No URAIAN KEGIATAN A PEKERJAAN PERSIAPAN 1 MOBILSASI DAN KOORDINASI 2 PENYEMPURNAAN METODOLOGI DAN RENCANA KERJA B PELAKSANAAN PENGAWASAN 1 PEMBUATAN PERENCANAAN C PENYIAPAN DAN PENYAMPAIAN PELAPORAN 1 LAPORAN PENDAHULUAN DAN RMK 2 LAPORAN ANTARA 3 LAPORAN FINAL D DISKUSI 1 DISKUSI LAPORAN PENDAHULUAN DAN RMK 2 DIKUSI LAPORAN ANTARA 3 DISKUSI LAPORAN AKHIR JUMLAH RENCANA PENCAPAIAN PELAKSANAAN KEGIATAN REALISASI PENCAPAIAN PELAKSANAAN KEGIATAN TINGKAT DEVIASI

Kurva S- Supervisi

Embed Size (px)

DESCRIPTION

Kurva S

Citation preview

Page 1: Kurva S- Supervisi

KURVA S PELAKSANAAN PEKERJAANPERENCANAAN PENIMBUNAN RUJAB ESSALON II, TAHAP II

TAHUN ANGGARAN 2014

No URAIAN KEGIATAN

BOBOT

KEGIATAN

(%)

A PEKERJAAN PERSIAPAN

1 MOBILSASI DAN KOORDINASI 0.90

2 PENYEMPURNAAN METODOLOGI DAN RENCANA KERJA 0.90

B PELAKSANAAN PENGAWASAN

1 PEMBUATAN PERENCANAAN 88.89

C PENYIAPAN DAN PENYAMPAIAN PELAPORAN

1 LAPORAN PENDAHULUAN DAN RMK 2.71

2 LAPORAN ANTARA 2.71

3 LAPORAN FINAL 2.71

D DISKUSI

1 DISKUSI LAPORAN PENDAHULUAN DAN RMK 0.13

2 DIKUSI LAPORAN ANTARA 0.52

3 DISKUSI LAPORAN AKHIR 0.52

JUMLAH 100.00

RENCANA PENCAPAIAN PELAKSANAAN KEGIATAN 0

REALISASI PENCAPAIAN PELAKSANAAN KEGIATAN

TINGKAT DEVIASI

0

10

20

30

40

50

60

70

80

90

100

Page 2: Kurva S- Supervisi
Page 3: Kurva S- Supervisi
Page 4: Kurva S- Supervisi

KURVA S PELAKSANAAN PEKERJAANPERENCANAAN PENIMBUNAN RUJAB ESSALON II, TAHAP II

TAHUN ANGGARAN 2014

PERIODE WAKTU KEGIATAN

MINGGU I MINGGU II

0.90

0.90

1 2.5 2.5 2.5 3 2.96 4 4 4 3.96

2.71

0.45 0.45 0.45

0.13

0.09 0.09 0.09

3.75 1.90 3.04 2.50 2.50 3.00 3.50 4.00 4.00 4.00 4.50

3.75 5.65 8.69 11.19 13.69 16.69 20.19 24.19 28.19 32.19 36.69

0

10

20

30

40

50

60

70

80

90

100

Page 5: Kurva S- Supervisi

KURVA S PELAKSANAAN PEKERJAANPERENCANAAN PENIMBUNAN RUJAB ESSALON II, TAHAP II

TAHUN ANGGARAN 2014

PERIODE WAKTU KEGIATAN

MINGGU II MINGGU III MINGGU IV

5.5 5.5 5.5 4.46 5 5 5 3.96 5 4.5 4.5

0.45 0.45

0.09 0.09

5.50 5.50 5.50 5.00 5.00 5.00 5.00 4.50 5.00 4.50 4.50

42.19 47.69 53.19 58.19 63.19 68.19 73.19 77.69 82.69 87.19 91.69

0

10

20

30

40

50

60

70

80

90

100

Page 6: Kurva S- Supervisi

KURVA S PELAKSANAAN PEKERJAANPERENCANAAN PENIMBUNAN RUJAB ESSALON II, TAHAP II

TAHUN ANGGARAN 2014

PERIODE WAKTU KEGIATAN

KETMINGGU IV

6

4.5 0.04 88.847 0.0422

0.45

2.71

0.09

0.52

4.50 3.81

96.19 100

0

10

20

30

40

50

60

70

80

90

100

Page 7: Kurva S- Supervisi

KURVA S PELAKSANAAN PEKERJAANREPLIKASI PENGELOLAAN SAMPAH TERPADU DI TANGERANG

(PSDP-02A-K)

No URAIAN KEGIATAN

DISTRIBUSI PENUGASAN TENAGA AHLI BOBOT PERIODE WAKTU KEGIATAN

Hari TL Sosek finc fasilt JUMLAH KEGIATAN Juni Juli Agst Sep Okt

1 1 1 1 (%) 3 4 1 4 5 6 1 2 3 4 1 2 3 4 1 2 3 4

A PEKERJAAN PERSIAPAN

1 MOBILSASI 14 14 14 1.04 0.52 0.52

2 KOORDINASI 7 21 21 21 1.56 0.52 0.52 0.52

3 PENYEMPURNAAN METODOLOGI DAN RENCANA KERJA 7 14 14 14 1.04 0.52 0.52

B SURVEY, PENGUMPULAN DAN ANALISA DATA

1 REFERNSI / LITERATUR 14 14 14 28 2.08 1.0401 1.0401

2 DISKUSI DENGAN LSM BEST 2 2 2 4 0.30 0.30

3 PENGAMATAN KEPERUMAHAN MUSTIKA-TIGARAKSA 2 2 2 4 0.30 0.30

4 DATA DEMOGRAFI DAN RENCANA TATA RUANG TANGERANG 6 6 6 12 0.89 0.89

5 LOKASI-LOKASI KAWASAN PERUMAHAN KLAS RENDAH-MENENGAH 2 2 2 4 0.30 0.30

6 PENENTUAN DAN PENYEPAKATAN LOKASI REPLIKASI 14 14 14 28 2.08 1.0401 1.04

C KONSEP PENANGANAN

1 SKENARIO REPLIKASI 12 14 14 14 14 42 3.12 1.5602 1.56

2 RENCANA SOSIALISASI 13 14 14 14 14 42 3.12 1.5602 1.5602

3 KONSEP BANTUAN STIMULAN 14 14 14 14 14 42 3.12 1.56 1.56

4 POLA PENANGANAN DAN ORGANISASI PENGELOLA 14 14 14 14 42 3.12 1.5602 1.5602

5 RENCANA PELAKSANAAN 7 7 7 7 21 1.56 1.56

C IMPLENTASI

1 SOSIALISASI 18 18 18 18 18 72 5.35 0.6686 0.6686 0.6686 0.6686 0.6686 0.6686 0.6686 0.6686

2 PEMBANGUNAN TPST KAWASAN 30 30 30 30 30 120 8.92 2.2288 2.2288 2.2288 2.2288

3 PENDAMPINANG 70 70 70 70 70 280 20.80 2.18 2.08 2.08 2.08 2.08

4 BIMBINGAN TEKNIS DAN MANAJEMEN 21 21 21 21 21 84 6.24 2.08 2.08

5 UJI COBA DAUR ULANG 30 30 30 30 30 120 8.92

6 UJI COBA PENGOMPOSAN 30 30 30 30 30 120 8.92

D MONITORING DAN EVALUASI 30 30 30 30 30 120 8.92

E PENYIAPAN PELAPORAN

1 LAPORAN RMK 27 7 7 7 7 21 1.56 1.56

2 LAPORAN PENDAHULUAN 28 7 7 7 14 1.04 1.04

3 LAPORAN ANTARA 29 7 7 7 7 21 1.56 1.56

4 LAPORAN DRAFT FINAL 30 7 7 7 7 21 1.56

5 LAPORAN FINAL 31 7 7 7 7 21 1.56

F DISKUSI

1 DISKUSI RMK 33 1 1 1 2 0.15 0.15

2 DISKUSI PENDAHULUAN 34 1 1 1 1 1 4 0.30 0.30

3 DIKUSI PERTENGAHAN 35 1 1 1 1 1 4 0.30 0.30

4 DISKUSI AKHIR (LAPORAN DRAFT FINAL) 36 1 1 1 1 1 4 0.30

JUMLAH 420 420 370 324 232 1346 100.00 0.52 1.04 1.04 3.64 2.08 3.27 7.28 7.80 0.67 0.67 0.67 2.23 0.97 2.85 4.98 4.98 6.39 6.39

RENCANA PENCAPAIAN PELAKSANAAN KEGIATAN 420 0.52 1.56 2.60 6.24 8.32 11.59 18.87 26.67 27.34 28.01 28.68 30.91 31.87 34.72 39.70 44.68 51.07 57.45

REALISASI PENCAPAIAN PELAKSANAAN KEGIATAN

TINGKAT DEVIASI

Page 8: Kurva S- Supervisi

KURVA S PELAKSANAAN PEKERJAANREPLIKASI PENGELOLAAN SAMPAH TERPADU DI TANGERANG

(PSDP-02A-K)

No URAIAN KEGIATAN

DISTRIBUSI PENUGASAN TENAGA AHLI

Hari TL Sosek finc fasilt JUMLAH

1 1 1 1

A PEKERJAAN PERSIAPAN

1 MOBILSASI 14 14 14

2 KOORDINASI 7 21 21 21

3 PENYEMPURNAAN METODOLOGI DAN RENCANA KERJA 7 14 14 14

B SURVEY, PENGUMPULAN DAN ANALISA DATA

1 REFERNSI / LITERATUR 14 14 14 28

2 DISKUSI DENGAN LSM BEST 2 2 2 4

3 PENGAMATAN KEPERUMAHAN MUSTIKA-TIGARAKSA 2 2 2 4

4 DATA DEMOGRAFI DAN RENCANA TATA RUANG TANGERANG 6 6 6 12

5 LOKASI-LOKASI KAWASAN PERUMAHAN KLAS RENDAH-MENENGAH 2 2 2 4

6 PENENTUAN DAN PENYEPAKATAN LOKASI REPLIKASI 14 14 14 28

C KONSEP PENANGANAN

1 SKENARIO REPLIKASI 12 14 14 14 14 42

2 RENCANA SOSIALISASI 13 14 14 14 14 42

3 KONSEP BANTUAN STIMULAN 14 14 14 14 14 42

4 POLA PENANGANAN DAN ORGANISASI PENGELOLA 14 14 14 14 42

5 RENCANA PELAKSANAAN 7 7 7 7 21

C IMPLENTASI

1 SOSIALISASI 18 18 18 18 18 72

2 PEMBANGUNAN TPST KAWASAN 30 30 30 30 30 120

3 PENDAMPINANG 70 70 70 70 70 280

4 BIMBINGAN TEKNIS DAN MANAJEMEN 21 21 21 21 21 84

5 UJI COBA DAUR ULANG 30 30 30 30 30 120

6 UJI COBA PENGOMPOSAN 30 30 30 30 30 120

D MONITORING DAN EVALUASI 30 30 30 30 30 120

E PENYIAPAN PELAPORAN

1 LAPORAN RMK 27 7 7 7 7 21

2 LAPORAN PENDAHULUAN 28 7 7 7 14

3 LAPORAN ANTARA 29 7 7 7 7 21

4 LAPORAN DRAFT FINAL 30 7 7 7 7 21

5 LAPORAN FINAL 31 7 7 7 7 21

F DISKUSI

1 DISKUSI RMK 33 1 1 1 2

2 DISKUSI PENDAHULUAN 34 1 1 1 1 1 4

3 DIKUSI PERTENGAHAN 35 1 1 1 1 1 4

4 DISKUSI AKHIR (LAPORAN DRAFT FINAL) 36 1 1 1 1 1 4

JUMLAH 420 420 370 324 232 1346

RENCANA PENCAPAIAN PELAKSANAAN KEGIATAN 420

REALISASI PENCAPAIAN PELAKSANAAN KEGIATAN

TINGKAT DEVIASI

KURVA S PELAKSANAAN PEKERJAANREPLIKASI PENGELOLAAN SAMPAH TERPADU DI TANGERANG

(PSDP-02A-K)

PERIODE WAKTU KEGIATAN

Nov Des

1 2 3 4 1 2

2.08 2.08 2.08 2.08 2.08

2.08

4.46 4.46

1.78 1.78 1.78 1.78 1.78

2.23 2.23 2.23 2.23

1.56

1.56

0.30

10.40 9.88 6.39 6.09 6.09 3.79

67.86 77.74 84.13 90.22 96.31 100