    QUALITY ASSURANCE IN THEPROCESS FROM ROCKS TO

    CATHODES.Gerencia Funcional Ingeniera y Procesos

    Vicepresidencia de Proyectos

    Magali Campos B.

  • 7/29/2019 Magali Campos (1)

    2/28

    INTRODUCTION

    ALONG THE VALUE CHAIN OF THE

    MINING BUSINESS, FROM ROCK TOCATHODES, MANY CRITICAL DECISIONARE BASED ON SAMPLES AND ASSAYS

    (P. Carrasco et al 2004)

  • 7/29/2019 Magali Campos (1)

    3/28

    THE ECONOMIC IMPACT OF CORRECTSAMPLING AND ANALYSIS PRACTICE

    SAMPLINGWhat Happened when a Proper Sampling Device wasInstalled in a Tail Discharge?

    Before the proper sampling device was installed thecopper tail grade was assumed to be 0,15 %, the realvalue was 0,2%.

    The flow rate was 96.000tons/day.

    The annual copper losses were 17520 ton/yearConsidering a copper price of 1 dollar/pound

    The annual loss is 38.544MUS$

  • 7/29/2019 Magali Campos (1)

    4/28

    THE ECONOMIC IMPACT OF CORRECTSAMPLING AND ANALYSIS PRACTICE

    ANALYSIS PRACTICE

    Some few years ago, Codelco decided to sell

    51% of El Abra deposit. Due diligence processencountered assays were biased by - 0,06%Cu in the oxide zone. Because of the hightonnage and low grade of the deposit, impactof analytical bias caused economic loss of

    300 MUS$

  • 7/29/2019 Magali Campos (1)

    5/28

    QUALITY ASSURANCE

    Define standards and procedures of thebest practices to ensure and confirm thequality, robustness and reliability of thegeo/mining/metallurgy base in order toobtain the economic benefits expected by

    the project, helping to maximize long-term economic value of the Corporation.

  • 7/29/2019 Magali Campos (1)

    6/28

    STANDARD, BEST PRACTICE GUIDESAND ANALYTICAL PROTOCOLS.

    FUNDAMENTAL

    ERROR

    GROUPING &

    SEGREGATION

    ERROR

    DELIMITATION

    ERROR

    PREPARATION

    ERROR

    EXTRACTION

    ERROR

  • 7/29/2019 Magali Campos (1)

    7/28

    IMPLEMENTATION OF SAMPLINGPROTOCOL

    CNAM 008

    HETEROGENEITY TEST TO DETERMINESAMPLING CONSTANTS ANDNOMOGRAMS FOR SAMPLE

    PREPARATION

  • 7/29/2019 Magali Campos (1)

    8/28

    SAMPLING CONSTANT

  • 7/29/2019 Magali Campos (1)

    9/28

    IMPLEMENTATION OF SAMPLINGPROTOCOL

    CNAM - 007

    STANDARD CONDITIONS OFSAMPLING STATIONS FOR MATERIALBALANCE AND TRANSFER POINTS OF

    PRODUCTS

  • 7/29/2019 Magali Campos (1)

    10/28

    SAMPLING METHODS

    Manual, not equiprobabilistic Automatic Sampler

  • 7/29/2019 Magali Campos (1)

    11/28

    IMPLEMENTATION OF SAMPLINGPROTOCOL

    CNAM - 017

    QUALITY ASSURANCE INDIAMOND DRILL CUTTING

  • 7/29/2019 Magali Campos (1)

    12/28

    IMPLEMENTATION OF SAMPLINGPROTOCOL

    CNAM - 011

    INGAMELLS TEST

    SUB SAMPLING IN A LABORATORY

  • 7/29/2019 Magali Campos (1)

    13/28

    Keep the position (X, Y) for everyanalysis and put it into a graphic

    Ingamells test

  • 7/29/2019 Magali Campos (1)

    14/28

    STATISTICAL ANALYSIS FOR THE TEST

  • 7/29/2019 Magali Campos (1)

    15/28

    IMPLEMENTATION OF SAMPLINGPROTOCOL

    CNAM - 015

    SAMPLING AND CHEMICALANALYSIS OF COPPER CATHODES

  • 7/29/2019 Magali Campos (1)

    16/28

    It is necessary to perform experiments to betterunderstand variability within cathodes, betweencathodes, and between processing units.

    The correct sampling of copper cathodes is aprofound issue in the copper industry, worldwide.The determination of various impurity contents has

    vast economic consequences for the copper cathodeproducers, and especially for the copper cathodeusers. F.Pitard (2002)

  • 7/29/2019 Magali Campos (1)

    17/28

    STRATIFIED RANDOM SAMPLING

  • 7/29/2019 Magali Campos (1)

    18/28

    PRESERVING SAMPLE INTEGRITY

    CNAM - 012

    STANDARD CONDITIONS TO FULFILLDURING SUBSAMPLING OPERATIONSAT THE LABORATORY

  • 7/29/2019 Magali Campos (1)

    19/28

    PREVENTION OF ANALYTICAL ERROR

    CNAM - 009

    PREPARATION AND OBTENTION OFREFERENCE MATERIALS

  • 7/29/2019 Magali Campos (1)

    20/28

    CERTIFIED VALUES FOR AREFERENCE MATERIAL

    When using Atomic Absorption methods orother non absolute methods, the final outcomecorresponds just to a recommended value.

    The certified value has to be obtained througha procedure where the result is a valueobtained from direct measurement of a

    relevant parameter, traceable to a fundamentalunit in the International Unit System (SI).

  • 7/29/2019 Magali Campos (1)

    21/28

    ABSOLUTE METHODMOLYBDENUM ABSOLUTE METHODARSENICABSOLUTE METHODCOPPER

  • 7/29/2019 Magali Campos (1)

    22/28

  • 7/29/2019 Magali Campos (1)

    23/28

    QUANTIFICATION OF ANALYTICALERROR

    CNAM - 010

    VERIFICATION OF CHEMICALANALYSIS RESULTS FOR MINERALS

    CNAM - 013

    QUALITY ASSURANCE IN PREPARATIONOF MINERAL SAMPLES FOR CHEMICAL

    ANALYSIS

  • 7/29/2019 Magali Campos (1)

    24/28

    Cu A % Cu B % Dif. Cu (A - B) %

    PROMEDIO 0,4534 0,4538 -0,0004

    VARIANZA 0,240 0,244 0,000092

    DESVIACION ESTANDAR 0,490 0,493 0,0068

    DATOS 410 410 410

    ERROR MEDIO 0,00034

    T -1,07

    CV % 1,50

    % ERROR SESGO -0,08

  • 7/29/2019 Magali Campos (1)

    25/28

    WEIGHTING ERROR

    CNAM - 014

    STANDARD CONDITIONS OFWEIGHTING SYSTEMS FOR CONVEYORBELTS FOR METALLURGICAL BALANCE

    AND TRANSFER OF MATERIALS

  • 7/29/2019 Magali Campos (1)

    26/28

    CONCLUSION

  • 7/29/2019 Magali Campos (1)

    27/28

    CONCLUSION

    The application of standards and best practice guides, enablequality assurance of data for resource estimation, grade control,metallurgical balance and commercial transactions.

    The Quality Assurance Analytical information is essential for thedevelopment of projects in the copper industry, the correctsampling and analysis practices give a huge benefit because theyeliminate hidden losses and maximize the available resources.

    The use of standards help to maximize long-term economic valueof the Corporation, allow the company to maintain excellence ineverything we do and the practice of continuous improvement,makes us a world leader in the copper industry.

  • 7/29/2019 Magali Campos (1)

    28/28

    PEDRO CARRASCO MENTOR OF STANDARDS

    AND BEST PRACTICE GUIDELINES

    Muchas Gracias