19

LCS Objectives

  • Upload
    garry

  • View
    48

  • Download
    4

Embed Size (px)

DESCRIPTION

LCS Objectives. Provide a standard interface for lane closure operations, closure tracking, and data retrieval for WisDOT regional offices statewide - PowerPoint PPT Presentation

Citation preview

Page 1: LCS Objectives
Page 2: LCS Objectives

LCS ObjectivesLCS Objectives Provide a standard interface for lane closure Provide a standard interface for lane closure

operations, closure tracking, and data retrieval for operations, closure tracking, and data retrieval for WisDOT regional offices statewideWisDOT regional offices statewide

Facilitate data sharing with WisDOT applications that Facilitate data sharing with WisDOT applications that require lane closure data such as 511 Traveler require lane closure data such as 511 Traveler Information, the STOC Incident Management System Information, the STOC Incident Management System (IMS), Inconvenience Map production, and (IMS), Inconvenience Map production, and Oversize/Overweight (OSOW) permittingOversize/Overweight (OSOW) permitting

Improve the completeness, reliability, and timeliness of Improve the completeness, reliability, and timeliness of lane closure data on state highwayslane closure data on state highways

Archive LCS data in the WisTransPortal system for Archive LCS data in the WisTransPortal system for future analysis and integration with other WisDOT / future analysis and integration with other WisDOT / TOPS Lab traffic engineering applications and researchTOPS Lab traffic engineering applications and research

Integrate historical traffic flow data and capacity Integrate historical traffic flow data and capacity information to calculate available closure thresholdsinformation to calculate available closure thresholds

Page 3: LCS Objectives

LCS BenefitsLCS Benefits Coordinates activities to reduce back-ups Coordinates activities to reduce back-ups

and potential conflictsand potential conflicts Multiple activities can utilize the same closure Multiple activities can utilize the same closure Avoid lane closures during a special eventAvoid lane closures during a special event Avoid right lane closure near a left lane closure Avoid right lane closure near a left lane closure

on the same roadwayon the same roadway

Eliminates duplications and inefficiencies Eliminates duplications and inefficiencies by streamlining information into one systemby streamlining information into one system

Provides link to historical data that can be Provides link to historical data that can be used to make informed decisions used to make informed decisions

Page 4: LCS Objectives

LCS Data FlowsLCS Data Flows

LCS WisTransPortal

Data Archive

Construction Map

OSOW

STOC ATMS

511 Travel Info

Email List

LCS Users

Request / Accept

WisDOT

Contracts, STN,Traffic Data

WisDOT Website

Special Project Websites

Page 5: LCS Objectives
Page 6: LCS Objectives

System UseSystem Use

What closures should be tracked?What closures should be tracked? All let projects (information formerly entered All let projects (information formerly entered

into Traffic Impediment Module)into Traffic Impediment Module)

Any planned closure or restriction on Any planned closure or restriction on Corridors 2030 roadwaysCorridors 2030 roadways

All major special eventsAll major special events

When should closures be entered? When should closures be entered? 14 days - Project start or full roadway closure14 days - Project start or full roadway closure

7 days - System ramp closure7 days - System ramp closure

3 days - Lane and service ramp closure3 days - Lane and service ramp closure

Page 7: LCS Objectives
Page 8: LCS Objectives

System UseSystem Use

Closure / Restriction Types Closure / Restriction Types Construction Construction – Let projects– Let projects

MaintenanceMaintenance

Permit Permit – Utility work– Utility work

Special Event Special Event – Summerfest – Summerfest Fireworks, Harley Parade, Farm Fireworks, Harley Parade, Farm Progress DaysProgress Days

Emergency Emergency

Page 9: LCS Objectives

Closure InformationClosure Information

General Section – includes attributes that General Section – includes attributes that pertain to the entire closure and once pertain to the entire closure and once entered cannot be changed (with limited entered cannot be changed (with limited exception)exception)

Facility Section – used to group closure Facility Section – used to group closure specific attributes within the same closure. specific attributes within the same closure. Facilities come in four types:Facilities come in four types: MainlineMainline RampRamp BridgesBridges System Interchanges System Interchanges

Page 10: LCS Objectives
Page 11: LCS Objectives

Closure Duration TypesClosure Duration Types

Daily/NightlyDaily/Nightly – Closures that will occur – Closures that will occur once on the day(s) or night(s) definedonce on the day(s) or night(s) defined

WeeklyWeekly – Closures that will occur on the – Closures that will occur on the same days of the week for a number of same days of the week for a number of weeksweeks

ContinuousContinuous – Closures that will last for – Closures that will last for longer than 24 hours, but less than two longer than 24 hours, but less than two weeksweeks

Long TermLong Term – Closures that will last for – Closures that will last for more than two weeks more than two weeks

Page 12: LCS Objectives
Page 13: LCS Objectives

System UsersSystem Users

System can be accessed via the Internet – System can be accessed via the Internet – therefore people outside of WisDOT can therefore people outside of WisDOT can log on with a username and passwordlog on with a username and password

LCS User Roles Supervisor Regional Traffic

Engineer (RTE) - Regional Coordinator

Statewide Traffic Operations Center (STOC)

Project Manager (PM)

Permit Coordinator (PC) Maintenance Coordinator

(MC) Project Leader (PL) Public Information (PUBLIC) Inspector (INSP) Requestor (REQ) Viewer (VIEWER)

Page 14: LCS Objectives

Acceptance ProcessAcceptance Process

Closures that will typically be automatically Closures that will typically be automatically accepted include: accepted include: Let project information that was formally Let project information that was formally

entered into the Traffic Impediment Module of entered into the Traffic Impediment Module of FITFIT

Closures that meet requirements outlined in the Closures that meet requirements outlined in the TMPTMP

Closures that should follow the approval Closures that should follow the approval process include: process include: Maintenance workMaintenance work Short-term project closures – i.e. overnight workShort-term project closures – i.e. overnight work

Page 15: LCS Objectives

LCS Work FlowLCS Work Flow

ACCEPT

REQUEST

FORWARD

Complete

Closure

Ret

urn

/ R

esc

hed

ule

Page 16: LCS Objectives

Acceptance ProcessAcceptance Process

Special events will typically be entered by a Special events will typically be entered by a Traffic Engineer who has already approved Traffic Engineer who has already approved the closure and the closure will not go the closure and the closure will not go through the acceptance processthrough the acceptance process

Acceptance authority can be delegated to Acceptance authority can be delegated to anyone by their supervisor anyone by their supervisor

Users with acceptance authority are allowed Users with acceptance authority are allowed to, but not required to, immediately accept a to, but not required to, immediately accept a closure they have entered into the system closure they have entered into the system

Page 17: LCS Objectives

System InterfacesSystem Interfaces

Request – Enter a closure into the systemRequest – Enter a closure into the system Accept – Edit, advance or accept a closureAccept – Edit, advance or accept a closure Modify – Modify or reschedule accepted closuresModify – Modify or reschedule accepted closures Search – Search for closuresSearch – Search for closures Reports – Run closure reportsReports – Run closure reports Capacity – Evaluate lane closureCapacity – Evaluate lane closure Calendar – View calendar of events (i.e. Packer Calendar – View calendar of events (i.e. Packer

Games)Games) E-mail – Add, edit or delete e-mail preferencesE-mail – Add, edit or delete e-mail preferences Preferences – Update user information Preferences – Update user information

Page 18: LCS Objectives

LCS Key PointsLCS Key Points

April 1, 2008 - LCS go live dateApril 1, 2008 - LCS go live date

Does Does notnot replace person to person replace person to person communicationscommunications

Can be run from almost any web browser using any internet connection

Flexible, statewide system developed to accommodate a variety of business needs

Page 19: LCS Objectives

http://transportal.cee.wisc.edu/clohttp://transportal.cee.wisc.edu/closuressures