Los Angeles River Ecosystem Restoration Los Angeles River Ecosystem Restoration Study

  • View
    0

  • Download
    0

Embed Size (px)

Text of Los Angeles River Ecosystem Restoration Los Angeles River Ecosystem Restoration Study

  • US Army Corps of Engineers

    BUILDING STRONG®

    Los Angeles River

    Ecosystem Restoration Study

    1

    Dr. Josephine R. Axt

    Chief of Planning

    Los Angeles District

    September 23, 2013

  • BUILDING STRONG® 2 2

    Why is the Army Corps

    of Engineers involved?

    How will the ARBOR

    get implemented?

    Can public input really

    make a difference?

    What is meant by

    the ARBOR study?

    (at long last -- the four alternatives

    in the final array)

  • 1 2

    3

    4

    5

    6

    7

    8

  • Alternative 10 • Pollywog Park • Bette Davis ParkBette Davis Park • Los Feliz Golf Course • Taylor Yard • Piggyback YardPiggyback Yard

  • Alternative 10 • Pollywog Park • Bette Davis Park

    Alternative 13 • Pollywog Park • Bette Davis ParkBette Davis Park • Los Feliz Golf Course • Taylor Yard • Piggyback Yard

    Bette Davis Park • Los Feliz Golf Course • Taylor Yard • Piggyback YardPiggyback YardPiggyback Yard • Taylor Yard Channel • Arroyo Seco

  • Alternative 10 • Pollywog Park • Bette Davis Park

    Alternative 13 • Pollywog Park • Bette Davis Park

    Alternative 16 • Pollywog Park • Bette Davis ParkBette Davis Park • Los Feliz Golf Course • Taylor Yard • Piggyback Yard

    Bette Davis Park • Los Feliz Golf Course • Taylor Yard • Piggyback Yard

    Bette Davis Park • Los Feliz Golf Course • Taylor Yard • Taylor Yard ChannelPiggyback YardPiggyback Yard • Taylor Yard Channel • Arroyo Seco

    Taylor Yard Channel • Arroyo Seco • Piggyback Yard • Reach 5 Wideningg • Piggyback Yard 

    Channel

  • Alternative 10 • Pollywog Park • Bette Davis Park

    Alternative 13 • Pollywog Park • Bette Davis Park

    Alternative 16 • Pollywog Park • Bette Davis Park

    Alternative 20 • Pollywog Park • Bette Davis ParkBette Davis Park • Los Feliz Golf Course • Taylor Yard • Piggyback Yard

    Bette Davis Park • Los Feliz Golf Course • Taylor Yard • Piggyback Yard

    Bette Davis Park • Los Feliz Golf Course • Taylor Yard • Taylor Yard Channel

    Bette Davis Park • Los Feliz Golf Course • Taylor Yard • Taylor Yard ChannelPiggyback YardPiggyback Yard • Taylor Yard Channel • Arroyo Seco

    Taylor Yard Channel • Arroyo Seco • Piggyback Yard • Reach 5 Widening

    Taylor Yard Channel • Arroyo Seco • Piggyback Yard • Reach 5 Wideningg • Piggyback Yard 

    Channel

    g • Piggy Back Yard 

    Channel • Reach 2 Widening

    8

    • Verdugo Wash • Cornfields

  • BUILDING STRONG®

    Alternative 13

    4

  • BUILDING STRONG®

    Pollywog Park - Riparian Corridors

    And Taking Care Of People!

    5

  • BUILDING STRONG®

    Daylighted

    culverts and

    side channels

    And Taking Care Of People!

    6

  • BUILDING STRONG®

    Los Feliz Golf Course existing

    7

  • BUILDING STRONG®

    Los Feliz Golf Course proposed

    8

  • BUILDING STRONG®

    Vegetated Wall Taylor Yard proposed

    9

  • BUILDING STRONG®

    Reach 6 Taylor Yard existing

    10

  • BUILDING STRONG®

    Reach 6 Taylor Yard proposed

    11

  • BUILDING STRONG®

    Reach 7 Arroyo Seco existing

    12

  • BUILDING STRONG®

    Reach 7 Arroyo Seco proposed

    13

  • BUILDING STRONG®

    Reach 7 Vegetated Walls proposed

    14

  • BUILDING STRONG®

    Alt 20

    15

  • BUILDING STRONG®

    Reach 2 Channel Widening

    16

  • BUILDING STRONG®

    Verdugo Wash Existing

    17

  • BUILDING STRONG®

    Verdugo Wash Restored

    18

  • BUILDING STRONG®

    Reach 5 Channel Widening

    19

  • BUILDING STRONG®

    LAR State Historic Park existing

    20

  • BUILDING STRONG®

    LAR State Historic Park proposed

    21

  • BUILDING STRONG®

    Reach 8 Piggyback Yard Existing

    22

  • BUILDING STRONG®

    Reach 8 Piggyback Yard proposed

    23

  • BUILDING STRONG® 24

  • BUILDING STRONG® 26

    Reconnaissance Study Feasibility Study

    Pre-construction

    Engineering Design (PED) Construction

    Feasibility Cost

    Sharing Agreement

    • 50%/50% Federal/Local Funding

    • Feasibility Report & EIS or EA

    • Washington Level Review

    Civil Works Review Board

    • 100% Federal Funding

    • 905 (b) Analysis

    • Project Management Plan

    Feasibility Study

    Congress

    Authorizes

    • 75%/25% Federal/Local Funding

    • Plans and Specs

    Project Partnership

    Agreement

    Congress Authorizes

    and Funds

    • Cost Sharing Varies

    Typ 65% Fed; 35% non-Fed

    • Local O&M varies

    • Sponsor Acquires Real Estate

    O & M

    How close are we to construction?

  • BUILDING STRONG®

    Extra slides - Alt 16

    27

  • BUILDING STRONG®

    Reach 5 Channel Widening

    28

  • BUILDING STRONG®

    Reach 8 Piggyback Yard Existing

    29

  • BUILDING STRONG®

    Reach 8 Piggyback Yard proposed

    30