    Agenda

    . omest c rrangements

    .

    3. Dockwise Short Introduction

    4. Dockwise Navantia ALHD project

    5. Dockwise Float on operations

    6. Follow on actions

    2

  • 7/31/2019 Loadign/cargando ALHD Canberra

    3/28

    1. Instructions in Case of Emer enc

    Domestic Arrangements

    Evacuation

    Other Emer encies

    Breaks

    Tele hones

    Introductions

    Photo Photo

    3

  • 7/31/2019 Loadign/cargando ALHD Canberra

    4/28

  • 7/31/2019 Loadign/cargando ALHD Canberra

    5/28

    . Dockwise operates a fleet of 18 semi-

    su mers e eavy transport vesse s.Heavy Marine Transport

    Transport & Installation

    Logistical Management

    Yacht Transport

    World-Wide Offices:Breda The Netherlands

    Houston USA

    Fort Lauderdale - USA

    Shanghai China

    Sin a ore

    Perth Australia

    Moscow Russia

    Rio de Janeiro - Brasil5

  • 7/31/2019 Loadign/cargando ALHD Canberra

    6/28

    .

    6

  • 7/31/2019 Loadign/cargando ALHD Canberra

    7/28

    Open deck ships

    7

  • 7/31/2019 Loadign/cargando ALHD Canberra

    8/28

    Dock-type ships

    8

  • 7/31/2019 Loadign/cargando ALHD Canberra

    9/28

    . oc w se or n ro uc on

    9

  • 7/31/2019 Loadign/cargando ALHD Canberra

    10/28

    Blue Marlin

    Length overall 224.50 m

    Open-deck vessel

    Breadth 63.00 m

    Depth 13.30 m

    Draft sailing 10.08 mra su merge . m

    Gross tonnage 51,821 t

    Deadweight 76,061 t

    .

    Deck load 27.5 t/sq.m

    Service s eed 12 kn

    Maximum speed 13.3 kn

    Range 65 days

    10

  • 7/31/2019 Loadign/cargando ALHD Canberra

    11/28

    . oc w se - avan a ro ec

    Contracts si ned Jul 2008

    Risk Mitigation by ongoing State of the Art Engineering.

    Sea state

    Structural Integrity

    Float on Float off method

    .

    Transport ALHD Adelaide January 2014 March 2014.

    11

  • 7/31/2019 Loadign/cargando ALHD Canberra

    12/28

    . oc w se - avan a ro ec

    12

  • 7/31/2019 Loadign/cargando ALHD Canberra

    13/28

    oa ng oca on: a oru a un a angos e ra

    Bullet text number one

    Bullet text number two

    Photo

    Bullet text number four

    Bullet text number five

    Bullet text number six

    Photo Photo

    min. water de th in dee hole : 23 m from LATmin. length deep hole : 250 mmin. width deep hole : 75 m

    13

  • 7/31/2019 Loadign/cargando ALHD Canberra

    14/28

    Loading operation : Blue Marlin along quayside

    Preparation of Blue Marlins deck:

    Cribbing installed on deck

    Guideposts installed on deck Photoar o ow suppor rame pre

    -installed on deck, heightdepending on required static

    support after loading

    (Rest of) bow support frame

    temporarily stowed on deck,well away from ALHDloading/stowage area

    Sea fastening equipment laidout on Blue Marlins deck

    Duration: 2 to 3 days

    Photo Photo

    14

  • 7/31/2019 Loadign/cargando ALHD Canberra

    15/28

    Photo

    Photo Photo

    15

  • 7/31/2019 Loadign/cargando ALHD Canberra

    16/28

    Photo

    Photo Photo

    16

  • 7/31/2019 Loadign/cargando ALHD Canberra

    17/28

    Loading operation : Blue Marlin submerged to 22 m draft

    Photo

    Photo Photo

    17

  • 7/31/2019 Loadign/cargando ALHD Canberra

    18/28

    Loading operation : Blue Marlin submerged to 22 m draft

    Photo

    Go/No go meeting held with

    Navantia, Harbour master,,

    Dockwise

    Communications tested. Allaware of responsibilities.

    eat er sea state w n ow

    agreed to be within limits fornext 48 hours

    Around midnight Blue Marlin to

    Photo Photostart submerging

    Daybreak ALHD brought

    towards Blue Marlin with

    assistance of tu s

    18

  • 7/31/2019 Loadign/cargando ALHD Canberra

    19/28

    Loading operation : Blue Marlin submerged to 22 m draft

    Photo

    ALHD brought close to the stern

    of the Blue Marlin with

    Vessels first tugger-wiresconnected to ALHD. DockwiseSuperintendent from now in

    .

    ALHD brought towards BlueMarlin with assistance of tugs

    More tugger-wires (aft)

    Photo Photoconnected to ALHD

    Forward tug dismissed

    19

  • 7/31/2019 Loadign/cargando ALHD Canberra

    20/28

    Loading operation : Blue Marlin submerged to 22 m draft

    Photo

    ALHD brought over Blue

    Marlins deck by means of-

    Tugs forward stand-by forassistance

    Photo Photo

    20

  • 7/31/2019 Loadign/cargando ALHD Canberra

    21/28

    Loading operation : Blue Marlin submerged to 22 m draft

    Photo ALHD brought over Blue

    Marlins deck by means of-

    Cross wires connected withhelp of the vessels workboat

    Tugs forward stand-by forass stance

    Photo Photo

    21

  • 7/31/2019 Loadign/cargando ALHD Canberra

    22/28

    Loading operation : Blue Marlin submerged to 22 m draft

    Photo ALHD brought over Blue

    Marlins deck by means of-

    Tugs forward stand-by forassistance

    Photo Photo

    22

  • 7/31/2019 Loadign/cargando ALHD Canberra

    23/28

    Loading operation : Blue Marlin submerged to 22 m draft

    Photo ALHD in position above

    Blue Marlins deck -

    assistance

    Photo Photo

    23

  • 7/31/2019 Loadign/cargando ALHD Canberra

    24/28

    Loading operation : Blue Marlin de-ballasting

    Tugs dismissed

    ALHD on cribbing / support

    Photo

    Photo Photo

    24

  • 7/31/2019 Loadign/cargando ALHD Canberra

    25/28

    Loading operation : Blue Marlin at sailing draft

    Photo ALHD on cribbing / support

    on Blue Marlins deck

    afternoon,

    Late evening - sailing draft

    reached

    Prepare for seafastening

    Prepare to go alongside

    Photo Photo

    25

  • 7/31/2019 Loadign/cargando ALHD Canberra

    26/28

    Typical examples of sea fastening with bracings to be installed

    Photo

    Photo Photo

    26

  • 7/31/2019 Loadign/cargando ALHD Canberra

    27/28

    Seafastening operation : Blue Marlin along the quay

    Installation work for sea

    fastening to startPhoto

    approval

    Customs clearance of ALHD

    cleared (Navantia)

    Port Authorities: Health,

    customs and immigrationcleared (Dockwise)

    Departure

    Daily reporting via Dockwise

    Head Office to all relevant

    Photo Photo

    .

    27

  • 7/31/2019 Loadign/cargando ALHD Canberra

    28/28

    6. Follow up actions:

    Assistance Shipping Agent

    In- and outward clearances

    Photo

    Assistance La Coruna Port Authorities

    Availability of the quay

    Availability of the anchor position

    Port security

    Notices to Mariners

    Assistance Navantia

    Crew on board Canberra

    Photo Photo

    28