Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
Commissioner Janette Sadik-Khan, New York City Department of TransportationPresentation to Manhattan Community Board 12, April 8, 2013
Spring 2014
Manhattan Waterfront Greenway ConnectorEast 37 Street
1Commissioner Polly Trottenberg New York City Department of TransportationPresented to Manhattan Community Board 6 on October 6th, 2014
Background
Gap in Greenway at E 37 St
Increased demand for greenway access:
• Glick Park improvements
• East River Ferryridership has exceeded expectations by 23%
• Citi Bike dock at E 35 St
Nearby bike routes:• north & south on 1 & 2 Av• east & west on 39 & 40 St
39 & 40 St
1 & 2 Av bike lanes
2 Av
1 Av
Glick Park
E 37 St
E 39 St
E 40 St
E 35 St
Waterside Pier
(Future)
CitiBikeDock
Issues
1ST AVENUE / 38TH STREETRoute to and from bike network
GREENWAYE34 St - Glick ParkWaterside Pier
37TH STREETBicycle/Pedestrian Connection from 1 Av
E 38 St
11
22
33
Issue #1 Proposed Improvements:
Existing and Proposed Greenway
Install signs & markings
Improve path surface
Existing path
Queens Plaza,Queens
Issue #2
Existing Conditions: E 37th Street / FDR Service Road
Bicycle/Pedestrian Connection from 1st Ave• Lack of visible link• Narrow Sidewalks• Safety - FDR Service
Rd inadequate greenway connection
FDR Service Rd at E 37 St, looking north
E 37 St between 1 Av and FDR Service Rd, looking east
E 37 Street Existing
Issue #2
Existing Conditions: E 37th Street
Issue #2
Proposal: E 37th Street
E 37 Street Proposed
Two-way buffered bike path
Provides safe connection to Greenway that avoids FDR Service Rd
Creates a visible link to Greenway for cyclists and pedestrians
Enhancements since last presentation• Loading / Parking lane• “Quick-Curb” at corner
Loading / parking
lane
Flexible bollards reinforce bike and vehicular
space
Issue #2
Proposal: E 37th Street
Issue #2
Proposal: E 37th Street
Issue #2
Proposal: E 37th Street
2 Av
1 Av
Glick Park
E 37 St
E 39 St
E 40 St
E 35 St
E 38 St
Issue #3Proposed Connection to Network
Install 2 way path on 1 Av between E 37 & E 38 Streets
Install shared lanes on E 38 St
Glick Park
Waterside Pier
(Future)
Glick Park
Waterside Pier
(Future)
CitiBikeDock
1 Avexisting
Issue #3Existing Conditions: First Avenue between 37th and 38th Sts
1 Avproposed Two-way protected path
Provides safe connection to Greenway that avoids FDR Service Rd and Midtown Tunnel entrance
Issue #3Proposal: First Avenue between 37th and 38th Sts
Issue #3Proposal: First Avenue between 37th and 38th Sts
E 38 Stexisting
Issue #3Existing Conditions: 38th Street between 1st and 2nd Aves
Issue #3 Proposed Improvements
Shared lanes on E 38 St – 1 Av to 2 Av
Shared Lanes
Serve as wayfinding for cyclists heading to/from the Greenway
Indicate where cyclists should ride in roadway
Alert motorists to the presence of bicycles
E 38 Stproposed
Issue #3Proposal: 38th Street between 1st and 2nd Aves
2 Av
1 Av
E 37 St
E 39 St
E 40 St
E 35 St
Summary of Proposed Improvements
E 38 St
Improve GreenwayPathE 34 St to Glick Park (E 37 St)
Create Greenway Gateway on E 37 StInstall 2 way path
New and Upgraded Bicycle Connections2 way path on 1 Av Shared lane on E 38
Glick ParkGlick Park
Waterside Pier
(Future)
Glick Park
Waterside Pier
(Future)
CitiBikeDock
Questions? Thank Youwww.nyc.gov/dot