LE-PROFILE | ver.3 | rev.5.2 | 10-Oct-2011
LINDENBERG-EMIRATES LLC
Company Profile 3~16
About Lindenberg Emirates 3
Scope of Activities 4
Completed Projects 5
Ongoing Projects 6
Representation of Lindenberg Anlagen 7
Company Organization Chart 8
Company Manpower Chart 9
Company Reg., PQ & Classification 10~13
Project References 14~15
Lindenberg Power Division 16~30
Division Profile 16~17
Scope of Activities 18
Typical Power Project Organization Chart 19
Featured Projects 20~29
Power Stations 30
Lindenberg Water & Drainage Division 31~42
Division Profile 31~32
Scope of Activities 32
Typical Water Project Organization Chart 33
Featured Projects 34~42
Quality, Health & Safety & Environment 43~44
Company Recourses 45~52
Workforce & Labour Camp 45
Store Facilities 46
Plant, Machinery, Vehicles & Equipments 47~52
Contact Information 53
3
About Lindenberg-Emirates
Located in the United Arab Emirates, with
its center of operation and main office in
Abu Dhabi, Lindenberg-Emirates LLC
specializes in Engineering, Procurement,
and Construction (EPC) mode of project
delivery.
Lindenberg-Emirates LLC employs manpower expertise in all aspects of contracting including civil
engineering, pipeline construction, turn-key industrial plants, substations, mechanical and electrical
installations, and services to the electromechanical industry including testing, commissioning,
maintenance and operational activities.
Company Details
Date Established: 20.11.2001
Ownership: UAE Partner 51%, Lindenberg Anlagen (Germany) 49%
Incorporated in: Abu Dhabi, United Arab Emirates
Principal Bankers: Arab Bank for Investment Foreign Trade Mashreqbank National Bank of Abu Dhabi HSBC Bank National Bank of Fujairah
4
Scope of Activities
Power Related Activities
Construction & Installation of Power Transmission and Distribution Networks
Installation of High Voltage Cables
Substation Turnkey Low, Medium and High Voltage & Package Substation Installation
High & Medium Voltage Switchgear & Transformer Installation
Submarine Cable Installation
Civil & Electro-mechanical General Contracting
Water Transmission & Distribution, Storm Water, Drainage & Irrigation Networks
EPC Projects of Water & Sewerage including Pumping Stations
Submarine Pipe Laying
Oil & Gas Related Activities
On Shore and Off Shore Oil and Gas Field Services
Maintenance Services for Oil/Gas Production Utilities
Technical Maintenance for Equipment, Industrial and Petroleum Plant
Repair & Maintenance Works
Repair and Maintenance of Pumping Stations, Sewerage Networks & Water Drainage Lines
Projects Successfully Completed in U.A.E. Project Value (AED)
Power Supply for Presidential Palaces and Hospitals 177 Million
Construction of Water Supply Network to Sadiyat Island 108 Million
Power Supply for Presidential Palaces and Hospitals 103 Million
Construction of Water Transmission Pipeline in Baniyas 94 Million
Construction of Water Transmission Pipeline in Dubai 84 Million
Water Transmission Lines inside Al Reem Island 56 Million
Security & Upgrading of 11kV Electrical Networks 40 Million
Supply of LV Panels Switchgear for Ruwais Housing Complex 29 Million
Power Supply for Palaces and Hospitals Stage3 26 Million
Construction of Water Transmission Line from Sweihan to Remah 26 Million
Modification of Switching Stations in Abu Dhabi 17 Million
Construction of Water Networks at Al Qadra Village 16 Million 5
Ongoing Power & Civil Projects in Abu Dhabi, U.A.E. Project Value (AED)
Electrical & Civil Engineering Works for Battery Energy Storage 142 Million
Replacement of 11 KV Switchgears and Substations 82 Million
Transfer of Load to New 132/11 kV W24 and E01 Primary Substations 34 Million
Civil Works for Shuweihat-3 Independent Power Plant 29.8 Million
Transfer of 11kV Load & Primary Substation in Abu Dhabi 19.7 Million
Supply and Installation of 11kV Package Unit Substation for Braka
Nuclear Power Plant
16.8 Million
Installation of 22 kV Cables to Masdar City 2.1 Million
Ongoing Water & Drainage Projects in Abu Dhabi, U.A.E.
Water Transmission Scheme inside Sadiyat Island 577 Million
EPC for 2 Nos. 25 MiG Steel Tanks, associated Civil & Pipeline Works. 174.5 Million
Replacement of Existing Sewer Networks Inside Abu Dhabi Island 116 Million
6
7
Representation of Lindenberg Anlagen
Lindenberg Emirates represents Lindenberg Anlagen GmbH Germany for its products and services in
the United Arab Emirates.
Lindenberg Anlagen GmbH Germany is a world class leader in the design and manufacturing of Power
Generation System and has international presence in more than 72 countries.
For more information about Lindenberg Anlagen GmbH, please visit www.lindenberg-anlagen.de.
8
Company Organization Chart
OPERATIONS
DEPARTMENT
POWER DIVISION
WATER &
DRAINAGE
DIVISION
PLANT /
WORKSHOP
DEPARTMENT
CIVIL
DEPARTMENT
PURCHASING
DEPARTMENT
COST CONTROL
DEPARTMENT
PLANNING
DEPARTMENT
FINANCE &
ACCOUNTS
DEPARTMENT
CONTRACTS
DEPARTMENT
INFORMATION
TECHNOLOGY
DEPARTMENT
ESTIMATION &
TENDERING
DEPARTMENT
DOCUMENT
CONTROL
DEPARTMENT
CHAIRMAN
GENERAL
MANAGER
LEGAL
DEPARTMENT
BUSINESS
DEVELOPMENT
DEPARTMENT
HSE DEPARTMENT
RECRUITMENT
DEPARTMENT
QA/QC
DEPARTMENT
HR/ADMIN
DEPARTMENT
Office Manager – 1
Exec. Sec / DC - 1
Senior Business
Associate
Operations
Manager
HR/Admin
Manager
Recruitment
Manager
Business Dev’t.
Director
Head of Legal
Department
HSE Manager
QA/QC Manager
Head of Power
Division
Planning Dept.
Manager
Plant Manager
Purchase
Manager
Estimation
Manager
Contracts
Manager
Senior IT
Administrator
Civil Department
Manager
Senior Document
Controller
Corporate Finance
Manager
Division Manager -
LWD
Cost Control
Manager
Sr. HR/A Officer – 1
Personnel Officer – 1
Asst. P.O. - 1
Admin Coordinator – 1
PR Coordinator - 1
PRO – 2
Admin. Clerk – 1
Doc. Controller – 1
Camp Boss – 1
Asst. Camp Boss – 2
Secretary - 1
Sr. HSE Engineer – 1
HSE Engineers – 9
Safety Officers – 11
Safety Asst. – 1
Male Nurse – 2
QA/QC Engineers – 3
QA/QC Inspectors – 2
Legal Advisor
Sr. Est. Eng’rs – 2
Estimation Eng’rs – 2
Secretary –1
Doc. Controller –1
Secretary – 1
Proc’t Eng’rs – 2
Asst. Proc. Eng’r – 1
Purchase Officer– 1
Secretary – 1
Workshop Engineer –1
WS Superintendent –1
F/men Mechanics – 3
Mechanics – 9
WS Administrator – 1
Storekeeper – 1
Purchaser/Coord’r – 1
Design Engineers – 6
Exec. Secretary – 1
Secretary - 1
Doc. Controller – 1
Project Managers – 3
Quantity Surveyor – 1
Project Engineer – 1
Project Support Team
Foremen
Work Crew
Design Engineer – 1
Exec. Secretary – 1
Secretary – 1
Doc. Controller – 1
Project Managers – 3
Sr. Qty. Surveyor - 2
Quantity Surveyor – 3
Const’n Managers – 3
Project Engineers – 2
Project Support Team
Foremen
Work Crew
Project Manager – 1
Quantity Surveyor – 1
Const’n Manager – 1
Project Engineer – 1
Project Support Team
Foremen
Work Crew
Lead C.C. Engr – 1
Cost Control Engr – 2
Tech’l. Secretary - 1
Accounts Manager – 1
Treasury Manager – 1
Bus. Sys Analyst – 1
Sr. Accountants – 6
Accountants – 3
Network Engineer – 1
Asst. Network Eng. - 1
Asst. IT Coord’r – 1
Desktop Support – 1
Sr. Planning Eng’rs – 2
Planning Engineers – 5
Sr. Administrator - 1
Exec. Sec / DC - 1
Business Development
Associate - 1
Sales Engineer - 1
Legal Secretary – 1
Engineers - All Discipline, 59
Foreman & Supervisors, 45
Project Managers / Dept. Heads, 30
Reception & Office Assistants, 17
Secretaries, 14
Land Surveyors, 13
Accountants, 11
Safety - Officers/Inspectors,
11
Storekeepers / Timekeepers, 10
Draftsman - All Discipline, 9
Document Controllers, 7
Officers & Legal Advisors, 6
Administrators, 6
Coordinators, 6
Planning & Cost Control, 4
QA/QC Engineers, 4
9
Staff Category (Total: 252) Skilled & Unskilled Workers (Total: 801)
Data as of 10-Oct-2011
Manpower Information
Lindenberg has got sufficient manpower, including Chartered Engineers, Certified Accountants,
Certified Electrical and Civil Discipline Technicians to participate and execute Mega Projects with
utmost professionalism and to the satisfaction of our Clients.
Laborers, 293
Carpenters, 119 Masons, 68
Electrician, 66
Steel Fixers, 59
Drivers - All Discipline, 47
Operators, 46
Cleaners / Office Boy, 30
Charged Hands, 27
Pipe Fitters, 19
Welders, 12
Mechanics, 9
Painters, 6
10
Registration / Clients List
Lindenberg is registered / pre-qualified or have submitted tender with the following companies /
government agencies:
1. Abu Dhabi Distribution Company (ADDC)
2. Abu Dhabi Future Energy Company
(MASDAR)
3. Abu Dhabi Gas Industries Ltd. (GASCO)
4. Abu Dhabi Health Services Co. PJSC (SEHA)
5. Abu Dhabi Marine Operating Company
(ADMA-OPCO)
6. Abu Dhabi Ministry of Defense – Military
Works Department
7. Abu Dhabi National Oil Company (ADNOC)
8. Abu Dhabi Oil Refining Company (TAKREER)
9. Abu Dhabi Police General Head Quarters
10. Abu Dhabi Polymers Co. Ltd. (Borouge)
11. Abu Dhabi Sewerage Services Company
(ADSSC)
12. Abu Dhabi Transmission & Despatch
Company (TRANSCO)
13. Abu Dhabi Water & Electricity Authority
(ADWEA)
14. Al Ain Distribution Company (AADC)
15. ALDAR Properties PJSC 20. Municipality of Abu Dhabi
16. Dubai Electricity & Water Authority (DEWA) 21. National Central Cooling Co. PJSC (TABREED)
17. Federal Electricity & Water Authority (FEWA) 22. Sultanate of Oman – Public Authority for Electricity and Water
18. International Petroleum Investment Co. (IPIC) 23. Tourism Development & Investment Company (TDIC)
19. Mubadala Development Company 24. UAE Armed Forces – Special Operations Command
1 2 3 4 5 6
7 8 9 10 11 12
13 14 15 16 17 18
19 20 21 22 23 24
11
Registration / Clients List
Lindenberg is highly experienced working with the following Project Consultants:
1. Deutsche Energie Consult GmbH (DECON)
2. Dorsch Consult
3. Dr. M. H. Ali El-Saie Consulting Engineers
4. Hyder Consulting Middle East Limited
5. ILF Consulting Engineers
6. Italconsult
7. Lahmeyer International GmbH
8. Mott Macdonald
9. Ozen Levent Power Engineering
Consultancy LLC
10. Parsons Brinckerhoff Power
11. Parsons International Ltd.
12. Tebodin Consultants & Engineers
1 2 3 4
5 6 7 8
9 10 11 12
12
1. Lindenberg Emirates was one of the 5
prequalified companies for the Sewerage
Tunnel Enhancement Project “STEP Project”
comprising of a 45 km tunnel of 5-meter
diameter at a depth of 40-45 meters which is
expected to be worth of AED 3 Billion. For
this tender, Lindenberg formed a consortium
with Major Korean Construction Companies.
2. Tender No. O-1506, STEP Deep Tunnel Sewer
Contract T-02.
3. Tender No. O-1578, STEP Deep Tunnel Sewer
Contract T-03.
Lindenberg was Prequalified & Tendered for ADSSC’s STEP Project:
13
Company Classification at Abu Dhabi Department of Planning & Economy
SN Field Scope of Works Category
1. WATER PROJECTS 1. Water Transport Plants & Networks
2. Water Distribution Plants & Networks
1st
1st
2. ELECTRICAL PROJECTS 1. Power Distribution Networks & Plants
2. Communications Networks
2nd
5th
3. SEWERAGE PROJECTS 1. Main Sewerage Networks
2. Sewerage Sub-Networks & House Connections
5th
5th
4. MECHANICAL & ELECTRICAL
WORKS PROJECTS 1. Mechanical and Electrical Works 5th
5. BUILDING PROJECTS 1. All types of Buildings
2. Metallic Constructions
5th
5th
14
Selected Power & Civil Projects
SN Contract No. Contract Name Client Contract Value Award Date Consultant Status
1
R-99-0157 Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces and Hospitals ADWEA AED 176,957,025 08.02.2000 Mott MacDonald Completed
2
G-6334 Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery
Energy Storage (42MW) ADWEA AED 142,271,120 23.11.2009 DECON Ongoing
3
G-1882 Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces and Hospitals (Stage-III Phase-III) ADWEA AED 103,122,825 07.08.2005
Lahmeyer
International GmbH Completed
4
D-6990 Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations ADDC AED 81,991,962 03.01.2010 Parsons Brinckerhoff Ongoing
5
D-7150 Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace
in Abu Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace ADDC AED 40,667,381 05.05.2008
Ozen Levent
Power Engineering
Consultancy LLC
Completed
6
D-10624 Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu
Dhabi Island ADDC AED 34,028,598 25.05.2010 DECON Ongoing
7
115979C13E Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical
Equipment – Low Voltage (LV) Panels Switchgear ADNOC AED 29,675,361 23.04.2009 - Completed
8
- Shuweihat S3 IPP Civil Work Package 3 Daewoo
E&C AED 29,191,474 27.07.2011
Fichtner Consulting
Engineers Ongoing
9
G-1494 Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces and Hospitals, Stage-III Phase-III, Lot-1 ADWEA AED 25,914,216 05.02.2003
Lahmeyer
International GmbH Completed
10
D-10599 Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi
Island & Eastern Region ADDC AED 19,683,403 10.02.2010 DECON Ongoing
11
D-7720 Modification of Switching Stations in Abu Dhabi Island ADDC AED 16,999,999 06.10.2008 - Completed
12
4600037153 Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power
Plant Hyundai E&C AED 16,865,843 27.07.2011 - Ongoing
15
Selected Water & Drainage Projects
SN Contract No. Contract Name Client Contract Value Award Date Consultant Status
1
N-5807 Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat /
Abu Dhabi Island TRANSCO AED 569,594,995 20.01.2008
Tebodin Consultants
and Engineers Ongoing
2
N-6821 EPC Works for Al Ain Distribution Network – Pipelines Umn Ghaffa Floating
Reservoir Station – Lot D TRANSCO AED 174,524,364 07.03.2010
ILF Consulting
Engineers Ongoing
3
O-1463 Works Associated with the Replacement of Existing Sewer Networks at Some
Sectors Inside Abu Dhabi Island - Category A ADSSC AED 116,026,699 13.06.2010 Dorsch Gruppe Ongoing
4
N-2622.1 Water Supply to Sadiyat Island and Adjacent Areas – Lot A,B, & C TRANSCO AED 108,118,493 22.07.2007 Tebodin Consultants &
Engineers Completed
5
D-7310.1 Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway ADDC AED 94,037,448 22.05.2008 Italconsult Completed
6
CW/119C/
2007
Supply, Installation, Testing and Commissioning of Fiber Cement / Glass
Reinforced Epoxy / Ductile Iron Water Transmission Pipelines and Associated
Works at Various Locations in Emirates of Dubai (1200 mm Dia Pipeline Along
Emirates Road)
DEWA AED 73,794,659 08-Jul-2007 NJS Consultants
Co. Ltd. Completed
7
N-5386 Water Transmission Lines Inside Al Reem Island – Lot A TRANSCO AED 56,455,067 03.02.2008 Tebodin Consultants
and Engineers Completed
8
N-4604 DN 1000mm Transmission Pipeline from Sweihan to Remah TRANSCO AED 25,889,764 23.07.2007 Mott Mac Donald Completed
9
D-5630 Urgent Works at Al Qadra Village Owned by
HH Sheikh Mansour Bin Zayed ADWEA AED 16,877,777 15.04.2006 Italconsult Completed
10
O-1047 Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib) ADSSC AED 10,400,000 30.01.2008 Parsons Intl Ltd Completed
11 D-6972 Linking of Delma Two (2) MGD RO Plant to Main Delma Reservoirs Construction
of 119 Water House Connections ADDC AED 4,633,941 06.08.2007
Dr. MH Ali El-Saie
Consulting Engineers Completed
Division Profile
Lindenberg Power Division provides expertise in implementing Electromechanical and
Instrumentation projects on turnkey basis, starting from the design stage to construction, testing and
commissioning and maintenance services for diverse industrial projects.
Having the expertise in turnkey contracting on many projects, the Power Division is very familiar
with all criteria necessary for the successful execution of Electromechanical projects. The Power
Division builds these mandatory requirements into all projects:
Reliable and efficient performance
Single-point responsibility
ISO-certified quality control procedures
Proven safety programs
Cost controls and reductions
Productive and on-time scheduling
16
Division Profile
The Power Division provides a dedicated technical and managerial team necessary to design and
construct new facilities or upgrades. By bringing together every aspect of a power project under a
single management team, the division provides economical and efficient solutions to meet the needs
of a diverse industry base.
The project management team comprised of specialists in the design, construction and operation of
complex type of projects. From concept through acceptance, the division provides the optimal
resources, equipment and services to meet all contractual requirements. The EPC team is
accountable for the following critical functions:
Planning, organizing and procedures
Scheduling and tracking
Cost control
Document control
Single-point customer contact
Progress reporting
17
Scope of Activities
Contracting works for Power Networks and Distribution Systems
Underground cable network including jointing, termination, testing and commissioning
Complete electrical and instrumentation works for Power Plants, Refineries, Power Stations, Desalination Plants and Sewerage Treatment Plants
Turnkey contracting works for LV / MV / HV Substations
EPC works for electric generators
Installation and commissioning of auxiliary powers, package substation, control panels and transmission lines
Contracting works for plant fire fighting and safety alarm systems, remote monitors, and fire suppression systems.
Control / MCC room fire suppression systems installation
Submarine Cable Installation
Industrial Building Construction
HVAC Works
LV / MV / HV Switchgear and Transformer Installation
Installation and Commissioning of Auxiliary Power Supplies
18
Typical Power Project Organization Chart
19
HEAD OF POWER DIVISION
OFFICE SUPPORT
Coordinator
Secretary
Doc. Controller
Storekeeper
Timekeeper
Watchman
HSE Engineer
QA/QC Engineer
HSE & QA/QC
Planning Engineer
Quantity Surveyor
PLANNING & QS
Civil Engineer
Electrical Engineer
ENGINEERING
Construction Manager /
Project Engineer
CONSTRUCTION
Site Electrical Engineer Testing & Comm. Eng.
Mechanical Foreman
Mechanical Engineer Site Civil Engineer
Civil Foreman Electrical Foreman Draftsmen
Design Coordinator
PROJECT MANAGER
20
Featured Projects
Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces and Hospitals
Contract No. R-99-0157
Client Abu Dhabi Water & Electricity Authority (ADWEA)
Value AED 176,957,025
Award Date 08.02.2000
Description Supply, Installation, Testing & Commissioning Works
Project was completed.
21
Featured Projects
Supply and Installation of 8 Nos. 415 Volts Diesel Generators
Contract No. G-1206
Client Abu Dhabi Water & Electricity Authority (ADWEA)
Value AED 13,039,984
Award Date 10.04.2002
Description Design, Supply, Installation, Testing and Commissioning of 8 Nos. 415
Volts Diesel Generators
Project was completed.
22
Featured Projects
Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces and Hospitals Stage-III Phase-III. Lot-1
Contract No. G-1494
Client Abu Dhabi Water & Electricity Authority (ADWEA)
Value AED 25,914,216
Award Date 05.02.2003
Description Design, Supply, Installation Testing and Commissioning Works
Project was completed.
23
Featured Projects
Security of the Electric Power Supply and Upgrade of the Network for Presidential
Palaces & Hospitals (Stage-III Phase-III)
Contract No. G-1882
Client Abu Dhabi Water & Electricity Authority (ADWEA)
Value AED 103,122,825
Award Date 07.08.2005
Description Design, Supply, Installation Testing and Commissioning including remote
control monitoring system, ISMS, and Medium Voltage Panels.
Project was completed in May 2010.
24
Featured Projects
Security and Upgrading of 11 kV Electrical Network for H.H. Shk. Khalifa Palace in Abu
Dhabi & Erection of Equipment in Substation No. 4 & 5 in Beach Palace
Contract No. D-7150
Client Abu Dhabi Distribution Company (ADDC)
Value AED 40,667,381
Award Date 05.05.2008
Description Design, Supply, Installation Testing and Commissioning of 11KV
Switching Station & replacement of Switchgears, Control Panels, DC
system in Beach Palace Stations B4, B5 Stations & Standby power plant
in H.H.Shk Khalifa Switching station. Completed in July 2010.
25
Featured Projects
Modification of Switching Stations in Abu Dhabi Island
Contract No. D-7720
Client Abu Dhabi Distribution Company (ADDC)
Value AED 16,999,999
Award Date 06.08.2008
Description Supply, Installation & Commissioning of RMU’s and Modification
of Transformer Panel to Feeder Panel in Switching Stations.
The Project was completed in Oct 2009.
Long Term Rate Agreement for Installation of Underground Cables, Electrical Distribution Equipment, OHL and allied works in Abu
Dhabi Eastern Region
Contract No. D-9710/C
Client Abu Dhabi Distribution Company (ADDC)
Value AED 10,000,000 per year
Award Date 16.04.2009
Description Installation of Underground Cables, Electrical Distribution Equipments, OHL and Allied Works as per Work Order
Basis.
26
Featured Projects
Electrical & Civil Engineering Works for the Implementation of 4 MW NGK Battery
Energy Storage (42MW)
Contract No. G-6334
Client Abu Dhabi Water and Electricity Authority (ADWEA)
Value AED 142,271,120
Award Date 23.11.2009
Description Design & Construction of 10 Nos. BESS Substation & Installation Testing
Commissioning of NGK Batteries & Supply of Auxiliary Items.
27
Featured Projects
Replacement of 11 KV Switchgears in W13, E15 and Salt & Chlorine Substations
Contract No. D-6990
Client Abu Dhabi Distribution Company (ADDC)
Value AED 81,991,962
Award Date 03.01.2010
Description Design & Construction of 1 New 132/11 kV Substation & Modification of 11 kV Network and Replacement with new 11
kV Switchgear @ 2 nos. Substation.
Ruwais Housing Complex Expansion – Phase III, Procurement of Electrical Equipment – Low Voltage (LV) Panels Switchgear
Contract No. 115979C13E
Client Abu Dhabi National Oil Company (ADNOC)
Value AED 29,675,361
Award Date 23.04.2009
Description Supply & Delivery of Low Voltage Panels Switchgear.
The project was completed .
28
Featured Projects
Transfer of Load to New 132/11 kV W24 and E01 Primary Substations in Abu Dhabi Island
Contract No. D-10624
Client Abu Dhabi Distribution Company (ADDC)
Value AED 34,028,598
Award Date 25.05.2010
Description Supply of 11kV Switchgear, DC System, LVAC, DMS System, Auxiliary Transformer and Joints & Terminations.
Installation of Power Cables, 11/0.415kV Package S/S and Civil Works i.e. Building, Trenching, etc.
Transfer of 11kV Load to E48/02 & Khalifa A2 Primary Substation in Abu Dhabi
Island & Eastern Region (2010)
Contract No. D-10599
Client Abu Dhabi Distribution Company (ADDC)
Value AED 19,683,403
Award Date 10.02.2010
Description Installation of Underground 11 kV Cables of 112 km & FO Cables
of 20 km.
29
Featured Projects
Supply and Installation of 11kV Package Unit Substation for Braka Nuclear Power Plant
Contract No. 4600037153
Client Hyundai Engineering & Construction
Value AED 16,865,843
Award Date 27.07.2011
Description Commissioning of 18 Nos. 11 kV Package Substations.
Shuweihat S3 IPP Civil Work Package 3
Client Daewoo E&C-Siemens (Consortium)
Value AED 29,191,475
Award Date 20.07.2011
Description Civil works which includes excavation, filling, concreting, finishing, waterproofing, structural steel works, etc. for
fuel gas pipelines with sleeper foundations & trenches, storm drain works and site roads with asphalt.
30
Power Stations
Power Station with Diesel Engine for operation
on Diesel, Crude Oil and HFO
Turnkey Power Stations up to 12 MW
Powered with Diesel, Gas and Dual Fuel Engines
Power Station with Gas Engines Power Station with Dual Fuel Engines
Division Profile
In order to accommodate the brisk developments of UAE’s industry, Lindenberg Water and Drainage
Division was established to provide water and drainage solutions.
The Division has up-to-date working knowledge of and is very well conversant with the requirements
in water supply and water distribution network. The necessary infrastructure, including manpower,
reliable sources of suppliers, equipment are readily available at our disposal.
31
Division Profile
The Water & Drainage Division is acknowledged as the premier provider of the highest quality
professional service in the field of water and drainage facilities; insuring absolute client satisfaction
through the expertise and experience of its people. The division aims to provide new technologies,
processes, and materials to build and deliver water and drainage facilities that are best suitable for
their class & area of usage.
Scope of Activities
Water Pipeline Networks
Water & Irrigation Reservoirs
Water & Sewerage Pumping Stations
Sewage Treatment Plants
Operation & Maintenance of Sewerage Networks and Pumping Stations
32
Typical Water & Drainage Project Organization Chart
33
DIVISION MANAGER
OFFICE SUPPORT
Civil Engineer
Electromech’l Engineer
Inst & Ctrl. Engineer
Planning Engineer
Quantity Surveyor
HSE Engineer
QA/QC Engineer
Coordinator
Secretary
Doc. Controller
Draftsman
Storekeeper
Timekeeper
Construction Manager /
Project Engineer
Civil Works Pipeline Works Chamber Works Electromechanical Works Inst’n & Control Works Water Tank Works (Concrete Construction)
Work Crew Land Surveyor Land Surveyor Land Surveyor E/W Work Crew I & C Work Crew
Civil Work Crew Pipeline Crew Chamber Crew
Site Engineer Site Engineer Site Engineer
CONSTRUCTION
PROJECT MANAGER
HSE & QA/QC PLANNING & QS ENGINEERING
Foreman Civil Foreman Pipeline Foreman Chamber Foreman E/M Foreman I & C Foreman
34
Featured Projects
Urgent Works at Al Qadra Village Owned by HH Sheikh Mansour Bin Zayed
Contract No. D-5630
Client Abu Dhabi Water & Electricity Authority (ADWEA)
Value AED 16,877,777
Award Date 15.04.2006
Description Supply, Construction & Maintain Water Supply Network
The Project was completed in July 2008
35
Featured Projects
DN 1000mm Transmission Pipeline from Sweihan to Remah
Contract No. N-4604
Client Abu Dhabi Transmission & Despatch Company (TRANSCO)
Value AED 25,889,764
Award Date 23.07.2007
Description Supply, Construction, and Installation of Water Transmission Pipelines
The Project was completed in June 2009
36
Featured Projects
Water Supply to Sadiyat Island and Adjacent Areas – Lots A, B, & C
Contract No. N-2622.1
Client Abu Dhabi Transmission & Despatch Company (TRANSCO)
Value AED 108,118,493
Award Date 22.07.2007
Description Supply, Construction, & Installation of Water Supply Network
The Project was completed in June 2009
37
Featured Projects
Water Transmission Scheme from Sas Al Nakheel (UAN) Junction to Sadiyat / Abu Dhabi
Island
Contract No. N-5807
Client Abu Dhabi Transmission & Despatch Company (TRANSCO)
Value AED 569,594,995
Award Date 20.01.2008
Description Construction of DI/CS Pipelines
38
Featured Projects
Sewerage and Surface Drainage Works (SAS Al Nakheel & Seeh Shua’ib)
Contract No. O-1047
Client Abu Dhabi Sewerage Services Company (ADSSC)
Value AED 10,400,000
Award Date 30.01.2008
Description Miscellaneous Sewerage and Drainage Works at Sas Al Nakheel & Sash
Shuhaib
The Project was completed in July 2009
39
Featured Projects
Water Transmission Lines Inside Al Reem Island – Lot A
Contract No. N-5386
Client Abu Dhabi Transmission & Despatch Company (TRANSCO)
Value AED 56,455,067
Award Date 03.02.2008
Description Installation of DI/CS Pipelines
The Project was completed in January 2010
40
Featured Projects
Replacement of 2 DN 600 Pipelines in Baniyas along Al Ain Highway
Contract No. D-7310.1
Client Abu Dhabi Distribution Company (ADDC)
Value AED 94,037,448
Award Date 22.05.2008
Description Supply and Replacement of Water Transmission Pipelines
The Project was completed in November 2010
41
Featured Projects
EPC Works for Al Ain Distribution Network - Pipelines Umn Ghaffa Floating Reservoir
Station - Lot D
Contract No. N-6821
Client Abu Dhabi Transmission & Despatch Company (TRANSCO)
Value AED 174,524,364
Award Date 07.03.2010
Description EPC for 2 Nos. 25 Million Gallons Steel Tanks and associated Civil and
Pipeline Works.
42
Featured Projects
Works Associated with the Replacement of Existing Sewer Networks at Some Sectors
Inside Abu Dhabi Island - Category A
Contract No. O-1463
Client Abu Dhabi Sewerage Services Company (ADSSC)
Value AED 116,026,699
Award Date 13.06.2010
Description Construction, Replacement & Rehabilitation of Existing Sewer Lines and
Manholes Inside Abu Dhabi Island.
QHSE Policy
LINDENBERG implements and maintains an effective QHSE Management System in line with the
requirements of ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007.
It is our policy to
Meet or exceed our clients' expectations, the first time and every time, through the application of
proven quality principles at all levels of our business;
Minimize the generation of hazardous & toxic waste, preventing the release of harmful substances
into the environment, while encouraging the reduction, recycling and re-use of materials;
Instilling and promoting safety consciousness to prevent ill health, injury and incidents; and provide a
safe and healthy working environment for our employees, clients, and subcontractors.
We are committed to
Ensuring that adequate resources are made available for QHSE purposes.
Ensuring that QHSE is accepted as a core management activity, given equal priority as other
objectives and management functions, and included in the company business plan.
Promoting a positive QHSE culture within the top management and encouraging active employee
participation in QHSE throughout all levels of the company.
AHMAD ZAABRI
General Manager 43 LE-IMS-Pol | rev. 1
44
QHSE Certificates & Membership
Lindenberg Emirates is an Integrated Management System (IMS) certified company and has
established, implemented and maintained an effective Quality, Occupational Health & Safety and
Environmental Management System, in line with the requirements of ISO 9001:2008, ISO 14001: 2004
and OHSAS 18001:2007 to ensure that customer satisfaction and requirements are being met.
British Safety Council OHSAS 18001:2007 ISO 14001:2004 ISO 9001:2008
Workforce and Labour Camp
Lindenberg-Emirates LLC employs almost 800 Skilled and Unskilled Labors. Labor Camps with all
modern facilities are established in Al Faya, Mussafah and Al Ain to accommodate the requirements of
the health & safety of the workforce.
45
Camp Location Size No. of Rooms Current No. of
Occupants
Al Faya 1,300 m2 96 600
Magenta Camp (rented) 46 264
Al Ain 400 m2 28 45
Data as of 10-Oct-2011
Store Facilities
Aside from Projects Sites Stores and Yards, two Main Stores of 30x20 m2 are operational at Mussafah to
help in storing & preserving the materials received for different projects, also used for storage of our
standard erection tools required during installation/ commissioning activities.
46
Plant, Machineries, Vehicles and Equipment
Lindenberg Emirates’ policy in Vehicles, Equipment and Machinery is to:
purchase and own all equipment to cover the project needs.
self-maintain these vehicles, equipment and machinery.
hire vehicles, equipment and machinery to prevent delays in the project execution.
47
List of Major Vehicles and Machineries
48
SN PLANT / EQUIPMENT DESC. CAPACITY / MODEL QUANTITY YEAR MANUFACTURED
1 BACKHOE LOADER CATERPILLAR 422E 4 2007 / 2010
2 BACKHOE LOADER J.C.B CX3 2 2008
3 EXCAVATOR CATERPILLAR 320CL - 20 TONS 1 2006
4 EXCAVATOR KOMATSU PC 220 - 20 TONS 2 2009
5 EXCAVATOR CATERPILLAR 330D - 30 TONS 1 2007
6 EXCAVATOR KOMATSU PC 300 7 - 30 TONS 4 2005 - 2009
7 EXCAVATOR KOMATSU PC 400 7 - 40 TONS 6 2008 - 2009
8 WHEEL LOADER CATERPILLAR 950H 4 2009
9 WHEEL LOADER CATERPILLAR 962H 5 2008
10 WHEEL LOADER CATERPILLAR 966H 2 2009
11 WHEEL EXCAVATOR CATERPILLAR M316D 16 TONS 1 2008
12 SKID STEER BOBCAT 630KG 1 2007
13 RAM PILING MACHINE 16M VIBRATOR MRZV925VS IC AUGER DRIVE 1 2001
14 MOBILE CRANE TADANO RT 70T 1 2008
15 MOBILE CRANE TADANO RT 55T 1 2008
16 PIPE LAYER KOMATSU 355C 2 2009
17 TRACTOR HEAD VOLVO FH440 2 2008
18 TRACTOR HEAD SCANIA JA 1 2008
Data as of 26-Jan-2011
List of Major Vehicles and Machineries
49
SN PLANT / EQUIPMENT DESC. CAPACITY / MODEL QUANTITY YEAR MANUFACTURED
19 DIESEL TANKER TRUCK SCANIA 1 1992
20 FLAT BED TRAILER MAMUTH 12 X 2.5 - 12 METERS 2 2008
21 FLAT BED TRAILER 18 METERS 2 2009
22 LOW BED MAMMUTH 6 X 4 1 2008
23 PASSENGER BUS TATA - 64 SEATER 1 2006
24 PASSENGER BUS DAEWOO - 64 SEATER 1 2008
25 WATER TANKER 6 X 4 WHEEL DRIVE - 3500 GL 3 2008
26 DIESEL TIPPER TRUCK VOLVO FM 400 (6X4) 2 2008
27 HIAB CRANE - DIESEL TRUCK NISSAN HIAP/320PS MTS60ADT/M 3 2008
28 MOBILE WORKSHOP (TRUCK) NISSAN 1 2007
29 4 WHEEL CAR TOYOTA FORTUNER 2 2008
30 4 WHEEL CAR RANGE ROVER 1 2009
31 4 WHEEL CAR FORD EXPLORER XLT 4 2007
32 PICK UP TOYOTA - DOUBLE CABIN 1 2006
33 SALOON CAR TOYOTA COROLLA 1.6 X LI 16 2010
34 MOTOR CYCLE SUZUKI EN125-2A 1 2009
35 OFFSHORE FLEET FAST BOAT 38" 1 2008
36 OFFSHORE FLEET FAST BOAT 34" 1 2008
Data as of 26-Jan-2011
List of Other Machines and Equipment
50
SN PLANT / EQUIPMENT DESC. CAPACITY / MODEL QUANTITY YEAR MANUFACTURED
1 GENERATOR DIESEL, 30 KVA 3 2008
2 GENERATOR DIESEL, 28 KVA 1 2008
3 GENERATOR SET F. G. WILSON P27P1 - 27 KVA 3 2010
4 GENERATOR DIESEL, 80 KVA 1 2008
5 GENERATOR DIESEL, 100 KVA 3 2008
6 GENERATOR DIESEL, 135 KVA 6 2008
7 GENERATOR YANMAR (JAPAN) 5 KVA 2 2009
8 GENERATOR SET F. G. WILSON P150P1 - 150 KVA 1 2010
9 GENERATOR SET PRIMAC S-6500 7 2006 / 2008
10 GENERATOR HONDA 1 2007
11 GENERATOR PETROL, 5 KVA 4 2008
12 GENERATOR PETROL, 12 KVA 1 2008
13 DEWATERING PUMP GEOVAC / SKYES 6" 45 2008 -2010
14 AIR COMPRESSOR DIESEL, IRMAIR RM AIR 8.0 6 2008
15 AIR COMPRESSOR ELECTRICAL, 270 LTR 1 2008
16 AIR COMPRESSOR ELECTRICAL, 150 LTR 1 2007
17 BAR BENDING MACHINE SILLA / ICARO / SILMPEDIL 6 2008
18 PIPE MULLING MACHINE PIPE MULLING MACHINE 2 2008
Data as of 26-Jan-2011
List of Other Machines and Equipment
51
SN PLANT / EQUIPMENT DESC. CAPACITY / MODEL QUANTITY YEAR MANUFACTURED
19 BAR CUTTING MACHINE SILLA / ICARO / SILMPEDIL 6 2007 - 2008
20 CONCRETE VIBRATOR MACHINE ROBIN, 1C 17 2006 / 2008
21 CONCRETE VIBRATOR MACHINE DIESEL, FARYMANN, 1C 4 2010
22 ASPHALT CUTTER FLOOR SAW, FS410D 2 2010
23 CONCRETE MIXER SILLA, 350 L 2 2008
24 CONCRETE MIXER LOMBARDIN, 750 L 1 2008
25 TABLE SAW BENCH CIRCULAR POWER CUTTER 9 2008 / 2010
26 FLOOR SAW YANMAR 1 2008
27 JETTING PUMP GEOVAC / SKYES 6" 4 2007 / 2008
28 PRESSURE WATER PUMP HONDA, 35 MM BAR 7 2006 / 2008 / 2009
29 PRESSURE WATER PUMP GCAAK 1/2 2 2008
30 PRESSURE WATER PUMP HONDA GX-160B TYPE 2 2010
31 PRESSURE WATER PUMP ROBIN 3" 5 2008
32 PRESSURE WATER PUMP BOOSTER PUMP, LUCKY PRO, 1.5 HP 1 2010
33 PRESSURE WATER PUMP LUCKY PRO, 1 HP 3 2010
34 PRESSURE WATER PUMP DIESEL WATER PUMP 3" YANMAR, 3" 3 2010
35 PIPE WRAPPING MACHINE PIPE WRAPPING MACHINE 2 2008 / 2009
36 TANK FOR STORING DIESEL 4,000 GL ~ 12,000 GL 12 2008
Data as of 26-Jan-2011
List of Other Machines and Equipment
52
SN PLANT / EQUIPMENT DESC. CAPACITY / MODEL QUANTITY YEAR MANUFACTURED
37 WATER BOOSTER PUMP SAER, ITALY 2 2009
38 WATER BOOSTER PUMP LUCKY PRO, 1.5 HP 1 2010
39 SUBMURSIBLE SEWERAGE PUMP ABS MODEL, 3" 5 2010
40 SUBMURSIBLE SEWERAGE PUMP ABS MODEL, 4" 2 2010
41 DIESEL SEWERAGE PUMP SYKES, WITH ECLOSURE, 6" & 12" 7 2010
42 SEWERAGE OVER PUMPING STEEL PIPE 1,000 M LENGTH, 16" 1 2010
43 SEWERAGE OVER PUMPING STEEL PIPE 500 M LENGTH, 10" 1 2010
44 TOWER LIGHTS 4 X 1,000 WATT, METAL HIGHLIGHT 6 2010
45 SUBMURSIBLE PUMP KTZ 35.5 TSURIMI, JAPAN, 2" 1 2008
46 SUBMURSIBLE PUMP KTZ 35.5 TSURIMI, JAPAN, 3" 2 2010
47 SUBMURSIBLE PUMP KTZ 35.5 TSURIMI, JAPAN, 4" 2 2010
48 DOUBLE DRUM ROLLER COMPACTOR WACKER RD 7H, 1.1T 9 2006 - 2008
49 PLATE COMPACTOR WACKER, DPS 1850 H 11 2008
50 PLATE COMPACTOR EY 20 ENGINE, 132 KG 4 2009
51 WELDING MACHINE DIESEL, 400 AMP 6 2008
52 WELDING MACHINE ELECTRICAL, 225 AMP 3 2008
53 WELDING MACHINE SINGLE PHASE STICK, CSE BUTT, PT250 4 2008
54 WELDING MACHINE ELECTRICAL, 400 AMP 2 2007
Data as of 26-Jan-2011
Contact Information
53
We hope that the information given and detailed in this Company Profile is sufficient to illustrate the
potential and capabilities of Lindenberg. We will be pleased to provide further information on your
request. Kindly contact us.
Lindenberg Emirates LLC Lindenberg Water & Drainage Division
Villa 101, Al Nahyan Camp Area, (A Division of Lindenberg Emirates LLC)
Muroor Road, P.O. Box 42630, Tel: +971 2 642 2576
Abu Dhabi, United Arab Emirates Fax: +971 2 642 2579
Tel: +971 2 642 2576 E-mail: [email protected]
Fax: +971 2 642 2591
E-mail: [email protected] Lindenberg Power Division
Website: www.lindenberg.ae (A Division of Lindenberg Emirates LLC)
Tel: +971 2 642 2576
Fax: +971 2 642 2571
E-mail: [email protected]
P.O. Box 42630, Abu Dhabi, United Arab Emirates Tel: +971 2 6811061, Fax: +971 2 6813655
E-mail: [email protected] Website: www.lindenberg.ae