Meadowbank Wharf and interchange upgrade COMMUNITY UPDATE 3 NOVEMBER 2015 Artist’s impression of the new Meadowbank Wharf viewed from the river This update provides important information about the start of work to upgrade the Meadowbank Wharf and interchange and upcoming night and early morning work required. The NSW Government is upgrading Meadowbank Wharf and interchange as part of the Transport Access Program. Work will start on Thursday 3 December 2015 and take about five months to complete, weather and maritime conditions permitting. Ferry services will continue to operate to the wharf during construction however there will be times when safe operations will not be possible and some changes to the timetable will be required. Transport for NSW will provide up to date information about changes to the timetable during the upgrade of Meadowbank Wharf. Plan your trip before starting your journey by calling Transport Info on 131 500 or visit transportnsw.info to use the trip planner. BACKGROUND Transport for NSW is improving ferry services for customers and new and upgraded wharves and interchanges are being delivered as part of the NSW Government’s Transport Access Program. The upgraded wharf and interchange will provide: } Better protection from wind, rain and sun } Improved seating and waiting areas } Improved safety for customers } Quicker and more efficient ferry boarding and disembarking } Improved access for mobility impaired customers and customers with prams } Improved pedestrian access } Efficient interchanges with other modes of transport } Effective wayfinding signage and lighting.

Meadowbank Wharf and interchange upgrade · Meadowbank Wharf and interchange upgrade COMMUNITY UPDATE 3 NOVEMBER 2015 Artist’s impression of the new Meadowbank Wharf viewed from

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Meadowbank Wharf and interchange upgrade · Meadowbank Wharf and interchange upgrade COMMUNITY UPDATE 3 NOVEMBER 2015 Artist’s impression of the new Meadowbank Wharf viewed from

Meadowbank Wharf and interchange upgrade

COMMUNITY UPDATE 3 NOVEMBER 2015

Artist’s impression of the new Meadowbank Wharf viewed from the river

This update provides important information about the start of work to upgrade the Meadowbank Wharf and interchange and upcoming night and early morning work required.

The NSW Government is upgrading Meadowbank Wharf and interchange as part of the Transport Access Program. Work will start on Thursday 3 December 2015 and take about five months to complete, weather and maritime conditions permitting. Ferry services will continue to operate to the wharf during construction however there will be times when safe operations will not be possible and some changes to the timetable will be required. Transport for NSW will provide up to date information about changes to the timetable during the upgrade of Meadowbank Wharf. Plan your trip before starting your journey by calling Transport Info on 131 500 or visit transportnsw.info to use the trip planner.

BACKGROUNDTransport for NSW is improving ferry services for customers and new and upgraded wharves and

interchanges are being delivered as part of the NSW Government’s Transport Access Program.

The upgraded wharf and interchange will provide:

} Better protection from wind, rain and sun

} Improved seating and waiting areas

} Improved safety for customers

} Quicker and more efficient ferry boarding and disembarking

} Improved access for mobility impaired customers and customers with prams

} Improved pedestrian access

} Efficient interchanges with other modes of transport

} Effective wayfinding signage and lighting.

Page 2: Meadowbank Wharf and interchange upgrade · Meadowbank Wharf and interchange upgrade COMMUNITY UPDATE 3 NOVEMBER 2015 Artist’s impression of the new Meadowbank Wharf viewed from

Bus zone

Existing pontoon and gangway to be removed

New metal roof on existing wharf shelter

Entry/exit to remain open during construction

Waiting area closedduring construction New covered

floating pontoon

Ferry at berth

4 new accessible parking spaces

Bowden Street

Restaurant

HelenePark

HeadlandPark

Parramatta River

Railway bridge

New covered gangway

Toilets

Bus shelters

New bicycle racks

OPAL readers

New kiss and ride space

Existing loading area remains

5 timed car spaces restablished after

construction. Accessible spaces relocated.

LegendSite compound

Proposed

Existing

Pedestrian access

NEW MEADOWBANK WHARF AND INTERCHANGE TEMPORARY WORK SITES FOR ILLUSTRATIVE PURPOSES

WHAT TO EXPECT DURING THE UPGRADE Construction activities will include:

} Setting up the site – installing fencing, site hoarding and site sheds

} Installation of piles – some of this work will be noisy

} Installation of wharf entry platform, bridge, gangway and pontoon

} Modification of the existing wharf entry shelter

} New wharf fit out

} Removal of existing pontoon and gangway

} Construction of new pathways and ramps in the interchange

} Reconfiguration of parking including kiss and ride and accessible parking

} Installation of bicycle racks

} Installation of wayfinding signage and lighting.

Equipment on site will include water based construction vessels including barges, cranes and service boats. Workers and equipment will usually be transported by water to minimise impacts on local traffic. There will be impacts and restrictions to vessel navigation and all vessel operators should navigate with caution when near the construction zone. Some construction traffic movements will be required, particularly for land side work.

The standard work hours for the project are 7am to 6pm on weekdays and 8am to 1pm Saturday.

Some work will be required outside of standard hours when water is at its calmest and when ferries are not operating to the wharf. Some work, including installation of piles, requires very still water for safety and accuracy. Nearby residents will be notified before any work is carried out outside of standard hours.

NOTIFICATION OF EARLY MORNING AND NIGHT WORK

Work to install piles for the new wharf will be carried out soon after the start of on-site work. This will require early morning and night work on some days between Friday 4 December 2015 and Friday 8 January 2016 as installation of piles requires calm water. Early morning and night work can be carried out between 11pm and 7am seven days a week. Hammering of piles is restricted between 5am and 7am.

The piling work, including drilling and hammering piles, will be noisy. The hammering will be carried out intermittently, with multiple one minute periods of hammering. We thank you for your patience during this work and apologise for any inconvenience.

Page 3: Meadowbank Wharf and interchange upgrade · Meadowbank Wharf and interchange upgrade COMMUNITY UPDATE 3 NOVEMBER 2015 Artist’s impression of the new Meadowbank Wharf viewed from

Orchard Street

Parkes Street

MeadowbankPark

Top RydeShopping

Centre

RydeTAFE

MeadowbankTAFE

Parramatta River

WEST RYDE

RYDE

MEADOWBANK

MeadowbankWharf

MeadowbankStation

West RydeStation Fo

rste

r Stre

et

513

513

513

513

Victoria Road

To Parramatta

Ryedale Road

Anza

c Ave

nue

Anthony Road

Herm

itage

Roa

dFo

rsyth

e Stre

etBo

wden

Stre

et

Lane

Cov

e Roa

d

Bowde

n St

reet

Bank

Str

eet

Chur

ch St

reet

Constitution Road

To Circular Quay

Constitution Road

BayDrive

To City

To Parramatta

T

T

F

ALTERNATIVE TRANSPORT DURING CONSTRUCTION

ALTERNATIVE TRANSPORT AT TIMES WHEN FERRIES ARE NOT OPERATING TO MEADOWBANK WHARF OR SERVICES ARE LIMITED

The work schedule for the upgrade is being planned to minimise disruptions to F3 Parramatta River ferry services to Meadowbank during construction.

Ferry services will continue to operate to Meadowbank Wharf during construction, however there will be times when safe operations are not possible and the wharf may need to be closed. Customers will be advised in advance of any temporary closures.

At times when ferries are not operating to Meadowbank, customers can connect to train services at Meadowbank Station – an eight minute walk from Meadowbank Wharf. Customers will also be able to catch the existing 513 bus service from Meadowbank Wharf to connect to bus services on Victoria Road to the city and Parramatta, or to train services at West Ryde Station.

Transport for NSW will provide up to date information about changes to the timetable during the upgrade of Meadowbank Wharf. Plan your trip before starting your journey by calling Transport Info on 131 500 or visit transportnsw.info to use the trip planner.

Page 4: Meadowbank Wharf and interchange upgrade · Meadowbank Wharf and interchange upgrade COMMUNITY UPDATE 3 NOVEMBER 2015 Artist’s impression of the new Meadowbank Wharf viewed from

Rivercat at the existing Meadowbank Wharf Gangway at the existing wharf

CONTACT THE TEAM

For more information about the Meadowbank Wharf and interchange upgrade you can:

Phone: 1800 770 973

Email: [email protected]

Visit the Roads and Maritime Services website: rms.nsw.gov.au/wharfupgrades

A4 CU + HOUSEHOLD LETTER / INTERPRETING SERVICES BANNER

DRAFT 5 / 30 OCTOBER 2012

If you need an interpreter, please call the Translating and Interpreting Service (TIS National) on 131 450 and ask them to telephone Roads and Maritime Services on 1800 770 973.

Arabicالرتجمة بخدمة االتصال الرجاء مرتجم، إىل بحاجة كنتم إذا

الخطية والشفهية (TIS National) عىل الرقم 450 131، Roads and Maritime Services والطلب منهم االتصال بوكالتكم

عىل الرقم 973 770 1800.Cantonese若你需要口譯員,請致電 131 450 聯絡翻譯和口譯服務署 (TIS National),要求他們致電 1800 770 973 聯絡 Roads and Maritime Services。

Mandarin如果你需要口译员,请致电 131 450 联系翻译和口译服务署 (TIS National),要求他们致电 1800 770 973 联系 Roads and Maritime Services。

GreekAν χρειάζεστε διερμηνέα, παρακαλείστε να τηλεφωνήσετε στην Υπηρεσία Μετάφρασης και Διερμηνείας (Εθνική Υπηρεσία TIS) στο 131 450 και ζητήστε να τηλεφωνήσουν Roads and Maritime Services στο 1800 770 973.

ItalianSe desiderate l’assistenza di un interprete, prego telefonare al Servizio Interpreti e Traduttori (TIS National) al 131 450 chiedendo di contattare Roads and Maritime Services al 1800 770 973.

Korean통역사가 필요하시면 번역통역서비스 (TIS National)에 131 450 으로 연락하여 이들에게 1800 770 973 번으로 Roads and Maritime Services 에 전화하도록 요청하십시오.VietnameseNếu cần thông ngôn viên, xin quý vị gọi cho Dịch Vụ Thông Phiên Dịch (TIS Toàn Quốc) qua số 131 450 và nhờ họ gọi cho Roads and Maritime Services qua số 1800 770 973.

Translating and Interpreting Service

November 2015RMS 15.605