Mercedes–Benz Stadium Project Executive Summary presented by:

Mercedes–Benz Stadium Project

Embed Size (px)

Citation preview

Page 1: Mercedes–Benz Stadium Project

Mercedes–BenzStadiumProject

ExecutiveSummarypresentedby:

Page 2: Mercedes–Benz Stadium Project

1MBSEBO#10

11/17/15

Introduction

This Executive Summary has been prepared to provide highlights of the Equal Business Opportunity activities and accomplishments that have occurred from contract inception through 30 September 2015, and to illustrate the progress made toward the M/FBE goal of 31% participation on the construction of the Mercedes-Benz Stadium Project (MBS).

As illustrated on the following pages, currently $276,141,262.54 of the total MBS contract value has been committed to M/FBE firms. This figure comprises the total contract dollars awarded to M/FBEs for the entire scope of the project, which includes the development, design, and construction phases of the NSP. Of the total dollars committed to M/FBEs, $121,943,994.20 has been paid through 30 September 2015, to the firms awarded. As of the close of the third quarter of 2015, M/FBE participation on the MBS was at 33.2% of the total contract.

Page 3: Mercedes–Benz Stadium Project

2MBSEBO#10

11/17/15

PartnershipsforSuccessEvery now and then a story comes alongthat invokes the thought: “THAT’S a greatstory…”or,“ THAT’S how it is supposed togo…”Thisisoneofthosetimes.

ARSMechanical, LLC is a mechanical contractor that specializes in commercialandindustrialheating,plumbing,ventilationandairconditioning(HVAC)repairs,maintenance,andinstallation.Owners,SadatNichols,andConyersnative,AlfredShepard, founded ARS over 13 years ago and maintain the company’sheadquartersinLithonia,Georgia.ItisanAfrican-Americanowned,DBEcertifiedentity.

ARS is responsible for insulation, fabrication, firestopping,coring,andhydronicdistributionintheMercedes-BenzStadium.Andsobeginsthestarttothisgreatstory.ARSisaprincipalandequitypartnerinthejointventureknownasAtlantaStadiumPartners(“ASP”).ThispartnershipiscomprisedofTDIndustries(basedinTexas) and Southland Engineering (based in California). ARS credits HHRMoutreachinitiativeswithbeingtheconduitforthecompaniesjoiningtogetherforthis venture. In fact, ARS’s president, Sadat Nichols, credits the joint venturepartnership–andthementorshiphiscompanyhasreceivedasaresultofit–asbeinganextraordinarybenefittoworkingonthenewstadiumproject.

It is thiscomponentthatmakesthestoryonetogetexcitedabout. InspeakingwithMr.Nichols,thetruesincerityandappreciationonehearsinhisvoicewhentalkingaboutthementorshiphiscompanyisreceivingissomuchmorepowerfulthanthewordsthemselvesusedtoconveythatmessage.Andeventhen,thefullimport of themessage doesn’t become clear until you speakwith other (non-Atlanta Stadium Partners / non-ARS) members of the construction communitywhomakeitclearthatsuchpartnershipsdonotalwaysofferthatvital,

Page 4: Mercedes–Benz Stadium Project

3MBSEBO#10

11/17/15

crucial component of mentorship that Mr. Nichols has come to appreciate somuchonthisstadiumconstructionproject.

In fact,ASP isoneofthe largestsubcontractorsontheMercedes-BenzStadiumproject.1ARS, in its involvement with the stadium construction, not only self-performsbutisalsoinvolvedinthemanagementofthework(andof lowertiersubcontractors)of itsportionofthisconstructionfeat.Thescopeofwork–anditsimplementation–ishuge.Asaresult,ARSisamassinganextraordinarylevelofexperiencethatissuretocatapultitintothehigheststratospheresofitsfield.

WhileARSisnostrangertolargeprojects(itwasajointventurepartnerforworkontheinternationalterminalatHartsfield-JacksonAirport,andithasdoneworkfortheGovernmentServicesAdministrationonfacilitiesinmultiplestates),itstillappreciatestheuniqueeducationthatworkingonacomplex,highprofileprojectsuchastheMercedes-BenzStadiumoffers.

AsaresultofARS’sinvolvementonthestadiumproject,ithasalsoincreaseditsusualranksof33-34employeesbyanadditional14newhires,toensurethat itcontinues tomeet thedemandsofsucha large-scaleproject. Indiscussing themagnitudeoftheworkinvolvedontheMercedes-BenzStadium,Nicholspointedout that “[he] appreciates these efforts for providing opportunities…because itgoesalongwaytogettingEBOfirmsinvolvedinlargescaleprojects….”

And as if that isn’t enough, there is yet another “high-five” component to thiswinningstory.ARS,priortobeginningitsworkonthestadiumconstruction,had

1ASP,oneofthelargestsubcontractorsontheproject,istrackingat40%EBOparticipationonitsportionoftheMercedes-BenzStadiumconstruction.

Page 5: Mercedes–Benz Stadium Project

4MBSEBO#10

11/17/15

met the necessary qualifications and received the necessary certifications toperformfiresafetywork.NorthstarFireProtection(basedinTexas),thecompanychosentocompletethisportionof theconstruction,washavingtroublefindingAtlanta Metro area–based EBO participation in its niche field. Fast forwardthrough outreach initiatives that brought the two firms together, and the finalresultisthatARSwillalsoself-performthefiresprinklermaterialandinstallationportionofthenewstadiumconstruction.Theby-productofthisportionofARS’scontractual duties is sure to lead to more work in the area of fire sprinklerinstallation.

Expandedscopeofworkopportunitiesandexpandedworkcapacitiesusuallygohand-in-hand with expanded company growth opportunities. Here’s to ARSMechanical and itswinning story that has us cheering along the sidelines as itmakesitswaytotheendzone(wehopeyou’vegotagreatvictorydanceinstore.ARS).ThankyoutoARSandtheMercedes-BenzStadiumforthe“THAT’Showitshouldbedone!”story.

Page 6: Mercedes–Benz Stadium Project

5MBSEBO#10

11/17/15

PaymentStatusSummary

PaymentSummaryStatusAABE FBE RemainingEBO’s

Total

TotalContractValue $831,748,230.36

M/FBECommitteddollars116,842,744 $121,374,148 $38,399,407 $276,141,262.54

M/FBEPaidtoDate $121,943,994.20

%committedtoMFBE’s 33.2%

TotalProject%GOAL 31%

Page 7: Mercedes–Benz Stadium Project

1

EBO SummaryCommitted EBO Contracts and Amounts Paid To-Date

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs TOTAL

TotalContractValue $831,748,231

M/FBECommittedDollars $116,942,744 $121,274,112 $37,924,407 $276,141,263

M/FBEPaidTo-Date $121,943,994

%CommittedtoMFBE's 33.2%

TotalProject%Goal 31%

ScopeofWork ContractorName ContractValue TotalEBOContractAmountTo-Date

AABE FBE RemainingEBOs

CivilEngineer-RoadwaysProjectsParsonsBrinckerhoff 2,513,005$

Surveyor&UtilityDesign LongEngineering $513,673

SiteLightingWilliams,Russell,Johnson(WRJ) $187,345

Contractor(MangumStreetRelocation)ReevesContractingCo. 3,208,311$

Markings&Signage HighwayServices $32,984

ErosionControl CleanWaterConsultants $2,084

Electrical MEContractors $28,646

TrafficControl TheCorbettGroup $280,000

Asphalt AtlantaPaving $270,000

Trucking MCTrucking $26,158

Fencing C&CFence $30,935

Trucking NavigatorsConstruction $5,874

Trucking GrierBrothers $101,000

Trucking HarrellHaulingInc. $190,193 *

Trucking MARTrucking $5,000

GADomeUtilities,ErosionControl,NSPSiteDemo(Incl.MtVernon) DennisTaylor 1,722,441$

Demolition SouthernSiteDevelopment $195,000

PAYMENTSTATUSSUMMARY

Page 8: Mercedes–Benz Stadium Project

2

AABE FBE RemainingEBOs

C&CFence $2,783

CornerstoneDemolition $551,670

MassExcavationandSiteGrading ReevesContractingCo. 17,862,357$

Paving AtlantaPaving $138,880

Engineering LongEngineering $19,368

Blasting SymmetryRockDrilling $35,000

Trucking HarrellHaulingInc. $1,996,008 *

Trucking GrierBrothers $134,135

Trucking MARTrucking $15,640

Trucking MCTrucking $46,020

TrafficControl TheCorbettGroup $955,106

Shoring AmericanShoring 319,952

Constructionofthevault NewGen $1,460,000

Trucking R.S.Senter $381,295

AugerCastPiles Berkel 7,762,314$

Steel Anatek $982,132

Trucking SAWATransportation $159,497

TruckingAmerconConstructionGroup $39,882

MicscellaneousMaterialRamToolandSupplyCompany $3,935

Fuel S.A.WhiteOilCompany $33,703

Anasteel $2,448

SheetingandShoring Berkel 748,266$

Steel Anasteel $223,348

RamToolandSupplyCo. $668

DrilledPiers ABE 9,061,054$

RamToolandSupply $22,514

S.A.WhiteOilCompany $133,418

Anasteel&Supply $1,528,512

CapitalCityMachineShop $262,866 *

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs

Page 9: Mercedes–Benz Stadium Project

3

Superstructure HHRMSelfPerform 123,941,225$

Gunby $1,201,462

RamTool $750,000

Anatek $10,164,640

Anasteel $19,555,961

BrysonConstructors $2,121,909

C.D.MoodyConstruction $11,869,789

C.D.MoodyConstruction(COW) $950,000

S.A.White $100,000

Long $250,000

Technique $53,000

H.J.Russell $11,869,789

EasternData $26,500

F.F.dbaMySupplies $6,663

ContractBusinessInteriors $1,865

ThePrintingPeople $105

EagleSafetySupply $2,638

ShallowFoundation/FirstLift Precision 25,225,867$

Technique $7,857,223

Anatek $3,930,591

RamTool $166,404

GrierBrothers $139,114

FriendshipBaptistChurchDemolitionandAbatement KissbergConstruction 194,220$ $194,220 *

LittleEnvironmental $10,000

StructuralPrecastMaterial Metromont 26,960,977$

Anasteel&SupplyCompany $26,015

BrysonConstructorsInc. $3,658,525

Arch.PrecastSolns. $154,272

StructuralSteelRoof-DesignAssist CanamSteelCorporation 27,365,000$

Amer.CustomManufacturing $2,990,861

BennettLogistics $4,441,592

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs

ChampionPainting $2,196,712

RyjohnSteel $54,180

Page 10: Mercedes–Benz Stadium Project

4

Electrical ICUElectric 68,758,790$

Uptime(JVPartner) $8,288,229 *Uptime(Self-performed

work) $8,288,229 *

Mayer $8,000,000

BoyetteBrothersCompany $570,756

JJDalSupply $100,000 *

B&SSupply $400,000

ContractBusinessSolutions $4,000

Mechanical&PlumbingAtlantaStadiumPartners,AJointVenture 120,226,808$

ARS(JVPartner) $6,538,447

ARS(Self-PerformedWork) $5,876,505

F&SMechanical $17,514,610

H&RCommericalFlooring $8,495

PeachtreeMechanical $2,000,851

PrecisionLayoutandDesign $150,000

VulcanIndustrial $3,536,778

SouthsideStreetMetal $4,553,955

AminSheetMetal $1,151,065

AtlantaCommunications $15,565

AlphaInsulation/Wtrprfg. $124,846

ChurchDemolitionSuperiorRigging&ErectingCompany 18,150$

FOTElectrical InglettandStubbs,LLC 198,085$

InteriorMasonry CornerstoneMasonryGroup,Inc. 10,904,735$

AnasteelSupply $1,200,000

TCMLLC $2,267,704

ExteriorEnclosure CrownCorr 47,792,502$

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs

TCMWaterproofing $175,000

C&KUnitedSheetMetal $5,442,882 *

EGM $6,572,720 *

ExteriorMetalServices $1,160,000

TBD $1,481,850

Page 11: Mercedes–Benz Stadium Project

5

ArchitecturalPrecast GatePrecastErectionCompany 3,573,955$

ArchitecturalPrecastSolutions $95,932

TCMWaterproofing $237,730

Elevators Kone,Inc. 10,626,569$

MillsSpecialityMetals $979,687

Millwork MortensenWoodwork,Inc. 13,300,000$

ProfessionalCarpentry $2,850,000

FireProtection NorthstarFireProtectionofTX 8,067,520$

AlzanServices,LLC $71,469 *

ARSMechanical $2,456,250

ExteriorMasonry PyramidMasonry 856,738$

MeadowsConstruction $214,185

RoadwaysPhaseII ReevesContracting,Inc. 15,843,032$

HarrellHauling $450,000 *

NewGen $600,000

BonnJ $401,898

Anatek $2,596,882

AtlantaPaving $400,000

CadenConstructionCo. $400,000

C&CFence $8,000

SpecialSystems InternationalBusinessMachines,Inc.60,956,550$

CoLiantSolutions $21,632,151

J&AEngineering $293,800

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs

DrywallandAcoustalWorkBelow1061' AcoustiEngineering 17,810,993$

AlphaInsulation&Waterproof $3,500,740

J.S.82ConstructionGroup $1,000,000

APDrywall $900,000

IwesConstructionSrvs. $1,340,030

Page 12: Mercedes–Benz Stadium Project

6

LevelConstructionSrvs. $637,937

SwitchBackRampDemolition D.H.GriffinWreckingCompany 473,097$

KellyConstructionCompany $32,824

DrywallandAcoustical MarekInteriorSystems,Inc. 19,779,941$

AlphaInsulation&Waterproof $5,661,000

Railings RaydeoEnterprises,Inc. 8,363,060$

RemediationGroup,Inc. $3,001,625

DoorsandFramesMaterial SouthernDoorandPlywood,Inc. 3,225,081$ $3,225,081

Hardscape/Landscape/IrrigationValleycrestLandscapeDevelopment5,726,763$

SiteScapes,LLC $1,855,617

SwitchbackStairRailing McPhersonEnterprises,Inc. 149,752$

ElevatorSteel SteinSteelandSupplyCompany 1,140,000$

AmericanCustomManufacturing $958,300

SiteWaterproofing AlphaInsulationandWaterproofing,Inc.4,695,793$ $4,695,793

ConcreteMaterial/PurchaseOrder ArgosUSAReadyMix 914,693$

StructuralPeer/ConsultantAgreementKSIStructuralEngineers 12,215$

PlazaPileCaps&FirstLiftofColumns,WestSide NewGenConstruction,LLC 703,525$ $703,525

SteelStairsandLids Immec,Inc. 2,675,000$

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs

Waterproofing/Caulking/ExpansionJoints ChamblissConst.Specialist,Inc. 2,737,787$

LevelConstruction $1,200,000

TCMWaterproofing $175,000

Specialties AccessoriesUnlmited,Inc. 5,273,873$

TBD $2,636,937

Page 13: Mercedes–Benz Stadium Project

7

GraphicsandWayfinding L&HSignsInc. 2,408,000$

TBD $746,480

SiteSecurity/Fencing Tusco,Inc. 1,415,000$ $1,415,000

CIPAisleSteps WorldDynamics 1,507,000$

SouthernDoorandPlywood $14,500

Anasteel $28,000 *

Paint/Wallcovering GoodmanDecoratingCo. 3,480,000$

TBD $1,078,800

PlazaFormwork SkylineFormingofGA,Inc. 2,459,600$

Carpet;ResilientandRubber/WoodFlooring&TileSpectraContractFlooring 6,957,532$

TBD $2,504,712

MiscellaneousSteel VariableSteelUnlimited 2,315,000$ $2,315,000

OverheadDoors/LoadingDockEqp.AcoustiDoorsandSpecialists,LLC 862,671$

AsphaltPaving Atl.PavingandConcreteConstructionCo.306,117$ $306,117

ResteelMaterial AnasteelandSupplyCompany 918,351$ $918,351 *

ResteelInstallation Anatek,Inc. 431,359$ $431,359 *

CONSTRUCTIONREQUIREMENTS

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs

ConstructionRequirements 20,317,240$

Fencing C&CFence(CR) $426,007

LongEngineering(CR) $750,000

RamTools(CR) $141,082

BilledDirect AllstateWaste(CR) $153,467ContractedthruWaste

Management AllstateWaste(GC) $387,500

EagleSecurity(CR) $337,880

EasternData(CR) $3,985

Page 14: Mercedes–Benz Stadium Project

8

MySupplies(CR) $68

ThePrintingPeople(CR) $975

JVPartner MoodyConstruction(CR) $1,275,763

EagleSafetySupply,Inc.(CR) $45,768

BrysonConstructors(CR) $76,223

INSURANCE,PERMITS,&FEES

Insurance,Permits,Fees 10,203,383$

JVPartnerC.D.MoodyConstruction(Bonds) $873,984

JVPartner H.J.Russell(Bonds) $598,975

GENERALCONDITIONS

41,991,753$

Fencing C&CFence(GC) $46,024

OfficeFurnitureContractBusinessInteriors(GC) $129,620

AActionVending(GC) $7,499

AActionJanitorial(GC) $88,271

Twelve&Associates(GC) $58,658

PhotosAerialInnovationsofGA(GC) $2,980

MovingServices B&BMovers(GC) $7,346

Electronics EasternData(GC) $130,979

JVPartnerC.D.MoodyConstr.(GCStaff) $1,109,551

ConsultantAgreementOasisConsultingServices,

LLC(GC) $23,710

WorkOrder BrysonConstructors(GC) $523,713

PrintingServices ThePrintingPeople(GC) $10,540

MySupplies(GC) $84,248

RamTools(GC) $6,525

BrysonConstructors(GCStaff) $56,422

JVPartner H.J.Russell(GCStaff) $615,076

FOTLandscaping WidespreadLandscaping $2,500

TOTAL $776,943,050 $110,589,591 $116,431,341 $37,409,308

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs

DESIGNTEAM

Architecture-DesignerandArchitectofRecordHOK,Inc. $22,578,522

Architecture-Local TVSDesign

Architecture-Local CNNA

Architecture-Local StanleyBeamanSears $1,219,865

Architecture-Local GoodeVanSlyke $2,296,806

Page 15: Mercedes–Benz Stadium Project

9

CivilEngineering-PrimeConsultantKimleyHorn $2,030,385

CivilEngineering-LocalTeamMemberLongEngineering $381,235

CivilEngineering-LocalTeamMemberSkylineEngineering $65,675

LandscapeArchitecture-PrimeConsultantHGOR $473,925

LandscapeArchitecture-LocalTeamMemberTheCreativeEye,LLC(TCE) $33,250

LandscapeArchitecture-LocalTeamMemberCentricity,LLC $49,875

StructuralEngineering-PrimeConsultantBuroHappold $10,621,655

StructuralEngineering-LocalTeamMemberSykesConsulting $1,340,390

StructuralEngineering-RoofMechanizationUnisystems

Mech,Plumb,ElecandFPEngineer-PrimeConsultantWSPFlack&Kurtz $3,923,765

Mech,Plumb,ElecandFPEngineer-LocalTeamMemberSLKing $600,000

Mech,Plumb,ElecandFPEngineer-LocalTeamMemberKhafra $600,000

LEEDAdministration Ecoworks $172,000 $172,000

A/V WJHW $899,954

A/V-LocalTeamMember J&AEngineering $336,143

FieldDrainageandTurfDesignFTE $75,000 $75,000

FoodService RiccaNewmarkDesign(RND) $181,000

FoodService-LocalTeamMemberComachoAssociates $54,300

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs

ExperientialGraphics TBD

BuildingCodesandLifeSafetyFSC $314,000

BuildingCodesandLifeSafety-LocalTeamMemberRLBrown $59,000

Accessibility/ADA UnitedSpinal $89,500

Accessibility/ADA-LocalTeamMemberMcAfee3Architects $22,500 *

VerticalCirculation LerchBates $95,585

DoorHardware StudioEight $16,300

Page 16: Mercedes–Benz Stadium Project

10

BuildingEnvelope Heitmann&Associates $290,776

BuildingEnvelope EpstenGroup $38,000

WindEngineering BMTFM $170,000

WindEngineering RWDI $49,000

TOTAL $41,981,367 $5,017,621 $1,860,975 $465,443

DEVELOPER

Darden&Company

Surveyor LongEngineering $848,872 $848,872

DiversityCoordinator Griffin&Strong,P.C. $340,000 $340,000

MaterialTester NOVA $104,878

MaterialsMngrs&Eng.,Inc. $26,220

FundamentalCommissioningWorkingBuildings $626,800

ConstructionMaterialsTestingAMEC $5,546,512

TriTech/Aldridge $545,000

WillmerEngineeringInc $730,000

DunlopNDT,LLC $300,000

Geotechnical/EnvironmentalEngineerLangan $3,218,890

AdvancedAnalyticalServ. $114,860

ExcaliburDrilling $166,812

PAYMENTSTATUSSUMMARYAABE FBE RemainingEBOs

ContourEngineering $23,436

OasisConstructionServices $28,475

WillmerEngineering $601,195

EnclosurePeerReview MorrisonHershfield $215,335

ME^3 $67,500

NSPSalesCenter HHRM $1,922,527

Uptime $383,032 *

AtlantaContractGlazing $24,569

F&SMechanical&Plumbing $133,912

AllianceFireProtection $15,625

Page 17: Mercedes–Benz Stadium Project

11

MBAWaste $1,980

SouthernDoorandPlywood $13,491

ConstructionClean-up $2,005

TOTAL $12,823,814 $1,335,532 $2,981,796 $49,656

TOTALS $831,748,231 $116,942,744 $121,274,112 $37,924,407