LID Cost ConsiderationsLID Cost Considerations“ALL Technologies”“ALL Technologies”
Project Life CycleProject Life Cycle
Planning Design
ConstructionOperation
MaintenanceRecapitalizationDecommission
Conventional 244 Lots
Cantura Coves: Cantura Coves: Mesquite, TexasMesquite, TexasD.R. Horton 241 Coved LotsD.R. Horton 241 Coved Lots
Cantura Coves: Cantura Coves: Mesquite, TexasMesquite, TexasD.R. Horton 241 Coved LotsD.R. Horton 241 Coved Lots
Coving:Coving:42% Less Street42% Less Street40% Larger Lots40% Larger LotsMeandering WalksMeandering Walks
3.7
Per A
c
3.7
Per A
c
3.7 Per A
c
3.7 Per A
c
3.7 Per Ac
3.7 Per Ac
Photo: Cantura Cove – Mesquite, Texas
Placitas de La Paz: Placitas de La Paz: Coachella, CaliforniaCoachella, CaliforniaCanaday & CompanyCanaday & Company271 Coved Lots271 Coved Lots
Coving:Coving:
42% Less Street42% Less Street
Same Avg. Lot Size.Same Avg. Lot Size.
Connective WalksConnective Walks
31 MORE Lots!31 MORE Lots!
Conventional Coved
City of Coachella, CaliforniaCity of Coachella, CaliforniaRESIDENTIAL PROJECT RESIDENTIAL PROJECT
OF THE YEAROF THE YEAR20022002
Awarded for Providing Awarded for Providing Beautiful, QualityBeautiful, Quality
Affordable HousingAffordable Housing
Construction Cost ComparisonConstruction Cost Comparison
Patuxent Riding
Conventional Low Impact
Grading /Roads 569,698$ 426,575$
StormDrains 225,721$ 132,558$
SWM Pond / Fees 260,858$ 10,530$
Bioretention / Micro -$ 175,000$
Total 1,086,277$ 744,663$
Unit Cost 14,679$ 9,193$
Green - LIDGreen - LID
Yellow - Conventional Yellow - Conventional
A Comparison of Two Different Land Plans
PROJECTED RESULTS FROM TOTAL DEVELOPMENT
Total SiteLot YieldLinear Feet - StreetLinear Feet - Collector StreetLinear Feet - Drainage PipeDrainage Sections(Inlets, Boxes, Headwalls)Estimated Total Cost
Conventional Plan35821,7707,36010,098103
$4.6 million
Revised Green Plan37521,12506,73379 $3.9 million
ACTUAL RESULTS FROM PHASE ONE
Total Site (engineer’s estimate)Lot YieldTotal Cost Cost Per Lot
Conventional Plan
63$1,028,544$16,326
Green Plan
72828,523$11,507
ECONOMIC AND OTHER BENEFITS FROM LOW-IMPACT DEVELOPMENT
Higher Lot YieldHigher Lot ValueLower Cost per Lot Enhanced Marketability Added Amenities Recognition
17 additional lots$3,000 more per lot than competition$4,800 less per lot80 percent of lots sold in the first year23.5 acres of green space/parksNational, state, and professional groups
TOTAL ECONOMIC BENEFIT More than $2.2 million in savings.
No Cost Stuff No Cost Stuff
1.1. Site Design to Conserve Terrestrial FunctionsSite Design to Conserve Terrestrial Functions
2.2. Disconnection Disconnection
3.3. Grading TechniquesGrading Techniques
4.4. Distributed Controls Distributed Controls
5.5. Multifunctional Use of SpaceMultifunctional Use of Space
6.6. Less Grading and Clearing Less Grading and Clearing
““Optimize the use of these smart design techniques” Optimize the use of these smart design techniques”
Rain Garden Treatment Train Approach
Bioretention CellStorm Drain System
Bioretention Cell
Flow Path
Grass Swale Grass Filter Strip
Rain Gardens
Conventional Conventional DevelopmentDevelopment
Stormwater Pond Problems
• High Design / Construction Costs
• Moderate Maintenance– Functional / Aesthetics
• Consumes Land / Resources
• Limited Effectiveness
• Disease
• Public Safety
LID Development
Conservation Conservation Minimization Minimization Soil Soil Management Management Open Drainage Open Drainage Rain Gardens Rain Gardens Rain Rain Barrels Barrels Pollution Pollution Prevention Prevention
Conservation Conservation Minimization Minimization Soil Soil Management Management Open Drainage Open Drainage Rain Gardens Rain Gardens Rain Rain Barrels Barrels Pollution Pollution Prevention Prevention
Disconnected Disconnected Decentralized Decentralized Distributed Distributed Multi-functional Multi-functional
Disconnected Disconnected Decentralized Decentralized Distributed Distributed Multi-functional Multi-functional
Multiple SystemsMultiple Systems
No Cost Stuff No Cost Stuff
1.1. Site Design to Conserve Terrestrial FunctionsSite Design to Conserve Terrestrial Functions
2.2. Disconnection Disconnection
3.3. Grading TechniquesGrading Techniques
4.4. Distributed Controls Distributed Controls
5.5. Multifunctional Use of SpaceMultifunctional Use of Space
6.6. Less Grading and Clearing Less Grading and Clearing
““Optimize the use of these smart design techniques” Optimize the use of these smart design techniques”
Construction Cost ComparisonConstruction Cost Comparison
Patuxent Riding
Conventional Low Impact
Grading /Roads 569,698$ 426,575$
StormDrains 225,721$ 132,558$
SWM Pond / Fees 260,858$ 10,530$
Bioretention / Micro -$ 175,000$
Total 1,086,277$ 744,663$
Unit Cost 14,679$ 9,193$
Rain Garden Treatment Train Approach
Bioretention CellStorm Drain System
Bioretention Cell
Flow Path
Grass Swale Grass Filter Strip
Rain Gardens
Somerset Cost Savings
• $780,000 Total Cost Savings – Eliminated
• Curb / Gutter $350,000• 4 stormwater ponds $650,000• Pipes / Structures $150,000
– Added • $370,000 for Rain Gardens
Bioretention Bioretention • Shallow Ponding - 4” to 6”
• Soil Depth 2’ - 2.5’
• Sandy Top Soil
• 50% Sand
• 20% Sandy Loam
• 30% Compost
• Under Drain System
• Plant Selection
Aesthetic Value / Habitat Value
Property Value / Low Cost
Low Maintenance
X 2’
Under Drain
Proprietary Devices
2” Mulch
Sandy Filter Media
Drain Pipe
Storm Drain
Roadway
A Grow ing Idea in Stormwater Filt ration.
Optional Infiltration Storage
Volatilization
BioretentionClean-out
Rip-Rap
Biodegradation
Root Uptake
Drains to infiltration storage
Tree Grate
Rain Garden on a commercial project with turf grass near I-395 and Edsall Road.
Rain Garden longitudinal view showing overflow device.
Cost Comparison Proprietory BMP's
Device Type Unit Cost Main.Cost Annual
Storm Solutions Absrobant 5,500$ 455$ Ab Tech Absrobant 5,000$ 1,600$ Bay Saver Hydrodynamic 6,700$ 2,000$ Vortechnics Hydrodynamic 12,000$ 2,000$ CDS Hydrodynamic 15,000$ 2,000$ Fossil Filter Filter Inlet Insert 5,400$ 6,300$ Stormceptor Hydrodynamic 34,570$ 2,000$ Stormtreat Filter Wetland 33,000$ 4,500$ Stormfilter Filter Cartrages 40,000$ 5,000$ Filterra Bioretention 6,000$ 100$
High Flow Rate Filter and Infiltration
Treats 90% of Total Annual Volume
Maintenance Cost - $200 / Year
Perspectives on Perspectives on Implementing Implementing Low-Impact Low-Impact
Developments since 1998Developments since 1998
Waukesha, WisconsinWaukesha, Wisconsin
Use native species in restoring open spaces and in lot bioretetnion landscapingUse native species in restoring open spaces and in lot bioretetnion landscaping
© Applied Ecological Services, Inc.
Home and Lot SalesHome and Lot Sales
Conventional Conventional Village of Jackson
Lot Size: 7,000 – 8,000 ft2
Price: low-mid $40,000$40,000
Low ImpactLow ImpactPrairie Meadows
Lot Size: 7,000 – 8,000 ft2
Price: mid-high $50,000$50,000
Advantages of LID Over Advantages of LID Over Conventional DesignConventional Design
Advantages of LID Over Advantages of LID Over Conventional DesignConventional Design
Added Value of LID Results in:Added Value of LID Results in:
• Lot PremiumsLot Premiums
• Increased Sales VelocityIncreased Sales Velocity
• Increased Sales Volume Increased Sales Volume
• Reduced Debt Service Reduced Debt Service
• Reduced Infrastructure CostsReduced Infrastructure Costs
Lessons Learned Nature Sells!Lessons Learned Nature Sells!Lessons Learned Nature Sells!Lessons Learned Nature Sells!
Biggest Obstacles to LIDBiggest Obstacles to LID
Local Ordinances Local Ordinances and and
Knowledge / Experience Knowledge / Experience of of
Local Building Officials Local Building Officials & &
Consultants!Consultants!
Biggest Obstacles to LIDBiggest Obstacles to LID
Local Ordinances Local Ordinances and and
Knowledge / Experience Knowledge / Experience of of
Local Building Officials Local Building Officials & &
Consultants!Consultants!