Millenium Challenge

Embed Size (px)

Citation preview

  • 8/9/2019 Millenium Challenge

    1/41

    1

    BILLING CODE: 921103

    MILLENNIUM CHALLENGE CORPORATION

    MCC FR 10-04

    Notice of Quarterly Report (October 1, 2009 - December 31, 2009)

    AGENCY: Millennium Challenge Corporation

    SUMMARY: The Millennium Challenge Corporation (MCC) is reporting for the quarter

    October 1, 2009 through December 31, 2009, on assistance provided under section 605 of the

    Millennium Challenge Act of 2003 (22 U.S.C. 7701 et seq.), as amended (the Act), and on

    transfers or allocations of funds to other federal agencies under section 619(b) of the Act. The

    following report will be made available to the public by publication in the Federal Register and

    on the Internet website of the MCC (www.mcc.gov) in accordance with section 612(b) of the

    Act.

  • 8/9/2019 Millenium Challenge

    2/41

    2

    Assistance provided under Section 605

    Country: Madagascar Year: 2010 Quarter 1

    Total Obligation: $87,998,166

    Entity to which the assistance is provided: MCA Madagascar Total Quarterly Disbursement: $4,193,753Projects Obligated Objectives Cumulative

    Disbursements

    Measures

    Area secured with land certificates or titles in the ZonesProportion of the population informed about land tenurereforms in the Zones

    Legal and regulatory reforms adopted

    Number of land documents inventoried in the Zones andAntananarivo

    Number of land documents restored in the Zones andAntananarivo

    Number of land documents digitized in the Zones andAntananarivo

    Average time for Land Services Offices to issue a duplicate

    copy of a title

    Average cost to a user to obtain a duplicate copy of a titlefrom the Land Services Offices

    Number of land certificates delivered in the Zones during theperiod

    Number of new guichets fonciers operating in the Zones

    Land TenureProject

    $30,123,098

    Increase Land

    Titling and

    Security

    $29,667,721

    The 256 Plan Local dOccupation Foncier- Local Plan of

    Land Occupation (PLOFs)

    are completed

    Volume of funds processed annually by the national paymentsystem

    The components necessary to implement the nationalpayment system are operational: network equipment andintegrator, real time gross settlement system (RTGS), retailpayment clearing system, telecommunication facilities

    Number of accountants and financial experts registered tobecome Certified Public Accountant (CPA)

    Finance Project $25,937,781

    IncreaseCompetition

    in the

    Financial

    Sector$23,535,849

    Percent of Micro-Finance Institution (MFI) loans recorded inthe Central Bank database

    Number of farmers that adopt new technologies or engage inhigher value production

    Number of enterprises that adopt new technologies or engagein higher value production

    Number of farmers receiving technical assistance

    Number of farmers employing technical assistance

    Number of businesses receiving technical assistance

    Number of Mnistre de l'Agriculture,de l'Elevage et de laPche- Ministry of Agriculture, Livestock, and Fishing(MAEP) agents trained in marketing and investmentpromotion

    AgriculturalBusiness

    InvestmentProject

    $13,687,196Improve

    Agricultural

    Projection

    Technologies

    and Market

    Capacity in

    Rural Areas

    $13,582,621

    Zones identified and description of beneficiaries within eachzone submitted

  • 8/9/2019 Millenium Challenge

    3/41

    3

    Number of people receiving information from AgriculturalBusiness Center (ABCs) on business opportunities

    Zonal investment strategies for the Zones are developed

    Number of ABC clients who register as formal enterprises,cooperatives, or associations

    Number of marketing contracts of ABC clients

    ProgramAdministration*

    and Control,Monitoring and

    Evaluation

    $18,250,091 $17583512

    Pendingsubsequentreports**

    $1,368,813

    *Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.

    **These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reported

    as such in subsequent quarterly report(s)

  • 8/9/2019 Millenium Challenge

    4/41

    4

    Country: Honduras Year: 2010 Quarter 1

    Total Obligation: $205,000,000

    Entity to which the assistance is provided: MCA Honduras Total Quarterly Disbursement: $23,018,243

    Projects Obligated ObjectiveCumulative

    DisbursementsMeasures

    Number of program farmers harvestinghigh-value horticulture crops

    Number of hectares harvesting high-value horticulture crops.

    Number of business plans prepared byprogram farmers with assistance fromthe implementing entity

    Total value of net sales

    Total number of recruited farmersreceiving technical assistance

    Value of loans disbursed(disaggregated by trust fund, leveragedfrom trust fund, and institutionsreceiving technical assistance fromACDI-VOCA)

    Number of loans disbursed(disaggregated by trust fund, leveragedfrom trust fund, and institutionsreceiving technical assistance fromACDI-VOCA)

    Percentage of loan portfolio at risk(disaggregated by trust fund andinstitutions receiving technical

    assistance from ACDI-VOCA)

    Funds lent from the trust fund tofinancial intermediaries through linesof credit

    Number of hectares under irrigation

    Number of beneficial biologicalcontrol agents developed for use byprogram farmers or other farmers forpilot testing

    Number of improved coffee hybridsavailable for cloning

    Number of farmers connected to thecommunity irrigation system

    Rural DevelopmentProject

    $69,907,000

    Increase the productivity and

    business skills of farmers

    who operate small and

    medium-size farms and their

    employees.

    $45,706,605

    Number of certified deliverables acrossall agricultural public goods grant

  • 8/9/2019 Millenium Challenge

    5/41

    5

    Freight shipment cost fromTegucigalpa to Puerto Cortes.

    Average annual daily traffic volume-CA-5

    International roughness index (IRI) CA-5

    Kilometers of road upgraded CA-5

    Percent of contracted road worksdisbursed CA-5

    Average annual daily traffic volume secondary roads

    International roughness index (IRI)

    secondary roads

    Kilometers of road upgraded secondary roads

    Percent of contracted road worksdisbursed secondary roads

    Average annual daily traffic volume rural roads

    Average speed rural roads

    Kilometers of road upgraded ruralroads

    Percent of contracted road worksdisbursed rural roads

    Signed contracts for feasibility and/ordesign studies

    Percent of contracted studies disbursed

    Kilometers (km) of roads under design

    Signed contracts for roads works

    TransportationProject

    $119,005,876

    Reduce transportation costs

    between targeted production

    centers and national,

    regional and global markets.

    $75,891,981

    Kilometers (km) of roads under workscontracts

  • 8/9/2019 Millenium Challenge

    6/41

    6

    ProgramAdministration* andControl, Monitoringand Evaluation

    $16,087,124 $9,027,708

    Pending subsequentreports**

    $1,521,767

  • 8/9/2019 Millenium Challenge

    7/41

    7

    Country: Cape Verde Year: 2010 Quarter 1

    Total Obligation: $110,078,488

    Entity to which the assistance is provided: MCA Cape Verde Total Quarterly Disbursement: $8,048,329Projects Obligated Objectives Cumulative

    Disbursements

    Measures

    Productivity: Horticulture, Paul watershed

    Productivity: Horticulture, Faja watershed

    Productivity: Horticulture, Mosteiros watershed

    Number of farmers adopting drip irrigation

    Area irrigated with drip irrigation

    Percent of contracted irrigation works disbursed (cumulative)

    Reservoirs constructed

    Watershed andAgriculturalSupport

    $11,001,130

    Increase

    agricultural

    production in

    three targeted

    watershed

    areas on three

    islands

    $8,116,030

    Number of farmers that have completed training in at least 3of 5 core agricultural disciplines

    Travel time ratio: percentage of beneficiary populationfurther than 30 minutes from nearest market

    Kilometers of roads rehabilitated

    Percent of contracted Santiago Roads works disbursed(cumulative)

    Percent of contracted Santo Antao Bridge works disbursed(cumulative)

    Kilometers (km) of roads under design

    Signed contracts for roads works

    Kilometers (km) of roads under works contracts

    Port of Praia: percent of contracted port works disbursed(cumulative)

    Cargo village: percent of works completed

    Quay 2 improvements: percent of works completed

    InfrastructureImprovement

    $83,160,208

    Increase

    integration of

    the internal

    market and

    reducetransportation

    costs

    $49,148,363

    Access road: percent of works completed

    Micro-Finance Institution (MFI) recovery rate, adjusted

    MFI portfolio at risk, adjusted

    Private SectorDevelopment

    $2,081,223

    Spur private

    sector

    development

    on all islandsthrough

    increased

    investment in

    the priority

    sectors and

    through

    financial

    sector reform

    $1,188,909Ratio of MFIs operationally self-sufficient

  • 8/9/2019 Millenium Challenge

    8/41

    8

    ProgramAdministration* and Control,Monitoring andEvaluation

    $13,835,927$9,213,906

    Pending

    subsequentreports**

    $1,471,195

  • 8/9/2019 Millenium Challenge

    9/41

    9

    Country: Nicaragua Year: 2010 Quarter 1

    Total Obligation: $113,599,752

    Entity to which the assistance is provided: MCA Nicaragua Total Quarterly Disbursement: $ 12,093,689

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Automated database of registry andcadastre installed in the 10municipalities of Leon

    Value of land, urban

    Value of land, rural

    Time to conduct a land transaction.

    Number of additional parcels with aregistered title, urban

    Number of additional parcels with aregistered title, urban

    Number of protected areas demarcatedArea covered by cadastral mapping

    PropertyRegularizationProject

    $7,205,205Increase Investment by

    strengthening property rights

    $7,204,952

    Cost to conduct a land transaction.

    Annual Average daily traffic volume:N1 Section R1

    Annual Average daily traffic volume:N1 Section R2

    Annual Average daily traffic volume:Port Sandino (S13)

    Annual Average daily traffic volume:Villanueva Guasaule Annual

    Average daily traffic volume:Somotillo-Cinco Pinos (S1)

    Annual average daily traffic volume:Len-Poneloya-Las Peitas

    International Roughness Index: N-ISection R1

    International Roughness Index: N-ISection R2

    International Roughness Index: PortSandino (S13

    TransportationProject

    $57,999,999

    Reduce transportation costs

    between Leon and Chinandega

    and national, regional and

    global markets

    $44,081,241

    International roughness index:Villanueva Guasaule

  • 8/9/2019 Millenium Challenge

    10/41

    10

    International roughness index:Somotillo-Cinco Pinos

    International roughness index: Len-Poneloya-Las Peitas

    Kilometers of NI upgraded: R1 and R2and S13

    Kilometers of NI upgraded: Villanueva Guasaule

    Kilometers of S1 road upgraded

    Kilometers of S9 road upgraded

    Kilometers of designed primary roads(including N-I/Puerto Sandino and V-G)

    Kilometers of designed secondaryroads

    Number of beneficiaries with businessplans prepared with assistance from theRural Development Business Project

    Numbers of manzanas (1 Manzana =1.7 hectares), by sector, harvestinghigher-value crops.

    Number of manzanas of beneficiaries of theprogram that harvest higher-value crops

    with irrigation or commercial reforestationunder Improvement of Water SupplyActivities

    Number of beneficiaries implementingbusiness plans

    Rural Development

    Project

    $32,897,500Increase the value added of

    farms and enterprises in theregion $22,401,745

    Average increase in income of beneficiariesdue to program

    ProgramAdministration*,Due Diligence,Monitoring andEvaluation

    $15,497,048$10,375,380

    Pending subsequentreports**

    $3,759,039

  • 8/9/2019 Millenium Challenge

    11/41

    11

    Country: Georgia Year: 2010 Quarter 1

    Total Obligation: $395,300,000

    Entity to which the assistance is provided: MCA Georgia Total Quarterly Disbursement: $45,135,334

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Household savings from InfrastructureRehabilitation Activities

    Savings in vehicle operating costs (VOC)

    International roughness index (IRI)

    Annual average daily traffic (AADT)

    Travel Time

    Kilometers of road paved

    Percent of contracted works disbursed

    Signed contracts for feasibility and/or design

    studies

    Percent of contracted studies disbursed

    Kilometers of roads under design

    Signed contracts for road works

    Kilometers of toads under works contracts

    Sites rehabilitated (phases I, II, III) - pipeline

    Construction works completed (phase II) -pipeline

    Savings in household expenditures for allsubprojects

    Population Served by all subprojects

    Subprojects completed

    Value of project grant agreements signed

    Value of project works and goods contractsSigned

    Regional InfrastructureRehabilitation

    $310,750,000Key Regional

    Infrastructure

    Rehabilitated

    $136,600,072

    Subprojects with works initiated

    Jobs Created by Agribusiness DevelopmentActivity (ADA) and by Georgia RegionalDevelopment Fund (GRDF)

    Household net income - ADA and GRDFJobs created ADA

    Firm income ADA

    Household net income ADA

    Beneficiaries (direct and indirect) - ADA

    Regional EnterpriseDevelopment

    $52,200,000Enterprises in

    Regions

    Developed

    $38,387,329

    Grant agreements signed - ADA

  • 8/9/2019 Millenium Challenge

    12/41

    12

    Increase in gross revenues of portfoliocompanies (PC)

    Increase in portfolio company employees

    Increase in wages paid to the portfolio companyemployees

    Cumulative number of Portfolio companies

    Funds disbursed to the portfolio companies

    ProgramAdministration*, DueDiligence, Monitoringand Evaluation

    $32,350,000 $16,093,973

    Pending subsequentreports**

    $0

    November 2008, MCC and the Georgian government signed a Compact amendment making up to $100 million of additional fundsavailable to the Millennium Challenge Georgia Fund. These funds will be used to complete works in the Roads, RegionalInfrastructure Development, and Energy Rehabilitation Projects contemplated by the original Compact. The amendment was ratifiedby the Georgian parliament and entered into force on January 30, 2009.

  • 8/9/2019 Millenium Challenge

    13/41

    13

    Country: Vanuatu Year: 2010 Quarter 1

    Total Obligation: $65,690,000

    Entity to which the assistance is provided: MCA Vanuatu Total Quarterly Disbursement: $6,590,285

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Number of international tourists - Efate

    Number of international tourists Santo

    Number of room nights occupied Efate

    Number of room nights occupied Santo

    Average annual daily traffic Efate

    Average annual daily traffic Santo

    Kilometers of road upgraded Efate

    Kilometers of roads upgraded - Santo

    Signed contracts for feasibility and/ordesign studies

    Percent of contracted studies disbursed

    Kilometers (km) of roads under design

    Signed contracts for roads works

    Kilometers (km) of roads under workscontracts

    TransportationInfrastructureProject

    $60,162,579Facilitate transportation to

    increase tourism and business

    development

    $42,223,234

    Percent of contracted roads works

    disbursed

    ProgramAdministration* ,Due Diligence,Monitoring and

    Evaluation

    $5,527,421$2,835,051

    Pending subsequentreports**

    $104,691

  • 8/9/2019 Millenium Challenge

    14/41

    14

    Country: Armenia Year: 2010 Quarter 1

    Total Obligation: $235,650,000

    Entity to which the assistance is provided: MCA Armenia Total Quarterly Disbursement: $12,688,383

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Recovery of Water User Associations(WUA) operations and maintenancecost by water charges

    Primary canals rehabilitated

    Tertiary canals rehabilitated

    Percent of contracted irrigation worksdisbursed

    Value of signed contracts for irrigationworks

    Number of farmers using better on-

    farm water management

    Number of farmers trained

    Number of agribusinesses assisted

    Irrigated AgricultureProject (Agricultureand Water)

    $152,629,208

    Increase agricultural

    productivityImprove andQuality of Irrigation

    $35,432,441

    Value of agricultural loans tofarmers/agribusinesses

    Average annual daily traffic

    International roughness index

    Kilometers of roads rehabilitated

    Percent of contracted roads worksdisbursed

    Signed contracts for roads works

    Percent of contracted studies disbursed

    kilometers (km) of roads under design

    Signed contracts for feasibility and/ordesign studies

    Rural RoadRehabilitationProject

    $67,100,000Better access to economic and

    social infrastructure

    $7,870,944

    Kilometers (km) of roads under workscontracts

    ProgramAdministration*,Due Diligence,Monitoring andEvaluation

    $15,920,792 $9,731,968

    Pending subsequentreports **

    $992,543

  • 8/9/2019 Millenium Challenge

    15/41

    15

    Country: Benin Year: 2010 Quarter 1

    Total Obligation: $307,298,040

    Entity to which the assistance is provided: MCA Benin Total Quarterly Disbursement: $17,276,237

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Volume of credits granted by theMicro-Finance Institutions (MFI)

    Volume of saving collected by theMicro-Finance Institutions

    Average portfolio at risk >90 days ofmicrofinance institutions at thenational level

    Operational self-sufficiency of MFIs atthe national level

    Average time required by Cellule deSurveillance des Structures FinanciresDcentralises (CSSFD) in treatingMFI applications

    Number of institutions receiving grantsthrough the Facility

    Second call for proposal for grantslaunched

    Access to FinancialServices

    $19,650,000Expand Access to Financial

    Services

    $3,337,246

    Number of MFIs inspected by CSSFD

    Average time to enforce a contract.

    Percent of firms reporting confidencein the judicial system

    Number of cases processed atArbitration Center per year

    Number of Information, Educationand Communication Campaign (IEC)sessions hosted by Chamber ofCommerce (CAMeC)

    Passage of new legal codes

    Average time required for Tribunauxde premiere instance-arbitrationcenters and courts of first instance(TPI) to reach a final decision on acase

    Average time required for Court ofAppeals to reach a final decision on a

    case

    Percent of cases resolved in TPI peryear

    Percent of cases resolved in Court ofAppeals per year

    Number of Court inspections per year

    Access to Justice $34,270,000Improved Ability of Justice

    System to Enforce Contracts

    and Reconcile Claims

    $1,940,659

    Number of Court employees trained

  • 8/9/2019 Millenium Challenge

    16/41

    16

    Number of beneficiaries of legalaid services

    Complete construction on 9 newcourt houses

    Average time required to register abusiness (socit)

    Average time required to register abusiness (sole proprietorship)

    Number of businesses accessingCAMEC service

    Business registration center (CFE)information and outreach campaignexecuted throughout Benin

    Total value of investment in targetedurban land parcels

    Total value of investment in targetedrural land parcels

    Average cost required to obtain a newland title through on demand process

    Average cost required to convertoccupancy permit to land title throughsystematic process

    Percentage of respondents perceivingland security in the Occupancy Permit(PH) into Land titles (TF) or RuralLand Plan Foncier Rural (PFR) areas.

    Number of new land disputes reportedby commune heads

    Seven studies complete

    Land code texts adopted (laws, decreesand land code)

    Value ($) of equipment purchased

    Number of land certificates issuedwithin MCA- Benin implementation

    Number of habitation permits

    converted to land titles

    Number of Continuously OperatingReference (CORS) stations installed

    Access to Land

    $36,020,000

    Strengthen property rights and

    increase investment in rural

    and urban land

    $12,582,598

    Number of public and privatesurveyors trained

  • 8/9/2019 Millenium Challenge

    17/41

    17

    Number of communes with newcadastres

    Land market information systemestablished

    Volume of merchandise traffic throughthe Port Autonome de Cotonou

    Bulk ship carriers waiting times at theport

    Container ship waiting times at theport

    Port design-build contract awarded

    Port crime levels (number of thefts)

    Internal port circulation time

    Average time to clear customs

    Execution rate of training plan

    Port meets -international port securitystandards (ISPS)

    Public consultation completed (3)

    Access to Markets

    $169,447,000

    Improve Access to Markets

    through Improvements to thePort of Cotonou $27,391,206

    Environmental permits issued

    ProgramAdministration*,Due Diligence,Monitoring andEvaluation

    $47,911,040

    $20,768,780

    Pending subsequentreports**

    $283,061

  • 8/9/2019 Millenium Challenge

    18/41

    18

    Country: Ghana Year: 2010 Quarter 1

    Total Obligation: $547,009,000

    Entity to which the assistance is provided: MCA Ghana Total Quarterly Disbursement: $33,331,317

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Number of farmers trained

    Number of agribusinesses assisted

    Number of hectares under productionwith MCC support

    Value of agricultural loans tofarmers/agribusinesses

    Value of signed contracts forfeasibility and/or design studies(irrigation)

    Percent of contracted(design/feasibility) studies complete(irrigation)

    Value of signed contracts for irrigationworks (irrigation)

    Percent of contracted irrigation worksdisbursed

    Percent of people aware of their landrights

    Total number of parcels surveyed inthe Pilot Land Registration Areas(PLRAs)

    Agriculture Project $227,899,382

    Enhance Profitability of

    cultivation, services to

    agriculture and product

    handling in support of the

    expansion of commercial

    agriculture among groups of

    smallholder farms

    $60,896,888

    Volume of products passing throughpost-harvest treatment

    Number of students enrolled in schoolsaffected by Education Facilities Sub-Activity

    Number of schools rehabilitated

    Number of basic school blocksconstructed to Ministry of Education(MOE) construction standards

    Number of schools designed and duediligence completed

    Distance to collect water

    Time to collect water

    Incidence of guinea worm

    Average number of days lost due toguinea worm

    Number of people affected by Waterand Sanitation Facilities Sub-Activity

    Rural DevelopmentProject

    $89,361,539

    Strengthen the rural

    institutions that provide

    services complementary to,

    and supportive of,

    agricultural and agriculture

    business development

    $12,640,404

    Number of stand-aloneboreholes/wells/nonconventional water

  • 8/9/2019 Millenium Challenge

    19/41

    19

    systems constructed/rehabilitated.

    Number of small-town water systemsconstructed.

    Number of pipe extension projectsconstructed

    Number of stand-aloneboreholes/wells/non-conventionalwater systems identified and duediligence performed forrehabilitation/construction

    Number of small-town water systemsdesigned and due diligence completedfor construction

    Number of pipe extension projectsdesigned and due diligence completedfor construction

    Number of agricultural processingplants in target districts with electricitydue to Rural Electrification Sub-Activity

    Number of electricity projectsidentified and due diligence completed

    International roughness index

    Annualized average daily traffic

    Kilometers of road completed

    Percent of contracted road worksdisbursed

    Value of signed contracts for roadworks

    Kilometers of road designed

    Percent of contracted design/feasibilitystudies completed

    Value of signed contracts forfeasibility and/or design studies

    Travel time for walk-on passengers.

    Travel time for small vehicles

    Travel time for trucks

    Annual average daily traffic (vehicles).

    Annual average daily traffic(passengers)

    Landing stages rehabilitated

    Ferry terminal upgraded

    Rehabilitation of Akosombo FloatingDock completed

    Transportation $174,285,120 Reduce the transportationcosts affecting agriculture

    commerce at sub-regional

    levels

    $29,089,944

    Percent of contracted work disbursedlandings and terminals

  • 8/9/2019 Millenium Challenge

    20/41

    20

    Value of signed contracts for works:ferry and floating dock

    Value of signed contracts for works:landings and terminals

    ProgramAdministration*,

    Due Diligence,Monitoring andEvaluation

    $55,462,959 $19,243,257

    Pending subsequentreports**

    $1,327,602

  • 8/9/2019 Millenium Challenge

    21/41

    21

    Country: El Salvador Year: 2010 Quarter 1

    Total Obligation: $460,940,000

    Entity to which the assistance is provided: MCA El Salvador Total Quarterly Disbursement: $16,870,583

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Employment rate of graduates ofmiddle technical schools

    Graduation rates of middle technicalschools

    Middle technical schools remodeledand equipped

    Scholarships granted to students ofmiddle technical schools

    Students of non-formal training

    Cost of water

    Time collecting water

    Households benefiting with watersolutions built

    Potable water and basic sanitationsystems with construction contractssigned

    Cost of electricity

    Electricity consumption

    Households benefiting with aconnection to the electricity network

    Household benefiting with theinstallation of isolated solar systems

    Kilometers of new electrical lines withconstruction contracts signed

    Population benefiting from strategicinfrastructure

    HumanDevelopmentProject

    $94,963,736

    Increase human and

    physical capital of

    residents of the Northern

    Zone to take advantage of

    employment and business

    opportunities.

    $11,720,541

    Community Infrastructure Works with

    Construction Contracts Signed

    Number of hectares under productionwith MCC support

    Number of farmers trained

    Productive

    Development

    Project

    $87,850,853Increase production and

    employment in the

    Northern Zone.

    $20,015,147

    Value of agricultural loans tofarmers/agribusinesses

  • 8/9/2019 Millenium Challenge

    22/41

    22

    Number of agribusinesses assisted

    Average annual daily traffic

    International roughness index

    Kilometers of roads rehabilitated

    Kilometers of roads under workscontract

    Signed contracts for roads works

    Connectivity Project $233,389,335

    Reduce travel cost andtime within the Northern

    Zone, with the rest of the

    country, and within the

    region.

    $22,054,330

    Percent of contracted roads worksdisbursed

    ProgramAdministration* andControl, Monitoringand Evaluation

    $44,736,076 $12,356,366

    Pending SubsequentReport **

    $0

  • 8/9/2019 Millenium Challenge

    23/41

    23

    Country: Mali Year: 2010 Quarter 1

    Total Obligation:$460,811,164

    Entity to which the assistance is provided: MCA Mali Total Quarterly Disbursement: $14,221,585

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Total wage bill of tourism industry

    Freight volume

    Employment at airport

    Signature of design contract

    Average number of weeklyflights(arrivals)

    Passenger traffic (annual average)

    Percent works complete

    Airside Infrastructure Design, andAirside Infrastructure ConstructionSupervision, (AIR A01) and LandsideInfrastructure Design (New Terminal &Associated Works) andLandside Construction Supervision islaunched

    Time required for passenger processingat departures and arrivals

    Passenger satisfaction level

    Percent works complete

    Percent of airport management andmaintenance plan implemented

    Airport meets Federal AviationAdministration (FAA) and InternationalCivil Aviation Organization (ICAO)security standards

    Bamako SnouAirportImprovementProject

    $181,254,264

    Establish an independent

    and secure link to the

    regional and global

    economy.

    $9,140,789

    Technical assistance delivered to project

  • 8/9/2019 Millenium Challenge

    24/41

    24

    Number of agricultural jobs created inAlatona zone

    Main season rice yields

    International roughness index (IRI) onthe Niono-Goma Coura Route

    Average daily vehicle count

    Percentage works complete

    Total irrigated land in the Alatona zone

    Irrigation system efficiency on AlatonaCanal during the rainy season and the dryseason

    Kilometers of road underdesign/feasibility study

    Value of signed contracts for road works

    Kilometers of road under works contract

    Percent of works completed on mainsystem construction

    Percent of contracted irrigation worksdisbursed for tranche 1

    Value of signed contracts for irrigationworks

    Value of signed contracts for feasibilityand/or design studies

    Percent of contracted (design/feasibility)studies disbursed

    Area planted by new settlers (wet season)

    Titles registered in the land registrationoffice of the Alatona zone (for 5- or 10-hectare farms)

    Total land payments made

    Total market gardens allocated inAlatona zones for the populationsaffected by the project (PAPs)

    Decree transferring legal control of theproject impact area is passed

    Selection criteria for new settlersapproved

    Contractor implementing the "Mappingof Agricultural and Communal Land

    Parcels" contract is mobilized

    School enrollment rate

    Percent of Alatona population withaccess to drinking water

    Number of schools available in theAlatona

    Alatona IrrigationProject

    $234,884,675

    Increase the agricultural

    production and

    productivity in the Alatona

    zone of the ON.

    $32,430,172

    Number of health centers available in theAlatona

  • 8/9/2019 Millenium Challenge

    25/41

    25

    Number of concessions that have beencompensated

    Resettlement census verified

    Adoption rate of improved agriculturetechniques among populations affectedby the project (PAPs)

    Number of operational mixedcooperatives

    Area planted by PAPs (wet season rice)

    Area planted with shallots during dryseason

    Number of farmers completing literacytraining

    Number of people completing the riceand shallot production techniques module

    Number of farmers completing landtitling training

    Water management system design and

    capacity building strategy implemented

    Call for proposals for the appliedresearch grants launched

    Average portfolio at risk among Alatonamicrofinance institutions

    Average loan repayment rate of Alatonaclients (farmers organizations orindividual farmers)

    Amount of credit extended to Alatonafarmers

    Number of farmers accessing grantassistance for first loan from financialinstitutions

    Financial institution partners identified(report on assessment of the financialinstitutions in the Office du Niger- -Office of Niger zone (ON zone)

    Occupancy level.

    Industrial ParkProject

    $2,643,432

    Develop a platform for

    industrial activity to be

    located within the Airport

    domain.

    2,637,472 Average number of days required foroperator to connect to Industrial Park

    water and electricity services.

    ProgramAdministration* andControl, Monitoringand Evaluation

    $42,028,793 $16,370,427

    Pending SubsequentReport ** $0

  • 8/9/2019 Millenium Challenge

    26/41

    26

    Country: Mongolia Year: 2010 Quarter 1

    Total Obligation: $284,902,443

    Entity to which the assistance is provided: MCA Mongolia Total Quarterly Disbursement: $1,895,217

    Projects Obligated Objective CumulativeDisbursements

    Measures

    Number of studies completed

    Legal and regulatory reformsadopted

    Number of landholders reached bypublic outreach efforts

    Personnel TrainedNumber of Buildingsrehabilitated/constructed

    Value of equipment purchased

    Rural hectares Mapped

    Urban Parcels Mapped

    Rural Hectares Formalized

    Property RightsProject

    $22,910,728

    Increase security andcapitalization of land assets

    held by lower-income

    Mongolians, and increased

    peri-urban herder

    productivity and incomes

    $824,383

    Urban parcels formalized

    Increase in gross domestic productdue to rail improvements

    Freight turnoverMine traffic

    Percent of wagons leased byprivate firms

    Railway operating ratio

    Customer satisfaction

    Wagon time to destination

    Rail Project $188,378,000 Increase rail traffic andshipping efficiency

    $369,560

    Average locomotive availability

    Rate of employment

    Students completing newlydesigned long-term programs

    Percent of active teachers receivingcertification training

    VocationalEducation Project

    $25,492,856Increase employment and

    income among unemployed

    and underemployed

    Mongolians

    $903,534

    Technical and vocational educationand training (TVET) legislationpassedDiabetes and hypertensioncontrolled

    Health Project $16,969,757 Increase the adoption ofbehaviors that reduce non-

    communicable diseases

    (NCDIs) among target

    $1,149,233

    Percentage of cancer casesdiagnosed in early stages

  • 8/9/2019 Millenium Challenge

    27/41

    27

    populations and improved

    medical treatment and

    control of NCDIs

    Road and traffic safety activityfinalized and key interventionsdeveloped

    ProgramAdministration* andControl, Monitoringand Evaluation

    $31,151,102 $6,277,475

    Pending subsequentreports**

    $265,000

    In late 2009, the MCCs Board of Directors approved the allocation of a portion of the funds originally designated for the railproject to the expansion of the health, vocational education and property right projects from the rail project, and the remainingportion to the addition of a road project.

  • 8/9/2019 Millenium Challenge

    28/41

  • 8/9/2019 Millenium Challenge

    29/41

    29

    Percent of Namialo - Rio Lrio Roadconstruction contract disbursed

    Percent of Rio Lrio - Metoro Roadconstruction contract disbursed

    Percent of Rio Ligonha - NampulaRoad construction contract disbursed

    Percent of Chimuara-Nicoadala Roadconstruction contract disbursed

    Feasibility/ Environmental and SocialAssessment studies, design,supervision, and construction contract

    (ESA) for Namialo-Rio Lrio-MetoroRoad segment signed

    Feasibility/ESA contract for RioLigonha-Nampula Road segmentsigned

    Feasibility/ESA contract for Chimuara- Nicoadala Road signed

    Time to get land usage rights direito deuso e aproveitamento da terra (state-

    granted land right) (DUAT)

    Cost to get land usage rights DUAT

    Total number of officials and residentsreached with land strategy and policyawareness and outreach messages

    Land strategy approved

    Number of buildings rehabilitated orbuilt

    Total value of procured equipment andmaterials

    Number of people trained

    Rural hectares mapped in Site SpecificActivity

    Rural hectares mapped in CommunityLand Fund Initiative

    Urban parcels mapped

    Rural hectares formalized through SiteSpecific Activity

    Rural hectares formalized through

    Community Land Fund Initiative

    Urban parcels formalized

    Number of communities delimited

    Land TenureServices Project

    $39,068,307 Establish efficient, secureland access for households

    and investors.

    $2,182,331

    Number of households having landformalized

  • 8/9/2019 Millenium Challenge

    30/41

    30

    Income from coconuts and coconutproducts

    Survival rate of coconut seedling

    Number of diseased or dead palm treescleared

    Number of coconut seedlings planted

    Hectares under production

    Number of farmers trained in pest anddisease control

    Number of farmers trained in cropdiversification technologies

    Farmer IncomeSupport Project

    $18,400,117 Improve coconutproductivity and

    diversification into cash

    crop.

    $1,267,243

    Contract for project implementationsigned

    ProgramAdministration* andControl, Monitoring

    and Evaluation

    $69,562,756 $9,116,105

    Pending SubsequentReport **

    $806,906

  • 8/9/2019 Millenium Challenge

    31/41

    31

    Country: Lesotho Year: 2010 Quarter 1

    Total Obligation: $362,514,382

    Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursement: $3,674,696

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    School days lost due to water bornediseases

    Diarrhea notification at health centers

    Time saved due to access to watersource

    Rural household (HH) provided withaccess to improved water supply

    Rural HH provided with access toimproved ventilated latrines

    Rural water points constructed

    Number of new latrines built

    Urban HH with access to potable watersupply

    Number of enterprises connected towater network

    Households connected to improvedwater network

    Cubic meters of treated water frommetolong dam delivered through aconveyance system to Water and

    Sewerage Authority(WASA)Value of water treatment contractworks award

    Value of conveyance system contractwork award

    Species population

    Livestock grazing per area

    Water Project $164,027,999

    Improve the water supply

    for industrial and

    domestic needs, and

    enhance rural livelihoods

    through improved

    watershed management.

    $5,470,756

    Area put under conservation

    People with HIV still alive 12 months

    after initiation of treatmentTB notification (per 100,000 pop.)

    Proportion of blood units collectedannually

    Deliveries conducted in the healthcenters

    Immunization coverage rate

    Health Project $122,398,000Increase access to life-

    extending ART andessential health services

    by providing a sustainable

    delivery platform.

    $3,194,630

    Number of Health Centers (H/C)constructed and fully equipped

  • 8/9/2019 Millenium Challenge

    32/41

    32

    Value of contract works for healthcenter construction

    Percentage of contract works forhealth center construction disbursed

    Percentage of contract works forBotshalo Complex disbursed

    Percentage of contract works for Out-

    Patient Department (OPD) Centersdisbursed

    Percentage of HSS Contract disbursed.

    Proportion of People Living WithAIDS(PLWA) receiving Antiretroviraltreatment (ARV) (by age and sex)

    Referred tests from central laboratoryper year by types (number)

    Average time (days) required toenforce a contract

    Pending commercial cases

    Cases filed at the commercial court

    Value of commercial cases

    Judicial staff trained

    Administrative and clerical stafftrained

    Awareness campaigns

    Portfolio of loans

    Loan processing time

    Bank accounts

    Paper-based payments

    Electronic payments

    Value of contract services signed

    Debit/smart cards issued

    Mortgage bonds registered

    Value of registered mortgage bonds.

    New land disputes brought to the LandTribunal and Courts of Law

    Time to complete a land transaction

    Time to complete transfer of landrights

    Private SectorDevelopmentProject

    $36,470,318Stimulate investment by

    improving access to credit,

    reducing transaction costs

    and increasing the

    participation of women in

    the economy.

    $1,961,646

    Land transactions recorded

  • 8/9/2019 Millenium Challenge

    33/41

    33

    Land parcels formalized

    Number of land administrationpersonnel trainedLand Act adopted

    People trained on gender equality and

    economic rightsID cards issued

    Population registered in the nationaldatabase

    ProgramAdministration* andControl, Monitoringand Evaluation

    $39,654,682 $10,222,540

    Pending SubsequentReport ** -$23,881

  • 8/9/2019 Millenium Challenge

    34/41

    34

    Country: Morocco Year: 2010 Quarter 1

    Total Obligation: $697,500,000

    Entity to which the assistance is provided: MCA Lesotho Total Quarterly Disbursement: $12,789,002

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Total annual volume of production ofdates and olives

    Cropped area covered by olive trees

    Survival rate of newly planted olivetrees after 2 years project-supportedestablishment period

    Yield of rehabilitated olive trees

    Cropped area covered by date trees

    Fruit TreeProductivity

    $300,898,445

    Reduce volatility of

    agricultural production

    and increase volume of

    fruit agricultural

    production

    $9,663,592

    Yield of rehabilitated date palms

    State of fish stock

    Domestic fish consumption level

    Fisherman net revenue

    Average fisherman sales price atPoints de DbarquementAmnags (PDA)

    Volume sold at wholesale markets

    Fish sale price

    Average sales price

    Small ScaleFisheries

    $116,168,027

    Improve quality of fish

    moving through domestic

    channels and assure the

    sustainable use of fishingresources $1,155,138

    Volume of sales among mobile fishvendors

    Average revenue of potters receivingArtisan Production Activity

    Employment and wages among project

    graduates

    Tourist arrivals

    Artisan and FezMedina

    $111,873,858Increase value added to

    tourism and artisan

    sectors

    $384,852

    Artisan profits (artisans engaged inproduct finishing and points of sale)

  • 8/9/2019 Millenium Challenge

    35/41

    35

    Employment created

    Small and Medium Enterprises (SME)value added

    Gross loan portfolio outstanding of

    microcredit associations

    Portfolio at risk >30 days ratioFinancial Services $46,200,000

    Increase supply and

    decrease costs of financial

    services available to

    microenterprises

    $12,937,907

    Operating expense ratio

    Average annual sales of participatingbusinesses

    Enterprise Support $33,850,000

    Improved survival rate of

    new SMEs and INDH-

    funded income generating

    activities; increased

    revenue for new SMEs and

    INDH-funded incomegenerating activities

    $1.352,603

    Survival rate of participatingbusinesses

    ProgramAdministration* andControl, Monitoringand Evaluation

    $88,511,670 $9,320,527

    Pending SubsequentReport ** $173,509

  • 8/9/2019 Millenium Challenge

    36/41

    36

    Country: Tanzania Year: 2010 Quarter 1

    Total Obligation: $698,136,000

    Entity to which the assistance is provided: MCA Tanzania Total Quarterly Disbursement: $3,161,608

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    New power vustomers

    Energy generation- Kigoma

    Transmission capacity

    Energy Sector $206,471,000Increase value added to

    businesses $2,952,318

    Percentage disbursed for design andsupervision contract ConsultingEngineer (CE) year 1 budgeted

    International roughness index

    (Tunduma, Tanga, Nantumbo,Peramiho)

    Average annual daily traffic(Tunduma, Tanga, Nantumbo,Peramiho)

    Kilometers upgraded/completed(Tunduma, Tanga, Nantumbo,Peramiho)

    Percent disbursed on constructionworks (Tunduma, Tanga, Nantumbo,Peramiho)

    Signed contracts for constructionworks (Tunduma, Tanga, Nantumbo,Peramiho)

    Percent disbursed for feasibility and/ordesign studies (Tunduma, Tanga,Nantumbo, Peramiho)

    Signed contracts for feasibility and/ordesign studies (Tunduma, Tanga,Nantumbo, Peramiho)

    Kilometers of roads under design(Tunduma, Tanga, Nantumbo,

    Peramiho)

    International roughness index(Zanzibar Rural Roads)

    Transport Sector $372,776,000

    Increase cash crop

    revenue and aggregatevisitor spending

    $3,034,852

    Average annual daily traffic (ZanzibarRural Roads)

  • 8/9/2019 Millenium Challenge

    37/41

    37

    Kilometers upgraded/completed(Zanzibar Rural Roads)

    Percent disbursed on constructionworks (Zanzibar Rural Roads)

    Signed contracts for constructionworks (Zanzibar Rural Roads)

    Percent disbursed for feasibility and/ordesign studies (Zanzibar Rural Roads)

    Signed contracts for feasibility and/ordesign studies (Zanzibar Rural Roads)

    Kilometers of roads under design(Zanzibar Rural Roads)

    Passenger arrivals

    Percentage of upgrade complete(airport)

    Percent disbursed on constructionworks (airport)

    Signed contracts for constructionworks (airport)

    Prevalence of diarrhea (Dar es Salaam)

    Prevalence of diarrhea (Morogoro)

    Prevalence of cholera (Dar es Salaam)

    Water Sector Project $66,335,000

    Increase investment in

    human and physical

    capital and to reduce the

    prevalence of water-

    related disease

    $1,095,219

    Prevalence of cholera (Morogoro)

  • 8/9/2019 Millenium Challenge

    38/41

    38

    Volume of individual waterconsumption (Dar es Salaam)

    Volume of individual waterconsumption (Morogoro)

    Number of households using improvedsource for drinking water (Dar esSalaam)

    Number of households using improvedsource for drinking water (Morogoro)

    Number of businesses using improvedwater source (Dar es Salaam)

    Number of businesses using improvedwater source (Morogoro)

    Volume of water produced (LowerRuvu)

    Volume of water produced (Morogoro)

    Volume of non-revenue water (Dar esSalaam)

    Operations and maintenance costrecovery ratio (Dar es Salaam)

    Operations and maintenance costrecovery ratio (Morogoro)

    Percent disbursed on constructionworks

    Signed contracts for constructionworks

    ProgramAdministration* andControl, Monitoringand Evaluation

    $52,554,000 $3,788,306

    Pending SubsequentReport ** $206,197

  • 8/9/2019 Millenium Challenge

    39/41

    39

    Country: Burkina Faso Year: 2010 Quarter 1

    Total Obligation: $478,943,569

    Entity to which the assistance is provided: MCA Burkina Faso Total Quarterly Disbursement: $2,397,440

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Roads Project $194,130,681Enhance access to markets

    through investments in the

    road network$14,871

    To Be Determined (TBD)

    Rural LandGovernance Project

    $59,934,614

    Increase investment in

    land and rural

    productivity through

    improved land tenure

    security and land

    management

    $465,530TBD

    AgricultureDevelopmentProject

    $141,910,059

    Expand the productive use

    of land in order to

    increase the volume and

    value of agricultural

    production in project

    zones

    $17,851

    TBD

    Bright 2 SchoolsProject

    $26,829,669Increase primary school

    completion rates$26,829,669

    TBD

    ProgramAdministration* andControl, Monitoringand Evaluation

    $56,138,546 $6,824,723

    Pending SubsequentReport ** $65,145

  • 8/9/2019 Millenium Challenge

    40/41

    40

    Country: Namibia Year: 2010 Quarter 1

    Total Obligation: $304,477,817

    Entity to which the assistance is provided: MCA Namibia Total Quarterly Disbursement: $2,455,717

    ProjectsObligated Objective

    Cumulative

    DisbursementsMeasures

    Education Project $144,976,559Improve the education

    sectors effectiveness,

    efficiency and quality$338,267

    To Be Determined (TBD)

    Tourism Project $66,959,291

    Increase incomes and

    create employment

    opportunities by

    improving the marketing,

    management and

    infrastructure of Etosha

    National Park

    $78,360TBD

    Agriculture Project $46,965,320

    Sustainably improve the

    economic performance

    and profitability of the

    livestock sector and

    increase the volume of the

    indigenous natural

    products for export

    $32,554

    TBD

    ProgramAdministration* andControl, Monitoring

    and Evaluation

    $45,576,647 $4,045,476

    Pending SubsequentReport ** $0

    *Program administration funds are used to pay items such as salaries, rent, and the cost of office equipment.

    **These amounts represent disbursements made that will be allocated to individual projects in the subsequent quarter(s) and reportedas such in subsequent quarterly report(s)

  • 8/9/2019 Millenium Challenge

    41/41

    Dated: April 6, 2010____________________________Charles CooperVice PresidentCongressional and Public AffairsMillennium Challenge Corporation

    [FR Doc. 2010-8314 Filed 04/12/2010 at 8:45 am; Publication Date: 04/13/2010]

    619(b) Transfer or Allocation of Funds

    U.S. Agency to which Funds were Transferred

    or Allocated

    Amount Description of program or project

    None $0 None