27
Slide 1. Title Hello everyone, My name is Graham Wilson and I lead the infrastructure team for SAGE Automation. Sage Automation were employed by Schneider electric to assist with the installation and commissioning of equipment both inside the tunnel and on the gantry approaches. Apologies from John Whittaker our commissioning lead who is very busy at present and is unable to make it today. Also like to thank Transcity for the use of photographs in this presentation. Lastly to make it clear that Schneider were not involved with the actual tolling gantry on this project 1

Legacy way ITS summit 2015 presentation with notes

Embed Size (px)

Citation preview

Page 1: Legacy way ITS summit 2015 presentation with notes

Slide 1. Title 

Hello everyone,My name is Graham Wilson and I lead the infrastructure team for SAGE Automation.Sage Automation were employed by Schneider electric to assist with the installation and commissioning of equipment both inside the tunnel and on the gantry approaches.

Apologies from John Whittaker our commissioning lead who is very busy at present and is unable to make it today. 

Also like to thank Transcity for the use of photographs in this presentation.

Lastly to make it clear that Schneider were not involved with the actual tolling gantry on this project

1

Page 2: Legacy way ITS summit 2015 presentation with notes

Slide 2 What is Legacy Way Project?

• Legacy Way is a twin two‐lane tunnel under construction in Brisbane. • Brisbane City Council engaged Transcity (comprising BMD Constructions, Italian 

company Ghella and Spanish construction company Acciona) to design and build Legacy Way. 

• The tolled tunnel will be approximately 4.6km in length and will run from the tunnel portals in Toowong (western end), where the western freeway joins

2

Page 3: Legacy way ITS summit 2015 presentation with notes

Slide 3 What is Legacy Way Project?

• To Kelvin Grove in the eastern end where the Inner city bypass joins.

• The Western freeway will be operated by Transport and Main Roads, with some shared infrastructure between tollroad and TMR

• The inner city bypass will be operated by Brisbane City Council

• Schneider are responsible for the SCADA, Tollroad Traffic Management and Control system, and also the Plant Monitoring and Control System

3

Page 4: Legacy way ITS summit 2015 presentation with notes

Slide 4. System Overview

Here is overview of the SCADA OASYS system

There are around 10,000 I/O points on the project.

I will outline the topology for the Plant Monitoring and Control Systems (PMCS)

4

Page 5: Legacy way ITS summit 2015 presentation with notes

Slide 5. System Overview

The PMCS controls a lot of equipment including

which covers equipment such as Dampers, fans, pumps, light circuits, air quality sensors and so on.

5

Page 6: Legacy way ITS summit 2015 presentation with notes

Slide 6.  PMCS Topology

The diagram shows the PMCS topology. There are

• 3 x Redundant CPU Pairs (TCC & Substation 1000)

• 76 I/O Nodes: Tunnel (62), W/Fwy (8), ICB (4), TCC (2)

• Relies on tunnel Ethernet network 

6

Page 7: Legacy way ITS summit 2015 presentation with notes

Slide 7.  PMCS Topology

Highlighted view of the Schneider Quantum PLC

7

Page 8: Legacy way ITS summit 2015 presentation with notes

Slide 8.  PMCS Topology

A closer view of the Schneider Advantys RIO equipment

8

Page 9: Legacy way ITS summit 2015 presentation with notes

Slide 9.  PMCS overview

Let’s go back to the PMCS overview.

Taking the jet fan example shown in the photo

9

Page 10: Legacy way ITS summit 2015 presentation with notes

Slide 10. Jet fan example

The SCADA system sends out a command to the relevant CPU cabinet over the PMCS network 

The CPU cabinet then communicates with the relevant Remote Input Ouput module called RIO module.

The RIO module sends a run output to the relevant switchboard.

The fan motor starts and sends feedback back to the SCADA system that the fan is running.

10

Page 11: Legacy way ITS summit 2015 presentation with notes

Slide 11. Field cabinets

The photo shows a surface field cabinet containing redundant power supplies and redundant Remote input output modules. 

Each RIO has a connection to each layer 2 switch in the cabinet, so the photo shows two Ethernet connections per RIO module

11

Page 12: Legacy way ITS summit 2015 presentation with notes

Slide 12. System Overview

So that’s the PMCS example.

Now to look at how the Tollroad Traffic Management and Control Systems (TTMCS) network has been designed.

The Tollroad Traffic Monitoring and Control systems Incorporates 

12

Page 13: Legacy way ITS summit 2015 presentation with notes

Slide 13. Tollroad Traffic Monitoring and Control

The Tollroad Traffic Monitoring and Control systems Incorporates several systems shown down the right side

13

Page 14: Legacy way ITS summit 2015 presentation with notes

Slide 14. Electronic Signs

Start with electronic signs. The photo shows a single line tunnel message sign

14

Page 15: Legacy way ITS summit 2015 presentation with notes

Slide 15. Electronic Signs

Electronic signs are across the project in the form of changeable message signs, variable message signs, variable speed limits signs, flashing warning signs, over height warning signs not forgetting dual aspect traffic signals, all Legacy way equipment uses controllers with Ethernet connections and IP addresses.

This photo shows variable speed limit signs on the Inner City Bypass

On this project there are two 3 x 18 VMS outside the tunnel and 55 single line vms in the tunnel.

VMS inside the tunnel will display preset messages.

VMS outside the tunnel will display preset messages and travel time.

There are 27 of the larger type C Variable Speed Limit Signs outside the tunnel , 18 operated by TMR.

15

Page 16: Legacy way ITS summit 2015 presentation with notes

Slide 16. Electronic Signs

Electronic signage will be used for standard tunnel operations and also emergency closures.

Sign Controllers mounted in local field cabinets have Ethernet ports connected to the network.

The sign controllers also have digital inputs activated via the Remote input output modules, remembering that the RIO is also connected to the network.

So the changeable message sign, can be driven through the Ethernet port on the controller or via a digital input from the RIO.

During an emergency the PMCS has priority. On button implements a complete tunnel closure.

16

Page 17: Legacy way ITS summit 2015 presentation with notes

Slide 17. Traffic Data

The Tollroad Traffic Monitoring and Control systems Incorporates standard road loops  provided by Juvana with loop interface units provided by excel technology group

There are also five bluetooth devices. 

There is one on the Innercity bypass tunnel approach, one on the western freeway 

tunnel approach, two Bluetooth sensors installed at the midpoint of tunnel, one on each direction. 

There is also one Bluetooth sensor on Milton Road, which is the congested road the tunnel will bypass.This device will be used as a measure to calculate journey times for vehicles bypassing the tunnel.

As a back up traffic data can be provided by the AID system.

17

Page 18: Legacy way ITS summit 2015 presentation with notes

Slide 18. PA speakers

All of the equipment is IP based including the PA speakers

The Public Address System Manager will use the PA speakers for:

• Providing voice messages for alerting tunnel users when required

• It also provides priority breaking‐in over radio rebroadcast informing to vehicle occupants within the tunnel

• Messages can be ad‐hoc or pre‐recorded• Messages can be edited and organized based on audio 

plans

18

Page 19: Legacy way ITS summit 2015 presentation with notes

Slide 19. help and emergency phones

The help and emergency phones are IP based

The SCADA raises alarms when and handset is picked up and connects the handset to the help phone system via the phone server.

There are 4  motorist help telephone external to the tunnel and 155 motorist help telephone in the tunnel

19

Page 20: Legacy way ITS summit 2015 presentation with notes

Slide 20. operation and maintenance phones

The operation and maintenance phones are IP based

And are located throughout the tunnel cross passages and within plant rooms.

20

Page 21: Legacy way ITS summit 2015 presentation with notes

Slide 21. dangerous goods cameras

The dangerous goods cameras, which are IP based Bosch Dinion HD units

The main purpose of the system is to automatically detects dangerous goods placards on vehicles.

The system consists in of a set of fixed cameras whose video feeds are streamed through the IP communication backbone to both Tollroad Control Centre (TCC) and Back‐up Control Centre (BkCC). 

21

Page 22: Legacy way ITS summit 2015 presentation with notes

Slide 22 PTZ cameras

And all of the fixed and PTZ cameras inside and outside the tunnel are IP based 

There are 270 cameras in total.

22

Page 23: Legacy way ITS summit 2015 presentation with notes

Slide 23 PTZ cameras

And a photo of the Automatic Incident Detection during the smoke tests.

23

Page 24: Legacy way ITS summit 2015 presentation with notes

Slide 24 Challenges

The main challenge within the tunnel has been the number of parallel work fronts taking place during equipment install.

There were literally hundreds of pieces of equipment such as scissor lifts and site vehicles in each bore, even with round the clock shift working.

The PMCS commissioning team were working alongside the electrical install teams to ensure no down time.

24

Page 25: Legacy way ITS summit 2015 presentation with notes

Slide 25 Challenges

Outside the tunnel there is more space to work but then the Queensland weather comes into play.

Our site utes were some of the 39,000 vehicles damaged in the Brisbane CBD area by the Hail storm last november

And the photo shows our site compound was also flooded by 400mm of rain in 24 hours and this has happened several more times since this photo was taken.

25

Page 26: Legacy way ITS summit 2015 presentation with notes

Slide 26 Conclusion

A fully IP based system tunnel system was a godo achievement

The design offers redundancy and will help reduce journey times.

There are many more systems not discussed such as overheight vehicle detection, radio rebroadcast system

26

Page 27: Legacy way ITS summit 2015 presentation with notes

Slide 27 Thank you

27