93
1 EXTRA LOW VOLTAGE DIVISION MALLS HOSPITALS HOTELS INFRASTRUCTURE PRE QUALIFICATION FILE 6312 C

MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

Embed Size (px)

Citation preview

Page 1: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

1

EXTRA LOW VOLTAGE DIVISION

MALLS HOSPITALSHOTELSINFRASTRUCTURE

PRE QUALIFICATION FILE

6312 C

Page 2: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

2

TABLE OF CONTENTS

1. About Extra Low Voltage Division

2. Quality Plan for Extra Low Voltage Division

3. Products

a. Building Automation / Building Management System

b. CO Monitoring System

c. Metering System (BTU, Water Meters, etc.)

d. Air Curtains

4. ELVD Scope of Works

a. ELVD Organizational Chart

b. Sales and Marketing

c. Contacts

d. Tender / Estimation

e. Design

f. Project Execution

g. Installation, Testing and Commissioning

h. Warranty and Certificates

6312 C

Page 3: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

TABLE OF CONTENTS

5. BMS Integration

a. Diagram

b. BMS Integration for AX Arena Typical Architecture

c. Direct Digital Controls (DDC)

d. DDC Excel Web Controller at Chiller Yard Integrated to BMS

e. FCU, Field Devices Integrated to BMS

f. Water Meter Integration to BMS

g. Air Curtain Integration to BMS

6. Project References

7. Major on Going and/or Executed Projects

6312 C 3

Page 4: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

4

Verger Delporte UAE Ltd has been operating in UAE since 1977 and have developedextensive experiences in many fields (i.e., Switchgear, IT, Trading, Contracting andEXTRA LOW VOLTAGE DIVISION “ELVD” ). Verger Extra Low Voltage Division isone of the Partners of Honeywell and Schneider Electric and Distributors of DiehlMetering (Hydrometer) and ABB.

Extra Low Voltage Division is specialize in the Supply, Engineering, Supervision andTesting and Commissioning for Building Management System (BMS), MeteringSystem, CO Monitoring System and other services involving System Integration.

We adhere to the highest standards of corporate governance by establishingprocesses and practices that promote and ensure integrity, compliance andaccountability.

Configured and manned to suit at best to an ever-changing market demand, thisdivision relies on:

● A proficient office personnels (Manager, Engineers, Designers, etc.) whose naturalskills stemming from a solid educational background and enhanced by a sharpknowledge of site, acquired by experience.

● Professional teams of well-trained technicians, foremen and site engineers,earnestly carrying out all the type of Low Voltage System site duties, performing oftenpraised quality jobs and services thanks to a high workmanship.

● Active coordination between clearly defined sections actually customer-oriented, isa clue to client and employees satisfaction. The Extra Low Voltage DivisionManagers sees to the productive and reliable operating of the Managers under hisfold, while in turn, the Managers looking after various discipline keep a close eye ontheir fellow members to complete the jobs assigned in a professional way fulfilling theproject requirements and at the same time exceeding the client’s expectation.

1. ABOUT EXTRA LOW VOLTAGE DIVISION

6312 C

Page 5: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

5

2. QUALITY PLAN

Scope: Supply and Engineering of BMS and other Extra Low Voltage Products

Striving to be always at the edge, in this relentless business sector, the company had tolay down sound foundations before setting its organization in an ever –improving qualitydrive.

Internal organization in business key-processes to meet Project’s Quality requirements.

1. Marketing & Business Development:

● Working with MEP contractors, Consultants and end users offering quotations andwriting specifications as well as offering budget quotations when required.

● To coordinate with the management and other department in all respectscollecting market information and future planning.

2. Upon Project Allocation:

Prior to the acknowledgment of order, under the responsibility of ELVD Manager –

● To check that Verger’s offer / proposal meet the clients’ requirements in allaspects.

● To ensure that the agreed technical submittals / scope of works remain within ourcapacity.

3. Project Process:

Once the order is accepted, the Project Manager shall make a technical submittal inaccordance with the consultant’s requirements and specifications.

On receipt of any comment or design changes, the submittal shall be changed in linewith the specifications and in line with the project costing.

6312 C

Page 6: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

6

4. Design Engineering:

Under the supervision and direction of ELVD Manager / Operations Manager, to planadequately the tasks and their related human and material/equipment resources as percontractual date of delivery.

● Design, material selection with optimal time margin to customers’ approval.● To carry out the design (i.e., schematic, riser, etc.) followed by general

arrangements BMS systems integration, etc.● The thoroughly reviewed and approved “design output” depends on initial

control of the “design input” (Specifications, technical guides from theconsultant, international and local standards, tailor-made software).

● Material procurement and execution.● Testing and Commissioning.

5. Material Control: (Refer to GP6 – Purchasing and Material Control Procedure)

● Selection – Under the responsibility of competent personnel.

To choose materials required and/or requested by/from the clients and Verger’s list ofapproved suppliers (Quality, Health, Safety and Environmental performance), the rightmaterials complying with the specifications and applicable quality standards.

● Purchasing –

To place the corresponding order, thoroughly reviewed and approved by ELVDManager.

● Incoming Goods Inspection:

Under the responsibility of Project Manager to check materials in compliance with thespecified requirements.

● Delivery –

Delivery notes or Invoices are prepared and material is sent to the site or to the controlPanel manufacturers for incorporation into relevant Control Panels where required. Alldocumentation recorded and filled up.

6312 C

2. QUALITY PLAN

Page 7: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

76312 C

2. QUALITY PLAN

6. Execution: (Refer to HSIM 6301)

● Under the Supervision of the projects Manager, the projects engineer will liaisewith the MEP contractor and Consultant through drawings or on site coordinationindicating the correct installation of the components where required and adoptingthe correct procedures for installation.

● After installation of all material and checking by the projects engineers thecommissioning will start and the complete system put into correct operation.

7. Site Hand-over / Maintenance period:

Under the control of Project Manager -

● To hand over a comprehensive quality documentation with a view to provideessential instruction for site operating / preventive maintenance /troubleshooting.

● Follow up for a Maintenance contract after handling over of the project if required.

8. Project’s Documents Control: (Refer to GP1 – General Documents Control)

Under the shared responsibility of the different section head:

● To record, file, update, withdraw and supersede the project-relate documents,when necessary, as per their relevance and importance with regard to qualityrequirements.

● To make information easy to retrieve, using electronic (diskettes, hard-disks) orpaper support, where applicable.

Page 8: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

86312 C

3. PRODUCTS

Controls, Automation & BMS and Metering System (Low Voltage); Total: 24+Engineers including technicians.

“Supply and/or Installation”

AMR ProviderSystem Integrator

Partner

Partner

Page 9: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

9

A. Building Automation / Building Management System:

● DDC Controls and Panels● Integrated Room Controls (FCU & Valve Controls)● Symmetre BMS Software● AX (Hawk) integration controllers● AX integration Platform (Hardware and Software)● Energy Management Software modules

Field Devices:

● Valves/Actuators● Frequency Inverters● LON Field Devices● Thermostats● Sensors● Humidistats● Damper Actuators (Fire & Smoke and Direct Coupled)● Pneumatic Controls

Thermostat & Room Control:

● Electronic & Electro-Mechanical Thermostats● Room Controllers for Commercial Buildings● DX and Package unit Thermostat (wired and wireless)

B. CO Monitoring System

C. Metering System (BTU, Water Meters, etc.)

D. Air Curtains

6312 C

3. PRODUCTS

Page 10: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

10

4. EXTRA LOW VOLTAGE DIVISION – SCOPE OF WORKS4A. ELVD – ORGANIZATIONAL CHART

6312 C

Page 11: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

11

4B. SALES AND MARKETING

Entrusted to Sales Manager – Projects Development, who closely coordinates with hisDivision Manager the duties require a clever knowledge of the market and its related chainof decisions: end users, local authorities, consultants, main contractors, et. al.

With a view to ensure a strong and lasting presence in the whole of the Emirates, thanksto a sound, professionals, accessible, highly responsive and trustworthy representatives,Verger Delporte UAE Ltd has established this outpost with a base in Sharjah, UAE, butcovering the whole of the Emirates.

From the initial contacts set with customers up to the internal contract review, the SalesManager – Projects Development will acts as facilitator, striving to get the best level ofunderstanding between the two parties, ultimately bound by a flawless contract withinproven Verger Delporte’s capability.

6312 C

Page 12: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

126312 C

4C. Contacts

1. Mr. Hatem DarwishManagerExtra Low Voltage DivisionP.O. Box 5629 Sharjah, UAETel. : +971 6 5432436Fax : +971 6 5434139Mobile: +971 50 9427956E-mail : [email protected]

2. Ms. Eden de GuzmanGeneral Coordinator/SecretaryExtra Low Voltage DivisionTel. : +971 6 5432436 ext. 310Fax : +971 6 5434139E-mail: [email protected]

Page 13: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

136312 C

4D. Tender / Estimation

Under the coordination and responsibility of a qualified engineers, a sound and confidentbusiness approach to get the best technical solutions, devised with the overridingconcern of meeting client’s needs.

The experienced Estimation Engineers have been trained to design the various systemsin accordance to the details available in the Tender specifications.

Always on a technological watch, the engineers strive to make the client’s benefit byadopting the latest state of art technology by introducing new advanced system.

Worked out in close conjunction with the other sections, if required. The offerssubsequently checked by the management to ensure its relevance and suitability.

Page 14: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

146312 C

4E. Design

Thoughtfully entrusted to a qualified Design team with a view to preserve the best ofspecialized competencies and foster maximum creativity.

The Main Activities carried out are the following:

1. Detailed Engineering2. Graphical Programming3. In house real time Programming

A well developed Engineering Workshop with latest state of art Demo set up helps theDesign Engineers to perform the programming and sequential checking of the operationbefore being transferred to the Execution Engineers. This helps in avoiding the delays inthe projects where in single Engineer carrying out the complete Job Distribution of theWorks speeds up our output time and Quality.

From the initial job assignments, optimally planned within the general time schedule, theproject joint works are all the more facilitated that the designers carry out their duties in asingle room, comfortably air-conditioned and economically furnished.

The Shop drawings and the Riser Drawings performed under the latest widely covetedAutoCAD software.

With the latest technology at hand, the sections’ output has substantially gained inproductivity, quality and reliability, giving nothing but entire satisfaction to thecustomers.

Page 15: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

156312 C

Adequately programmed from a collaboration of all the parties (Estimation Section,Design Section, and Logistical Support Section of the Administration Department andSite teams), which produces a collection of expert advises, the project is entrusted to aExperienced Execution Engineer, under the overall supervision of the ExecutionManager coordinating with the Manager-Projects for site activities reporting back to theManager Low Voltage Division.

Drawings and materials approval by the consultant stand for the starting point of therelated site works, to be executed, tested, commissioned, and handed over to the client,within the allotted time.

Suitably manned as per the updated workload, the site is initially organized according tothe specificity of the job, hierarchical levels optimized in order to get the best output froma responsible and earnest personnel.

Current site competencies and resources can be described as follows:

● Execution Manager on assignment, exercising functional responsibilities,● Incumbent Site Engineers, guiding Foremen or Team-Leaders,● Safe and well-suited transport and handling means, carefully controlled

quality tools and electrical appliances, make up actual conditions for a quality and productive job on site, source of satisfaction from the contractor to the end user.

4F. Project Execution

Page 16: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

166312 C

Adequately programmed from a collaboration of all the parties (Estimation Section,Design Section, and Logistical Support Section of the Administration Department andSite teams), which produces a collection of expert advises, the project is entrusted to aExperienced Execution Engineer, under the overall supervision of the ExecutionManager coordinating with the Manager-Projects for site activities reporting back to theManager Low Voltage Division.

Drawings and materials approval by the consultant stand for the starting point of therelated site works, to be executed, tested, commissioned, and handed over to the client,within the allotted time.

Suitably manned as per the updated workload, the site is initially organized according tothe specificity of the job, hierarchical levels optimized in order to get the best output froma responsible and earnest personnel.

Current site competencies and resources can be described as follows:

● Execution Manager on assignment, exercising functional responsibilities,● Incumbent Site Engineers, guiding Foremen or Team-Leaders,● Safe and well-suited transport and handling means, carefully controlled

quality tools and electrical appliances, make up actual conditions for a quality and productive job on site, source of satisfaction from the contractor to the end user.

4F. Project Execution

Page 17: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

17

4G. Installation, Testing and Commissioning

Clearly of outstanding concerns for the consultant, main contractor or end user, theFinal visual inspection, Pre-commissioning, Commissioning duties are entrusted to dulyFactory Trained Engineers, certified by our Principle Manufacturers for specific type ofSystems.

These Engineers will coordinate with the contractor to Install the system as per theproject specification requirement. Upon completion of the Installation, they perform thePre-commissioning works followed by the commissioning of the Installed system.

Execution Managers keep a close track on the site activities and provide is value addedsuggestions and help for the proper completion of the Job.

What evidence could we provide to a customer or any third party, likely but legitimatelyconcerned of our delivery's conformance to his specified requirements and otherapplicable standards ?

Proper Quality Records are just thoroughly maintained for that very purpose. They bearwritten trace of all the actions that directly or indirectly affect the quality of product andservice delivered to the customer: Inspection, Pre-commissioning reports andCommissioning reports.

Finally, the client is given an Operation and Maintenance Manual, where he will find allrelevant information necessary to a safe and efficient operating of the installed system.

Below are the following important matters being discussed during the testing andcommissioning:

● Introduction and Scope● Location of Activity● Method and Procedure● Responsibilities● Tools/Equipment● Health and Safety● Test Sheets

6312 C

Page 18: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

18

4H. WARRANTY PERIOD / MAINTENANCE

With the warranty period stipulated by the contracts (a defined period from the sitehand over), the customer can call anytime for Verger Delporte’s intervention, providedthe issue prior assessment confirms it is in our scope of work.

An experienced team, equipped with proper tooling and / or instruments, conduct thenthe required maintenance, using the already released instructions and MaintenanceManual.

A Maintenance Contract will be offered to the client when it is necessary.

6312 C

Page 19: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

19

5. BMS INTEGRATION5A. Diagram

6312 C

Page 20: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

20

5B. BMS Integration for AX ArenaTypical Architecture

6312 C

Page 21: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

21

5C. Direct Digital Controls (DDC)

6312 C

Page 22: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

22

5D. DDC Exel Web Controller at Chiller Yard Integrated to BMS

Supply , Programming and Testing Commissioning DDC Excel WEB Controller at Chiller Yard Integration to Building Management System.

DDC EXCEL WEB CONTROLLER IN MAIN CONTROL CENTER PLANT ROOM

6312 C

Page 23: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

23

Supply , Programming and Testing Commissioning FCU ( Fan Coil Unit )Controller Complete Function of all field devices Integration to BuildingManagement System.

FAN COIL UNITS WITH CORRESPONDING HONEYWELL CONTROLLLER

5E. FCU, Field Devices Integrated to BMS

6312 C

Page 24: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

24

Supply , Programming Testing and Commissioning Complete Water Metering System Integration to Building Management System.

WATER METERING SYSTEM

5F. Water Meter Integration to BMS

6312 C

Page 25: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

25

WATER METER REPORT SNAP SHOT FROM M-BUS GATEWAY

6312 C

5F. Water Meter Integration to BMS

Page 26: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

26

Supply , Programming Testing and Commissioning Complete Air Curtain System Integration to Building Management System.

AIR CURTAIN SYSTEM

5G. Air Curtain Integration To BMS

6312 C

Page 27: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

27

5G. AIR CURTAIN

6312 C

Page 28: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

286312 C

6. Project References

SR. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

1General Hospital at Al Rahba ‐ Female 

Ward Hospital ABU DHABI Standalone 

Control SEHA 

2General Hospital at 

Al Rahba ‐ ICU Ward 

Hospital ABU DHABI Standalone Control SEHA 

3General Hospital at Al Rahba ‐Male 

Ward Hospital ABU DHABI Standalone 

Control SEHA 

4General Hospital at 

Al Rahba ‐Obygyne/Pediatric 

Ward 

Hospital ABU DHABI Standalone Control SEHA 

5Sheikh Khalifa Bin Zayed Hospital ‐

Ajman Hospital AJMAN iBMS AJZ ENGR.

6 National Reference Laboratory Project  Laboratory  ABU DHABI iBMS  AL HASHMI

7 National Reference Laboratory Project  Laboratory  ABU DHABI

Fume Hood Extract Fans  AL HASHMI

8 Masdar Mist 1A ‐Controllers  Laboratory  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

Page 29: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

296312 C

6. Project References

SR. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

1General Hospital at Al Rahba ‐ Female 

Ward Hospital ABU DHABI Standalone 

Control SEHA 

2General Hospital at 

Al Rahba ‐ ICU Ward 

Hospital ABU DHABI Standalone Control SEHA 

3General Hospital at Al Rahba ‐Male 

Ward Hospital ABU DHABI Standalone 

Control SEHA 

4General Hospital at 

Al Rahba ‐Obygyne/Pediatric 

Ward 

Hospital ABU DHABI Standalone Control SEHA 

5Sheikh Khalifa Bin Zayed Hospital ‐

Ajman Hospital AJMAN iBMS AJZ ENGR.

6 National Reference Laboratory Project  Laboratory  ABU DHABI iBMS  AL HASHMI

7 National Reference Laboratory Project  Laboratory  ABU DHABI

Fume Hood Extract Fans  AL HASHMI

8 Masdar Mist 1A ‐Controllers  Laboratory  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

Page 30: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

306312 C

6. Project References

S. NO. PROJECT NAME

PROJECT TYPE PROJECT LOCATION SYSTEM CONSULTANT

8 Masdar Mist 1A ‐Controllers  Laboratory  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

9 Masdar Mist 1A –Chiller Yard  Special project  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

10 Masdar MIST 1A –Air Curtains Special project  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

11Masdar MIST 1A –Fume Hood Extract 

Fans Laboratory  ABU DHABI Fume Hood 

Extract fans RWA ‐

ARMSTRONG

12 MIST 1A  Laboratory  ABU DHABIMetering & Energy 

Monitoring 

RWA ‐ARMSTRONG

13 Masdar Mist 1B  Laboratory  ABU DHABIMetering & Energy System 

RWA ‐ARMSTRONG

14 Masdar Mist 1B Air Curtain  Special project  ABU DHABI DDC Control 

RWA ‐ARMSTRONG

15 Masdar Mist 1C  Special project  ABU DHABIMetering & Energy 

Monitoring WSP

16 Indoor GO Karting  Special Project  DUBAI BMS BURTHILL

Page 31: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

31

6. Project References

6312 C

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

17 Ras Eng Proclad factory  Factory  RAS AL KHAIMAH DDC Control  DIRECT FROM 

CLIENT

18 UAE Al Ain University  University  AL AIN DDC 

Controls  AECOM

19 British Petrol  Oil & Gas  ABU DHABI BMS  DIRECT FROM CLIENT

20 CML Industries  Factory  ABU DHABI DDC Control DIRECT WITH CLIENT

21 Saudi Arabia  DDC Control  SAUDI ARABIA Oil and Gas  DIRECT WITH CLIENT

22 Dalma Gloria Hotel  Hotel  DUBAI iBMS  NEB

23 Al Yassat Gloria Hotel  Hotel  DUBAI iBMS NEB

24 Nation Tower  Mall, Hotel & Residential  ABU DHABI iBMS  KEO

25 Ritz Carlton Hotel  Hotel/Apartments  DUBAI BMS WSP

26B +G+4 Bldg Emirates Garden

Residential DUBAI BMS Conin Inc.

Page 32: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

326312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

27 3B+G+4P+22 (Metropolis) Commercial  DUBAI BMS LACAZA/HYDR

O

28 JBR‐Sheraton  Hotel  DUBAI iBMS  ARENCO

29 Rotana Hotel ‐Fujairah  Hotel  FUJAIRAH BMS  ACG

30 Arabtec New head Office  Commercial  DUBAI BMS  DIRECT FROM 

CLIENT

31 DIP Head Quarters Building DUBAI BMS DEWAN

32 Dubai Silicon Oaisis ‐ Jade  Tower  DUBAI BMS LACAZA

33 Dubai Silicon Oaisis ‐ Coral  Tower  DUBAI BMS LACAZA

34 Dubai Silicon Oaisis ‐ Saphire  Tower  DUBAI BMS LACAZA

35 Dubai Silicon Oaisis ‐ Ruby  Tower  DUBAI BMS LACAZA

36 Ajman Villa Residential AJMAN BMS DIRECT WITH CLIENT

37 MBG Laboratory at Za’beel  Laboratory  DUBAI

Pressure Control System

HIDI RAE 

Page 33: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

336312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

38Fortress 

Compound –First Gulf Bank 

Residential  ABU DHABI BMS  DIRECT WITH CLIENT

39 IMPZ ‐ Tower  Residential  DUBAI BMS bdpl Architects & Consul.

40 Express Hotel by Holiday Inn  Hotel  DUBAI Lighting 

Control NEB

41 Al Furjan Sales Center ‐ Dubai  Villas  DUBAI BMS  BURTHILL

42 Al Naeem Mall at RAK  Mall  RAS AL KHAIMAH BMS  RICE & PERRY

43 RAK Substation 400 KV  Special Project  RAS AL KHAIMAH DDC Control  MOTT 

MACDONALD

44 RAK Substation 400 KV  Special Project  RAS AL KHAIMAH DDC Control  MOTT 

MACDONALD

45

Expansion of 33kV Network in Western Region 

Madinat Zayed Substation 

Special Project  ABU DHABI DDC Control  PB POWER

46 ICAD WEST Substation  Special Project  ABU DHABI DDC Control  LAHMEYER 

INT'L

Page 34: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

346312 C

6. Project References

S. NO PROJECT NAME

PROJECT TYPE PROJECT LOCATION SYSTEM CONSULTANT

47West Wharf Residential Tower 

Tower  DUBAI BMS  RMJM

48 Techload  Special Project  SHARJAH Solar Energy; DDC Control 

DIRECT WITH CLIENT

49 Mayfair Tower  Twin Tower  DUBAI BMS & BTU Meters  HYDRO ENGR.

50 Appricot Tower  Tower  DUBAI DDC Control  MEECON

51Sub Station 4 at Saadiyat Island, 

Abu Dhabi Special Project  ABU DHABI DDC Control  MOTT 

MACDONALD

52Sub Station 6 at Saadiyat Island, 

Abu Dhabi   Special Project  ABU DHABI DDC Control  MOTT 

MACDONALD

53 Al Dahma Substation  Special Project  ABU DHABI DDC Control  MOTT 

MACDONALD

54Substation 3 at Saadiyat Island, 

Abu Dhabi Special Project  ABU DHABI DDC Control  MOTT 

MACDONALD

Page 35: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

356312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

55Substation 5 at Saadiyat Island, 

Abu Dhabi Special Project  ABU DHABI DDC Control  MOTT 

MACDONALD

56 Zabee'l Sports Club Sports Complex DUBAI DDC Control EO

57 Neopharma Pharmaceutical ABU DHABI BMS POYRY 

58 Appricot Tower  Tower  DUBAI CO System  MEECON

59

Dubai Investment Park 

New Head Office 

Tower  DUBAI BMS  DEWAN

60 Unibras –Fabtech  Factory  DUBAI Green 

Building DIRECT WITH 

CLIENT

61 Thales Project  Airport FZ  DUBAI CCTV  DIRECT WITH CLIENT

62 Masdar MIST 1A – Water Meters  Laboratory  ABU DHABI

Metering & Energy 

Monitoring 

RWA ‐ARMSTRONG

63 Guardian Tower  Tower  ABU DHABI CO System  ERGA 

Page 36: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

366312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

64

Dubai Silicon Oaisis 

Community Center 

Sales Center  DUBAI BMS  ARCH GROUP

65 Dome Tower  Tower  DUBAI BMS  QHC

66 Novotel Hotel  Hotel  ABU DHABI BMS  ACG

67 Ibis Hotel  Hotel  ABU DHABI BMS  ACG

68 Botanica Tower  Tower  DUBAI BMS NEB

69 Botanica Tower  Tower  DUBAI CO System  NEB

70 Al Bateen  Towers  DUBAIMetering & Energy System

NEB

71G+4 Labour 

Accommodation 

Accommodation  DUBAI DDC Control  AL AJMI

72 Meydan  Hotel  DUBAI Hotel Mgnt. System 

DIRECT WITH CLIENT

Page 37: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

376312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

73 Presidential Palace  Palace  ABU DHABI DDC Control DIRECT WITH 

CLIENT

74 Dubai Land Project  Sales Center  DUBAI HVAC 

Control DIRECT WITH 

CLIENT

75 Sky News New Head Quarters  Special Project  ABU DHABI

BMS  & Control Panel 

NORR GROUP

76 Sorouh Tower  Towers  SHARJAH BMS  TRILLIUM

77Fujairah 

Commmercial Complex

Mall FUJAIRAH BMS ACG

78 Garhoud Hospital Hospital DUBAI BMS PIONEER 

ENGR.

79 Dubai Police Government Building DUBAI BMS NOVA

80 Construction of School ‐ RAK School RAS AL KHAIMAH BMS DIRECT WITH 

CLIENT

81 Leaf Tower Tower ABU DHABI BTU E‐TAN CONSUL.

Page 38: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

386312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

82 Dubai Mall  (Penguin chiller)  Mall DUBAI DDC Control WSP

83Dubai Mall Aquarium 

ModificationMall DUBAI DDC Control DIRECT WITH 

CLIENT

84 Oxford Tower Tower DUBAI BMS AREX

85 Yasmine Tower Tower RAS AL KHAIMAH BMS DIRECT WITH CONTRACTOR

86 Al Kasmi Hospital Hospital SHARJAH BMS DIRECT WITH 

CLIENT

87 Saraya Creek Tower Tower ABU DHABI BTU E‐TAN CONSUL.

88Construction of 

Secondary School for Girls

School SHARJAH BMS DIRECT WITH CLIENT

89 C19 Capital Tower Tower ABU DHABI BMS AECOM

90 Capital Bay Tower DUBAI BMSELEGANT 

CONSULTING ENGR.

Page 39: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

396312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

91 Burlington Tower Tower DUBAI BMS NOVA

92 Airport Dubai T2 Airport  DUBAI

BMS SOFTWARE INTERFACE FOR PAS BET. 

T2 & T3 

EDPI

93 Al Safouh Villa Villa DUBAI BMS ACG

94 Oceanic Hotel Hotel KORFAKHAN BMS DIRECT FROM CLIENT

95 Executive Bay Damac Tower DUBAI BMS

ELEGANT CONSULTING 

ENGR.

96 Investment Bank Sharjah Bank  SHARJAH BMS AL TERAZ

97 Sky News Arabia TV Network ABU DHABI AMC DIRECT WITH CLIENT

98 Dubai Studio Studio DUBAI BMS AECOM

Page 40: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

406312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

99 Everest Factory Factory  SHARJAH BMS PIONEER ENGR.

100 Oceana Penthouse Penthouse DUBAI BMS BLANCHARD

101 Ocean Scape Residential ABU DHABI BTU KHATIB & ALAMI

102 Res'l Tower @ DSO Residential DUBAI BMS ARCH GROUP

103

Neighborhood Retail Center ‐Discovery Garden

Mall DUBAI BMS ARIF BINTOK

104Neighborhood 

Retail Center

Mall DUBAI BMS ARIF BINTOK

Page 41: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

416312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

105Residential 

Tower at DSO

Tower DUBAI BMS ARCH GROUP

106 Lake Tower Towre DUBAI BMS NEB

107 Milleneum Golf Resort Hotel ABU DHABI BMS ACG

108

Exec. Bay on Plots 

BB.A05.039

Commercial  DUBAI BMSENGR. CONSORT

IUM

109 Gulf Data Center Data Center DUBAI BMS NOVA

110 Burj Damac 5 Hotel  DUBAI BMS LACAZA

Page 42: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

426312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

111 Best Food Factory Factory  DUBAI BMS SHAHID ENGR. 

CONSUL

112

Fujairah Commmer

cial Complex

Mall FUJAIRAH BMS ACG

113 Ruwais Refinery Extension Refinery ABU DHABI BMS ECG

114 Multi Use hall in Fujairah Hall FUJAIRAH BMS

GOLDEN PLANNER

S

Page 43: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

436312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

115Emaar Boulevard Restaurant

Restaurant DUBAI BMS B.H.NS ENGR. CON.

116 Mina Al Fajer (Fairmont) Hotel FUJAIRAH BMS DCC

117 B+G+7 Hotel Hotel DUBAI BMS ATOZ

118 Sky Garden Tower ABU DHABI BMS & BTU Meters 

PIONEER ENGR.

Page 44: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

446312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

119 Madaam Mosque Mosque SHARJAH BMS C.A.B. CONSUL.

120Mushref Cooperative Mall

Mall ABU DHABI BMSELEGANT CONSULTING ENGR.

121G+3 Residential 

Building @ Al Barsha

Residential DUBAI BMS GLOBALTECH

122 AABar Tower Tower ABU DHABI BTU APG

123 Ambulatory Clinic Clinic AL AIN BMS SEHA 

Page 45: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

456312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

124 G+M General Clinic Clinic DUBAI BMS ORBIT ENGR.

125Mixed Use 

Building in Dubai

Residential DUBAI BMS BEL‐YOAHAH

126 Sheraton Hotel Hotel DUBAI BMS TORONTEC

127 Chemical Ware house Warehouse DUBAI BMS SPEC

Page 46: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

466312 C

6. Project References

S. NO PROJECT NAME PROJECT TYPE PROJECT 

LOCATION SYSTEM CONSULTANT

128 GSL Warehouse Warehouse DUBAI BMS WINNER CONSUL.

129 Najmat Residential Residential ABU DHABI BMS, BTU APG

130 Family Complex Residential DUBAI BMS ARCH DOME

Page 47: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

47

7. Major Ongoing and/or Executed Projects

6312 C

PROJECT NAME : NATION TOWERSPROJECT  TYPE : Mall, Hotel and ResidentialLOCATION : Abu DhabiCLIENT : ICTCONSULTANT : KEOMAIN CONTRACTOR : Arabtec/NPCMEP CONTRACTOR : EFECOSCOPE : Building Management SystemPRODUCT : HoneywellPROTOCOL : BACnet/IP‐Lon works – Modbus NUMBER OF POINTS : 10,000

Page 48: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

486312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : DALMA GLORIA HOTELPROJECT  TYPE : Hotel LOCATION : Dubai, Sheikh Zayed Road CLIENT : Gloria HotelsCONSULTANT : NEBMEP CONTRACTOR : Verger Delporte UAE LtdSCOPE : Integrated Building Management SystemPRODUCT : HoneywellPROTOCOL : BACnetNUMBER OF POINTS : 10,000

Page 49: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

496312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : AL YASSAT GLORIA HOTELPROJECT  TYPE : Hotel LOCATION : Dubai, Sheikh Zayed RoadCONSULTANT : NEBMEP CONTRACTOR : Verger Delporte UAE LtdSCOPE : Integrated Building Management SystemPRODUCT : HoneywellNUMBER OF POINTS : 10,500

Page 50: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

506312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : METROPOLIS TOWERPROJECT  TYPE : TowerLOCATION : Dubai, Business Bay RoadCONSULTANT : Lacaza/HydroMEP CONTRACTOR : THERMO LLCSCOPE : Building Management SystemPRODUCT : Honeywell

Page 51: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

516312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : SHERATON HOTEL, CREEK PROJECT  TYPE : HotelLOCATION : Dubai, DeiraCONSULTANT : ArencoMEP CONTRACTOR : DiplomatSCOPE : Integrated Building Management SystemPRODUCT : HoneywellNUMBER OF POINTS :

Page 52: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

526312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : JADE TOWER PROJECT  TYPE : TowerLOCATION : Dubai, DSOCONSULTANT : LacasaMEP CONTRACTOR : Omega EngineeringSCOPE : Building Management SystemPRODUCT : HoneywellNUMBER OF POINTS : 1,200

JADE TOWERJADE TOWER

Page 53: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

536312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : CORAL TOWER PROJECT  TYPE : TowerLOCATION : Dubai, DSOCONSULTANT : LacasaMEP CONTRACTOR : Omega EngineeringSCOPE : Building Management SystemPRODUCT : HoneywellNUMBER OF POINTS : 1,200

CORAL TOWER

Page 54: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

546312 C

7. Major Ongoing and/or Executed Projects

SAPHIRE TOWER

PROJECT NAME : SAPHIRE TOWER PROJECT  TYPE : TowerLOCATION : Dubai, DSOCONSULTANT : LacasaMEP CONTRACTOR : Omega EngineeringSCOPE : Building Management SystemPRODUCT : HoneywellNUMBER OF POINTS : 1,200

Page 55: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

556312 C

7. Major Ongoing and/or Executed Projects

RUBY TOWER

PROJECT NAME : RUBY TOWER PROJECT  TYPE : TowerLOCATION : Dubai, DSOCONSULTANT : LacasaMEP CONTRACTOR : Omega EngineeringSCOPE : Building Management SystemPRODUCT : HoneywellNUMBER OF POINTS : 1,200

Page 56: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

566312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : OAKWOOD TOWER PROJECT  TYPE : Residential TowerLOCATION : Dubai, IMPZ AreaCONSULTANT : bdpl Architects & ConsultingMEP CONTRACTOR : Omega EngineeringSCOPE : Building Management SystemPRODUCT : HoneywellNUMBER OF POINTS : 3,500

Page 57: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

576312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : WEST WHARF  TOWER PROJECT  TYPE : TowerLOCATION : Dubai, Business Bay CONSULTANT : RMJMMEP CONTRACTOR : Omega EngineeringSCOPE : Building Management SystemPRODUCT : HoneywellNUMBER OF POINTS : 3,500

Page 58: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

586312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : MAYFAIR  TOWERSPROJECT  TYPE : Twin TowersLOCATION : Dubai, Business Bay CONSULTANT : Hydro EngineeringMEP CONTRACTOR : United MastersSCOPE : Building Management System,PRODUCT : HoneywellNUMBER OF POINTS : 3,500

Page 59: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

596312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : APRICOT  TOWERPROJECT  TYPE : TowerLOCATION : Dubai, DSOCONSULTANT : MEECONMEP CONTRACTOR : Larsen and ToubroSCOPE : Building Management System,PRODUCT : HoneywellNUMBER OF POINTS : 3,500

Page 60: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

606312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : GUARDIAN  TOWERPROJECT  TYPE : TowerLOCATION : Abu DhabiCLIENT : Guardian Towers RealtyCONSULTANT : DYENAMEP CONTRACTOR : EFECOSCOPE : CO Monitoring SystemPRODUCT : Honeywell

Page 61: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

616312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : DOME  TOWERPROJECT  TYPE : TowerLOCATION : Dubai, JBRCONSULTANT : NEBMEP CONTRACTOR : RadiantSCOPE : Building Management SystemPRODUCT : Honeywell

Page 62: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

626312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : NOVOTEL & IBIS HOTEL PROJECT  TYPE : HotelLOCATION : Abu DhabiCONSULTANT : ACGMEP CONTRACTOR : Verger Delporte UAE Ltd.SCOPE : Building Management SystemPRODUCT : HoneywellNUMBER OF POINTS : 3,500 – Novotel

3,500 ‐ Ibis

Page 63: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

636312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : AL BATEEN TOWERSPROJECT  TYPE : TowersLOCATION : Dubai, JBRCONSULTANT : NEBMEP CONTRACTOR : Commodore Contracting LLCSCOPE : Metering & Energy SystemPRODUCT : Hydrometer

Page 64: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

646312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : SOROUH TOWERPROJECT  TYPE : TowerLOCATION : Sharjah,  CornicheCONSULTANT : TRILLIUMMEP CONTRACTOR : Thermo LLCSCOPE : Building Management SystemPRODUCT : HONEYWELLNUMBER OF POINTS : 5,000

Page 65: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

656312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : LEAF TOWERPROJECT  TYPE : TowerLOCATION : Abu DhabiCLIENT :CONSULTANT : E‐TAN CONSULTINGMAIN CONTRACTOR :MEP CONTRACTOR : Commodore Contracting LLCSCOPE : BTU Metering  SystemPRODUCT : HYDROMETERPROTOCOL :

Page 66: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

666312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : OXFORD TOWERPROJECT  TYPE : TowerLOCATION : DubaiCONSULTANT : AREXMEP CONTRACTOR : Sigma Engineering LLCSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 67: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

676312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : YASMINE OXFORD TOWERPROJECT  TYPE : TowerLOCATION : Ras Al KhaimaMEP CONTRACTOR : SAWA Electromechanical Works LLCSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 68: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

686312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : SARAYA CREEK TOWERSPROJECT  TYPE : TowersLOCATION : Abu DhabiMEP CONTRACTOR : Commodore Contracting LLCSCOPE : BTU SystemPRODUCT : HYDROMETER

Page 69: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

696312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : CAPITAL HOUSE TOWERPROJECT  TYPE : TowerLOCATION : Abu DhabiMEP CONTRACTOR : Verger Delporte UAE LtdSCOPE : BMSPRODUCT : HONEYWELL

Page 70: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

706312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : CAPITAL BAY TOWERPROJECT  TYPE : TowerLOCATION : Dubai, Business BayMEP CONTRACTOR : SIGMA ENGINEERING LLCSCOPE : BMSPRODUCT : HONEYWELL

Page 71: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

716312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : BURLINGTON TOWERPROJECT  TYPE : TowerLOCATION : Dubai, Business BayCONSULTANT : NovaMEP CONTRACTOR : SIGMA ENGINEERING LLCSCOPE : BMSPRODUCT : HONEYWELL

Page 72: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

726312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : EXECUTIVE BAY TOWERPROJECT  TYPE : TowerLOCATION : Dubai, Business BayCONSULTANT : Elegant Consulting Engr.MEP CONTRACTOR : SIGMA ENGINEERING LLCSCOPE : BMSPRODUCT : HONEYWELL

Page 73: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

736312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : LAKE TOWERPROJECT  TYPE : TowerLOCATION : Dubai, JumeirahCONSULTANT : NEBMEP CONTRACTOR : RadiantSCOPE : BMSPRODUCT : HONEYWELL

Page 74: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

746312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : SKY GARDEN TOWERPROJECT  TYPE : TowerLOCATION : Abu DhabiCONSULTANT : Pioneer Engr.MEP CONTRACTOR : Gulf SailSCOPE : BMSPRODUCT : HONEYWELL

Page 75: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

756312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : ARBIFT TOWERPROJECT  TYPE : TowerLOCATION : DubaiMEP CONTRACTOR : Verger Delporte UAE Ltd.SCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 76: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

766312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : NAJMAT RESIDENTIAL TOWERPROJECT  TYPE : TowerLOCATION : Abu DhabiCONSULTANT : APGMEP CONTRACTOR : ETTSSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 77: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

776312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : MINA ALFAJER (FAIRMONT) HOTELPROJECT  TYPE : HotelLOCATION : FujairahMEP CONTRACTOR : MenascoSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 78: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

786312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : FUJAIRAH COMMERCIAL COMPLEXPROJECT  TYPE : Mall & ResidencesLOCATION : FujairahMEP CONTRACTOR : ETASCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 79: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

796312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : JBR RAMADA PLAZA HOTELPROJECT  TYPE : HotelLOCATION : Dubai, JBRMEP CONTRACTOR : Thermo LLCSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 80: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

806312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : JBR HILTONPLAZA HOTELPROJECT  TYPE : HotelLOCATION : Dubai, JBRMEP CONTRACTOR : Thermo LLCSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 81: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

816312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : DAMAC HEIGHTS TOWER – Under ProgressPROJECT  TYPE : TowerLOCATION : Dubai, MarinaSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 82: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

826312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : JBR RAMADA PLAZA HOTELPROJECT  TYPE : HotelLOCATION : Dubai, JBRMEP CONTRACTOR : Thermo LLCSCOPE : Building Management SystemPRODUCT : HONEYWELL

Page 83: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

836312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : AABAR TOWERPROJECT  TYPE : TowerLOCATION : Abu DhabiCONSULTANT : APGMEP CONTRACTOR : EcothermSCOPE : BTU SystemPRODUCT : HYDROMETER

Page 84: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

846312 C

7. Major Ongoing and/or Executed Projects

PROJECT NAME : Najmat Residential Tower, Plots C1 & C4, Al Reem IslandPROJECT  TYPE : TowerLOCATION : Abu DhabiCONSULTANT : Union National Bank/ Al Wifaq Abu DhabiMEP CONTRACTOR : Verger Delporte UAE LtdSCOPE : BMSPRODUCT : HONEYWELL

Page 85: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

856312 C

7. Major Ongoing and/or Executed Projects

Page 86: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

866312 C

7. Major Ongoing and/or Executed Projects

Page 87: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

876312 C

7. Major Ongoing and/or Executed Projects

Page 88: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

886312 C

7. Major Ongoing and/or Executed Projects

Page 89: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

896312 C

7. Major Ongoing and/or Executed Projects

Page 90: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

906312 C

7. Major Ongoing and/or Executed Projects

Page 91: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

916312 C

7. Major Ongoing and/or Executed Projects

Page 92: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

926312 C

7. Major Ongoing and/or Executed Projects

Page 93: MALLS HOSPITALSINFRASTRUCTURE HOTELS … · MALLS HOSPITALSINFRASTRUCTURE HOTELS ... g. Installation, Testing and Commissioning h. ... Metering System Integration to Building Management

936312 C

7. Major Ongoing and/or Executed Projects

TAKREER RUWAIS REFINERY – NON PROCESS BLDG.