© Siemens AG 2014 All rights reserved. Abu Dhabi, 2014-10-12 Meeting the Middle East Energy Demand with the Proven 8000H Series Armin Städtler, Product Manager 8000H

Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

Embed Size (px)

Citation preview

Page 1: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

© Siemens AG 2014 All rights reserved.

Abu Dhabi, 2014-10-12

Meeting the Middle East Energy Demand with the Proven 8000H SeriesArmin Städtler, Product Manager 8000H

Page 2: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

Siemens Structure as of Oct 1 2014

Page 2

Page 3: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

Siemens Power and GasContributing clean energy to the world

Page 3

Page 4: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

Gas Turbine portfolio

50 H

z SGT5-8000H

SGT5-4000FSGT5-2000E

295 MW

172 MW

400 MW

SGT6-8000H

112 MWSGT6-5000F

SGT6-2000E

274 MW232 MW

60 H

z

Indu

stria

l Gas

Tur

bine

sLa

rge-

scal

eG

as T

urbi

nes

Pow

er G

ener

atio

n

Oil

& G

as P

ower

Gen

erat

ion

Mec

hani

cal D

rive

50/6

0 H

z

47/50 MW

33 MW24 MW

8 MW7 MW

SGT-800

5 MW

37 MW

19 MW13/14 MW

SGT-800SGT-750

SGT-700SGT-600SGT-500SGT-400

SGT-300SGT-200

SGT-100

Product NamingSGT = Siemens Gas TurbineSST = Siemens Steam TurbineSGen = Siemens GeneratorSCon = Siemens CondenserSGT-PAC = Siemens Gas Turbine PackageSST-PAC = Siemens Steam Turbine PackageSCC-PAC = Siemens Combined-Cycle PackageSSC = Siemens Simple-Cycle (Power Plant)SCC = Siemens Combined-Cycle (Power Plant)

Page 5: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

SGT5-2000E series Reliable, robust, fuel flexible

*) 12-month rolling average as of December 2013

Siemens units

Az Zour (Kuwait), CCPP

8xSGT5-2000E

Muara Tawar (Indonesia), SCPP

6xSGT5-2000E

SGT5-2000E: >450 units sold (>260 Siemens units, >180 licensed units)

Fleet operating experience> 17’0 EOH> 270 kEOH fleet leader

Fleet reliability is at > 99%*Fleet availability is at > 96%*

licensed units

0

50

100

150

200

250

300

350

400

450

500

Year of initial operation

Page 6: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

SGT5-4000F series Trusted operational excellence

SGT5-4000F: >330 units sold (>310 Siemens units, 16 licensed units)

*) 12 Month rolling avg. Dec 2013)

Year of initial operation19

9819

97

2011

2010

2009

2008

2007

2006

2005

2004

2003

2002

2001

2000

1999

300

250

200

150

100

50

0

2014

2013

2012

Fleet operating experience>10’6 EOH>136kEOH fleet leader

Fleet reliability = 99.4%*Fleet availability = 95.9%*

Glow (Thailand)CCPP, 1x1

Antalya (Turkey)CCPP, 2x1

Page 7: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014Page 7

SGT-8000HEfficient, flexible, reliable

> 60% combined cycle efficiency

4 stages of fast acting variable-pitch guide vanes (VGV) allowing

for improved part load efficiency and high load transients

Proven rotor design (Hirth serration,

central tie rod, internal cooling air passages) for world class fast (cold) start and hot restart capability

High cycling capability due to fully internally air cooled

turbine section

Evolutionary 3D blading

3D Four stage turbine with advanced materials and thermal barrier coating

HCO for reduced clearance losses

Transient protection of clearances for reduced degradation with

hydraulic clearance optimization (HCO) active clearance control

Advanced Can Annular combustion system

Performance features

Flexibility features

Proven efficiency, flexibility and reliability in 11 commercial applications already

Page 8: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

SGT-8000HRotor & Compressor

• Disc type, central tie rod

• Self-centering and -aligning discs with hirth serration

• Light and stiff design with internal air passages for faster thermal transients

• Axial & radial bearing at compressor with HCO

• 13 stages

• 4 variable guide vanes

• vane carriers at rear stages for clearance control

• Flat flow path for HCO

CompressorRotor

Page 8

Page 9: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

SGT-8000HCombustion & Turbine

Combustion System

• Can combustion system, gas & oil #2

• 5-stages for emission compliance over wide load range

• combustor hardware is removable without cover-lift

Page 9

Turbine

• Four stage turbine w. on-board air cooling, supply pressure control

• b1, v1, b4 removable without cover lift

• Single turbine vane carrier for shorter outages and conical flow path with HCO

• Combustion firing level, TIT and RIT at similar level as for G-engines

Page 10: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

SGT-8000HHydraulic clearance optimization HCO

cold

Start-up

CASING

TURBINEBLADE

AXIAL SHIFT w. HCO

INITIALTIP GAP

REDUCEDTIP GAP

HCO – simple and fail-safe turbine clearance protection

Page 11: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

The SGT-8000HHarmonized engine concept

Siemens Design

• Turbine cylinder• Turbine vane carrier• Exit housing

• Front hollow shaft• Bearings• Compressor cylinder

• Can-Annular Combustion• Turbine features• Turbine diffuser

• Single tie bolt • Compr. stat. design• HCO

Westinghouse Design

The SGT-8000H concept uses proven features from Siemens andWestinghouse design heritage, avoiding risky new technologies

Page 12: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

Siemens SGT-8000H seriesTechnology step

Design base:Siemens advanced frames*>500 units in operationavg. availability:>95%avg. reliability: >99%

4000F(>2004)

5000F(>2005)

W501G

* Several of the following criteria is met: GT efficiency >38%,4 stage turbine, TBC with advanced cooling, at least 1400°C firing temperature level

Firing temperature increasecompared to proven design

Massflow increasecompared to proven design

Pressure Ratio increasecompared to proven design

~ 20K

~ 5%

~ 0.5 bar

Moderate and evolutionary design step - especially in the high risk areas

Page 13: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

What can You expect from SGT-8000H?

Page 13

Current Status of F-Class Fleet

Expectation SGT-8000H8000H is based on 4000F and 5000F heritage without adding significant technology /risks, so the expectation is that 8000H will see similar values mid term

Experience SGT-8000HThe 8000H fleet leaders have the following status:

>98 % availability (no major outage yet)>98.9% reliability >99% start reliability

Frame Availability Reliability Start ReliabilitySGT6-5000F (~150 units reporting) 94.9% 99.3% 94.3%

SGT5-4000F (~200 units reporting) 95.6% 99.1% 97.0%

Siemens Advanced Frames (50/60 Hz) 95.4% 99.3% 95.8%

Note: Above data represent average fleet data. Guarantees include fleet scatter and thus will be lower.

12 month rolling average – 06/2014

Availability and Reliability are expected to be on same level as proven F-Class.Current 8000H operating experiences perfectly underline this expectation

Page 14: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

SGT-8000HDirect scaling approach

Speed x 1.2

Dimensions / 1.2

Power, Mass Flow / 1.44

Stresses & Temperatures x 1.0

Efficiency x ~1.0

50Hz 60Hz

Scaling rules 50Hz to 60Hz version

SGT5-8000H

SGT6-8000H

Page 15: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

SCC5-8000H 1S

SCC-8000H seriesPerformance and configuration overview

SCC-8000H 2x1

SCC5/6-8000H 2x1

50 Hz 60 Hz

SGT-PAC 8000H 400 MW 286 MW40 % 40 %

SCC-8000H 1S 600 MW 430 MWSCC-8000H 1x1 > 60 % > 60 %

SCC-8000H 2x1 1.200 MW 860 MW> 60 % > 60 %

SCC-8000H 3x1 - - 1.290 MW- - > 60 %

SCC6-8000H 3x1

Page 16: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

SGT-8000H gas turbine seriesScaling and validation approach

12 combustors16 combustors

SGT6-8000H

Testing in grid-independent environment

Validation SGT6-8000HBerlin Test Center

SGT5-8000H

Testing in simple & combined cycle

Validation SGT5-8000HIrsching-4 Plant Scale

50Hz à 60Hz

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

COD RivieraTesting @ Berlin Test Center

Development COD Canaveral

Combined Cycle Commercial OperationCOD Irsching

CC Validation

60Hz

First Fire CC extensionTesting @ Irsching

50Hz

COD Samsun

8000H philosophy: keep the risk inhouseby thorough GT validation before customer rollout

Page 17: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

Validation hot topicsWhat testing can prove

GT Design Concept

GT Performance

GT vibration behaviour

GT grid code compliance

GT long term integrity

Plant integration (& schedule)

CC operation & performance

fully instrumentedtest bed

base load

part load Off grid

Commercial project

full load dispatch

Start driven load regime

>500 starts

>8000 hrs

8000H

ü

ü

ü

ü

ü

ü

ü

Siemens’ comprehensive testing approach covered all relevant aspectsfor GT and combined cycle – and it is completed successfully

Page 18: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

SGT5-8000HTechnology proven at Ulrich Hartmann CCPP

22.07.2011 PAC/Commercial Operation

May 2012 12.000 EOH 1. Comb. Inspectionengine in excellent condition

June 2014 >16.000 EOH Opportunistic Inspectionengine in excellent condition

Engine in excellent condition. Lifetime prediction confirmed. * According IR4 contract definition

Page 19: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

Fleet status

Page 19

2011 2012 2013 2014 2015 2016

250Hz (Malaysia)

Leading Units Units

1

260Hz (Korea)

360Hz (Korea)

360Hz (USA)

50Hz (Turkey) 1

1

50Hz (Germany)

60Hz (Korea)

160Hz (Korea)

160Hz (Korea)

360Hz (USA)

150Hz (Germany)

EO

H(E

quiv

alen

t Ope

ratin

g H

ours

)

50Hz

60Hz

Total

u First Fireu COD

>100k EOH and >1800 starts have been accumulated

Page 20: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

SGT-8000HFleet Overview

Page 20

x Number of GTs

Operating – COD 2011

Ulrich HartmannIrsching, Germany

1

Under Contract – PAC 2015

FortunaDüsseldorf, Germany

1

Under Contract – PAC 2015/2016

PraiMalaysia

2

Under Contract – PAC 2016

Bandirma IIBalikesir, Turkey

1

Under Contract – PAC 2015

Samsun CengizSamsun, Turkey

1

60.75% world record efficiency

Under Contract PAC 2017

PengerangMalaysia

4

Sta

tus

Aug

ust 2

014

Operating – COD 2014

FPL RivieraRiviera Beach, USA

Under Contract – PAC 2015

LibertyPennsylvania, USA

2

Operating – COD 2013

Cape CanaveralCape Canaveral, USA

3 3

Under Contract – PAC 2016

Port Everglades Ft. Lauderdale, USA

3Under Contract – PAC 2016

San GabrielBatangas, Philippines

1

Under Contract – PAC 2016

PatriotPennsylvania, USA

2

5 weeks ahead 8 weeks ahead

Unit 1+ 2 in operation – COD 2014Unit 3 – PAC 2015

POSCO Power 2Incheon, South Korea

3

Under Contract – PAC 2014

Daegu CityDaegu, South Korea

1

Under Contract – PAC 2017

JangMoonSouth Korea

4

Under Contract – PAC 2017

Dainjin IVSouth Korea

2

12 days ahead

Operating – COD 2013

Dangjin IIIDangjin-gun, South Korea

1

24 months - on time

Operating – COD 2014

Andong (KOSPO)Andong, South Korea

1

Unit 1+2 in operation – on time

Under Contract – PAC 2014

AnsanGyeongggi-do, South Korea

2

38 SGT-8000H sold - 11 GTs in commercial operation - p, eff. & timeline metÞ Siemens 8000H is the first successful H-class in the market

Page 21: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

Restricted © Siemens Energy, Inc. 2014 All rights reserved.October 2014 SGT6-8000H Update Power and Gas Division / PG GT

SGT-8000HCommissioning Experience

The air-cooled SGT-8000H design together with validated conceptsenable fast project implementation.

• USA: 5 weeks ahead of schedule• USA: 2 months ahead of schedule• Korea: 2 weeks ahead of schedule• Korea: 24 months execution time

1 2 3 4 5 6 7 8

SGT6-8000H 3x1, US, Compon.

SGT6-8000H 3x1, US, Compon.CODPerformance GT

SGT-8000H

Months

SGT5-4000F, 1S, EPC

SGT5-4000F, 1S, EPC

SGT5-4000F, 1S, EPC

SGT5-4000F 1S, EPC

SGT5-4000F

SGT6-8000H 1S, Korea, EPC

SGT6-8000H 1S, Korea, EPC

First Fire

SGT-8000H Commissioning times are on same level as proven F-Class

Page 22: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014Page 22

SGT-8000HTechnology application risk overview

Compressor/Rotor Hot gas Path

riskreductionby design

• replaceable b/v w.o. rotor lift (except IGVs)

• Rotor destack on site• HCO

• no firing temp increase• Stage1 & blade4 replaceable

w.o. cover lift• all b/v replaceable w.o. rotor lift

• No additional complexity• Simple plant integration• Service friendly layout

riskreduction

by validation

• 2005: full BTF test• Irsching validation• 2011: BTF validation

• Full load Irsching validation• 2011: full load BTF validation

• Irsching validation• 2011: BTF validation

Plant design

commercialexperience

• Fleet leader in operation since 07/2011 w.o. issues• In total 11 units in commercial operation w.o. issues

• 3rd party EPC contracts handover on schedule

• Performance risk• Functionality risk/cost (outside LTP)

• Delayed handover/commercial operation• Unavailability (Unplanned / forced outages)

Customerrisk

The proven SGT-8000H series does not increase any power projects risk

Page 23: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014

Summary SGT-8000H

• Designed & validated for robustness

• Proven in commercial operation (5 units over 8000 hours)

• Proven customer benefits

• economy of size

• no additional plant complexity

• no added project risk

The proven SGT-8000H series is the perfect fitto meet the energy demand of the region

Page 24: Meeting the Middle East Energy Demand with the Proven ...m.energy.siemens.com/ru/pool/hq/energy-topics/technical-papers/... · 24/10/2014 · Meeting the Middle East Energy Demand

PowerGen Middle East, Abu Dhabi© Siemens AG 2014 All rights reserved.

A. Städtler, Siemens Power & Gas, October, 2014Page 24

Disclaimer

This document contains forward-looking statements and information – that is, statements related to future, not past, events. These statements may be identified either orally or in writing by words as “expects”, “anticipates”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “will” or words of similar meaning. Such statements are based on our current expectations and certain assumptions, and are, therefore, subject to certain risks and uncertainties. A variety of factors, many of which are beyond Siemens’ control, affect its operations, performance, business strategy and results and could cause the actual results, performance or achievements of Siemens worldwide to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements. For us, particular uncertainties arise, among others, from changes in general economic and business conditions, changes in currency exchange rates and interest rates, introduction of competing products or technologies by other companies, lack of acceptance of new products or services by customers targeted by Siemens worldwide, changes in business strategy and various other factors. More detailed information about certain of these factors is contained in Siemens’ filings with the SEC, which are available on the Siemens website, www.siemens.com and on the SEC’s website, www.sec.gov. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in the relevant forward-looking statement as anticipated, believed, estimated, expected, intended, planned or projected. Siemens does not intend or assume any obligation to update or revise these forward-looking statements in light of developments which differ from those anticipated.

Trademarks mentioned in this document are the property of Siemens AG, it's affiliates or their respective owners.