific items of equipment and identifies the key factors driving the risk.A tool which demonstrates the value (or not) of performing specific inspection activities.It is a decision making management tool applied to the issue of Inspection Planning.

  • Equipment Types

    Pressure VesselsAll pressure containing components.Process PipingPipe and piping components.Storage TanksAtmospheric and pressurized.Rotating EquipmentPressure containing components.Boilers and HeatersPressurized components.Heat exchangers (shells, floating heads, channels, and bundles).Pressure-relief devices.

  • Strategic Process Increasing reliability (revenue) Lowering cost Lowering risk

    Integrated Methodology Risk factors

    LikelihoodConsequence

    Supports effective decision making

    Risk Based Inspection

  • What Constitutes an Undesirable Event In RBI?

    Failure is defined as a leak of the equipment contents to the atmosphere; breach of containment or LOPC Heat exchanger failures are channel or

    shell leaks. Pump failures are due to seal leaks and

    adjacent piping fatigue cracking.

  • RBI_Key_Concepts.vsd

    Risk = Likelihood of Failure XConsequenceof Failure

    GFF DFx

    Age

    DamageType/Rate

    InspectionEffectiveness

    Damage Area.

    Equip. RepairOther repairs

    InjuryBusiness Int.

    x

    Abbreviations: :

    DF: DamageFactor

    GFF: Generic FailureFrequency

    Fi : Process, Mechanical& Universal Factor

    Fdomino:Domino Eff.FactorMF: Management Factor

    xMF Fp x Fm x Fu

    RBI - Detailed Analysis

    Components in the calculation of the risk

    Fdomino x CoF

  • Common Damage Mechanisms in RBI

    DamageMechanisms

    InternalThinning

    Stress CorrosionCracking

    External Damage

    Brittle Fracture

    PipingFatigue

    HTHA Lining PRVs

    General HCl HT Sulfide .

    & Nap. Acid HT H 2S/H2 H2SO 4 HF

    Sour Water Amine HT

    Oxidation

    Caustic Amine SSC HIC/SOHIC Carbonate PTA ClSCC HSC-HF HIC/SOHIC-HF

    Cl SCC

    CUI

  • Damage factor CalculationMANUAL ACTIVITYEstimate the likely

    damage state /severityConsider data source

    Assess theinspection history(Effectiveness)

    Inspection Effectiveness

    Determine the Likelihood of being in oneof the different possible damage states:

    1 No worse than predicted X %2 Up to 2x worse than predicted Y %3 Up to 4x worse than predicted Z %

    Damage states

    Calculate the failure frequency for eachstate using the relevant limit state

    equation

    Calculate the weighted failure frequencyfor the item based on the Likelihood of

    being in the different states.Steps in Bayes_LoF

    CALCULATING THE FAILURE FREQUENCY

    Failures only occur when the rate of degradation is

    higher than expected.

  • Undesirable Consequences in RBI

    HEAT from flames destroys equipment, injures peoplePRESSURE WAVE from explosions knocks down structures and people, causes flying objectsTOXIC cloud, for some duration, causes toxic exposure injuriesENVIRONMENTAL DAMAGE due to spill (currently only included in AST RBI software)

  • Consequence Calculation

    Physical Properties

    Process Information

    Equipment Damage Costs

    Business Interruption Costs

    Calculate Release Rate or Release Mass

    Equipment Information

    Safety Costs

    Assessment of Incident Outcome

    Damage Areas

  • Amount of Effort - RBI vs QRA

    QRA*

    RBI**

    Likelihood Consequence

    * Quantitative Risk Assessment ** Risk Based Inspection

  • Input Data For A Quantitative RBI Assessment

    For some damage mechanisms, e.g. SCC, brittle fracture, fatigue, other data may be needed e.g. PWHT, Charpy test temp.

    What has been looked for and what has been found

    Is it operating as intended?

    Identify all items

    The main input data collectedItem

    OD Tnom Matl Ins Press Temp Fluid Temp. Press Fluid Mechanism Severity/rate Done? Result?A Thinning,

    SCC, Furnace, HTHA,..

    BC

    Inspection dataDesign Data Operating Data Damage mechanisms

    What do we expect to find and what at what severity?

  • RBI Results?

    Why -(Damage mech. &factor)

    Where / How -(Item - Effectiveness - Material - Mechanism)

    When -(Basis Inspection planning targets.)

    What -(Risk priority)

    Item no.

    Type From To Damage Mechanism

    GFF DF LoF CoF Risk Insp. Type

    Insp. Date

    New DF

    1 Pipe Thinning 30002 Vessel CUI 1003 Fin Fan Erosion 0.5

    Calculation of the risk with a lookahead: Inspection Plan

  • 54

    3

    2

    1

    High RiskMedium-High Risk

    Med. High Risk

    Medium Risk

    Low Risk

    L

    i

    k

    e

    l

    i

    h

    o

    o

    d

    C

    a

    t

    e

    g

    o

    r

    y

    Consequence CategoryA B C D E

    The Presentation Of Risk

  • A B C D EConsequence of Failure

    L

    i

    k

    e

    l

    i

    h

    o

    o

    d

    o

    f

    F

    a

    i

    l

    u

    r

    e

    A

    C

    B

    How Will This Picture Change With Time?

  • Risk Increase Over Time

    Likelihood of failure will increase over time because of time-dependent material degradation

    A B C D EConsequence of Failure

    L

    i

    k

    e

    l

    i

    h

    o

    o

    d

    o

    f

    F

    a

    i

    l

    u

    r

    e

  • What is the effect of Inspection ?

    A B C D EConsequence of Failure

    L

    i

    k

    e

    l

    i

    h

    o

    o

    d

    o

    f

    F

    a

    i

    l

    u

    r

    e

  • Steps Leading To The Inspection Plan

  • Risk CriteriaHigh Risk

    Negligible risk

    Unacceptable region

    The ALARP or Tolerabilityregion(Risk is undertaken only ifa benefit is desired)

    Broadly acceptable region(No need for detailed working todemonstrate ALARP)

    Risk cannot be justifiedsave in extraordinary

    circumstances

    Tolerable only if risk reduction isimpracticable or if it cost is grossly

    disproportionate to the improvementgained

    Tolerable if cost of reduction would exceed the improvement

    Necessary to maintain assurancethat risk remains at this level

  • Traditional Vs. Risk-Based Inspection PlanningTraditional

    Inspection based on experience (usually by previous leaks and breakdowns)Inspection effort driven by Likelihood of failure

    Reactive fire fighting, running behind the ball

    Use of appropriate / Inappropriate NDT techniques

    RBIInspection based on experience and systematic (risk) review

    Inspection effort driven by risk, i.e. Likelihood of failure and consequences of failurePro-active planning and execution of inspections

    Systematic identification of appropriate NDT techniques

  • Change inspection frequencies (when)Change inspection scope / thoroughness (what)Change inspection tools / techniques (how)

    Inspection Program Options for Influencing Risk

  • RBI - Applications

    Risk-prioritized Turnaround planning High safety/reliability impact = more attention (in order to

    lower risk Less impact safety/reliability = less attention (in order to

    lower costs) Result:

    Lower equipment life cycle costsFewer incidents / outagesFewer unnecessary inspectionsHigher reliability

    May also assess the impact of delaying a turnaround/ shut down

  • RBI - Applications

    Special focus studies e.g.: Corrosion under insulation. Positive material identification. Hydrogen sulfide etc.

    What if studies e.g. Assess the impact of process changes. Assess the impact of a different feed.

  • Can RBI Help To Prevent All Releases?

  • MechanicalFailure

    43%Process Upset11%

    Sabotage/Arson1%

    Unknown14%Operational

    Error21%

    Design Error5%

    Natural Hazard5%

    About half of thecontainmentlosses in a

    typicalpetrochemicalprocess plant

    can beinfluenced by

    inspectionactivities

    Where Inspection Can Help

    Source: Large Property Damage Losses in the HC-Chemical Industries - A thirty year review, 17th edition, J&H Marsh& McLennan.

  • THE SYSTEM FACTORS

    "HARDWARE" "SOFTWARE" PEOPLE

    Managing Risk - Considerations

  • Risk Exposures (Potential Losses)

    Experienced Losses - Cause and Costs

    0

    50

    100

    %

    a

    n

    d

    M

    M

    $

    PercentageAvg. $ loss

    Percentage 43 21 14 11 5 5 1Avg. $ loss 72.1 87.4 68.9 81 55.7 82.5 37.1

    Mech. Fail.

    Operator error

    Unknown Process upsets

    Natural hazards

    Design errors

    Sabotage/arson

    Source: Large Property Damage Losses in the HC-Chemical Industries - A thirty year review, 17th edition, J&H Marsh& McLennan.

  • The Equipment Involved

    Losses vs Equipment Type

    0

    50

    100

    %

    a

    n

    d

    M

    M

    $

    % of lossesAvg. $ loss

    % of losses 33 15 10 8 8 7 5 5 5 2 2

    Avg. $ loss 76.9 61.9 151.8 86.9 68.1 38.9 69.6 60.6 34.6 82.4 16.3

    Piping Tanks Reactors

    Towers

    Pumps/Com

    Drums

    Heat exch.

    Unknown

    Misc. VesselsHeater

    s

  • Presentation Topics

    General IntroductionThe benefits of RBIWhat RBI isHow RBI fits within existing plant systemsImplementing RBISome case studies

  • Managing Integrity

    Trained and Competent Staff

    PlantIntegrity

    Plant DesignOperating &MaintenanceProcedures

    Data

    Dataanalysis

    Management SystemNormally fixed.

    RBI projectprocedures. Data Integrity is

    essential!

    Trained staff areneeded.

    Cannot beneglected!

  • Model For An MI System

    SystemDocumentation

    (Say what you do)

    Documentation/Records

    (Document the actions)

    Actions(Do what you say)

    FILING SYSTEM:

    Asset RegisterDesign data

    MI equipmentInspection dataOperational dataDeficiency data

    Inspection PlansRepair information

    Defect AssessmentsInspection due dates

    TOP LEVELSYSTEM

    DOCUMENTS

    GENERALPROCEDURES:

    WORKINSTRUCTIONS

    STANDARDS

    ESTABLISHSYSTEM

    INSPECT

    UPDATE/REVISE PLANS:

    ASSESS THERESULTS

    PLANNINGRBI

  • The Integrated PlanINSPECTION PLANNING

    06_Inspection Planning RBI role.vsd

    The InspectionPlan

    Database

    Corporate Philosophy

    Local Legislation

    Corporate Policy

    Inspection Planning activity

    i. Inspectii. Onsite assessment

    iii. Detailed FfS ifneeded

    Update database

    Codes andStandards, RP's,

    RAGAGEPM

    o

    n

    i

    t

    o

    r

    i

    n

    g

    i

    n

    f

    o

    .

    G

    e

    n

    e

    r

    a

    l

    "

    G

    o

    o

    d

    H

    o

    u

    s

    e

    k

    e

    e

    p

    i

    n

    g

    f

    i

    n

    d

    i

    n

    g

    s

    R

    B

    I

    a

    n

    a

    l

    y

    s

    i

    s

    /

    p

    r

    i

    o

    t

    i

    t

    i

    z

    a

    t

    i

    o

    n

    Data analysis

    DesignInspectionOperation

    Construction

    DM'sAnomalies

  • Presentation Topics

    General IntroductionThe benefits of RBIWhat RBI isHow RBI fits within existing plant systemsImplementing RBISome case studies

  • Typical RBI implementationDefine scope of RBI StudySet up RBI team and trainCollect DataIdentify inventory groups (For consequences)Identify Corrosion circuitsPerform Screening AnalysisSelect high risk equipment items for Detailed AnalysisPerform detailed RBI analysis Consequence data-Likelihood data Run risk assessment & Review the results Develop action criteria Discuss Orbit proposed inspection guidelines and run final

    Translate into an actual inspection plan with scheduleImplement plan-perform inspectionsUpdate the model with latest inspections

  • Risk Target and Inspection Planning

    Inspection Target

    R

    i

    s

    k

    /

    D

    a

    m

    a

    g

    e

    F

    a

    c

    t

    o

    r

    (

    D

    F

    )

    Predicted Risk Increase

    Now

    Time to next inspection

    Highly Effective

    Risk / DF

    1stTurnaround

    Fairly Effective

    2ndTurnaround

    Time

  • Implementation Timeline (Tight Deadlines)

    Equipment Data Collection

    Risk Analysis and Prioritization

    Inspection Program Improvements

    Weeks 2 4 6 8

    Effort Evergreen Level of Effort

  • Critical Success Factors

    Defined objectives and planningA robust working process to assure efficiency and quality A good knowledge of the RBI theoryTrained competent staffA good understanding of the tools to be used.Evergreening the process.

  • Types of Analysis

    A qualitative unit analysis (API 581 for Plant Units) Which unit or platform should be the first based on risk

    A system screening analysis Which piping systems need to be included

    A qualitative circuit based analysis A qualitative equipment analysisA semi-quantitative circuit based analysisA semi-quantitative equipment based analysisA fully quantitative equipment based analysis.

  • THE STEPWISE APPROACH

    Will be of most benefit to a large facility just starting on the journey.

    This course introduces the semi-quantitative approach but focuses on the quantitative.

    These steps may beformal or informal.

    System Screening- Determine which systems to be included

    Semi-quantitative analysis of theincluded equipment

    Quantitative analysis ofhigh risk items

    FfS/ CBAof a few.

    Facility Screening- Determine where to start the study

    Vision for the RBI Services.vsd

  • Qualitative vs Quantitative - COST COMPARISON

    For repeat analyses the quantitative approach is far more efficient.The benefits multiply with time

    Method Est. total hours Hours onAccum. Hours "Value"

    Data Coll. Analysis Insp. plan insp plan

    Qual. 310 10% 40% 50% 155 na 40

    Quant 500 60% 10% 30% 150 na 100

    Qual. 310 10% 40% 50% 155 620 40

    Quant 200 15% 15% 70% 140 700 100

    Second time around:

    Initial Analysis

    Activity

    Proportion of the time spent on activity:

  • ADVANTAGES OF THE QUANTITATIVE APPROACH

    Not simply opinion based-easily reproducibleAccuracy-Time model The results of qualitative and semi quantitative studies are

    frozen in time. In reality the risk will change as the equipment ages and as new data is available from inspection. The quantitative method incorporates this.

    What if studies, e.g.: New campaigns in swing plants If the study had been done qualitatively or semi

    quantitatively, the effort would be much higher i.e. It is more efficient and powerful to use an analytical

    approach

  • Presentation Topics

    General IntroductionThe benefits of RBIWhat RBI isHow RBI fits within existing plant systemsImplementing RBISome case studies

  • Issue:

    Should we change our feed to a cheaper but more corrosive alternative? What does this mean for our risks and inspection requirements?

    EXAMPLE STUDY 1

  • Risk

    Inspection Interval

    Corrosive Conditions

    Tolerable Risk

    Maximum Tolerable Risk

    Changed Inspection Frequency

    Unacceptable Risk

    Standard OperatingConditions

    Example Study 1

  • Financial Risk Exposure

    $34,793

    $46,846

    $26,421$15,000$25,000$35,000$45,000$55,000$65,000

    0.1% 0.5% 0.8%Corrosive in the feed

    F

    i

    n

    a

    n

    c

    i

    a

    l

    R

    i

    s

    k

    a

    f

    t

    e

    r

    I

    n

    s

    p

    e

    c

    t

    i

    o

    n

    (

    $

    p

    e

    r

    y

    e

    a

    r

    p

    e

    r

    e

    q

    u

    i

    p

    m

    e

    n

    t

    i

    t

    e

    m

    )

    Example Study 1

  • Cost of Inspection

    $0$50,000

    $100,000$150,000$200,000$250,000$300,000$350,000

    0.1% 0.5% 0.8%

    % Corrosive in Process Feed

    C

    o

    s

    t

    o

    f

    I

    n

    s

    p

    e

    c

    t

    i

    o

    n

    Example Study 1

  • The study gave the facility the information on: The increased risk exposure The increased cost of inspection

    They compared this with the cost benefits of the cheaper feed and made their decision.

    Example Study 1

  • -$400,000

    -$200,000

    $0

    $200,000

    $400,000

    $600,000

    $800,000

    $1,000,000

    $1,200,000

    $1,400,000

    Unit 30 Unit 33 Unit 34 Unit 48 Unit 51

    Current Inspection CostsCurrent Maintenance CostsTotal Current CostsRBI Inspection CostsRBI Maintenance CostsRBI TotalTotal Savings

    Example Study 2

  • Inspecti

    on

    Mainte

    nanc

    e

    Total

    SavingsRBI

    Current

    $0$500,000

    $1,000,000$1,500,000$2,000,000$2,500,000

    $3,000,000

    COST BENEFIT ANALYSIS Results for all Units

    Example Study 2

  • Cost effective decision making for an older refinery with a limited inspection history.

    Example Study 3

  • Using The Financial Risk Values

    Total Risk vs. Risk RankRefinery Process Unit, Top 10% Risk Items

    $0

    $200,000

    $400,000

    $600,000

    $800,000

    $1,000,000

    $1,200,000

    $1,400,000

    0 10 20 30 40 50

    Risk Rank

    R

    i

    s

    k

    ,

    $

    /

    y

    r Total Risk = $11,500,000/year

  • Assess The Cost Benefits Of InspectionTotal R isk vs . R isk Rank

    Re finery Process Unit, Top 10% Risk Items,Same Ite ms, Each with 1 M ore Inspe ction

    $0

    $20 0,000

    $40 0,000

    $60 0,000

    $80 0,000

    $1 ,000,000

    $1 ,200,000

    0 10 20 30 40 50

    Ris k Rank

    R

    i

    s

    k

    ,

    $

    /

    y

    r

    Total Risk = $4,100,000/yr,Savings = $7,400,000/yrCost = $250,000 (mostly piping, approximately $5,000 avg. insp. cost)

  • The Risk of the Lowest 10% Items

    Total Risk vs. Risk RankRefinery Process Unit, Bottom 10% Risk Items

    $0$200$400

    $600$800

    $1,000$1,200

    $1,400$1,600

    0 10 20 30 40 50

    Risk Rank

    R

    i

    s

    k

    ,

    $

    /

    y

    r

    Total Risk = $12,000/yr

  • The Inspection Benefits HereTotal R is k vs . R is k R ank

    R e fine ry Proce s s Unit, B ottom 10% R is k Ite ms ,Same Ite ms , Each with 1 M ore Ins pe ction

    $ 0

    $ 2 0 0

    $ 4 0 0

    $ 6 0 0

    $ 8 0 0

    $ 1 ,0 0 0

    $ 1 ,2 0 0

    0 1 0 2 0 3 0 4 0 5 0

    Ris k Rank

    R

    i

    s

    k

    ,

    $

    /

    y

    r

    Total Risk = $4,300/yr,Savings = $7,700/yrCost = $250,000 (mostly piping, approximately $5,000 avg. insp. cost)

  • END