8
LCSC - Relaying the Astro; week 4 By Heinz

LCSC - Relaying the Astro ; week 4

  • Upload
    hija

  • View
    56

  • Download
    0

Embed Size (px)

DESCRIPTION

LCSC - Relaying the Astro ; week 4. By Heinz. Carpet-laying progressing well in the good weather. 2 –part adhesive is thoroughly mixed before being used to joint the carpet. White tape prevents glued joint adhering to shock pad. Power-brushing sand into the carpet. - PowerPoint PPT Presentation

Citation preview

Page 1: LCSC - Relaying the  Astro ;  week  4

LCSC - Relaying the Astro; week 4

By Heinz

Page 2: LCSC - Relaying the  Astro ;  week  4

Carpet-laying progressing well in the good weather

Page 3: LCSC - Relaying the  Astro ;  week  4

2 –part adhesive is thoroughly mixed before being used to joint the carpet

Page 4: LCSC - Relaying the  Astro ;  week  4

White tape prevents glued joint adhering to shock pad

Page 5: LCSC - Relaying the  Astro ;  week  4

Power-brushing sand into the carpet

Page 6: LCSC - Relaying the  Astro ;  week  4

Terrace construction on-going

Page 7: LCSC - Relaying the  Astro ;  week  4

Another layer of sand being brushed in at the half-way line

Page 8: LCSC - Relaying the  Astro ;  week  4

80% of the carpet laid at the end of week 4