    •   Hydropower potential study (1983) has identified 1,249

    oca on w o a capac y o , . ev ew s u y

    1999) identified 21,480 MW passed the 3rd screening.

    •   , ,

    MW ( 89 location ) plan to develope for the next 15 years. PLN

    propossed 4,425 MW ( 35 %) as an IPP schemes.

    •   Current status of Hydropower development 3,762 MW in

    operation. ( 5 % of the potential, excluding own use

    y ropower y pr va e nves or•   552 MW total capacity of Mini hydropower development by

    ,

    MW in operation ) and 217 MW under PPA preparation.

  • 8/9/2019 Mochamad Sofyan

    3/11

    Hydro Power Potential Map

    (HPPS 1983: 75.000 MW)

     ACEH:5.062 MW

    KALSELTENGTIM:16.844 MW

    :3.808 MW

    SUMBAR & RIAU:

    3.607 MW

    KALBAR:4.737 MW

    SULUTTENG:3.967 MW

    MALUKU:430 MW

    PAPUA:.

    SUMSEL, JAMBI,

    BENGKULU & LAMPUNG:3.102 MW JATENG:

    813 MW

    SULSELRA:6.340 MW

    3

    JABAR:2.861 MW JATIM:

    525 MWBALI NUSRA:

    624 MW

  • 8/9/2019 Mochamad Sofyan

    4/11

    PLN Plan & PolicPLN  Electricity Development Plan (2011 ‐2020 ) 

    2020

    •  The electricity demand growth by 8.5 %

    annually, supplied by various energy11%8%

    Non‐ReNEW Hydro Geothermal

    GasLNGresources. Fossil power plant remaindominant ( 81 % ), mainly Coal Steam

    Coal

    .

    •   Share of renewable energy will increase

    from 11 % ( 2011 ) to be 19 % ( 2020).

    81%

    HSD MFO

    •  To reduce oil consumption from 21 % (

    2011) to 5 % by 2013.5,583 6,877 

    4,971 

    5,941 

    7,164 

    6,436 

    5,034  4,882 

    6,000 

    7,000 

    8,000 

    ,

    Geothermal

    Hydro

    •   eve opmen o renewa e energyresources will be first priority.

    Hydropower and“ Hydro Pump Storage

    4,271 

    4,181 

    2,000 

    3,000 

    4,000 

    ,  

    Power Plant“ as peaking plant.

    4

    1,000 

    2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

    PL TU PL TA PL TP PL TGU PL TG PL T Lain T otal

  • 8/9/2019 Mochamad Sofyan

    5/11

    Renewable Energy Development Plan

    • The utillisation of Renewable Energy has been planned, mainly hydro power :

    5,722 MW, geothermal : 6,247 MW and other small RE ( 253 MW ).

    5

    , ,

    Green energy expected from IPP.

  • 8/9/2019 Mochamad Sofyan

    6/11

    Hydropower Development Program 2011‐2020

    1102

    9681000

    MW West  Indonesia  East  Indonesia  Java  ‐ Bali

    493

    405450

    600

    0 0

    9577 62

    132

    0 029

    254

    78  93

    43

    252

    145

    235

    296

    119

    9   468

    18

    257

    370

    200

    COD / Capacity ( MW )

    2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

    Region 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020Grand

     

    Total

    West  Indonesia  0 0 95 77 62 493 405 132 0 0 1264

    6

    as  n ones a 

    Java  ‐ Bali 9 4 68 18 257 1102 37 0 450 968 2914

    Grand Total 38 258 241 188 362 1847 587 367 746 1087 5722

  • 8/9/2019 Mochamad Sofyan

    7/11

    Hydropower Pump Storage Power Plant 

    To meet the electricity demand during the peak load in Java-Bali system, a total

    ,

    years, consist of:

    Upper Cisokan P/S : 1,040 MW ( pre-construction stage, expected COD:

    Matenggeng P/S : 900 MW ( expected COD : 2019/2020 )

    Grindulu P/S : 500 MW ex ected COD : 2020

    75,5 m height of upper dam and 98 m height of lower dam will be build using

    RCC dam for Upper Cisokan P/S . 4 units of adjustable speed pump turbine and

    enerator will be install in the under round owerhouse.

    Pump Srorage with capacity of 400 MW in Sumatera and 800 MW Sea water

    Pump Storage in East Java has been identified for future study

    7

  • 8/9/2019 Mochamad Sofyan

    8/11

    Implementation Schemes for IPP participation

    Government Regulation no 14/2012, MEMR Decree no 04/2007:

    The project should be listed in “General Plan of Electricity Development “ (RUPTL)

    “ “ 

    MEMR Decree no 04/2007 ) as far as no others Developer at a certain proposedproject location.

      .

    President Regulation no. 56/2011 jo no. 13/2010 concerning Public Private Partnership (

    PPP ) :

    Solicited Project (listed in RUPTL) or unsolicited ( not listed in RUPTL ).

    The Project listed in the PPP Book

      Procurement process through competitive bidding with “ right to match” for the

    Project Iniciator.

    8

    Pre qualification required.

  • 8/9/2019 Mochamad Sofyan

    9/11

    Regulation for Feed‐in Tariffs ( FIT ) 

    capacity has been issued :

    656 IDR /Kwh for Mini hydro in Jawa Bali system  (connected to 

    medium 

    voltage 

    line, 

    with incentive factor 

    of  

    1.2 

     – 1.5 

    for 

    outside 

    Java‐Bali)

      ,  

    waste and  1050 IDR/Kwh for zero  waste power plant in Jawa and 

    Sumatera system

     (connected

     to

     medium

     voltage

     line,

     with

    incentive factor of  1.2  – 1.3 for outside Java‐Sumatera)

    It’s also applied  for excess power energy transaction. 

    ar 

    g er 

    an 

    mec an sm an 

    su ec 

    o approval

    Pre aration of  FIT for solar PV and Wind Power on  ro ress.

    9

    FIT for small and medium scale RE aims to accelerate and attract 

    private investor

     on

     RE

     development.

  • 8/9/2019 Mochamad Sofyan

    10/11

    Summary and Conclusion

    To meet electricity demand, a total of 5.7 GW new additional hydropowerplant has been planned for the next ten years and 20% expected to be

    developed by private ( IPP ).

    Indonesia has abundant hydropower potential, as for supporting the

    energy conservation policy , development plan as a peak power plant willreduce oil consum tion. 

    PLN has identified a total of 12.9 GW of hydropower plant for the next

    15 years development and 35 % propossed to be developed by IPP.

    FIT for small and medium scale renewable energy ( RE ) will acceleratethe development of renewable energy and attract private participation.

    10

    .

  • 8/9/2019 Mochamad Sofyan

    11/11

    Terima asiherima asiherima asiherima asiherima asiherima asiherima asiherima asih

    11