11
Manhattan Greenway – Harlem River Community Board 11 Update December 5, 2019

Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

Manhattan Greenway – Harlem RiverCommunity Board 11 Update

December 5, 2019

Page 2: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

Project Background

Manhattan Greenway – Harlem River Update, 12/5/19 2

East Harlem

125th – 132nd Sts Gap

Existing Greenway

Existing On-Street Route

Missing Greenway Link

125th – 132nd Sts

Page 3: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

2018 Concept Plan

Manhattan Greenway – Harlem River Update, 12/5/19 3

125th – 132nd Sts

Page 4: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

Project Scope

Manhattan Greenway – Harlem River Update, 12/5/19 4

▪ Sub-Project 1: 125th to 132nd Sts

▪ New 7-acre waterfront park

including bike and pedestrian pathways, plantings, bulkhead railings, lighting, and utilities

▪ New and repaired seawalls

▪ Sub-Projects 2 & 3: 132nd to 145th Sts, 155th St to Swindlers Cove

▪ Structural repairs and reconstruction of the bulkhead

Page 5: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

Draft Timeline

Manhattan Greenway – Harlem River Update, 12/5/19 5

2019 2020 2021 2022 2023

Construction Complete

Design, Environmental Review, Permitting complete

Construction commences

Design procurement, selection + kickoff with Langan

Pre-construction kickoff with Hunter Roberts

Design, Reviews, Permitting begins Construction Ongoing

Design

Surveys + Site Investigations Construction

Page 6: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

Sub-Project 1: 125th – 132nd Sts

Manhattan Greenway – Harlem River Update, 12/5/19 6

Page 7: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

Site Investigations

Manhattan Greenway – Harlem River Update, 12/5/19 7

Bulkhead: The project features various types of bulkheads in different states of disrepair from 125th all the way to Swindlers Cove

Greenway: Entrance to future park at 127th/2nd. Sinkholes- exhibiting effects of deteriorated bulkhead

Park: View from Willis Ave Bridge; currently staging for TBTA construction

Page 8: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

Timber Pile Supported Low-Level Relieving Platform

Seawall Types

Manhattan Greenway – Harlem River Update, 12/5/19 8

Steel Sheet Pile Bulkhead

DRAFT

Page 9: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

Seawall Types

Manhattan Greenway – Harlem River Update, 12/5/19 9

Timber Crib Supported Gravity Retaining Wall Concrete-encased steel H-Pile supported high level platform

DRAFT

Page 10: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

Anticipated Milestones

▪ Existing Conditions – Early 2020

▪ Concept Design – Early 2020

▪ Schematic Design – Mid 2020

▪ Final Design – Late 2021

▪ Environmental Review & Permitting – Late 2021

▪ Construction Start – Late 2021

Manhattan Greenway – Harlem River Update, 12/5/19 10

*CB11 updates anticipated in 2020

Page 11: Manhattan Greenway Harlem River Community Board ... - edc.nyc · 12/4/2019  · Concept Design –Early 2020 Schematic Design –Mid 2020 Final Design –Late 2021 Environmental Review

https://edc.nyc/project/manhattan-waterfront-greenway

Thank you!