51
METRO Gold Line BRT CBAC Meeting August 23, 2018 1

METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

METRO Gold Line BRTCBAC Meeting

August 23, 2018

1

Page 2: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Today’s Topics

• Introductions• Corridor Management Committee Update• Public Engagement Update• History of Alignment• Project Scope Discussions• Upcoming CBAC Meetings

2

Page 3: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

3

CBAC Co-Chairs Attending First CMC Meeting

• CBAC Co-Chairs Appointed in July– Darrell Paulsen, Community Representative– Steve Morris, Business Representative

• Both Co-Chairs are members of the Gold Line CMC• Attended August 2 CMC Meeting

July 26 CBAC MeetingCBAC Co-Chairs

Page 4: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Public Engagement Update

4

Page 5: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

5

Stakeholder Engagement Update

• Open Houses • Two corridor-wide events to review design updates and

options

July 17 and 18 Open Houses

Page 6: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

6

Stakeholder Engagement Update

• Neighborhood Meetings• Three locations where input

is needed on design options:

• Mounds vs. Maria Station Location

• Hudson Road between Etna and White Bear; mixed traffic vs. dedicated guideway

• White Bear Avenue Station Location

July 31 Neighborhood Meeting

Page 7: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

7

Stakeholder Engagement Update

• Door Knocking • Two neighborhoods where input

is needed on design options• One-on-One Meetings

• With various stakeholders along the corridor

• Community Events• Throughout the corridor

Flyer Translation into Hmong Language

July 31 East Metro Garage Open House

Page 8: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

History of Alignment

8

Page 9: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

9

Alternatives Analysis 2010-2013

• Many options were considered and ultimately eight alternatives were analyzed

Page 10: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

10

Environmental Scoping 2013-2016

• Same route was considered for bus rapid transit and light rail transit service

Page 11: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

11

Locally Preferred Alternative 2016

Page 12: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

12

Project Development 2017-2019

Page 13: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Project Scope in Environmental

Assessment

13

Page 14: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

GBRT Goals and Objectives

Improve Mobility (Ridership & Travel Time)

Cost-Effective & Economically Viable

Support Economic Development

Protect the Natural Environment

Preserve & Protect Quality of Life

Tier 1 goals must be considered first

Page 15: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Gold Line Committee Structure

Issue Resolution

Teams (IRTs)

Technical Advisory

Committee (TAC)

Community and

Business Advisory

Committee (CBAC)

Corridor Management Committee

(CMC)Counties Metropolitan

Council

Page 16: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Gold Line Scope Refinement Process

Community Planning

Station Area Planning

Environmental Assessment

Scope

Local Scope

Gold Line Project Scope

16

Ongoing

2017-2018

2018

2018-2019

2019

Page 17: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

17

Scope Refinement Tasks• July

– Reviewed scope currently included in the Environmental Assessment

• August – Discuss stakeholder feedback and areas along route where

options exist• Fall/Winter

– Review updated project costs at 15% design• 2019

– Review 30% Design, Cost Estimate, and Funding

Page 18: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

18

Discussion Outline• Consider all information presented to date • Participate in the conversation• Allow time for others to speak• Be open to all ideas and comments• Consensus is not required

Page 19: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Percent Dedicated Guideway

19

Page 20: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

20

BRT as a Premium Service• What makes the Gold Line a premiere service?

– BRT is like LRT• Distinctive station architecture and design• Station amenities like real time signage• Uniquely branded buses• Regular all-day reliable service• Direct connection to METRO system• Exclusive lanes

Page 21: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

21

Types of Guideway

Mixed Traffic

Center RunningSide Running

Curbside Running

Page 22: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

22

Gold Line BRT Mixed Traffic

• Where is mixed traffic proposed an why?Location Reason

Sections of downtown Right of Way constraints

Kellogg Bridge Planned replacement of bridge is not part of GBRT Project

Maria Ave Option (not preferred option)

Right of Way constraints

Hudson from White Bear to Etna

Low ADT means it operates like dedicated guideway, avoids impact to vegetation and neighborhood character

Tanners Lake Right of Way constraints and environmental impacts to lake

4th Street Planned replacement of bridge is not part of GBRT Project. Bridge width is constraint.

Bielenberg/Tamarack Nature Preserve

Right of Way constraints and environmental impacts to nature preserve.

Page 23: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

23

Gold Line BRT Mixed Traffic

Page 24: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

24

Mixed Traffic versus Dedicated Guideway• Federal Transit Administration requires at least 50%

dedicated• LPA route is 78% dedicated• Amount of dedicated lanes could be less depending

on options selected

CBAC Discussion

Page 25: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Mounds Blvd/Maria Ave Station Location

25

Page 26: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

26

Mounds Boulevard Station Option

Page 27: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

27

Mounds Boulevard Station Option

Page 28: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

28

Mounds Boulevard Station Option

Page 29: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

29

Maria Avenue Station Option

Page 30: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

30

Maria Avenue Station Option

Page 31: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

31

Maria Avenue Station Option

Page 32: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Mounds Blvd Maria AveBRT operations Preserves two-lane

dedicated guidewayMixed-traffic: lower level of BRT service

Property impacts No impacts No impactsNoise wall Requires noise wall

reconstructionNo impacts

I-94 impacts Changes to I-94 offramp and Mounds Blvd required

No impacts

Location Station further from neighborhood center

Station closer to neighborhood center

City policy Adopted in city’s Station Area Plan

Not in city policy

Cost Included in current $420M estimate

$4M cost savings over Mounds

32

Mounds Blvd/Maria Ave Station Location

Page 33: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

• Technical Advisory Committee (TAC) prefers Mounds Blvd option– Pending review of

• Americans with Disabilities Act (ADA) concerns• Final technical review by Minnesota Department of

Transportation

CBAC Discussion

33

Mounds Blvd/Maria Ave Station Location

Page 34: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Hudson Road Mixed Traffic/Dedicated Guideway

34

Page 35: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

35

Hudson Rd Mixed Traffic Option

Page 36: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

36

Hudson Rd Dedicated Guideway Option

Page 37: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

37

Hudson Rd

Page 38: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

38

Hudson Rd Mixed Traffic Option

Page 39: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

39

Hudson Rd Dedicated Guideway Option

Page 40: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Mixed Traffic Dedicated GuidewayPedestrian bridge No impacts Impacts Hazelwood bridgeNoise wall Minimal impacts Impacts wall full length of

HudsonProperty impacts Reduced property / boulevard

impacts by 8’Impacts properties / boulevard 8’ more

Parking Maintains on-street parking Eliminates on-street parkingHudson Rd No change: remains two-way One lane westboundBRT operations Operates as if dedicated

(existing 200 cars/day traffic volumes)

Highest level of operations

Neighborhood character

Limited impacts Potential for perceived impacts

Grace Lutheran Church

No impacts Impacts driveway

Cost $7.5M cost savings over dedicated guideway

Included in current $420M estimate

40

Hudson Rd Mixed Traffic / Dedicated Guideway Option

Page 41: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

• Technical Advisory Committee (TAC) has not indicated a preference

CBAC Discussion

41

Hudson Rd Mixed Traffic/Dedicated Guideway Option

Page 42: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

White Bear Avenue Station Location

42

Page 43: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

43

Van Dyke Station Option

Page 44: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

44

Van Dyke Station Option

Page 45: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

45

Hazel Station Option

Page 46: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

46

Hazel Station Option

Page 47: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Van Dyke St Hazel StNeighborhood access

Closer to White Bear Ave businesses

Closer to high-density housing and potential redevelopment sites

Property impacts Property impacts to provide station access

No impacts

Visibility Station may be obstructed by buildings

Greater visibility

Station spacing Further from Sun Ray Station

Closer to Sun Ray Station

Cost Included in current $420M cost estimate

$400K increase over Van Dyke

Bike-ped links No improvements planned for Van Dyke

Hazel designated as future minor bikeway

City policy Adopted in city’s Station Area Plan

Not currently in city policy

47

White Bear Avenue Station Location

Page 48: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

• Technical Advisory Committee (TAC) has not indicated a preference

• Station area planning process lead by the counties prefers Hazel

CBAC Discussion

48

White Bear Avenue Station Location

Page 49: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

Upcoming CBAC Meetings

49

Page 50: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

• Next CBAC meeting will be a bus tour• Hold Tuesday September 25 from 10 am to 2 pm for tour

– Meet up location and exact times forthcoming

50

September CBAC Meeting

Page 51: METRO Gold Line Project Update...Aug 23, 2018  · 3 CBAC Co-Chairs Attending First CMC Meeting • CBAC Co-Chairs Appointed in July – Darrell Paulsen, Community Representative –

For more information:www.metrotransit.org/gold-line-project

51