22
E-R DIAGRAM OF LIBRARY MANAGEMENT SYSTEM

Latest Print

Embed Size (px)

Citation preview

Page 1: Latest Print

E-R DIAGRAM OF LIBRARY MANAGEMENT SYSTEM

USE CASE OF LIBRARY MANAGEMENT SYSTEM

Page 2: Latest Print
Page 3: Latest Print

DFD OF LIBRARY MANAGEMENT SYSTEM

Page 4: Latest Print

USE CASE OF BANK MANAGEMENT SYSTEM

Page 5: Latest Print

cust_id

branchname

age

address

loan_id

l_branch

policy_name

Man_id

Man_password

trans_id

acc_noa_branch

type

balance

accno

a_bal

customer loan

amount

account

Manager

borrows

withdraws

deposits

creates

M

1

1

1

M

1

M

1

1

1

M

Grant

1

M

E-R DIAGRAM OF BANK MANAGEMENT SYSTEM

Page 6: Latest Print

USE CASE OF AIRLINE MANAGEMENT SYSTEM

Page 7: Latest Print

USE CASE OF RAILWAY RESERVATION SYSTEM

Page 8: Latest Print

E-R DIAGRAM OF RAILWAY RESERVATION SYSTEM

Page 9: Latest Print

STATE TRANSITION DIAGRAM OF ATM

Page 10: Latest Print

STATE TRANSITION DIAGRAM OF MICROWAVE

Page 11: Latest Print

STATE TRANSITION DIAGRAM OF REFRIGERATOR

Page 12: Latest Print

DFD OF AIRLINE MANAGEMENT SYSTEM

LEVEL -0 DFD

Page 13: Latest Print

DFD OF AIRLINE MANAGEMENT SYSTEM

LEVEL -1 DFD

Page 14: Latest Print

LEVEL -0 DFD

Page 15: Latest Print

LEVEL -1 DFD

Page 16: Latest Print

LEVEL -0 DFD

Page 17: Latest Print

LEVEL -1 DFD

Page 18: Latest Print

STATE TRANSITION DIAGRAM OF ELEVATOR

FEASIBILITY STUDY

Page 19: Latest Print

Feasibility study is to check the viability of the project under consideration. Theoretically various types of feasibilities are conducted, but we have conducted three type of feasibilities explained as under.

ECONOMIC FEASIBILITY

With the manual system the operating cost of the system is about 5 Lacks P.A.. This cost comprises salary of 25 people, stationary, building rent, electricity, water, telephone etc. But with the new system this reoccurring cost comes out to be about 1 Lacks P.A. Hence the new system is economically feasible.

TECHNICAL FEASIBILITY

The new system requires only 3 trained person to work with the system and in overall 5 people per office are sufficient. So we will identify 6 best people from existing system and train them.

As our existing system is purely manual, so we need a one time investment of Rs 50k for the purchase of 3 computers, a laser printer, AC and networking etc. It requires 1 Lacks PA as a operating cost.

With the above details our system is technically feasible as after investing 1 Lacks in a year, the College is still saving Rs 4Lacks PA.

OPERATIONAL FEASIBILITY

The new solution is feasible in all sence but operationally it is not. The new system demands the expulsion of at least 15 people from the staff. It creates an environment of joblessness and fear among the employees. It can lead to an indefinite strike in the college also. So the management must take corrective actions prior in advance in order to start the further proceedings.

Page 20: Latest Print