  • K. D. MALAVIYA NATIONAL OIL MUSEUM

    AT GUWAHATI

    CIVIL, ARCHITECTURAL & STRUCTURAL,

    INCLUDING FINISHING, SITE DEVELOPMENT,

    SANITATION & PLUMBING WORKS

    VOLUME - II

    SPECIFICATIONS

    Architect Pheroze Kudianavala Consultants Engrs. Pvt. Ltd. Mackinnon Mackenzie Building, 2nd Floor, Ballard Estate, Mumbai 400 001.

  • INDEX

    ----------------------------------------------------------------------------------SR. NO. DESCRIPTION PAGE NOS.

    ----------------------------------------------------------------------------------

    1. SCOPE OF WORKS SW-1 2. CIVIL WORKS CW -1 to CW-248 3. SANITATION & PLUMBING WORKS SPW-1 to SPW-38

  • SCOPE OF WORK

    Entire work shall be carried out as per the specifications, drawings and instructions of the Consultant and Engineer-in-Charge in best workman like manner. The tenderers are advised to go through all the drawings to arrive at the estimated quantity of each of the items listed herein or those items, which may not have been specifically listed but are required to be executed as per intent of the drawing or for completion of the buildings. Site Development

    Excavation and Earth Filling Storm Water Drain On site Sewerage and Water Supply Network Compound wall and Gates Road Work and Paving Retaining Walls Security Cabin Septic Tank & Soak Pit

    Museum Building

    Pile foundation work. Entire building work Structural glazing and aluminium cladding, glass pyramid Underground and overhead water tanks with pump house Sanitation & Plumbing works.

    1. SITE

    1.1 The site is situated at Jawahar Nagar, Guwahati, Assam.

    1.2 INVESTIGATIONS The OIL has done soil investigations through Architect / Consultant and the data is available for inspection with OIL. However, the Bidders are advised to either on this data or to make their own investigation / enquiries at their cost, as deemed fit.

  • CW- 1

    CIVIL WORKS

  • CW- 2

    K. D. MALAVIYA NATIONAL OIL MUSEUM

    INDEX

    -------------------------------------------------------------------------------- SR. NO. DESCRIPTION PAGE NOS. -----------------------------------------------------------------------------------------------------------------------------------

    (1) SPECIAL CONDITIONS FOR CIVIL WORKS CW 2 - CW 6

    (2) SPECIFICATIONS FOR MATERIALS CW 7 - CW 11

    (3) LIST OF APPROVED MATERIALS & SPECIALISED AGENCIES CW 12 - CW 15

    (4) PARTICULAR SPECIFICATIONS

    i. EARTH WORK CW 16 - CW 22 ii. CONCRETE & STEEL REINFORCEMENT STRUCTURAL, STEEL, PILING WORK CW 23 - CW 67 iii. MASONRY WORK CW 68 - CW 70 iv. PLASTER WORK CW 71 - CW 72 v. PAINTING & POLISHING CW 73 - CW 81 vi FLOORING & WALL CLADDING CW 82 - CW 93 vii. WOOD WORK CW 94 - CW 98 viii. METAL WORK CW 99 - CW 101 ix. ALUMINIUM WINDOWS CURTAIN WALL, ALUMINIUM CLADDING, DOORS, LOUVERS CW 102 - CW 199 x. GLASS PYRAMID CW 200 - CW 213 xi. STAINLESS STEEL RAILINGS CW 214 - CW 215 xii. FALSE CEILING CW 216 - CW 223 xiii. WATERPROOFING TREATMENT CW 224 - CW 230 xiv. ROAD WORK CW 231 - CW 245

    (5) LIST OF DRAWINGS CW 246 - CW 248

  • CW- 3

    SPECIAL CONDITIONS FOR CIVIL WORKS

    1. SETTING OUT 1.1 The Contractor shall carry out survey of the work area, at his own cost, setting

    out the layout and fixing of alignment of the building in consultation with the Engineer-in-Charge / Consultant & proceed further. Any discrepancy between the architectural drawings and actual layout at site shall be brought to the notice of the Engineer-in-charge/ Consultant. It shall be responsibility of the Contractor to ensure correct setting out of alignment. Total station survey instruments only shall be allowed to be used for layout, fixing boundaries, centre lines, etc., along with theodolites. Nothing extra s hall be payable on this account.

    1.2 The Contractor shall establish, maintain and assume responsibility for grades, lines, levels and benchmarks. He shall report any errors or inconsistencies regarding grades, lines, levels, dimensions etc. to the Engineer-in-Charge before commencing work. Commencement of work shall be regarded as the Contractors acceptance of such grades, lines, levels, and dimensions and no claim shall be entertained at a later date for any errors found.

    1.3 If at any time, any error in this regard appears during the progress of the work, the Contractor shall, at his own expense rectify such error, if so required, to the satisfaction of the Engineer-in-Charge / Consultant. Nothing extra shall be payable on this account.

    1.4 Though the site levels are indicated in the drawings the Contractor shall ascertain and confirm by himself, the site levels with respect to benchmark from the concerned authorities. The Contractor shall protect and maintain temporary/permanent benchmarks at the site of work through out the execution of work. These benchmarks shall be got checked by the Engineer-in-Charge / Consultant or his authorized representatives. Nothing extra shall be payable on this account.

    1.5 The work at different stages shall be checked with reference to bench marks maintained for the said purpose. The cost of carrying out lay outs at all stages including marking of reference points, center lines of the building etc. including construction/maintenance of said bench marks shall be deemed to be included in quoted rate. Nothing extra shall be payable on this account.

    1.6 The entire work upto the plinth level, as required for obtaining approval of the plinth from the local authority, shall be completed by the Contractor at the same time. The Contractor shall also extend all co-operation and liaison with the local body for approval of plinth. Nothing extra shall be payable on this

  • CW- 4

    account. Work above plinth shall be carried out only after obtaining approval from the local body. No extension of time on this ground and also no claim whatsoever on account of any delay in approval at plinth level by the local body, if required, shall be entertained from the Contractor. Nothing extra shall also be payable on this account.

    1.7 The approval by the Engineer-in-Charge, of the setting out of the alignment of the building, by the Contractor, shall not relieve the Contractor of any of his responsibilities and obligation to rectify the errors/ defects, if any, which may be found at any stage during the progress of the work or after the completion of the work.

    1.8 The Contractor shall be entirely and exclusively responsible for the horizontal, vertical and other alignments, the level and correctness of every part of the work and shall rectify effectively any errors or imperfections therein. Such rectifications shall be carried out by the Contractor at his own cost to the entire satisfaction of the Engineer-in-Charge.

    1.9 The rates quoted by the Contractor are deemed to be inclusive of site clearance, dewatering, removal of slush from PCC etc. setting out work, profile, establishment of reference bench mark(s), taking spot levels, construction of all safety and protection devices, barriers, providing and constructing temporary ramp from the ground level for accessing the site at PCC level for execution of work and other preparatory works, working during monsoon, working at all depths, height and location etc. and any other incidental works required to complete this work. Nothing extra shall be payable on this account.

    2 QUALITY CONTROL AND TESTING OF MATERIALS

    All the material to be used in the work shall bear ISI certification mark. In case ISI mark materials or the materials mentioned in the tender documents are not available, the material to be used shall conform to CPWD specifications applicable to this tender and / or national / international codes as approved by Engineer-in-Charge. In such cases, the Engineer-in-charge shall satisfy himself about the quality of such materials and give his approval in writing. Only articles classified as first quality by the manufacturers / suppliers shall be used in the work. All materials not having ISI mark, if allowed to be used in the work by Engineer-in-Charge, shall be tested as per relevant specifications, as approved by the Engineer-in-Charge. In all cases of use of ISI marked materials, proper proof of procurement of materials from authentic manufacturers shall be provided by the Contractor to the entire satisfaction of Engineer in charge.

  • CW- 5

    3 The Contractor shall procure and provide all the materials from the manufacturers / suppliers as per the list attached with the tender documents, as per the item description and particular specifications for the work. The equivalent brand for any item shall be permitted to be used in the work, only when the specified make is not available. This is, however, subject to documentary evidence produced by the Contractor for non-availability of the brand specified and also subject to independent verification by the Engineer-in-Charge. In such cases, of deviation in specification or material, the matter should be referred to Engineer-In-Charge for final decision. No claim, whatsoever, of any kind shall be entertained from the Contractor on this account. Nothing extra shall be payable on this account. Also, the material shall be procured only after the written approval of Engineer-in-Charge

    4 QUALITY CONTROL AND TESTING OF MATERIALS:

    4.1 The Contractor shall submit, immediately after the award of work, a detailed and complete method stateme