dr Aleksandar Jovović, v.prof.
dipl.inž.maš.
CEDEF‐januar 2012.
Komunalni otpad kao energent
NIMBY – “not in my backyard”BANANA – “build absolutely nothing anywhere near anybody”Not in my election timePo ovome smo vec kao I drugirazvijeni….
Solid Waste Legislation Timeline – DUG i DUG i ……
1975 2005
20001980
1995
1990
1985
2010
3rd WasteDirective
1st WasteDirective
IncinerationDirective
LandfillDirective
TFS 1TFS 2 IPPC
(2nd) WasteDirective
Hazardous WasteDirective
OILs SewageSludge Directive
PRODUCER RESPONSIBILITY
INATITIVES
(PCB’S, BATTERIES, ..)
PRODUCER RESPONSIBILITY
INATITIVES
(WEEE, ELV, ..)
RoHS
TitaniumDioxideDirective
WasteStatistics
Packaging Waste, Waste Catalogue, Hazardous Waste List
WEEE
Framework legislation
Waste treatment operations
Specific waste streams
Waste Framework Directive(Dir. 1991/156/EEC)
Hazardous waste Directive(Dir. 1991/689/EEC)
Waste Shipments Regulation(Reg. (EEC/2006/1013)
Incineration Directive(Dir. 2000/76/EC)
Landfill Directive(Dir. 1999/31/EC)
Waste OilsDirective
(Dir 1975/439/EEC)
Sewage SludgeDirective
(Dir. 1986/278/EEC)
BatteriesDirective
(Dir. 91/157/EEC& 93/86/EEC)
PackagingDirective
(Dir. 1994/62/EC)
End-of-Life Directive(2000/53/EC)
Electric andElectronic Waste
Directive(Dir. 2002/96/EC)
EU legislativa – posle 2007 – … veoma komplikovan put
IPPC Directive(Dir. 96/61/EC)
Thematic Strategy on Waste Prevention and Recycling
BiowasteDirective
Ključni problemi zaštite životne sredine
Mogući uticaji na životnu sredinu
Emisija u vazduh & uticaj na zdravlje
Neprijatnosti (prašina, neprijatni mirisi, buka, štetočine, smeće)
Saobraćaj
Vodni resursi
Vizuelno ometanje
Potencijal iskorišćenja resursa
DIOKSINI I FURANI
Ova jedinjenja se stvaraju pri nekontrolisanom spaljivanju otpada, preradi metala, proizvodnji cementa, pri sagorevanju fosilnih goriva, požarima.
SRF (Solid Recovered Fuels) ili RDF (Refuse‐derived fuel) – gorivo dobijeno iz otpada CEN/TC 343
Dobija se obično sortiranjem, usitnjavanje i odredjenim sušenjem komunalnog otpada
Često prerada u pelete ili brikete
Svaki element nastajanja (dobijanja), daljeg tretmana, ispitivanja, odredjivanja karakteristika važnih za zdravstvenu ispravnost i zdravlje ljudi, odredjivanje karakteristika važnih za termički tretman – propisan standardima
Screening drums separate the waste.
Air classifiers separate a paper/ plastic fraction.
Production location VAGRON (Groningen)
The pressed bales of paper/plastic fraction. Bales ready for transport.
Production locations Vagron and Wijster
SRFSRF
SRF SRF je gorivo dobijeno iz otpada za je gorivo dobijeno iz otpada za ččije se ije se karakteristike mokarakteristike možže garantovatie garantovatiTrTržžiiššte je i dalje u razviju (posebno znate je i dalje u razviju (posebno značčajan rast ajan rast je u CHP)je u CHP)KoriKoriššććenje SRF smanjuje potrebu za uvoznim enje SRF smanjuje potrebu za uvoznim energentimaenergentimaKoriKoriššććenje SRF dovodi do smanjenja emisija CO2enje SRF dovodi do smanjenja emisija CO2SRF predstavlja znaSRF predstavlja značčajan ajan obnovljiviobnovljivi izvor energijeizvor energijeSRF je reSRF je reššenje za tretman onih frakcija otpada enje za tretman onih frakcija otpada koje se ne mogu lako i koje se ne mogu lako i ispaltivoispaltivo recikliratireciklirati
Primer (neki vole reći Case Study –studija slučaja)
1. Energetska upotreba otpada za pokrivanje dela energetskih potreba u Celju
2. Ispunjavanje strogih zahteva oko količine dozvoljenogbiorazgradljivog ugljenika u deponovanom otpadu posle jula2009. godine ‐ zbrinjavanje lake frakcije
3. Zbrinjavanje mulja sa centralnogpostrojenja za prečiščavanjekomunalnih otpadnih voda
EnerganaEnergana Celje: Celje: razlozirazlozi za za gradnjugradnju
Lokacija Lokacija EnerganeEnergane CeljeCelje
Blizina centra gradaBlizinaBlizina centra gradacentra grada Blizina MBO objekata i sanitarne deponije
BlizinaBlizina MBO MBO objekataobjekata i i sanitarne deponijesanitarne deponije
3 3 kkmm
Lokacija Lokacija EnerganeEnergane CeljeCelje
EnerganaEnergana Celje u slikamaCelje u slikama……teren teren prepre popoččetkaetka gradnje gradnje –– martmart 20072007
EnerganaEnergana Celje u slikamaCelje u slikama……tehnitehniččkki pregled i pregled –– sept 2008sept 2008
EnerganaEnergana Celje u slikamaCelje u slikama……loložžiišštete i parni i parni kotaokotao
EnerganaEnergana Celje u slikamaCelje u slikama……sistem prsistem preeččiiššččavanjaavanja dimnih dimnih gasovagasova
Shematski prikaz Shematski prikaz kogeneracikogeneracionogonogpostrojenjapostrojenja
1 – Skladište2 – Transportni kran3 – Zajam vazduha iz skladišta4 – Umesno sklad.+dozirne jedin.5 – Ložište6 – Sistem odpepeljivanja7 – Pregrivač
8 – Ekonomajzer9 – Isparivač10 – Napojna voda11 – Aktivno uglje u prahu12 – Soda bikarbona13 – Mlin in mešalna enota14 – Keramički filter
15 – Silos za filterski prah16 – Aktivni koks filter17 – Ventilator dim. plinov18 – Dimnjak19 – Nadzorni sistem20 – Emisijski monitoring
OpOpšštiti podacipodaci o o termitermiččkojkoj obradiobradi otpadaotpada u u EnerganiEnergani CeljeCelje
Kapaciteta sistema (laka fr.+mulj): 25.000 t/leto
Prosečna toplotna moc: ~14 MJ/kg
Snaga parnog kotla: 15 MW
Snaga parne turbine: 2 MWe
Parametri pare: 350°C in 28 barToplotna snaga daljinskog grejanja: do 15 MW
Uslovi za rad uređenja: 24 sata/dan;8.000 sata/godišnje
U skladu sa:
EU direktivama (WID, IPPC) Slovenačkom legislativom‘EU Best Available Techniques Reference’ (BREF) i ‘Best AvailableTechnology’ (BAT)
OtpadOtpad za za EnerganuEnerganu CeljeCelje(prema (prema dozvolidozvoli))
Laka frakcija otpada (19 12 10) ‐ 20.000 tona:
papir
karton
les
plastika
folije
tekstil
Mulj iz komunalnog postrojenja za prečiščavanje otpadnihvoda (19 08 05) ‐ 5.000 tona
UtUticajicaj EnerganeEnergane CeljeCeljena na žživotnuivotnu sredinusredinu
emisije u vazduh (www.toplarna‐ce.si)
emisije u vode
buka
elektromagnetno zračenjeOstatak iz procesa
Waste Managament in SerbiaUrban population generates 1 kg of MSW/cap./day
Belgrade - 1,2 kg MSW/cap./day
App. 0,87 kg MSW/cap./day (318 kgMSW/cap./a)
2.4 milion tons of MSW/a (2010.)3.4 milion tons of MSW/a (2020.)
Plasticpackaging waste,
3.73%
Metal‐aluminumcans, 0.26%
Metal‐packaging
Aluminumcardboard,
1.01%
Diapers, 3.65%
Leather, 0.4%
Textile, 5.25%
Plastic bags 5.61%
Waxed cardboard, 1.09%
Cardboard, 6.13%Glass, 5.44%
Paper, 5.34%
Fine particles, 7.82% Gardening waste
12.14%
Other biodegradable waste, 37.62%
Hard plastic, 3.39%
and other, 1.12%
Waste Managament in Serbia
Moisture content – high
Heat value - low
Change/Serbia
Serbian GHG emission in future from waste sector
Society of Thermal Engineers of Serbia
Beograd
Primer – potencijalno postrojenje naRDF/SRF za BeogradMasa SRF na ulazu 150.000,00 t/god
Donja toplotna moć Hd=16000 kJ/kg
koristi se laka frakcija otpada (191210) papir, karton, drvo, plastika, folije, tekstil
Snaga 90 MW
Ukupna količina šljake i letećeg pepela ‐ 25000‐30000 t šljake godišnje i 7500 t letećeg pepela
CHP postrojenje ‐ u zavisnosti od novca koji se uloži u kotao i turbinu, i uz dobar sistem grejanja grada dobija se
toplote oko 70MWth
električne energije iz oko 18MWth, tj. 6MWelektrične energije
Investicije
oko 100 miliona EUR (tj. nešto više od 1milion EUR po MWth instalisane snage)
oko 65% mašinski deo, 20% elektro deo, 15% građevina (sve ±5%)
Godišnji troškovi direktni bez amortizacije oko 10% od investicije, a sa amortiyacijom do 20%
Celokupna vremenskaCelokupna vremenska sskalakala projektaprojektaGodina: Produkt/proces/postupak:
0ta godina Idejni projekat i Investicioni program
1 godina Prostorni i drugi planovi
2 godina EIA dozvola, tenderi, ugovor
3. godina Dobijanje građevinske dozvole i gradjenje
4. godina Zavrsetak gradnje i početak probnog rada
5. godina Dozvola za upotrebu i predaja objekata
Konsultacije javnosti
Spaljivanje ostaje jedno od kontraverznih pitanja za mnoge zajednice
Naučna osnova mnogih briga je ponekad slaba, ali te brige se moraju razmotriti
ZakljuZaključčcici
Objekti za termičku obradu moraju biti i raditi u saglasnosti sa svim standardima i propisima iz oblasti zžs
Potrebno je osigurati visok stepen iskorišćenja –maksimalna energetska efikasnost
Sasvim automatizovan proces (pouzdanost/ekonomičnost)
Niski troškovi rada i održavanja
UpotrebljavatiUpotrebljavati samo samo proverenuproverenu i i pouzdanpouzdanuu tehnologijutehnologiju
ISWA/SeSWA/WTERT Serbia
ISWA – International Solid Waste AssociationSeSWA
Serbian Solid Waste AssociationMember of ISWA as a National CommitteeFounded on September 2007.
WTERT Serbia – part of SeSWA