12
PETRONA PACKAGE 2 ACCESS AND THE RAPID _________ OWNER A Name: Date (DDSignature Documen Pages mo 0 11 REV. DD S RAPID PROJ 0C1: COMMON D PERMANENT SITE AT PENGER ____________ Approval: MMMYY): : t class: odified under 1Sep14 DATE DMMMYY Sections JECT CONSTRUCTION ROADS WITHIN RANG JOHOR ____________ HEAL JO D Z this revision: IFA Issued F STATUS – REV changed in la Project RAPID Packa P20C N JOB HA ___________ TH SAFETY OB HAZAR DRIVEN PI For Approval ISION MEMO ast revision a ge C1 Originator WCTB AZARD ANALY ____________ Y AND ENV RD ANALYS LES / SPUN Mohamad WRITT (name re identified DOCUMENT N Discipline HSE Doc P YSIS ____________ VIRONMEN SIS (JHA) N PILES W d Rasydi N TEN BY & visa) by a vertical NUMBER . Type RC Unit n 0 7410 ____________ NT WCT BERHAD Ng Mun Wai CHECKED BY (name & visa) line in the ma Serial n 0 0007 Rev 0 ____________ Ihsan Mohd APPROVED (name & vi argin Page 1/12 _ d Idris D BY isa)

JHA/JSA - Driven Piles Spun Piles

Embed Size (px)

DESCRIPTION

Job hazard analysisJob safety analysisRisk assessment for piling work

Citation preview

Page 1: JHA/JSA - Driven Piles Spun Piles

 

PETRONAPACKAGE 2ACCESS ANDTHE RAPID 

 

_________

 

 

 

OWNER A

Name: 

Date (DD‐

Signature

 

Documen

 

Pages mo

 

 

 

 

 

 

 

 

0  11

REV. DD

 

S RAPID PROJ0C1: COMMON D PERMANENT SITE AT PENGER

____________

Approval: 

‐MMM‐YY): 

t class:           

odified under 

 

   

   

   

   

1‐Sep‐14 DATE 

D‐MMM‐YY 

Sections 

JECT CONSTRUCTIONROADS WITHINRANG JOHOR 

____________

HEAL

JO

D

 

 

 

 

 

this revision:

 

IFA ‐ Issued F

STATUS – REV

changed in la

Project 

RAPID Packa

P20C

N    

JOB HA___________

TH SAFETY

OB HAZAR

DRIVEN PI

  

For Approval

ISION MEMO 

ast revision a

ge 

C1 Originator 

WCTB 

AZARD ANALY____________

Y AND ENV

RD ANALYS

LES / SPUN

MohamadWRITT(name 

re identified 

DOCUMENT NDiscipline 

HSE Doc

P

YSIS ____________

VIRONMEN

SIS (JHA) 

N PILES 

W

 

 

 

 

d Rasydi  NTEN BY& visa) 

by a vertical 

NUMBER . Type 

RC Unit n

7410 

____________

NT 

WCT BERHAD 

 

 

 

 

Ng Mun Wai CHECKED BY (name & visa) 

line in the ma

Serial n0 

0007 

Rev

____________

 

 

 

 

Ihsan MohdAPPROVED(name & vi

argin 

Page   

1/12 

d Idris D BYisa) 

Page 2: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

No.

1

2

3

4

5

6

7

8

Prepared by; Checked by; Approved by;

_________________________ _________________________ _________________________( Mr. Mohamad Rasydi ) ( Mr. Ng Mun Wai ) ( Mr. Ihsan Idris )

PROJECT MANAGER PROJECT DIRECTOR

WCT BERHAD WCT BERHAD WCT BERHAD

No.

1

2

3

Development Team

Specific Area :Task Duration :DRIVEN PILES / SPUN PILES

work supervisor : I certified that I have explain this JHA to all workers

Signature Date

Name  DateSignatureIC No.

Task/ Job Description :Task/ Job Description :

Name  Position

CONSTRUCTION MANAGER

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 2 / 12

Document Number

JOB HAZARD ANALYSIS

Page 3: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

Severity :

slip/trip/fall back injury

struck/against hazardous chemical

overhead work contact by/with

burn (heat/chemical) caught/in/on/between

eye injury strains medium

radiation hazard electrical hazard

sharp object

fire gas release (HC/ H2s) severity Medium High Low

damage (physical) spill or loss of containment Low L M Medium

loss of production dusty Medium M H High

explosion off‐site impact High H EX

risk rating 

1 M

L1.2 Trip and fall.

1.1 Land surveyor or his 

assistant hit by moving 

machine/vehicle.

ACTION BY;

low

low

Equipment Likelihood Mitigation

Extreme

medium

Major & minor injury /loss of 

Single Fatality, major injury, > 1 lost 

Time Injury (LTI) major and loss of 

CONTROLS

SWP, PTW, HSEMS, HSE awareness

SWP, PTW, HSEMS

No injury, slight damage to equipment 

and no loss to production

Special procedure, HSE awareness, OSH program

highPossible could occur                  

(0.5‐4 year)

DRIVEN PILES / SPUN PILES Task Duration : Specific Area :

multiple facilities, extensive damage or 

prolong loss of production > RM 2000high

Document Number

Probable, likely to occur               

(0‐0.5 year)highextremeextreme

Safe working Practices

Environment

Potential Hazard Examples for Specific Categories :

Worker

risk rating

Likelihood:

BASIC JOB STEP POTENTIAL HAZARDS

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

1.3 Plastic barriers and flagmen will be 

provided when survey points are located 

at the road side.

WCT's Site 

Supervisor / HSSE 

Personnel

personal injury 1.1 Land surveyor and his assistant must 

attend induction before entering the 

site.

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

WCT HSSE 

Supervisor

1.2 Traffic diversion will be 

implemented in the event survey points 

are located on access roads.

WCT's HSSE 

Personnel / Site 

Supervisor

personal injury

Land surveyor set out piling points in the site

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 3 / 12

JOB HAZARD ANALYSIS

remote, unlikely to occur              

(4‐30 year)

Task/ Job Description :

Page 4: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

risk rating 

L

H

2 L

Document Number

1.9 Land surveyor is NOT allowed to 

work in an open field during rain.

WCT's HSSE 

Personnel

Delivery and unloading of piles using a mobile 

crane

2.1 Trailer collide with 

ongoing/moving traffic

WCT's HSSE 

Personnel

Fatality / 

personal injury

POTENTIAL HAZARDS

1.3 Hand injury when installing 

survey pegs

1.4 Struck by lightning

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

Personnal 

injury/property 

damage

BASIC JOB STEP

JOB HAZARD ANALYSIS

ACTION BY;CONTROLS

2.1 Escort by WCT personnel or site 

supervisor.

Personal injury

WCT's site 

supervisor

1.4 Passage / pathways for workers are 

inspected daily to ensure materials / 

equipment / tools are NOT kept along 

the passage / pathways.

WCT's Site 

Supervisor

Specific Area :

1.7 Any self‐made tool will be 

confiscated and removed from the site.

Task/ Job Description : DRIVEN PILES / SPUN PILES Task Duration :

1.10 Pre‐start briefing and tool box talk 

will be performed to raise awareness 

and reinforce

1.5 To maintain good housekeeping in 

each work site.

WCT's Site 

Supervisor / HSSE 

1.6 Proper ladder with handrail will be 

provided for ingress/egress of an 

excavation.

WCT's HSSE 

Personnel / Site 

Supervisor

WCT's HSSE 

Personnel

1.8 Land surveyor and his assistant must 

wear cotton glove and PPE while 

ki

WCT's Project 

Manager / Site 

Supervisor

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 4 / 12

Page 5: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

risk rating 

M

M

L

H

L

Document Number

WCT's Site 

Supervisor and 

HSSE Personnel

2.7 To obtain PTW prior to any lifting 

and unloading.

WCT's HSSE 

Personnel

Fatality / 

Personal injury

Task/ Job Description : DRIVEN PILES / SPUN PILES

2.6 Delivery trailer must be inspected 

and its brake, tyres, windscreen and etc. 

are in an acceptable condition before it 

is allowed to enter the site.

Personal injury

2.3 Piles hit people during 

lifting and unloading

2.2 Trailer skid and out of 

control on slippery road

CONTROLS

Personnal 

injury/property 

damage

2.5 Lifting cable snapped or 

lifting gears failed

Task Duration : Specific Area :

BASIC JOB STEP POTENTIAL HAZARDS

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

ACTION BY;

2.4 Worker fall from the trailer

2.6 Fingers of the workers 

caught in between the piles

WCT's HSSE 

Personnel

Personal Injury

2.4 No vehicle movement in the site 

during heavy rain and immediately after 

the rain.

WCT's HSSE 

Personnel

2.2 Supervisor only allows the trailer to 

enter the site after he has assess 

condition of the access roads in the site 

are safe for vehicle movement

JOB HAZARD ANALYSIS

2.8 Crane must be inspected and must 

have must valid PMA.

WCT's Site 

Supervisor and 

HSSE Personnel

Personnal 

injury/property 

damage

2.5 Driver of the trailer to observe speed 

limit in the site (25 km/hr) and follow 

the escort

2.3 Pre‐plan and identify safe access 

route to the unloading site

WCT's Site 

Supervisor

WCT's Site 

Supervisor and 

HSSE Personnel

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 5 / 12

Page 6: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

risk rating 

Document Number

JOB HAZARD ANALYSIS

WCT's HSSE 

Personnel

CONTROLS

Task Duration : Specific Area :

WCT's HSSE 

Personnel

Task/ Job Description : DRIVEN PILES / SPUN PILES

2.13 Radius of the lifting must be 

barricaded with plastic barriers to 

prevent people walking into the lifting 

zone.

2.16 Signs will be placed around the 

lifting zone.

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

2.9 The crane must have a permit‐to‐

operate sticker.

2.10 Crane operator must attend 

induction before entering the site.

2.11 Lifting gears must be inspected and 

have all the necessary certificates 

before being used. 

2.12 Only lifting gears (sling, chain, 

shackles, hooks) with proper color 

coding are allowed to be used.

WCT's HSSE 

Personnel

WCT's HSSE 

Personnel

WCT's Site 

Supervisor and 

HSSE Personnel

WCT's Site 

Supervisor and 

HSSE Personnel

WCT Site 

Supervisor

2.14 Signalman / watchman to guide the 

crane operator and coordinate lifting 

process.

BASIC JOB STEP POTENTIAL HAZARDS

2.15 Tag line to be used to control the 

spun pile when it is being lifted

ACTION BY;

WCT's Site 

Supervisor

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 6 / 12

Page 7: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

risk rating 

3 L

M

L

Document Number

Property damage

3.4  Flagmen / watchmen will be 

deployed when the piling rig is moving.

WCT's Site 

Supervisor and 

HSSE Personnel

3.3 The piling rig tilted due to 

uneven ground.

Task Duration : Specific Area :

CONTROLS ACTION BY;

2.18 Pre‐start briefing and tool box 

talks.

2.19 Crane operator and workers must 

wear proper PPE.

3.1 Operator or mechanic falls 

from the piling rig

3.2 The piling rig accidentally 

hit people working nearby.

DRIVEN PILES / SPUN PILES

Moving and positioning a piling rig

3.3 Operator or mechanic has to use 

body harness when he is performing 

routine maintenance and checking 

where he is exposed to falling from high.

Property damage 

/ Personel Injury

Property damage 

/ Personel Injury

BASIC JOB STEP

WCT's Site 

Supervisor and 

HSSE Personnel

POTENTIAL HAZARDS

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

WCT's Site 

Supervisor

WCT's Site 

Supervisor and 

HSSE Personnel

2.17 Full‐time supervisor and safety 

personnel throughout the unloading 

process.

WCT's Site 

Supervisor and 

HSSE Personnel

JOB HAZARD ANALYSIS

Task/ Job Description :

WCT's HSSE 

Personnel

WCT's Site 

Supervisor and 

HSSE Personnel

3.1  Operator of the piling rig and 

mechanic must attend induction.

3.2  The piling rig must be inspected 

before entering the project site.

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 7 / 12

Page 8: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

risk rating 

4 H

Document Number

Fatality / 

Personal injury / 

Property damage

4.1 Falling pile due to snapped 

lifting cable or lifting gears 

failure

Hoisting a spun pile to the piling frame 4.1  Only lifting ropes and lifting gears 

(sling, chain, shackles, hooks) with 

proper color coding are allowed to be 

d

WCT's Site 

Supervisor

3.8  Working platform for the piling rig 

must be leveled / flattened by an 

excavator or a motorgrader.

3.9  Soft ground will be removed and 

replaced with suitable earth and 

compacted.

WCT's Site 

Supervisor

3.7  Full‐time supervisor. WCT

WCT's HSSE 

Personnel

3.5  Workers must be kept at least 5m 

from the piling rig when it is moving.

4.2  All lifting ropes and gears must be 

visually inspected for any abnormally 

before put to use.

WCT's Site 

Supervisor

WCT's HSSE 

Personnel

WCT's Site 

Supervisor

4.3 PTW must be obtained before 

commencing the works.

WCT's Site 

Supervisor and 

HSSE Personnel

Task/ Job Description : DRIVEN PILES / SPUN PILES Task Duration : Specific Area :

BASIC JOB STEP POTENTIAL HAZARDS

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

CONTROLS

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 8 / 12

JOB HAZARD ANALYSIS

ACTION BY;

3.6 Windscreen and windows are free of 

obstruction or shed.

Page 9: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

risk rating 

5 L

L

Document Number

Personal injury

5.1 Supervisor, operators and workers 

exposed to the noise for a long duration 

must wear ear muffs.

WCT's Site 

Supervisor & 

HSSE personnel

5.2 To obtain PTW before commencing 

the works.

WCT's HSSE 

Personnel & Site 

Supervisor

5.3 Warning signs will be put up to 

ensure NO worker is standing below the 

piling frame.

WCT's HSSE 

Personnel & Site 

Supervisor

5.1 Hearing impairment People working 

close to the piling 

rig

Driving of spun pile into the ground

4.4 Lifting zone must be barricaded.  WCT's Site 

Supervisor

4.7  Full‐time supervisor throughout the 

lifting process.

WCT's Site 

Supervisor

4.8 Operator will be given interval short 

break to avoid fatigue.

WCT's HSSE 

Personnel & Site 

Supervisor

5.2 Falling object from the 

piling frame

4.5 Signalman / watchman must be full 

time at the site.

WCT's Site 

Supervisor

4.6  Tool box talk or pre‐start briefing 

will be conducted by supervisor

WCT's HSSE 

Personnel & Site 

Supervisor

JOB HAZARD ANALYSIS

Task/ Job Description : DRIVEN PILES / SPUN PILES Task Duration : Specific Area :

BASIC JOB STEP POTENTIAL HAZARDS

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

CONTROLS ACTION BY;

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 9 / 12

Page 10: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

risk rating 

6 M

L

L

Document Number

6.1 Hot Work Permit must be secured 

before commencing with the welding.

6.5 Welder must use leather glove and 

welding shield.

6.6 Warning signs will be displayed 

when hot work is being carried out.

WCT's HSSE 

Personnel & Site 

Supervisor

WCT's Site 

Supervisor

6.2 Burns due to accidental 

contact with hot surface

Personal injury

6.3 Burns caused by welding 

sparks

Personal injury

6.4 Proper housekeeping and proper 

storage for flammable material.

WCT's Site 

Supervisor

WCT's HSSE 

Personnel

6.2 Fire extinguiher must be in place 

during the hot work.

6.3 Flammable substances such as fuel, 

paint, lubricant, cleaning agent and etc. 

must be kept away from the hot work.

5.4 Supervisor and workers must wear 

safety helmet.

WCT's HSSE 

Personnel & Site 

Supervisor

5.5 Tool box talk or pre‐start briefing will 

be conducted by supervisor.

WCT's Site 

Supervisor

WCT's HSSE 

Personnel & Site 

Supervisor

WCT's Site 

Supervisor

Welding when joining of spun piles 6.1 Sparks from the welding 

cause fire to flammable 

material nearby

Personal injury / 

property 

damaged

BASIC JOB STEP POTENTIAL HAZARDS

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

CONTROLS ACTION BY;

Task/ Job Description : DRIVEN PILES / SPUN PILES Task Duration : Specific Area :

JOB HAZARD ANALYSIS

/ 12

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 10

Page 11: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

risk rating 

7 L

M

L

Document Number

Cutting of spun piles using handheld circular saw 

and removal of the cut piles

7.1 The handheld circular saw must be 

inspected and approved before use.

7.1 Accidental cuts by the 

rotating blade

7.2 Pre‐cut pile falls / collapses 

on the worker

7.3 Cut pile hit worker while it 

is being lifted.

WCT's HSSE 

Personnel

JOB HAZARD ANALYSIS

Task/ Job Description : DRIVEN PILES / SPUN PILES Task Duration :

7.2 Permit to work must be secured 

prior to commencement of the work.

WCT's HSSE 

Personnel & Site 

Supervisor

7.3 Only trained worker is allow to 

operate the circular saw.

WCT's HSSE 

Personnel & Site 

Supervisor

7.7 Lifting zone will be barricaded. WCT's HSSE 

Personnel & Site 

Supervisor

7.4 Warning signs will be displayed to 

ward off any unauthorized entry to the 

work area

WCT's HSSE 

Personnel & Site 

Supervisor

7.5 Free‐standing pile more than 3m in 

height will be secured and hoisted by a 

rope hooked to an excavator's bucket

WCT's Site 

Supervisor

7.6 Only ONE (1) worker is allowed in 

cutting of piles at one time in the same 

place.

WCT's HSSE 

Personnel & Site 

Supervisor

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 11 / 12

Specific Area :

BASIC JOB STEP POTENTIAL HAZARDS

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

CONTROLS ACTION BY;

Page 12: JHA/JSA - Driven Piles Spun Piles

RevProject Package Originator Discipline Doc. Type Unit n° Serial no

RAPID P20C1 WCTB HSE PRC 7410 0007

Date :

risk rating 

Document Number

7.9 Worker must use polka dot gloves 

and goggles.

WCT's HSSE 

Personnel & Site 

Supervisor

7.10 Tool box talk or pre‐start briefing 

will be conducted by supervisor.

WCT's Site 

Supervisor

7.8 Flagmen / signalmen will be 

provided throughout the lifting works

WCT's HSSE 

Personnel & Site 

Supervisor

JOB HAZARD ANALYSIS

Task/ Job Description : DRIVEN PILES / SPUN PILES Task Duration : Specific Area :

BASIC JOB STEP POTENTIAL HAZARDS

 Who or What might be 

harmed (person/ 

Equipment/ 

Environment)

CONTROLS ACTION BY;

Page

PETRONAS RAPID PROJECT                                                                                                                                                                             

PACKAGE 20C1: COMMON CONSTRUCTION ACCESS AND PERMANENT ROADS WITHIN THE RAPID SITE AT PENGERANG 

JOHOR

0 12 / 12