    JOB-ORDER AND BATCH COSTING

    JOB/ORDER COSTING

    BATCH COSTING

  • 8/2/2019 Job-Order and Batch Costing 186

    3/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-3

    Job Order Costing

    Such a system can be appropriately applied to accumulate costs in the followingsituations:

    Auto-repair shops, where each repair job requires varying amounts of material andlabour. The mechanic will charge the cost of any replaced parts and the number oflabour-hours spent in repairing.

    Automobile assembly, where each car includes a variety of different options. Printing shops, where each print order requires a different type of paper, ink,

    design and so on.

    Foundries, where special parts are to be manufactured as per order.

    Hospitals, where the costs of services provided to each patient are billedseparately.

    Contractors, shipbuilders and motion picture companies. Machine shops, tool shops and design engineers.

    Public accounting firms and other similar professions, where each audit, taxreturn, or management services engagement needs varying amounts ofprofessional time and attention.

    Furniture making firms, where they may produce a batch of similar chairs, tables,sofas, and so on. Each batch may be treated as a job.

    Job order costing is the procedure to accumulate cost when work isperformed pursuant to an order to meet individual customers

    specifications.

  • 8/2/2019 Job-Order and Batch Costing 186

    4/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-4

    Job Cost Sheet

    On receipt of an order by a firm employing job costing,a job cost sheet is prepared. Every job order is given aspecific number. For identification, a job cost sheet

    bearing the allotted number is maintained for each jobput into production. General information in respect ofthe job order is recorded at the top of the job sheet. Asregards specific information, the job cost sheet

    enumerates the appropriate inputs required in threebasic categories: direct material, direct labour andoverhead to carry out the order.

  • 8/2/2019 Job-Order and Batch Costing 186

    5/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-5

    Exhibit 1: Job Cost Sheet

    Customer name________________________

    and address ________________________

    Description ________________________

    Quantity ________________________

    Job No.

    Date started __________________

    Date promised __________________

    Date finished __________________

    Special remarks, if any __________________

    Materials Labour Overheads

    Quantity Rate Amount Hours Rate Amount Hours Rate Amount

    Department 1

    Department 2

    Department 3

    Cost Summary

    Materials Laobur Overheads Total

    Actual Estimate

    Department 1

    Department 2

    Department 3Job order price

    Profit (Loss)

    Discrepancies between actual and estimated costs are explained below:

    1.

    2.

    3.

  • 8/2/2019 Job-Order and Batch Costing 186

    6/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-6

    Recording Job Costs inAccounts

    The accounting system of recording job costs will depend onwhether the general ledger records all cost transactions

    or a special ledger called factory ledger is separatelymaintained for the purpose.

    Modus operandi is that a factory ledger account is opened in thegeneral ledger to substitute for the accounts, which have been

    recorded in the factory ledger. Likewise, a general ledger

    account is provided in the factory ledger. The balancesin these accounts are kept equal at all times.

  • 8/2/2019 Job-Order and Batch Costing 186

    7/26 Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-7

    Accounting procedure if both the factoryand general ledgers are maintained

    1) Accounting for Materials

    2) Accounting for Labour

    3) Accounting for Overheads

    4) Accounting for Completed Jobs

  • 8/2/2019 Job-Order and Batch Costing 186

    8/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-8

    Accounting for Materials

    The relevant accounting entries in the factory and general ledgers torecord the (i) purchase, (ii) issue, and (iii) return of materials

    would be as follows

    Factory ledger:

    1. Debit materials inventory/materials and supplies A/c, and Credit generalledger.

    2. Debit work-in-process A/c, and Credit materials inventory/materials andsupplies A/c.

    3. Reversal of entry (2).

    General ledger:

    1. Debit factory ledger, and Credit accounts payable/cash or bank.

    2. No entry.

    3. No entry.

  • 8/2/2019 Job-Order and Batch Costing 186

    9/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-9

    Accounting for Labour

    The following journal entries would be recorded in respectof the labour cost:

    Factory ledger:

    Debit work-in-process A/c (for direct labour) and Debit factoryoverhead control (A/c (for indirect labour) and Credit generalledger.

    General ledger:Debit factory ledger A/c, and Credit wages payable A/c /cash orbank.

  • 8/2/2019 Job-Order and Batch Costing 186

    10/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-10

    Accounting for Manufacturing Overheads

    Manufacturing overheads can be charged to various jobs either at the

    actual overhead rate or a predetermined overhead rate.

    Predetermined Overhead Rate

    Predetermined overhead rate is budgeted manufacturing overheadsdivided by budgeted activity. The merits of a predetermined overhead rateare:

    (a) It is useful in bidding cases to determine the tender/quotation price;

    (b) It enables individual jobs to be costed as soon as they are completedand, thus, helps in providing more rapid product cost information to themanagement; and

    (c) Such a rate levels out the fluctuations which may be caused by

    variations in actual overhead costs and actual activity.

    Predetermined overhead rate = Budgeted manufacturing overheads/Budgeted activity.

    Budgeted manufacturing overheads = [Total budgeted fixed overheads +Budgeted variable overhead rate] Budgeted activity.

  • 8/2/2019 Job-Order and Batch Costing 186

    11/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-11

    Example 1: Determining Predetermined Overheads Rate

    Hypothetical Ltd employs job-order costing. It uses an annual

    predetermined rate for applying manufacturing overheads to jobs. The

    company furnishes you with the following information regarding its

    overheads for the coming year at normal activity: Fixed overheads, Rs4,00,000; and Variable overheads, Rs 3,00,000.

    The estimates of the direct labour cost, direct labour hours and machine-

    hours at normal activity along with a set of correlation coefficients between

    overheads and various measures of activity, as compiled from past

    records, are also given:Normal level of activity Correlation coefficient

    with overheads

    Direct labour cost

    Direct labour hours

    Machine hours

    Rs 10,00,000

    2,00,000

    1,00,000

    0.7

    0.8

    0.6

    Determine the predetermined (i) fixed, (ii) variable, and (iii) total overhead

    rates.

  • 8/2/2019 Job-Order and Batch Costing 186

    12/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-12

    Further assume that Hypothetical Ltd during the first quarter received an

    invitation from a regular customer to bid on a job. The job was estimated to

    require Rs 1,00,000 of direct materials and the following: Direct labour

    cost, Rs 50,000; Direct labour-hours, 15,000; and Machine-hours, 5,000

    Determine the bid price the company should quote assuming its normal

    practice of charging 20 per cent on factory cost to cover other

    administrative overheads and profit. Assume further that the companyuses a predetermined factory overhead rate to assign factory overheads to

    jobs.

    Solution

    Predetermined overhead rates should be based on direct labour-hours(DLH)

    (i) Predetermined fixed overhead rate = Rs 4,00,000 2,00,000 = Rs 2(ii) Predetermined variable overhead rate = Rs 3,00,000 2,00,000 = Rs 1.50

    (iii) Total predetermined overhead rate = Rs 7,00,000 2,00,000 = Rs 3.50

  • 8/2/2019 Job-Order and Batch Costing 186

    13/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-13

    Solution: Job Cost Sheet to Determine the Bid Price

    Particulars AmountDirect materials Rs 1,00,000

    Direct labour cost 50,000

    Prime cost 1,50,000

    Add factory overheads (15,000 direct labour-hours @Rs 3.5 per hour) 52,500

    Factory cost 2,02,500

    Add 20 per cent for administrative overheads andprofit 40,500

    Bid price 2,43,000

  • 8/2/2019 Job-Order and Batch Costing 186

    14/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-14

    Disposition of Variance

    Disposition of Variance Overhead variances may bedisposed of by following either of the two methods: (i)

    They may be assigned to the income statement of thecurrent period by charging the entire amount to the costof goods sold account; or (ii) They may be considered asthe cost of production of the current period andaccordingly may be pro-rated to work-in-process,

    finished goods and cost of goods sold. The treatmentwould depend on the nature of such variance.

  • 8/2/2019 Job-Order and Batch Costing 186

    15/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-15

    If the variance has been an outcome of unusual events of the currentperiod, it should be charged to the cost of goods sold. But if such avariance has been caused by errors in estimation or fundamentalchanges in cost structure, it should be pro-rated over work-in-process, finished goods and cost of goods sold. For the firm inExample 1, consider the following additional information:

    JobNo.

    Direct costs Overheadscharged In

    quarter

    Status of job at the end ofthe quarter

    50 Rs 2,20,000 Rs 72,000 Cost of goods sold

    51 1,80,000 45,000 Finished goods in inventory

    52 1,30,000 40,500 Work-in-process inventory

    5,30,000 1,57,500

    Show the process of adjusting under-applied overheads.

  • 8/2/2019 Job-Order and Batch Costing 186

    16/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-16

    Solution: Manufacturing/Factory Overhead Adjustment

    Account Over-

    charged inquarter

    Percentage of

    overheadapplied inquarter

    Under-

    appliedoverheads(Rs 22,500)

    (percentage)

    Total costs

    assigned tojobs afteradjustment

    Cost of goods sold Rs 72,000 45.7 Rs 10,282.50 Rs 82,282.50

    Finished goodsinventory 45,000 28.6 6,435.00 51,435.00

    Work-in-processinventory 40,500 25.7 5,782.50 46,282.50

    1,57,500 100.00 22,500.00 1,80,000.00

  • 8/2/2019 Job-Order and Batch Costing 186

    17/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-17

    The following journal entries would be required to give effect tomanufacturing overheads.

    Factory ledger

    1. Debit Factory Overhead Control A/c, and Credit General Ledger

    (For indirect manufacturing costs incurred).

    2. Debit Work-in-Process/Individual Jobs A/c, and Credit Factory OverheadControl A/c

    (For charging indirect overheads to jobs).

    3. Debit Cost of Goods Sold A/c, and Credit Factory Overhead Control A/c

    (For charging under-applied overheads to cost of goods sold account underfirst method).

    Entry number (3) would be reversed in the case of over-applied overheads.4. Debit Work-in-Process/Individual Jobs

    Debit Finished Goods inventory

    Debit Cost of Goods Sold, and

    Credit Factory Overhead Control A/c

    (For charging under-applied overheads under pro-rating method).

    Entries (3) and (4) would be reversed in the case of over-applied overheads.

    General ledger

    1. Debit Factory Ledger A/c, and Credit Various Credits (Accounts Payable),Credit Accumulated Depreciation, and so on.

    (For indirect manufacturing costs incurred).

  • 8/2/2019 Job-Order and Batch Costing 186

    18/26

  • 8/2/2019 Job-Order and Batch Costing 186

    19/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-19

    Example 2: (Job Costing System: Factory Ledger and General LedgerMethod)

    Jay Engineering Company Ltd uses a job-order cost system. The following isa summary of its operations during January:

    1. Purchases of raw materials and supplies, Rs 37,500.2. Materials and supplies were requisitioned and issued as follows:

    Direct materials:

    Job No. 101 Rs 6,000

    102 9,000

    103 1,400 Rs 16,400Indirect materials 400

    3.Factory payroll sent to the general office for payment was distributed asfollows:

    Direct labour:

    Job No. 101 Rs 5,400102 6,000

    103 600

    Rs 12,000

    Indirect labour 4,000

  • 8/2/2019 Job-Order and Batch Costing 186

    20/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-20

    4. Indirect miscellaneous manufacturing costs incurred, Rs 5,200.

    5. Indirect manufacturing costs were applied using a rate of 70 per cent ofdirect labour cost.

    6. Job No. 101 (100 units) and Job No. 102 (50 units) were completed andtransferred to finished goods.

    7. Goods despatched to customers were as follows: From Job No. 101, 50units; From Job No. 102, 100 units.

    Prepare the required ledger accounts to record the above transactions in thefactory ledger.

    Solution: Job Ledger

    Particulars Job No. 101 Job No. 102 Job No. 103

    Raw materials and supplies Rs 6,000 Rs 9,000 Rs 1,400

    Direct labour 5,400 6,000 600

    Indirect manufacturing costsapplied 3,780 4,200 420

    15,180 19,200 2,420

  • 8/2/2019 Job-Order and Batch Costing 186

    21/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-21

    Factory Ledger Accounts

    Raw Materials and Supplies A/c

    To general ledger(purchase of inventory) Rs 37,500By work-in-processBy factory overhead controlA/c

    Rs 16,400

    400

    Work-in-Process A/c

    To raw materials andsupplies Rs 16,400

    By finished goods (costof Job Nos. 101 and 102 Rs 34,380

    To general ledger (directlabour payment) 12,000

    To factory overhead control(applied A/c) 8,400

  • 8/2/2019 Job-Order and Batch Costing 186

    22/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-22

    Finished Goods Inventory A/c

    To work-in-process Rs 34,380 By cost of goodssold (Rs 7,590 + Rs12,800) Rs 20,390

    Cost of Goods Sold A/c

    To finished goods inventory Rs 20,390

    Factory Overhead Control A/c

    To raw materials and supplies Rs 400

    To general ledger (indirect labourpayment) 4,000

    To general ledger (miscellaneousexpenses) 5,200

    Factory Overhead Control Applied A/c

    By work-in-process Rs 8,400

    General Ledger Accounts

    By raw materials and supplies Rs 37,500

    By work-in-process 12,000

    By factory overhead control A/c 4,000

    By factory overhead control A/c 5,200

    Note: Ledger accounts are not balanced as the transactions pertain to only amonths period.

  • 8/2/2019 Job-Order and Batch Costing 186

    23/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-23

    General Ledger Accounts

    Factory Ledger (A/c)

    To accounts payable Rs 37,500

    To wages payable 16,000

    To miscellaneous credits 5,200

    Accounts Payable* A/c

    By factory ledger A/c Rs 37,500

    Wages Payable* A/c

    By factory ledger A/c Rs 16,000

    Miscellaneous Credits* A/c

    By factory ledger A/c Rs 5,200

    *Debits in these accounts would be made when payments are made.

  • 8/2/2019 Job-Order and Batch Costing 186

    24/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-24

    Evaluation

    Job order costing is useful in the following ways:

    Job costing data can be utilised for estimating the production costs ofspecific jobs or lots of production.

    Estimates of future job costs serve not only as a basis for bidding and

    price setting but also as a standard for measuring efficiency andevaluating the performance through comparisons with the actualcosts incurred. From the point of view of accounting also, the systemis easy to operate as the costs are recorded order or job-wise.

    From the point of view of accounting also, the system is easy tooperate as the costs are recorded order or job-wise.

    Finally, job cost sheets which are the focal point of job order systemcan be utilised by the management to segregate jobs on the basis ofcontributions/profits made by them. This information, in turn, will helpthe management in deciding which types of jobs should be accordedpriority.

  • 8/2/2019 Job-Order and Batch Costing 186

    25/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-25

    Batch Costing

    Batch costing is a variant of job costing. It is a natural type ofsystem to be utliised in situations when a firm manufactures

    products in readily identifiable batches or definite lots

    For identification purposes, each batch is required to benumbered in batch costing as each job is numbered

    in the job costing system.

    The unique feature which distinguishes job costing from batch

    costing is that, while in the former production is tailoredto meet the customers specifications, in the latter, in

    general, goods are produced to inventory themfor future sale to customers.

  • 8/2/2019 Job-Order and Batch Costing 186

    26/26

    Tata McGraw-Hill Publishing Company Limited, Management Accounting 13-26

    Determination of Batch Costing

    Example 4

    The following details are available in respect of a small tool manufacturing firm:

    Annual estimated demand per year (units)

    Cost of production per unit

    Carrying costs per unit for one year

    Setting up cost per batch

    1,600

    Rs 5

    1

    50

    Determine EBQ.

    Solution

    EBQ =2 1,600 Rs 50

    = 400 unitsRs 1

    EBQ = 2 AS/C

    Where A = annual requirements of the product

    S = setting-up costs per batch

    C = carrying cost per unit of inventory per annum