20 August 2013 1 BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3 J5 J6 J7 J8 Refresher J1 Insulation and Rooflights J2 Glazing and Shading, J3 Building Sealing J5 Air-Conditioning & Ventilation J6 Artificial Lighting & Power J7 Pools & Spas, J8 Metering

J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

Embed Size (px)

Citation preview

Page 1: J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

20 August 2013

1

BCA SECTION J CHANGES OVERVIEW

THE BCA: THE GOOD THE BAD & THE UGLY

20 August 2013

MICHAEL SHAW

ESD MANAGER

J1,J2,J3

J5

J6

J7

J8

Refresher

• J1 Insulation and Rooflights

• J2 Glazing and Shading, J3 Building Sealing

• J5 Air-Conditioning & Ventilation

• J6 Artificial Lighting & Power

• J7 Pools & Spas, J8 Metering

Page 2: J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

20 August 2013

2

Major Changes since 2009

Major Changes since 2009

• Section J major overhaul in BCA2010. Class 2&4 - 6 star

HERS rating, commercial buildings 2:1 benefit/cost ratio.

BCA2013 changes:

• Application of J1, J2 & J3 Building fabric non-conditioned

space exemption clause rewritten

• Fan motor power limits redefined

• Glazing & rooflight clarification: U-value and SGHC are

whole system values

• Application of glazing & rooflight area limits to non-

conditioned “buffer” spaces to allow reduced insulation in

internal envelope wall

Page 3: J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

20 August 2013

3

R2.2/3.2→

R3.2-4.2

R4.3 → R4.8

R2.7/3.2 → R3.2-4.2

R3.0/3.2 → R3.2-4.2

R3.8/3.2 → R3.7

R3.2 unchanged

}

J1.3 DTS Insulation – Changes 2009-2010+ Roof/Ceiling

J1.3 DTS Insulation – Changes 2009-2010+ Roof/Ceiling

• Table J1.3b introduced to increase ceiling insulation

where there is significant (>0.5%)loss of insulation

Page 4: J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

20 August 2013

4

R1.4/1.8

→ R3.3

R2.8 → R3.8

R1.4/1.8 → R2.8

R1.7/1.8 → R2.8

R1.9/1.8 → R2.8

R1.7/1.8 → R2.8

}

J1.5 DTS Insulation – Changes 2009-2010+ External Walls

Nil/R1.5

→ R2.0

R2.5 → R3.5

Nil → R2.0

Nil/R1.5 → R2.0

R1.0/1.5 → R2.0

R1.0/1.5 → R2.0

}

J1.6 DTS Insulation – Changes 2009-2010+ Susp. Floors

Worst case exposure (d) from Table 1.6

Page 5: J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

20 August 2013

5

• BCA2009 allowed <10%, now 5% maximum allowed

• Section J1.4 Rooflight areas for rooflight shaft index<0.5

Rooflight area

as % of floor

area served

<2% 2-3% 3-4% 4-5%

SHGCmax 0.83 0.57 0.43 0.34

U-valuemax 8.5 5.7 4.3 3.4

Example SG clear Low-E clr DG supergreen

J1.4 DTS Rooflights – Changes 2009-2010+

• Control of internal glazing thermal performance in

envelope between conditioned and “buffer” space

• Façade glazing area limits dependent on:

– Climate zone

– Exposure: window orientation and external shading

– U-value and SHGC of glass and frame

– Building type: 1) shopfront, 2) other,

3)accommodation (classes 3 and 9c) AND Internal

– Wall insulation type (option A or B)

J2.4 DTS Glazing stringency between BCA 2009 and 2010+

Page 6: J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

20 August 2013

6

J2.4 DTS Glazing stringency* between BCA 2009 and 2010+, classes 5-8, 9a & 9b (non-residential)

Zone

*all

ow

ed

gla

zed

are

a in

BC

A2010

as a

perc

en

tag

e o

f B

CA

2009 a

llo

wan

ce

*as an exact percentage of BCA 2009 allowance

J2.4 DTS Glazing stringency* between BCA 2009 and 2010+, classes 3 and 9c (residential accommodation)

Zone

*as an indicative percentage of BCA 2009 allowance

*all

ow

ed

gla

zed

are

a in

BC

A2010

as a

perc

en

tag

e o

f B

CA

2009 a

llo

wan

ce

Page 7: J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

20 August 2013

7

J3 DTS Building Sealing refresher

• J3.2 Dampers in chimneys & flues solid fuel appliances

• J3.3 Weather-sealed rooflights

• J3.4 Weather-sealed windows and doors (clause J3.4(d)

BCA2010+ requires all entrances to conditioned spaces

>50m2 to have airlock, self-closer or revolving door)

• J3.5 Self-closing dampers for exhaust fans (NEW

habitable rooms in climate zone 5 added in BCA2010+)

• J3.6 Sealing of roof, walls, floors and openings therein

• J3.7 Self closing dampers for evap coolers (NEW

habitable rooms in climate zone 5 added in BCA2010+)

J5.2 DTS Airconditioning & Ventilation Systems BCA2010+

• BCA2013: Fan motor power targets increased by 30% -

New definition includes fan motor losses for all configs

• Reed switches for Class 3 external doors open >1 min

• VSD’s for fans where supply air quantity varies (no PACs)

• Economy cycle threshold lowered from 50-35kWr

o BCA2011+ Eco cycle: frozen food areas of

supermarkets, labs etc exempted, BCA2012+

processes where humidity control needed

Page 8: J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

20 August 2013

8

J5.2 DTS Airconditioning & Ventilation Systems BCA2010+

• Fan power allowances reduced in 2010 & expressed as

“fan power” the power delivered to a fan

• Fresh air (Part F4) oversupply limit reduced from 50-20%

• Energy reclaim or modulation extended to all other

building classes (not just 9b) with density <1 person/m2

• Maximum fan power to air flow rate ratio reduced by

10% for mech (not A/C) ventilation systems

• BCA2012+: Elec Substation exemptions

J5.4 DTS Heating & Cooling BCA2010+

• Variable speed pump threshold reduced to 3kW pumps

• Maximum pump power targets altered - expressed

separately for chilled, condenser and heating water

• Slight changes to min efficiencies for water heaters

• Direct electric heating prohibited in most cases

• Condenser fan power clauses (e) to (h) simplified

Page 9: J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

20 August 2013

9

J6 DTS Artificial Lighting & Power BCA2010+

• J6.2 Illumination Power Density target for class 2&4

• Minor changes to Maximum Illumination Power Density

• Formula for room aspect adjustment factor changed

• Table J6.2b adjustment factors for control devices

added: timer for corridor lighting (0.7 adj factor)

• J6.3 (c)(ii) switching zone max size: function-related

refinement to exempt single functional use spaces

J7 DTS Hot Water Supply BCA2010+

• J7.3 swimming pool heating & pumping added

• J7.4 spa pool heating & pumping added

• Water heating fuel must not be electric resistance

• Cover, time switch for water heater & pump

Page 10: J1,J2,J3 J7 J6 J5 J8 BCA SECTION J CHANGES OVERVIEW ·  · 2016-09-17BCA SECTION J CHANGES OVERVIEW THE BCA: THE GOOD THE BAD & THE UGLY 20 August 2013 MICHAEL SHAW ESD MANAGER J1,J2,J3

20 August 2013

10

J8 DTS Access for Maintenance & Monitoring BCA2010+

• Exempt: Class 2 > 2,500m2 and common areas < 500m2

• Gas and/or elec: building or SOU’s > 500m2

• Building > 2,500m2

o A/C plant, heating, cooling, air handling

o Artificial lighting

o Appliance power

o Central hot water supply

o Lifts, escalators, travelators

o Other ancillary plant

OR Alternative Solutions permitted

• JV3 modelling comparison to DTS Reference Building

• Glazing/shading requirements too restrictive

(e.g. clear glazed retail shopfronts)

• Larger rooflights preferred

• Green star projects (e.g. IEQ increased fresh air rates)

• Energy efficient design solutions to multi-res commercial

buildings (3 and 9c)