Kurva S
Citation preview
KURVA S PELAKSANAAN PEKERJAANPERENCANAAN PENIMBUNAN RUJAB ESSALON II, TAHAP II
TAHUN ANGGARAN 2014
No URAIAN KEGIATAN
BOBOT
KEGIATAN
(%)
A PEKERJAAN PERSIAPAN
1 MOBILSASI DAN KOORDINASI 0.90
2 PENYEMPURNAAN METODOLOGI DAN RENCANA KERJA 0.90
B PELAKSANAAN PENGAWASAN
1 PEMBUATAN PERENCANAAN 88.89
C PENYIAPAN DAN PENYAMPAIAN PELAPORAN
1 LAPORAN PENDAHULUAN DAN RMK 2.71
2 LAPORAN ANTARA 2.71
3 LAPORAN FINAL 2.71
D DISKUSI
1 DISKUSI LAPORAN PENDAHULUAN DAN RMK 0.13
2 DIKUSI LAPORAN ANTARA 0.52
3 DISKUSI LAPORAN AKHIR 0.52
JUMLAH 100.00
RENCANA PENCAPAIAN PELAKSANAAN KEGIATAN 0
REALISASI PENCAPAIAN PELAKSANAAN KEGIATAN
TINGKAT DEVIASI
0
10
20
30
40
50
60
70
80
90
100
KURVA S PELAKSANAAN PEKERJAANPERENCANAAN PENIMBUNAN RUJAB ESSALON II, TAHAP II
TAHUN ANGGARAN 2014
PERIODE WAKTU KEGIATAN
MINGGU I MINGGU II
0.90
0.90
1 2.5 2.5 2.5 3 2.96 4 4 4 3.96
2.71
0.45 0.45 0.45
0.13
0.09 0.09 0.09
3.75 1.90 3.04 2.50 2.50 3.00 3.50 4.00 4.00 4.00 4.50
3.75 5.65 8.69 11.19 13.69 16.69 20.19 24.19 28.19 32.19 36.69
0
10
20
30
40
50
60
70
80
90
100
KURVA S PELAKSANAAN PEKERJAANPERENCANAAN PENIMBUNAN RUJAB ESSALON II, TAHAP II
TAHUN ANGGARAN 2014
PERIODE WAKTU KEGIATAN
MINGGU II MINGGU III MINGGU IV
5.5 5.5 5.5 4.46 5 5 5 3.96 5 4.5 4.5
0.45 0.45
0.09 0.09
5.50 5.50 5.50 5.00 5.00 5.00 5.00 4.50 5.00 4.50 4.50
42.19 47.69 53.19 58.19 63.19 68.19 73.19 77.69 82.69 87.19 91.69
0
10
20
30
40
50
60
70
80
90
100
KURVA S PELAKSANAAN PEKERJAANPERENCANAAN PENIMBUNAN RUJAB ESSALON II, TAHAP II
TAHUN ANGGARAN 2014
PERIODE WAKTU KEGIATAN
KETMINGGU IV
6
4.5 0.04 88.847 0.0422
0.45
2.71
0.09
0.52
4.50 3.81
96.19 100
0
10
20
30
40
50
60
70
80
90
100
KURVA S PELAKSANAAN PEKERJAANREPLIKASI PENGELOLAAN SAMPAH TERPADU DI TANGERANG
(PSDP-02A-K)
No URAIAN KEGIATAN
DISTRIBUSI PENUGASAN TENAGA AHLI BOBOT PERIODE WAKTU KEGIATAN
Hari TL Sosek finc fasilt JUMLAH KEGIATAN Juni Juli Agst Sep Okt
1 1 1 1 (%) 3 4 1 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4
A PEKERJAAN PERSIAPAN
1 MOBILSASI 14 14 14 1.04 0.52 0.52
2 KOORDINASI 7 21 21 21 1.56 0.52 0.52 0.52
3 PENYEMPURNAAN METODOLOGI DAN RENCANA KERJA 7 14 14 14 1.04 0.52 0.52
B SURVEY, PENGUMPULAN DAN ANALISA DATA
1 REFERNSI / LITERATUR 14 14 14 28 2.08 1.0401 1.0401
2 DISKUSI DENGAN LSM BEST 2 2 2 4 0.30 0.30
3 PENGAMATAN KEPERUMAHAN MUSTIKA-TIGARAKSA 2 2 2 4 0.30 0.30
4 DATA DEMOGRAFI DAN RENCANA TATA RUANG TANGERANG 6 6 6 12 0.89 0.89
5 LOKASI-LOKASI KAWASAN PERUMAHAN KLAS RENDAH-MENENGAH 2 2 2 4 0.30 0.30
6 PENENTUAN DAN PENYEPAKATAN LOKASI REPLIKASI 14 14 14 28 2.08 1.0401 1.04
C KONSEP PENANGANAN
1 SKENARIO REPLIKASI 12 14 14 14 14 42 3.12 1.5602 1.56
2 RENCANA SOSIALISASI 13 14 14 14 14 42 3.12 1.5602 1.5602
3 KONSEP BANTUAN STIMULAN 14 14 14 14 14 42 3.12 1.56 1.56
4 POLA PENANGANAN DAN ORGANISASI PENGELOLA 14 14 14 14 42 3.12 1.5602 1.5602
5 RENCANA PELAKSANAAN 7 7 7 7 21 1.56 1.56
C IMPLENTASI
1 SOSIALISASI 18 18 18 18 18 72 5.35 0.6686 0.6686 0.6686 0.6686 0.6686 0.6686 0.6686 0.6686
2 PEMBANGUNAN TPST KAWASAN 30 30 30 30 30 120 8.92 2.2288 2.2288 2.2288 2.2288
3 PENDAMPINANG 70 70 70 70 70 280 20.80 2.18 2.08 2.08 2.08 2.08
4 BIMBINGAN TEKNIS DAN MANAJEMEN 21 21 21 21 21 84 6.24 2.08 2.08
5 UJI COBA DAUR ULANG 30 30 30 30 30 120 8.92
6 UJI COBA PENGOMPOSAN 30 30 30 30 30 120 8.92
D MONITORING DAN EVALUASI 30 30 30 30 30 120 8.92
E PENYIAPAN PELAPORAN
1 LAPORAN RMK 27 7 7 7 7 21 1.56 1.56
2 LAPORAN PENDAHULUAN 28 7 7 7 14 1.04 1.04
3 LAPORAN ANTARA 29 7 7 7 7 21 1.56 1.56
4 LAPORAN DRAFT FINAL 30 7 7 7 7 21 1.56
5 LAPORAN FINAL 31 7 7 7 7 21 1.56
F DISKUSI
1 DISKUSI RMK 33 1 1 1 2 0.15 0.15
2 DISKUSI PENDAHULUAN 34 1 1 1 1 1 4 0.30 0.30
3 DIKUSI PERTENGAHAN 35 1 1 1 1 1 4 0.30 0.30
4 DISKUSI AKHIR (LAPORAN DRAFT FINAL) 36 1 1 1 1 1 4 0.30
JUMLAH 420 420 370 324 232 1346 100.00 0.52 1.04 1.04 3.64 2.08 3.27 7.28 7.80 0.67 0.67 0.67 2.23 0.97 2.85 4.98 4.98 6.39 6.39
RENCANA PENCAPAIAN PELAKSANAAN KEGIATAN 420 0.52 1.56 2.60 6.24 8.32 11.59 18.87 26.67 27.34 28.01 28.68 30.91 31.87 34.72 39.70 44.68 51.07 57.45
REALISASI PENCAPAIAN PELAKSANAAN KEGIATAN
TINGKAT DEVIASI
KURVA S PELAKSANAAN PEKERJAANREPLIKASI PENGELOLAAN SAMPAH TERPADU DI TANGERANG
(PSDP-02A-K)
No URAIAN KEGIATAN
DISTRIBUSI PENUGASAN TENAGA AHLI
Hari TL Sosek finc fasilt JUMLAH
1 1 1 1
A PEKERJAAN PERSIAPAN
1 MOBILSASI 14 14 14
2 KOORDINASI 7 21 21 21
3 PENYEMPURNAAN METODOLOGI DAN RENCANA KERJA 7 14 14 14
B SURVEY, PENGUMPULAN DAN ANALISA DATA
1 REFERNSI / LITERATUR 14 14 14 28
2 DISKUSI DENGAN LSM BEST 2 2 2 4
3 PENGAMATAN KEPERUMAHAN MUSTIKA-TIGARAKSA 2 2 2 4
4 DATA DEMOGRAFI DAN RENCANA TATA RUANG TANGERANG 6 6 6 12
5 LOKASI-LOKASI KAWASAN PERUMAHAN KLAS RENDAH-MENENGAH 2 2 2 4
6 PENENTUAN DAN PENYEPAKATAN LOKASI REPLIKASI 14 14 14 28
C KONSEP PENANGANAN
1 SKENARIO REPLIKASI 12 14 14 14 14 42
2 RENCANA SOSIALISASI 13 14 14 14 14 42
3 KONSEP BANTUAN STIMULAN 14 14 14 14 14 42
4 POLA PENANGANAN DAN ORGANISASI PENGELOLA 14 14 14 14 42
5 RENCANA PELAKSANAAN 7 7 7 7 21
C IMPLENTASI
1 SOSIALISASI 18 18 18 18 18 72
2 PEMBANGUNAN TPST KAWASAN 30 30 30 30 30 120
3 PENDAMPINANG 70 70 70 70 70 280
4 BIMBINGAN TEKNIS DAN MANAJEMEN 21 21 21 21 21 84
5 UJI COBA DAUR ULANG 30 30 30 30 30 120
6 UJI COBA PENGOMPOSAN 30 30 30 30 30 120
D MONITORING DAN EVALUASI 30 30 30 30 30 120
E PENYIAPAN PELAPORAN
1 LAPORAN RMK 27 7 7 7 7 21
2 LAPORAN PENDAHULUAN 28 7 7 7 14
3 LAPORAN ANTARA 29 7 7 7 7 21
4 LAPORAN DRAFT FINAL 30 7 7 7 7 21
5 LAPORAN FINAL 31 7 7 7 7 21
F DISKUSI
1 DISKUSI RMK 33 1 1 1 2
2 DISKUSI PENDAHULUAN 34 1 1 1 1 1 4
3 DIKUSI PERTENGAHAN 35 1 1 1 1 1 4
4 DISKUSI AKHIR (LAPORAN DRAFT FINAL) 36 1 1 1 1 1 4
JUMLAH 420 420 370 324 232 1346
RENCANA PENCAPAIAN PELAKSANAAN KEGIATAN 420
REALISASI PENCAPAIAN PELAKSANAAN KEGIATAN
TINGKAT DEVIASI
KURVA S PELAKSANAAN PEKERJAANREPLIKASI PENGELOLAAN SAMPAH TERPADU DI TANGERANG
(PSDP-02A-K)
PERIODE WAKTU KEGIATAN
Nov Des
1 2 3 4 1 2
2.08 2.08 2.08 2.08 2.08
2.08
4.46 4.46
1.78 1.78 1.78 1.78 1.78
2.23 2.23 2.23 2.23
1.56
1.56
0.30
10.40 9.88 6.39 6.09 6.09 3.79
67.86 77.74 84.13 90.22 96.31 100
1 24 5 8 12 25 6 30 43 26 7 31 44 27 8 31 45 28 9 30 46 29 10 31 47 30 11 19 3 6.3338 31 24
180