1
PDM Agenda
• Manufacturing Overview
• Product Data Management Overview
• Inventory Overview
• Bill of Material
• Work Center & Routing
• Leadtime
• Engineering Change Management
Manufacturing Overview
2
Manufacturing Overview
Manufacturing
Overview
Customer order
Design BOM and Routing and Product
Costing
Material/Capacity Planning
Manufacturing Accounting
Customer Company
Shop Floor Sales Order
3
Manufacturing Module Integration
ProcurementPurchase orders
Supplier information
Supplier performance
Supplier/item
relationships
Approval
Receiving
Authorization
Inventory Management :Items, Branch/plant, Stocking locations, Costs, Prices, Characteristics, Lot & serial information
Inv
en
tor
y T
ran
sa
cti
on
sR
ec
eiv
ing
, Is
su
es
, Tra
ns
fer
s,
Ad
jus
tme
nts
Accounts Payable
Voucher paymentsReports
Sales Order ProcessingSales orders, Shipment,
Returns, Special
Instructions, Customer
information, Pricing
Plant
MaintenanceParts Lists,
Work Order
Costs
Issues, Returns
General Ledger : Inventory movement, Variances, Sales, Returns, Breakage, Taxes
Payroll / HREmployee
Data
Payroll
Information
Accounts
ReceivableInvoices/Cash
receipts
Credit/Collection
Mgmt
StatementsManufacturing
Planning Systems
Resource Planning
Forecasting
Engineering Change
Work Orders
Work in process
Shop Floor Control
4
3
Integration with Other System
Product Data
Management
MPS
MRP
DRP
Shop Floor
Control
Inventory
Management
Manufac.Accounting
Product Costing
Manufacturing Systems
Inventory Management
Product Data Management
Bills of Material
Work Centers
Routing
Product Costs
Item Master
Item Branch/Plant
Item Costs
Sales Order
History
Best Fit
Detail Forecasts
G41G30
Forecasting
G34
4
Manufacturing Systems
Material
Requirements
PlanningWork Order Processing
Material Issues
Hours and Quantities
Completions
Journal Entries
Variances
Shop Floor
Control
G34G31
G34
Master
Production
Scheduling
Demand from
Sales Order or
Forecast
Time Series
Supply / Demand
Dependent demand
Material Plan
Validation
System Concepts
Inventory
System
F4101
Item Master
F4102
Item Branch/Plant
Product Data
ManagementF3002
Bill of Material
F3003 Routing
Engineering Change Order
Product Costing
5
System Concepts
Product Data
Management F3002
Bill of Material
F3003 Routing
Engineering Change Order
Product Costing
Shop Floor
Control
F3111
Part List F4801
F3112 Work Order
Routing
Manufacturing Accounting
Product Data Management
Overview
6
Manufacturing Flow
Product Data Management
Product Costing
Material/Capacity Planning
Manufacturing Accounting
Your company
Shop Floor
Product Data Management Features
All the types of Manufacturing
�Discrete
�Process
�Repetitive
Use BOM, Work Centers and Routing
12
7
Discrete Manufacturing
Work Order driven by item
� Parts List
� Routing Instructions
� Specific Order
� Date
� Quantity
� Production of distinct items
Process Manufacturing
Production results
include
the completions of one or
more co/by products
Work Order is driven by the
process, resulting in...
Ingredients List
Routing Instructions
Co- and By- Products
8
Repetitive Manufacturing
Schedule driven by product
families with...
� Similar End Items
� Smooth, continuous demand
� Product families assembled
on a dedicated flow line
� Reduced setup and leadtimes
� Rate Schedules
� High volumes
� Low Work In Process
Production driven by customer demand
Sales Order driven
Supports use of sub-assemblies
Assemble-to-Order Manufacturing
9
Inventory Overview
How are Units of Measure Used?
produced in a unit of measure
other than primary
consumed in a unit of measure other than primary
Production
Component
10
19
20
11
21
22
12
13
26
14
Product Data Management
Product Data Management
� Bills of Materials
� Work Center & Routing
28
15
Bills of MaterialBills of Material
Rim (P)
Bicycle
Wheel Assy. (M)
Lock (P)Chain Assy.
(M)Brake
(P)Frame
(M)
Bearing (P)
Seat (P)
Chain (P)
Pedal (P)
Handle Bar (P)
Tube/Pipe (P)
Plate (P)
Tyre (P)
Bill of Material is the method of defining and communicating
the structure of the product.
Define:
� Parent/Component relation
� When an item is consumed in manufacturing
� When an item is issued in manufacturing
� Quantity
� Branch/Plant
Define Bill of Material
16
Bill of Material CharacteristicsBill of Material Characteristics
� Supports Product Costing� Allows Master Schedule to be stated in
the highest possible end items
� Reflects material flow -how product is built
Variable Bill of MaterialVariable Bill of Material
� Supports Discrete and Process environments
� Specifies component requirements
17
Based on % of sales
Module Family
Module Family
D Hcolor
D Hcolor
D Hcolor
Module FamilyMountain Bike
SubsetModule Group
DH
SubsetModule GroupActive
SubsetModule GroupCarbon
Planning BillModular Bill of MaterialPlanning BillModular Bill of Material
Percent Bills of MaterialPercent Bills of Material
� Supports Discrete and
Process environments
� Used in highly
regulated industries
� Enforces specified
quantities for an
ingredient or
component
Fixed/Variable field = %
18
Batch Bills of MaterialBatch Bills of Material
Supports Discrete and Process environments
� Used in conjunction with shop floor constraints
� Quantity of a parent item
� Specifies component requirements
Bills of Material
Parent Item
A
Raw Material
CPart
BSub Assembly
D
Raw Material
ESub Assembly
GPart
F
PartB
Raw MaterialE
Single-Level
Indented-Level 4
3
Parent
Component
0
1
2
Parent
Component
19
Bill of Material Item Cost
Shop Floor Control
MPS/MRP
Product Costing
Parent Item
A
Raw Material
C
Part
B
Sub Assembly
D DemandSupply
Information Flow
20
Work Center & RoutingWork Center & Routing
Work Centers
� People and machines that make up the production
facilities on the shop floor where the routing operations
occur
� Consists of one or more
� People
� Machines
� Considered as one unit for
� Capacity Planning
� Detailed Scheduling
21
Define Work Centers
Receipt Inspection 100-101
Cutting Machine 100 -102
Welding Machine 100 -103
Assembling100-104
Testing100-105
Milling Machine 100 -106
Final Inspection100-107
Painting 100-108
Packing100-109
� Work Center Number and Description
� Define Work Center as a Business Unit
� Define:
� Operator, machine and hours per day
� Rates:
� Setup
� Labor
� Machine
� Overhead
22
23
Routings
� Define:
� Production Process
� Operations
� Sequence
� Applicable Work Centers
� Standards for setup and run times
� Types of Routings
� Manufacturing
� Alternate
24
Information Flow
1.2.3.
Process Routing Work Center
Shop Floor Control
CRP
Product Costing
25
Scrap, Yield and Shrinkage
Scrap - % ของ Component ที�จะ unusable ระบุใน BOM
Yield - % ของ Output ที�จะได้เมื�อผ่าน Operation นี/ระบุในRouting
Shrink - % ที� Expected Loss of Parent เนื�องจากธรรมชาติเช่นการหดตัว ระบุใน Item Branch(F4102)
Yield in Routing
Operation Yield Compound Yield
40 80 80%
30 90 80 x 90 = 72%
20 100 72 x 100 = 72%
10 95% 72 x 95 = 68%
26
Planned Yield Update
Operation Scrap ใน BOM
Operation Compound Yield Operation Scrap
40 80 100/80 - 100 = 25
30 72 100/72 - 100 = 39
20 72100/72 - 100 =
39
10 68 100/68 - 100 = 47
Lead Time ConceptLead Time Concept
27
Lead Time Type
� Fixed Lead Time
� Level Lead Time
� Cumulative Lead Time
� Manufacturing Lead Time
� Variable Lead Time
� Lead time per unit
Lead Time Example
A
B C
D E
LLT = 3Cum LT = 3
LLT = 5Cum LT = 5
LLT = 4Cum LT = 9MFG LT = 4
LLT = 2
Cum LT = 2
LLT = 1Cum LT = 10MFG LT = 5
28
Engineering Change Management
Engineering Change Management
Engineering Change Order Features
ECO
•Costs•Dates
Additional Details
1. Test2. Approve3. Change
ECO Routings
ECO Approvals
•Engineering •Production
Item Changes
A
1 2 3 4X
29
ECO Process
1. Set Up ECO System
2. Create ECO
3. Approve ECO
4. Implement ECO
ECO Change Types
N add new part
C change existing part
S swap old part with new part
R remove existing part