lansdowne Road and Dingwall Road roundabout improvements
Citation preview
PRECEDENT IMAGERY
Precedents of indicative high quality materials, street furniture and planting that reflect the special qualities of the environment.
LANSDOWNE ROAD & DINGWALL ROAD ROUNDABOUT IMPROvEMENTS
DRAFT PLAN FOR CONSULTATION
Find out more at: www.croydon.gov.uk/lansdowneroad-consultation
Please send comments by the 30th November 2012 to: [email protected]
PROvIDING A SAFER MORE ATTRACTIvE DIRECT ROUTE BETWEEN THE NEW EAST CROYDON STATION BRIDGE AND THE WHITGIFT CENTRE
LANSDOWNE RD & DINGWALL RD ROUNDABOUT IMPROvEMENT
WORKS
WHITGIFT SHOPPING
CENTRE
NEW EAST CROYDON
STATION BRIDGE ENTRANCE
OPENING 2013
NEW
WELLESLEY
RD CROSSING
2014
NEW
LANSDOWNE
WALK LINK
2013
CONNECTED CROYDON
DRAFT DESIGN PROPOSAL (INDICATIvE)
LANSDOWNE ROAD
WEL
LESL
EY R
OA
D
LANSDOWNE WALK LINK TO EAST
CROYDON STATION BRIDGE
vISUALISATION 1
Future Lansdowne Road looking towards Wellesley Road
vISUALISATION 2
Future Lansdowne Road / Dingwall Roundabout looking towards Lansdowne Road
TIMESCALES:• Project is currently at the design
stage• Proposed start on site - April
2013• Proposed completion - Summer
2013
DELIvERY PARTNERS:• Croydon Council• GLA• Skanska
FUNDING:• Mayors Regeneration Fund -
£2.13M
WA
LPO
LE R
OA
D
Level Surface
New widened & re-paved footpath
New Tree Planting
New Seating Elements
Re-surface of carriageway
Compliant Crossing Points
Re-paved footpath
Compliant Crossing Points
New high quality materials
New Taxi Rank
SUMMARY:
From July 2013 with the opening of the new northern entrance to East Croydon Station, Lansdowne Road will be the vital pedestrian and cycle connection between East Croydon Station, the major South London public transport interchange, and Croydon’s retail core (the Whitgift Centre, North End and Centrale). The proposed improvement works will provide a safer more attractive route to handle the predicted 30% of people who currently use East Croydon Station to access these parts of the town.
These works are part of the wider Connected Croydon programme of public realm enhancements. The project, over the next three years, will deliver a lasting legacy for Croydon Metropolitan Centre
The works will also connect with a proposed new surface-level pedestrian crossing on Wellesley Road that will connect Lansdowne
Road and the main eastern entrance of the Whitgift Centre by 2014. This will further strengthen the role of Lansdowne Road as a direct pedestrian link between the new East Croydon footbridge and Croydon’s major commercial and retail core.
MAIN OBJECTIvES:• To transform Lansdowne
Road between Wellesley Road and Dingwall Road (including Dingwall Road roundabout) into a pedestrian-friendly space that still accommodates vehicles
• To strengthen the sense of arrival to an important London destination by creating an inviting public space
• To set a high-quality benchmark for public realm improvements in Croydon Metropolitan Centre
• To improve connectivity and increase capacity for pedestrians and cyclists between Lansdowne Road and the new East Croydon
footbridge via Lansdowne Walk whilst maintaining its role as a vehicular route
• To preserve existing bus movement and timing, and allow for future increase in capacity
• Improve public transport interchange in the vicinity of the western entrance to the new East Croydon footbridge including a new taxi rank
(NOT TO SCALE)