2
Making Marginal Field Production More Profitable than Ever With over 56 installations worldwide, Tarpon Systems has earned a reputation for making marginal field production more profitable than ever. Designed for water depths of 60’ to 350’, a Tarpon System platform can: Support 8-well Configuration Support Topside Weight up to 350 Tons Support Production Process Requirements Meets or Exceeds API RP2A design requirements to withstand 100 Year Storm A Tarpon System Platform is easy to install with a proven methodology. The platform is constructed onshore then transported offshore where it is erected. As an option, the caisson can be installed with the drilling rig to improve efficiencies and allow for well completion during one mobilization. Above the surface, the production platform can be configured in a number of different ways. Here we have a helideck, and related production equipment. Just above the waterline we have a boat landing with access ladders to the main deck area. It all begins with an engineered caisson capable of housing multiple wells internally, or externally using a series of conductor clamps. The termination assembly located just below the surface is connected to guy wire cables which are secured to three anchor-piles. Cable is then tensioned to the engineered specifications which provide the additional stability. Life Cycle Cost Advantages of a Tarpon System include: Low Capital Expense Simple Construction Ease of Installation Early Production Capability Low Abandonment Cost Recoverable and Reusable Components Copyright 2012. Tarpon Systems LLC. All rights reserved. www.tarponsystems.com

Making Marginal Field Production More Profitable than …tarponsystems.com/pdf/Tarpon2page2NoAdd.pdf · Making Marginal Field Production More Profitable than Ever With over 56 installations

  • Upload
    vudiep

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Making Marginal Field Production More Profitable than …tarponsystems.com/pdf/Tarpon2page2NoAdd.pdf · Making Marginal Field Production More Profitable than Ever With over 56 installations

Making Marginal Field Production More Profitable than Ever

With over 56 installations worldwide, Tarpon Systems has earned a reputation for making marginal field production more profitable than ever.

Designed for water depths of 60’ to 350’, a Tarpon System platform can:

• Support8-wellConfiguration• Support Topside Weight up to 350 Tons• Support Production Process Requirements• Meets or Exceeds API RP2A design requirements

to withstand 100 Year Storm

A Tarpon System Platform is easy to install with a proven methodology. The platform is constructed onshore then transported offshore where it is erected. As an option, the caisson can be installed withthedrillingrigtoimproveefficienciesandallow for well completion during one mobilization.

Above the surface, the production platform can be configured in a number of different ways. Here we have a helideck, and related production equipment. Just above the waterline we have a boat landing with access ladders to the main deck area.

It all begins with an engineered caisson capable of housing multiple wells internally, or externally using a series of conductor clamps. The termination assembly located just below the surface is connected to guy wire cables which are secured to three anchor-piles. Cable is then tensioned to the engineered specifications which provide the additional stability.

Life Cycle Cost Advantages of a Tarpon System include:

• Low Capital Expense• Simple Construction• Ease of Installation • Early Production Capability• Low Abandonment Cost• Recoverable and Reusable Components

Copyright 2012. Tarpon Systems LLC. All rights reserved.

www.tarponsystems.com

Page 2: Making Marginal Field Production More Profitable than …tarponsystems.com/pdf/Tarpon2page2NoAdd.pdf · Making Marginal Field Production More Profitable than Ever With over 56 installations

Tarpon Systems Texas262 N Sam Houston Pkwy E.Suite 230Houston Tx 77060

Telephone: 281-260-7500FAX: 281-260-7508E-mail: [email protected]

Tarpon Systems SingaporeASEAN-ACADIAN MARKETING INC. c/o 545 Orchard Road #12-03 Far East Shopping Centre Singapore 238882Telephone: 65 6736-3439E-mail: [email protected]

Tarpon Systems International, has offices in Houston, Texas and in Singapore:

Our Management Team handles all of the planning, construction, and erection work. Under our “Fast Track” program a platform can go from Engineering through Installation in just 16 weeks.

So if you need a cost-effective alternative totraditionalfixed,multi-legplatformswith

low construction costs, minimal capitalinvestment and rapid installation,

then a Tarpon System may be just right for you.