106
B-PROJEKT d.o.o. za graditeljstvo, trgovinu i usluge Bjelovar, Tr. Markovac, Trojstvena ulica 15, Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091; mob:098-530-503; MB 2473607; OIB 54648399349 T.D. 310/16 List br: INVESTITOR: GRAD GRUBIŠNO POLJE (OIB: 13918656679) Trg bana J. Jelačića 1, GRUBIŠNO POLJE GRAEVINA: PROIZVODNO PODUZETNIČKI INKUBATOR GRUBIŠNO POLJE ZAHVAT: GRADNJA LOKACIJA: GRUBIŠNO POLJE, Ulica Ivana σepomuka Jemeršića k.č.br. 984/12, k.o.Grubišno Polje (z.k.č.br. 1102/5, k.o.Grubišno Polje) Z.O.P.: GRAD GRUBIŠNO POLJE T.D. : 310/16 BJELOVAR, prosinac 2016. godina IZVEDBENI PROJEKT GRAEVINSKI DIO ARMIRANO BETONSKA KONSTRUKCIJA PROJEKTANT IZVEDBENOG PROJEKTA: Marko Večerić, dipl. ing. građ. PROJEKTANTICA SURADNICA: Daria Rajković, mag. ing. aedif. za "B-PROJEKT"direktor: Igor Barberić,dipl.ing.građ.

IZVEDBENI PROJEKT

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

INVESTITOR: GRAD GRUBIŠNO POLJE (OIB: 13918656679) Trg bana J. Jelačića 1,

GRUBIŠNO POLJE

GRAĐEVINA: PROIZVODNO – PODUZETNIČKI INKUBATOR

GRUBIŠNO POLJE

ZAHVAT: GRADNJA

LOKACIJA: GRUBIŠNO POLJE, Ulica Ivana σepomuka Jemeršića

k.č.br. 984/12, k.o.Grubišno Polje

(z.k.č.br. 1102/5, k.o.Grubišno Polje)

Z.O.P.: GRAD GRUBIŠNO POLJE

T.D. : 310/16

BJELOVAR, prosinac 2016. godina

IZVEDBENI PROJEKT GRAĐEVINSKI DIO

ARMIRANO BETONSKA KONSTRUKCIJA

PROJEKTANT IZVEDBENOG PROJEKTA:

Marko Večerić, dipl. ing. građ.

PROJEKTANTICA SURADNICA:

Daria Rajković, mag. ing. aedif.

za "B-PROJEKT"direktor:

Igor Barberić,dipl.ing.građ.

Page 2: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

SADRŽAJ:

I τPĆI DIτ:

1. Izvod iz sudskog registra

2. τvlaštenje inženjera 3. Program osiguranja kontrole i kvalitete

II. GRAFIČKI DIτ:

1. TLOCRT TEMELJA

2. TLOCRT PRIZEMLJA

3. PRESJEK A-A I PRESJEK B-B

TEMELJNE STOPE, TRAKE I GREDE

4. PLAN OPLATE-TEMELJNE STOPE, TRAKE I GREDE

5. PLAN ARMATURE-TEMELJNE STOPE

6. PLAN ARMATURE-TEMELJNE TRAKE I GREDE

PτDσA PLτČA d=15 cm i d=18 cm

7. ARMATURA- DONJA ZONA

8. ARMATURA- GORNJA ZONA

ZIDOVI – PLAN OPLATE

9. ZID U OSI 1

10. ZID U OSI 2

11. ZID U OSI 3

12. ZID U OSI 4

13. ZID U OSI 5

14. ZID U OSI 6

15. ZID U OSI A

16. ZID U OSI B

17. ZID U OSI C

18. ZID U OSI D

19. ZID U OSI E

20. ZID U OSI F

21. ZID U OSI G

ZIDOVI – PLAN ARMATURE

22. ZID U OSI 1

23. ZID U OSI 2

24. ZID U OSI 3

25. ZID U OSI 4

26. ZID U OSI 5

27. ZID U OSI 6

28. ZID U OSI A

29. ZID U OSI B

30. ZID U OSI C

31. ZID U OSI D

32. ZID U OSI E

33. ZID U OSI F

34. ZID U OSI G

Page 3: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

PLτČA PτZ 100, d=15 cm

35. ARMATURA- DONJA ZONA

36. ARMATURA- GORNJA ZONA

Specifikacija i rekapitulacija šipki

Specifikacija, rekapitulacija i plan rezanja mreža

Sveukupna rekapitulacija šipki i mreža

Page 4: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

PROGRAM KONTROLE I OSIGURANJA KAKVOĆE ZA NOSIVU KONSTRUKCIJU GRAĐEVINE:

ZEMLJANI RADOVI

Pri izvedbi zemljanih radova imaju se u svemu primjenjivati postojeći propisi i građevinske norme. Postoji li u području gradilišta javna infrastruktura, izvođač radova mora se pridržavati postojećih propisa i uputa nadležnih službi ili organa uvjetovanih po otvaranju gradilišta. Teren je potrebno

očistiti i ustanoviti eventualni položaj postojećih instalacija elektrike, vode i kanalizacije,

grijanja, plina.

Potrebne geodetske kontrole treba izvesti sukladno s projektnom dokumentacijom. Gornji sloj

terena (humus, travnjak ili šumska zemlja) prije početka radova potrebno je odstraniti i deponirati

u kupe po organizaciji sheme građenja. Iskope vršiti s pravilnim odsjecanjem bočnih strana i dna

kanala ili jame prema traženim profilima iz projektne dokumentacije ili kvalitete terena (prirodni pokos) za dublje iskope. Propisane mjere iskopa ne smiju se prekoračiti bez naročitog odobrenja nadzornog inženjera, odnosno odobrenja investitora. Iskope kod kojih može doći do urušavanja ili klizanja zemlje treba izvoditi u odsjecima s razupiranjem. Eventualno ugrožene druge građevine moraju se pri tome osigurati.

Dno iskopa temeljnih kanala ili temeljne jame mora u pravilu biti izvedeno horizontalno, a pri

instalacionim kanalima kanalizacije u zahtijevanom padu prema projektu. σajmanja širina iskopa

za temelje ili instalacione kanale iznosi 25 cm za dubinu temeljenja do 30 cm, 35 cm za dubinu

temeljenja 30-50 cm, 50 cm za dubinu temeljenja 50-100 cm, 60 cm za dubinu temeljenja

100-200 cm, 80 cm za dubinu temeljenja 200-250 cm, 100 cm za dubinu temeljenja preko 250 cm.

τdbacivanje iskopanog materijala vršiti na udaljenost od barem jednog metra od ruba iskopa.

Pri iskopima dubljim od dva metra iskopani materijal odbacivati putem postupnog prebacivanja.

Ručno otkopavanje zemlje mora se izvoditi odozgo naniže. Svako potkopavanje je zabranjeno. Kopanje zemlje na dubini većoj od jednog metra mora se izvoditi pod kontrolom određene osobe

izvođača.

Pri strojnom iskopu terena, radnik za strojem ili poslovođa radova moraju voditi računa o sigurnosti

radnika koji rade ispred ili oko stroja za iskop terena.

Temelji i drugi radovi u temeljnim iskopima ili temeljnoj jami kao i instalacionim kanalima smiju se

izvoditi tek po izvršenoj izmjeri i snimanju iskopanih profila.

Materijal od iskopa svrstava se prema kvaliteti na gradilišnoj deponiji prema organizacijskoj shemi građenja razvozom po terenu do udaljenosti od 50 metara, tako da se ne

ugrožava stabilnost temeljne jame ili kanala tokom izvođenja radova.

Sav upotrebljiv iskopani materijal koristiti za eventualna nasipavanja kanala instalacija ili pokosa

oko temeljnih zidova objekta, a preostali materijal od iskopa odvesti na gradsku deponiju.

Za nasipavanje ispod pojedinih temeljnih ploča na terenu upotrijebiti prirodni šljunak veće granulacije ili drobljeni kamen od homogene i čvrste stijene u slojevima propisanim projektnom dokumentacijom. Svaki sloj nakon razastiranja potrebno je nabiti, s tim da se nabijanje vrši od ruba prema sredini. Izvođač radova dužan je dati ateste o zbijenosti nasipa.

Page 5: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

BETONSKI I ARMIRANO-BETONSKI RADOVI

Kontrola kvalitete oplate

Oplata temelja treba:

biti otporna na svako djelovanje kojem je izložena tijekom izvedbe,

biti dovoljno čvrsta da osigura zadovoljenje tolerancija uvjetovanih za konstrukciju i da spriječe oštećivanje konstrukcije.

zadovoljavati mjerodavne norme (EN 1065).

od materijala koji osigurava zadovoljenje tolerancija zadane tolerancije

mjera temelja

osigurati betonu traženi oblik dok beton ne očvrsne

biti čista i glatka s unutarnje strane

čvrsto povezana da ne dođe do popuštanja tijekom betoniranja

τplata i spojnice između elemenata trebaju biti dovoljno nepropusni da spriječe gubitak finog

morta.

τplatu koja apsorbira značajniju količinu vode iz betona ili omogućava evaporaciju treba odgovarajuće vlažiti da se spriječi gubitak vode iz betona.

Može se upotrijebiti svaki materijal koji će ispuniti uvjete konstrukcije ovih tehničkih uvjeta. τplata se ne smije uklanjati dok beton ne dobije dovoljnu čvrstoću (najmanje 7-dnevnu):

Uklanjanje oplate treba izvoditi na način da se konstrukcija ne preoptereti i ne ošteti.

Kontrola kvalitete betonskih radova

Izvođenje betonske konstrukcije mora biti u skladu s normom HRN ENC 13670-1, a kontrola

pri izvođenju odgovara razredu nadzora 2. Beton se ugrađuje u betonsku konstrukciju prema ovom projektu, normi HRN ENV 13670-1 i normama na koje ta norma upućuje kao i prema odredbama ovoga Priloga.

Primjena norme HRN ENV 13670-1 i tehnički uvjeti iz ovog projekta propisuje slijedeće obveze za izvođača:

provjeriti je li isporučeni beton u skladu sa zahtjevima iz projekta betonske konstrukcije

provjeriti je li tijekom transporta betona došlo do promjene njegovih

svojstava koja bi bila od utjecaja na tehnička svojstva betonske konstrukcije.

kontrolirati svaku otpremnicu

vizualno kontrolirati konzistenciju betona kod svake dopreme

u slučaju opravdane sumnje provesti kontrolni postupak ispitivanja konzistencije istim postupkom kojim se ispituje u proizvodnji

uzeti uzorke prije ugradnje betona radi kontrolnog postupka utvrđivanja tlačne čvrstoće

za svaki uzorak se bilježe podaci o elementu konstrukcije u koji se ugrađuju i podaci o betonu iz otpremnice

svaki od navedenih temelja mora biti izveden unutar 24 sata bez prekida

osigurati kontrolni postupak utvrđivanja tlačne čvrstoće očvrsnulog betona ocjenjivanjem rezultata ispitivanja uzoraka i dokazivanje karakteristične

Page 6: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

tlačne čvrstoće betona provodi se odgovarajućom primjenom kriterija za

„Ispitivanje identičnosti tlačne čvrstoće“. Za slučaj nepotvrđivanja zahtijevanog razreda tlačne čvrstoće betona treba

na tom dijelu konstrukcije provesti naknadno ispitivanje tlačne čvrstoće betona u konstrukciji prema HRN EN 12504-1 i ocjenu sukladnosti prema

prEN 13791.

Ako se utvrdi da geometrija temelja odstupa od pretpostavki potrebno je napraviti dodatnu

kontrolu statičkog proračuna.

Beton mora biti proizveden prema normi HRN EN 206-1:2003 i tehničkim uvjetima iz ovog projekta.

σadzor i kontrolu kakvoće treba provesti na mjestu ugradnje i to najmanje u opsegu definiranom ovim tehničkim uvjetima.

Konstrukcijske spojnice moraju biti čiste i navlažene. τplatu treba očistiti od prljavštine, leda, snijega ili vode.

Konstrukcijske elemente treba podložnim betonom odvojiti od temeljnog tla prema ovom projektu (podložni betoni).

Predviđa li se temperatura okoline ispod 0oC u vrijeme ugradnje betona ili u razdoblju

njegovanja, treba planirati mjere zaštite betona od oštećenja smrzavanjem.

Ako se predviđa visoka temperatura okoline u vrijeme betoniranja ili u razdoblju njegovanja, treba planirati mjere zaštite betona od tih negativnih djelovanja.

Beton treba ugraditi i zbiti tako da se sva armatura i uloženi elementi dobro obuhvate betonom

i osigura zaštitni sloj betona unutar propisanih tolerancija te beton dobije traženu čvrstoću i trajnost. Posebnu pažnju treba posvetiti ugradnji i zbijanju betona na mjestima promjene presjeka, suženja presjeka, uz otvore, na mjestima zgusnute armature i prekida betoniranja.

Vibriranje, osim ako nije drugačije uvjetovano projektom, treba u pravilu izvoditi uronjenim vibratorima. Beton treba sipati u oplatu što bliže konačnom položaju u konstrukcijskom elementu: Vibriranjem se beton ne smije namjerno navlačiti kroz oplatu i armaturu.

σormalna debljina sloja ne bi smjela biti veća od visine uronjenog vibratora. Vibriranje treba izvoditi sustavnim vertikalnim uranjanjem vibratora tako da se površina donjeg sloja revibrira. Kod debljih slojeva je revibriranje površinskog sloja preporučljivo i radi izbjegavanja plastičnog slijeganja betona ispod gornjih sipki armature.

Vibriranje površinskim vibratorima treba izvoditi sustavno dok se iz betona oslobađa zarobljeni zrak. Prekomjerno površinsko vibriranje koje slabi kvalitetu površinskog sloja betona treba izbjeći. Kad se primjenjuje samo površinsko vibriranje, debljina sloja nakon vibriranja obično ne treba prelaziti 100 mm, osim ako nije prethodno eksperimentalno dokazano drugačije. Korisno je dodatno vibriranje površina uz podupore.

Brzina ugradnje i zbijanja betona treba biti dovoljno velika da se izbjegnu hladne spojnice i

dovoljno niska da se izbjegnu pretjerana slijeganja ili preopterećenje oplate i skela. Hladna spojnica se može stvarati tijekom betoniranja, ako beton ugrađenog sloja veže prije ugradnje i zbijanja narednog.

Page 7: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

Segregaciju betona treba pri ugradnji i zbijanju svesti na najmanju mjeru.

Beton treba tijekom ugradnje i zbijanja zaštiti od insolacije, jakog vjetra, smrzavanja, vode, kiše i snijega.

σaknadno dodavanje vode, cementa, aditiva ili sličnih materijala nije dopušteno.

Beton u ranom razdoblju treba zaštititi: da se skupljanje svede na najmanju mjeru,

da se postigne potrebna površinska čvrstoća, da se osigura dovoljna trajnost površinskog sloja od smrzavanja, od štetnih

vibracija, udara ili drugih oštećivanja.

Pogodni su sljedeći postupci njegovanja primijenjeni odvojeno ili uzastopno:

držanje betona u oplati, pokrivanje površine betona paronepropusnim folijama, posebno

učvršćenim i osiguranim na spojevima i na krajevima,

pokrivanjem vlažnim materijalima i njihovom zaštitom od sušenja, držanjem površine betona vidljivo vlažnom prikladnim vlaženjem, primjenom zaštitnog premaza utvrđene uporabivosti (potvrđene

certifikatom ili tehničkim dopuštenjem).

Postupci njegovanja trebaju osigurati nisku evaporaciju vlage iz površinskog sloja betona ili

držati površinu stalno vlažnom. Prirodno njegovanje je dovoljno ako su uvjeti u cijelom

razdoblju potrebnog njegovanja takvi daje brzina evaporacije vlage iz betona dovoljno niska,

npr. u vlažnom, kišnom ili maglovitom vremenu. Njegovanje površine betona treba bez odgode

započeti odmah po završetku zbijanja i površinske obrade. Ako slobodnu površinu betona treba

zaštititi od pucanja zbog plastičnog skupljanja, privremeno njegovanje treba primijeniti i prije

površinske obrade.

Trajanje primijenjenog njegovanja treba biti funkcija razvoja svojstava betona u površinskom

sloju ovisno o omjeru:

čvrstoće i zrelosti betona, oslobođene topline i ukupne topline oslobođene u adijabatskim uvjetima.

Beton za uporabu u uvjetima izloženosti konstrukcije XC1, i XC2 treba njegovati dok

površinski sloj betona ne dosegne najmanje 50 % uvjetovane tlačne čvrstoće.

Primjena zaštitnih premaza nije dopuštena na konstrukcijskim spojnicama, na površinama koje

će se naknadno obrađivati ili na površinama na kojima treba osigurati vezu s drugim

materijalima, osim ako se prethodno potpuno ne uklone prije te sljedeće operacije ili ako

dokazano ne djeluju štetno na tu sljedeću operaciju.

Ako projektnim specifikacijama nije naglašeno dopušteno, zaštitni premazi se ne smiju koristiti

ni na površinama s uvjetovanim posebnim izgledom površine.

Površinska temperatura betona ne smije pasti ispod 0°C dok površina betona ne dosegne

čvrstoću dovoljnu za otpornost na smrzavanje (iznad 10 N/mm2).

σajviša temperatura betona ne smije prijeći 65°C.

Page 8: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

Mogući negativni utjecaji visokih temperatura betona tijekom njegovanja uključuju: značajno smanjenje čvrstoće, značajno povećanje poroznosti, odloženo formiranje etringita, povećanje razlike temperature betoniranog i prethodnog elementa.

Nakon skidanja oplate nadzorni inženjer treba prema uvjetovanom razredu nadzora provesti

kontrolu površine betona i potvrditi sukladnost sa zahtjevima.

Površinu betona treba tijekom izvedbe zaštititi od oštećivanja i remećenja površinske teksture.

Potrebe ispitivanja betona na građevini (svojstvo, učestalost i kriterije sukladnosti) treba prema

uvjetima izvedbe i eksploatacije građevine utvrditi prema ovom prilogu.

Spojni dijelovi bilo kojeg tipa trebaju biti neoštećeni, točno postavljeni i ispravno izvedeni tako

da osiguraju učinkovito ponašanje konstrukcije.

Izvedene dimenzije konstrukcija trebaju biti unutar najvećih dopuštenih odstupanja radi

izbjegavanja štetnih utjecaja na:

mehaničku otpornost i stabilnost u privremenom i kasnijem uporabnom stanju,

ponašanje tijekom uporabe građevine, kompatibilnost postavljanja i izvedbe konstrukcije i njezinih

nekonstrukcijskih dijelova.

Nenamjerna mala odstupanja od referentnih vrijednosti koje nemaju značajniji utjecaj na

ponašanje izvedene konstrukcije mogu se zanemariti.

Date tolerancije, nominirane kao normalne tolerancije, odgovaraju projektnim pretpostavkama,

EσV 1992 i traženoj razini sigurnosti.

Zahtjevi ovog poglavlja odnose se na ukupnu konstrukciju. Kod pojedinih dijelova svaka

međukontrola tih dijelova mora poštivati uvjete konačne kontrole izvedene konstrukcije. Ako je određeno geometrijsko odstupanje pokriveno različitim zahtjevima (preduvjetovano), primjenjuje se stroži uvjet.

Zaštitni sloj betona za armature za razred izloženosti XC1 iznosi 20 mm, a za razred izloženosti XC2 35 mm sa dopuštenim odstupanjima do 10 mm.

Dimenzije poprečnog presjeka, zaštitni sloj betona i položaj armature ne smiju odstupati od

zadanih vrijednosti više no što je prikazano u slijedećoj tablici. Tolerancije

N° Tip odstupanja Opis Dopušteno odstupanje

a Dimenzije poprečnog presjeka + 10 mm

b Položaj obične armature u

poprečnom presjeku

Za sve h vrijednosti je:

Δ(minus) - 10 mm

a pozitivno za

h< 150 mm + 10 mm

Page 9: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

h = 400 mm + 15 mm

h > 2500 mm + 20 mm uz linearnu interpolaciju

međuvrijednosti

cmin = traženi najmanji zaštitni sloj betona

cn = nominalni zaštitni sloj = c + IΔ(minus) c = stvarni zaštitni sloj Δ = dopušteno odstupanje od cn

h = visina poprečnog presjeka

Uvjet: c + Δ(plus) > cn - I Δ(minus) I Dopušteno pozitivno odstupanje zaštitnog sloja temelja i elemenata u temeljima može se povećati za 15 mm. Dano negativno odstupanje ne može. c Preklopni spoj l preklopna duljina -0,06 l

d okomitost poprečnog presjeka a – duljina dimenzije

poprečnog presjeka ne više od 0,04 a ili 10 mm

e

ravnost

τplaćena ili zaglađena površina

σe oplaćene površine : globalno

lokalno

L = 2,0 m

L = 0,2 m

L 2,0 m

L = 0,2 m

9 mm

4 mm

15 mm

6 mm

f Zakošenost poprečnog presjeka ne veće od h/25 ili b/25 ali ne više od 30 mm

g ravnost bridova

za dužine

> = 1 m

> 1 m

8mm

8 mm / m ali ne više od 20 mm

h otvori i ulošci Δ 1 ; Δ 2 ; Δ 3 ; + - 25 mm

Kontrola kvalitete površinske obrada betona

Plohe predgotovljenih temelja moraju biti glatke s padom od 0.5%. Betonska ploha se

zaglađuje nanošenjem mase za površinsku obradu betona.

Gornje plohe betonskih temelja treba zagladiti masom za vanjsku površinsku obradu betona

slijedećih svojstava: brzo vrijeme vezivanja (24 sata)

otpornost na trošenje abrazijom

optimalna prionjivost na beton

mehanička otpornost vodonepropustan

otporan na cikluse smrzavanja i odmrzavanja

Prije nanašanja mase za površinsku obradu betona potrebno je pažljivo ukloniti temeljitim četkanjem svaki dio koji nije čvrst uklanjajući svaki ostatak cementnog mlijeka, i nečistoća općenito i pridržavati se uputa proizvođača materijala za izravnanje betona.

Page 10: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

σadzorni inženjer može zahtijevati izvedbu pokusnih uzoraka površinske zaštite na prethodno pripremljenim betonskim kockama.

KONTROLA KVALITETE PROIZVODA

Kontrola kvalitete betona

Beton se proizvodi i prema normi HRN EN 206-1:2003.

Elementi konstrukcije objekta nalaze se u suhom okolišu, te pripadaju izloženosti XC1. Temelji su na podložnom betonu, a nalaze se u umjerenoj vlazi te pripadaju izloženosti XC2. Svi elementi nosive konstrukcije zgrade predviđeni su iz slijedećih materijala:

Beton razreda tlačne čvrstoće C25/30 (fckvaljak=25 N/mm2, fckkocka= 30

N/mm2

Beton razreda tlačne čvrstoće C30/37 (fckvaljak=3 N/mm2, fckkocka= 37

N/mm2

Uzdužna armatura izrađena od čelika za armiranje B500B, (Re = 500

N/mm2)

Poprečna armatura ( spone) izrađena od čelika za armiranje B500A (Re =

500 N/mm2)

.

Razred čvrstoće cementa za beton 32.5.

Podložni beton je razreda tlačne čvrstoće C12/15 (fck=12 N/mm2, ńtd=015 N/mm2)

Svojstva betona:

SVOJSTVA BETONA podbeton armirani beton

razred izloženosti XC1,XC2

razred tlačne čvrstoće betona C12/15 C25/30

cement za beton CEM I/CEM II CEM I/CEM II

minimalna količina cementa kg/m3 260 kg 280 kg

maksimalno zrno agregata mm 16 32

σaručitelj betona treba s proizvođačem usuglasiti datum isporuke, vrijeme, količinu betona, uvjete transporta na gradilište, ograničenja za vozila isporuke (veličine, visine ili bruto težine) kao i posebne postupke ugradnje.

Proizvođač betona treba naručitelju betona dati informacije o sastavu mješavine betona radi primjene pravilne ugradnje i zaštite svježeg betona i utvrđivanja razvoja čvrstoće betona prije isporuke betona.

Za tvornički proizveden beton proizvođač treba dati podatke o sastavu mješavina betona s pojedinostima o klasama čvrstoće, klasama konzistencije, težini mješavine i druge mjerodavne podatke. Proizvođač betona treba naručitelju dati i podatke o razvoju čvrstoće pri radnoj temperaturi betoniranja (radi utvrđivanja vremena zaštite betona) na način kako je to prikazano u slijedećoj tablici.

Razvoj čvrstoće betona pri 20°C

Page 11: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

Razvoj čvrstoće τmjeri čvrstoće ibetona starosti 2 i 28 dana

Ń2 / Ń28

Brz >0,5

Srednji >0,3 i< 0,5

Polagan > 0,15 i < 0,3

Vrlo polagan <0,15

U ovim početnim ispitivanjima uzorke za utvrđivanje čvrstoće treba izraditi, njegovati i ispitivati prema HRN EN 12350-1, HRN EN 12390-1, HRN EN 12390-2 i HRN EN 12390-3.

Pri isporuci betona proizvođač mora dostaviti korisniku otpremnicu za svaku isporučenu količinu betona, na kojoj su otisnute, utisnute ili upisane najmanje sljedeće informacije:

ime tvornice betona,

serijski broj otpremnice,

datum i vrijeme utovara, tj. vrijeme prvog kontakta cementa i vode,

broj vozila,

ime kupca,

ime i lokacija gradilišta, detalji ili reference uvjeta, npr. kodni broj, redni broj,

količina betona u m3,

deklaracija sukladnosti s referentnim uvjetima kvalitete i EN 206,

ime ili znak certifikacijskog tijela ako je relevantno,

vrijeme kad beton stiže na gradilište, vrijeme početka istovara, vrijeme završetka istovara.

Općenito je svako dodavanje vode ili kemijskih dodataka pri isporuci zabranjeno. U posebnim

slučajevima voda ili kemijski dodaci mogu biti dodani kad je to pod odgovornošću proizvođača

i primjenjuje se za dobivanje uvjetovane vrijednosti konzistencije, osiguravajući da uvjetovane

granične vrijednosti nisu prekoračene i da je dodatak kemijskog dodatka uključen u projekt

betona. Količina svakog dodatka vode ili kemijskog dodatka dodana u vozilo (mikser) mora

biti upisana u otpremni dokument u svim slučajevima.

Kontrola sukladnosti i kriteriji sukladnosti

Kontrola sukladnosti sastoji se od aktivnosti i odluka koje treba poduzeti u skladu s pravilima

sukladnosti prilagođenim unaprijed radi provjere sukladnosti betona s propisanim uvjetima.

Kontrola sukladnosti je integralni dio kontrole proizvodnje.

Svojstva betona kojima se kontrolira sukladnost jesu ona koja se mjere odgovarajućim

ispitivanjima prema normiranim postupcima. Stvarne vrijednosti svojstava betona u

konstrukcijama mogu se razlikovati od tih utvrđenih ispitivanjima, npr. ovisno o dimenzijama

konstrukcije, ugradnji, zbijanju, njegovanju i klimatskim uvjetima.

Plan uzorkovanja i ispitivanja te kriteriji sukladnosti trebaju zadovoljavati postupke navedene u

ovom poglavlju.

Mjesto uzimanja uzoraka za ispitivanje sukladnosti treba odabrati tako da se mjerodavna

svojstva betona i sastav betona značajnije ne mijenjaju od mjesta uzorkovanja do mjesta

isporuke.

Page 12: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

Kada su ispitivanja kontrole proizvodnje ista kao i ispitivanja uvjetovana za kontrolu

sukladnosti, treba ih uzeti u obzir pri vrednovanju sukladnosti. Proizvođač može koristiti i druge rezultate ispitivanja isporučenog betona u prihvaćanju sukladnosti.

Sukladnost ili nesukladnost prosuđuje se prema kriterijima sukladnosti. σesukladnost može voditi daljnjim akcijama na mjestu proizvodnje i na gradilištu.

Kontrola proizvodnje betona

Proizvođač je odgovoran za besprijekorno upravljanje proizvodnjom betona. Sav beton mora

biti predmet kontrole proizvodnje. Kontrola proizvodnje obuhvaća sve mjere nužne za održavanje svojstava betona u sukladnosti s uvjetovanim svojstvima.

To uključuje: izbor materijala,

projektiranje betona,

proizvodnju betona,

preglede i ispitivanja,

uporabu rezultata ispitivanja sastavnih materijala, svježeg i očvrslog betona i opreme

kontrolu sukladnosti.

Kontrola proizvodnje mora se odvijati prema načelima serije normi HRσ Eσ ISτ 9000.

Sustav kontrole proizvodnje treba sadržavati odgovarajuće dokumentirani postupak i upute. Taj postupak i upute treba po potrebi utvrditi uzimajući u obzir potrebe kontrole iskazane u tablicama 22, 23 i 24 Eσ 206. σamjeravanu učestalost ispitivanja i nadzora treba

dokumentirati. Rezultate ispitivanja i kontrola treba evidentirati izvještajima.

Svi mjerodavni podaci o kontroli proizvodnje trebaju biti zapisani (sadržani u izvještajima), Izvještaje o kontroli proizvodnje treba čuvati najmanje 3 godina, ako zakonske obveze ne traže duže razdoblje.

Vrednovanje i potvrđivanje sukladnosti betona

Proizvođač je odgovoran za ocjenu sukladnosti betona s uvjetovanim svojstvima. U tu svrhu proizvođač mora provoditi početno ispitivanje kad je traženo, kontrolu proizvodnje i kontrolu

sukladnosti.

Proizvođač je odgovoran za održavanje sustava kontrole proizvodnje.

Kontrola kvalitete ugradnje armature

Čelik za armiranje betona treba rezati i savijati prema projektnim specifikacijama. Pri tome: savijanje treba izvoditi jednolikom brzinom,

savijanje čelika pri temperaturi ispod -5 °C, ako je dopušteno projektnim specifikacijama,

treba izvoditi uz poduzimanje odgovarajućih posebnih mjera osiguranja, savijanje armature grijanjem smije se izvoditi samo uz posebno odobrenje

u projektnim

specifikacijama.

Page 13: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

Promjer trna za savijanje šipki treba biti prilagođen stvarnom tipu armature.

Rukovanje, skladištenje i zaštita armature treba biti u skladu sa zahtjevima tehničkih specifikacija koje se odnose na čelik za armiranje, projekta betonske konstrukcije te odredbama

ovoga Priloga.

Prije ugradnje armature provode se odgovarajuće nadzorne radnje određene normom HRσ ENV 13670-1.

Izvođač mora prema normi HRσ EσV 13670-1 prije početka ugradnje provjeriti: je li armatura u skladu sa zahtjevima iz projekta betonske konstrukcije,

je li tijekom rukovanja i skladištenja armature došlo do njezinog oštećivanja, deformacije ili druge promjene koja bi bila od utjecaja na tehnička svojstva betonske konstrukcije.

σadzorni inženjer neposredno prije početka betoniranja mora provjeriti: postoji li isprava o sukladnosti za čelik za armiranje, odnosno za armaturu

i jesu li iskazana svojstva sukladna zahtjevima iz projekta betonske

konstrukcije,

je li armatura izrađena, postavljena i povezana u skladu s projektom

betonske konstrukcije te u skladu s Prilozima »B« te dokumentirati nalaze

svih provedenih provjera zapisom u građevinski dnevnik.

Nastavci u obliku preklopa, zavara ili mehaničkog spoja se izvode prema odredbama priznatih

tehničkih pravila iz Pnloga H Tehničkog propisa za betonske konstrukcije Armatura

proizvedena prema tehničkoj specifikaciji za koju je sukladnost potvrđena na način određen

spomenutim propisom smije se ugraditi u betonsku konstrukciju ako ispunjava zahtjeve

projekta te betonske konstrukcije.

Armatura izrađena od čelika za armiranje prema odredbama ugrađuje se u armiranu betonsku

konstrukciju prema projektu betonske konstrukcije, normi HRN ENV 13670-1, normama na

koje ta upućuje.

KONTROLA KVALITETE MATERIJALA

Kontrola cementa

Kontrola cementa prije proizvodnje betona provodi se u centralnoj betonari (tvornici betona) i

u betonari na gradilištu prema normi HRσ Eσ 206-1.

Kontrola agregata

Agregat za beton označava se na otpremnici i na pakovanju prema normi HRσ Eσ 12620. Oznaka mora obvezno sadržavati upućivanje na tu normu, a u skladu s posebnim propisom.

Ispitivanje svojstava, ovisno o vrsti agregata za beton i laganog agregata za beton, provodi se

prema normama niza HRN EN 932, HRN EN 933, HRN EN 1097, HRN EN 1367 i HRN EN

1744.

Uzimanje i priprema uzoraka za ispitivanje svojstava, ovisno o vrsti agregata za beton, provodi

se prema normama niza HRN EN 932, HRN EN 933, HRN EN 1097, HRN EN 1367 i HRN

EN 1744.

Page 14: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

Kontrola agregata provodi se u centralnoj betonari (tvornici betona) i u betonari na gradilištu prema normi HRN EN 206-1.

Proizvođač i distributer agregata te proizvođač betona dužni su poduzeti odgovarajuće mjere u cilju održavanja svojstava agregata tijekom rukovanja, prijevoza, pretovara i skladištenja prema Dodatku H norme HRN EN 12620. odnosno Dodatku F norme HRN EN 13055-1.

Kontrola vode

Tehnička svojstva i drugi zahtjevi, te potvrđivanje prikladnosti vode, određuje se odnosno provodi prema Prilogu "F" Tehničkog propisa za betonske konstrukcije (σσ 101/05.), te u skladu s odredbama posebnog propisa.

Kontrola čelika za armiranje

Čelik za armiranje betona treba zadovoljavati uvjete Eσ 10080 i uvjete projekta konstrukcije. Svaki proizvod treba biti jasno označen i prepoznatljiv.

Sidreni i spojni elementi trebaju zadovoljavati uvjete ENV 1992-1-1, priznatih propisa

navedenih u TPBK i uvjete projekta.

Površina armature mora biti očišćena od slobodne hrđe i tvari koje mogu štetno djelovati na čelik, beton ili vezu između njih.

Kod galvanizirane armature koristiti cement za beton koji nema štetnog djelovanja na vezu s galvaniziranom armaturom.

Tehnička svojstva i drugi zahtjevi, te dokazivanje uporabljivosti armature izrađene prema projektu betonske konstrukcije određuje se odnosno provodi u skladu s tim projektom. Tehnička svojstva i drugi zahtjevi, te potvrđivanje sukladnosti čelika određuje se odnosno provodi prema normama navedenim u nastavku.

nHRN EN 10080-1 Čelik za armiranje betona — Zavarljivi armaturni čelik - 1. dio:

τpći zahtjevi (prEσ 10080-1:1999),

nHRN EN 10080-2 Čelik za armiranje betona -Zavarljivi armaturni čelik - 2. dio:

Tehnički uvjeti isporuke čelika razreda A (prEσ 10080-2:1999)

nHRN EN 10080-3 Čelik za armiranje betona — Zavarljivi armaturni čelik — 3. dio:

Tehnički uvjeti isporuke Čelika razreda B (prEN 10080-3:1999),

nHRN EN 10080-4 Čelik za armiranje betona - Zavarljivi armaturni čelik - 4. dio:

Tehnički uvjeti isporuke čelika razreda C (prEσ 10080-4:1999),

nHRN EN 10080-5 Čelik za armiranje betona - Zavarljivi armaturni čelik — 5. dio:

Tehnički uvjeti isporuke zavarenih armaturnih mreža (prEσ 10080-

5:1999),

nHRN EN 10080-6 Čelik za armiranje betona — Zavarljivi armaturni čelik — 6. dio:

Tehnički uvjeti isporuke zavarenih rešetki za gredice (prEσ 10080-

6:1999).

Dokazivanje uporabljivosti armature izrađene prema projektu betonske konstrukcije provodi se prema tom projektu te odredbama Tehničkog propisa za betonske konstrukcije i uključuje zahtjeve za kontrolom izrade i ispitivanja armature, te nadzorom proizvodnog pogona i

nadzorom izvođačeve kontrole izrade armature, na način primjeren postizanju tehničkih svojstava betonske konstrukcije u skladu s Tehničkim propisom za betonske konstrukcije.

nHRN EN 10080 Potvrđivanje sukladnosti armature proizvedene prema tehničkoj specifikaciji

Page 15: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

nHRN CR 10260

HRN EN 10027-1:1999

HRN EN 10027-2:1999

HRN EN 10020:1999.

provodi se prema odredbama te specifikacije i prema odredbama Dodataka

norme nHRN EN 10080-1. Armatura se označuje oznakom iz tehničke specifikacije (iskaz armature). Ista oznaka se unosi na otpremnicu. Oznaka

mora obvezno sadržavati upućivanje na tu normu, a u skladu s posebnim propisom.

nHRN EN 10080

nHRN EN 10138

HRNENISO 156301

HRN EN 10002-1.

Uzimanje uzoraka, priprema ispitnih uzoraka i ispitivanje svojstava Čelika za armiranje provodi se prema normama navedenih nizova (lijevo).

NADZOR

σadzor nad građenjem investitor je dužan povjeriti osobama registriranim za obavljanje tih djelatnosti. Investitor je dužan osigurati povremeni stručni nadzor nad građenjem konstruktivnih dijelova građevine i izvođenjem instalacija. Investitor je dužan nadležnom tijelu graditeljstva prijaviti početak radova najkasnije na dan početka radova. U slučaju prekida radova investitor je dužan poduzeti mjere radi osiguranja građevine i susjednih građevnih površina.

Stručni nadzor nad građenjem u ime investitora može obavljati samo pravna osoba registrirana za obavljanje poslova nadzora. Dužnosti nadzornog inženjera su:

1. voditi računa da se gradi u skladu s građevnom dozvolom i važećom građevinskom regulativom

2. voditi računa da je kvaliteta ugrađenih proizvoda i opreme u skladu sa zahtjevima projekta, te da je kvaliteta dokazana propisanim ispitivanjima i

dokumentima;

3. napraviti završno izvješće o izvedbi građevine.

Pregledi i nadzor trebaju osigurati da se radovi završavaju u skladu s ovim projektom. Nadzor u

ovom kontekstu odnosi se na verifikaciju (potvrđivanje) sukladnosti svojstava proizvoda, materijala i izvedbe radova.

Odabran je razred nadzora 2 u skladu s normom HRN ENV 13670-1.,pa sve radnje nadzora

odgovaraju zahtjevima koji su tamo navedeni. Projektant ne zahtjeva ništa dodatno ili posebno.

σadzor svojstava materijala i proizvoda provodi se na način prikazan u slijedećoj tablici.

PREDMET VRSTA NADZORA

Materijali oplate Vizualni nadzor

Armaturni čelik Prema ENV 10080 i zahtjevima projekta3

Svježi beton proizveden u tvornici ili na gradilištu.

Prema Eσ 206 i prema tehničkim uvjetima iz ovog projekta. Pri preuzimanju betona treba postojati otpremnica.

Ostali materijali2' Prema projektnim specifikacijama i normama

Predgotovljeni elementi Prema projektnim specifikacijama 3)

σadzorni izvještaj Treba

Page 16: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

1) σa gradilištu izrađeni sastavni dijelovi smatraju se kao sastavni dijelovi proizvedeni sa "svježim betonom, tvorničkim ili gradilišnim", osim ako nisu proizvedeni prema normi.

2) σpr. element ugrađenog čelika, opeka i si. 3) Proizvode s potvrdom sukladnosti treće osobe treba vizualno pregledati i provjeriti otpremnicu.

U slučaju sumnje treba poduzeti daljnje provjere sukladnosti sa specifikacijama. τstale proizvode treba provjeriti i ispitati prema projektnim specifikacijama.

σadzor nad izvedbom radova provodi se kako je to prikazano u slijedećoj tablici.

PREDMET VRSTA NADZORA

Kalupi, oplata i skele Glavne kalupe i oplatu pregledati prije betoniranja

τbična armatura Glavnu armaturu pregledati prije betoniranja

Ugrađeni elementi Prema projektnim specifikacijama i tehničkim uvjetima iz ovog projekta

Zidani elementi Prema projektnim specifikacijama i ovim

tehničkim uvjetima

Čelična konstrukcija Prema projektnim i izvedbenim specifikacijama i

ovim tehničkim uvjetima

Predgotovljeni elementi Prema izvedbenim specifikacijama

Gradilišni prijevoz i ugradnja betona Prema ovim tehničkim uvjetima

Završna obrada i njegovanje betona Prema ovim tehničkim uvjetima

Geometrija Prema uvjetima iz ovog projekta

Nadzorna dokumentacija Kako se traži ovim uvjetima

Prije početka betoniranja nadzor obuhvaća: geometriju oplate,

stabilnost oplate,

nepropusnost oplate,

uklanjanje nečistoća (kao što su prašina, ostaci žice) s dijela koji će se betonirati,

obradu lica konstrukcijskih spojnica,

uklanjanje vode s dna oplate, osim ako se ne betonira pod vodom,

pripremu površine oplate, otvore u oplati.

σadzor armature prije betoniranja obuhvaća predviđa da nadzor potvrdi da je: armatura iskazana u nacrtima ugrađena i prema nacrtima postavljena u

projektiranu poziciju,

zaštitni sloj u skladu s ovim uvjetima i projektnim specifikacijama, armatura nezagađena uljem, mastima, bojom ili drugim štetnim

materijalima,

armatura ispravno učvršćena i osigurana od pomicanja tijekom

betoniranja,

razmak između sipki armature dovoljan za ugradnju i zbijanje betona, ugrađena armatura popraćena odgovarajućom potvrdom sukladnosti sa

svojstvima uvjetovanim u EN 10080.

Page 17: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

Ako za armaturu dopremljenu u savijalište ili na građevinu nema odgovarajuće potvrde sukladnosti s uvjetovanim svojstvima, ta svojstva treba korisnik potvrditi ispitivanjem odgovarajućeg broja uzoraka dopremljenih profila.

Nadzor i ispitivanje postupka betoniranja treba planirati, izvoditi i dokumentirati prema

slijedećoj tablici:

PREDMET VRSTA NADZORA

Planiranje nadzora

Plan nadzora, procedure i instrukcije prema

specifikacijama

Aktivnosti kod nesukladnosti

Nadzor Osnovni i povremeni detaljni nadzor

Dokumentacija Svi dokumenti planiranja, Izvještaji o svim nadzorima

Izvještaji o svim nesukladnostima i popravnim mjerama

Plan nadzora treba identificirati sve nadzore, motrenja i ispitivanja za potrebne dokaze

kvalitete.

σadzor treba biti kontinuirani nadzor sukladnosti i uobičajene dobre prakse.

σadzor poslije betoniranja obuhvaća: Na konstrukcijskim spojnicama treba provjeriti i potvrditi da je preklopna

(kontinuitetna) armatura u projektiranom položaju. Treba provjeriti položaj dilatacijske trake

MJERE U SLUČAJU NESUKLADNOSTI

Kad nadzor otkrije nesukladnost, treba poduzeti odgovarajuće aktivnosti koje će osigurati uvjetovanu stabilnost i sigurnost konstrukcije i zadovoljiti planiranu uporabu.

Kad je nesukladnost potvrđena, treba istražiti sljedeće:

utjecaj nesukladnosti na izvedbu i uporabu,

mjere potrebne da bi se nesukladni element ili dio konstrukcije učinili prihvatljivima,

potrebu zabrane i zamjene nepopravljivog nesukladnog elementa ili dijela

konstrukcije.

Veličina nesukladnosti uvjetovanih svojstava betona utvrđuje se naknadnim ispitivanjima istih

svojstava na uzorcima betona iz konstrukcijskog elementa prema važećim normama.

Ispitivanja se odlukom nadzornog inženjera povjeravaju odgovarajućoj ovlaštenoj instituciji.

Nesukladnost tlačne čvrstoće (postignute i uvjetovane klase) betona rješava se naknadnim

ispitivanjem uzoraka betona izvađenih iz dijela konstrukcije u koji je ugrađen nesukladni

beton. Ispitivanja treba provesti prema HRN EN 7034 i HRN U.M1.048 i utvrditi klasu tlačne

čvrstoće kojoj ugrađeni beton odgovara u vrijeme ispitivanja! približnu klasu kojoj je

odgovarao pri 28-dnevnoj starosti. Prva služi za kontrolu stabilnosti i sigurnosti predmetnog

konstrukcijskog dijela a druga za reguliranje ugovornih odnosa između proizvođača i kupca

betona.

Page 18: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

Ako su neispravnosti i nesukladnosti zanemarive za izvedbu i uporabu element treba preuzeti.

Ako se nesukladnost može popraviti, element treba preuzeti nakon popravka. τcjenu sukladnosti elementa nakon popravka trebaju dati nadzorni inženjer i ovlaštena institucija koja je utvrdila veličinu nesukladnosti i uvjetovala popravak.

Rektifikacija nesukladnosti mora biti u skladu s projektnim specifikacijama i ovim Tehničkim uvjetima.

Dokumentaciju postupka i materijala koji će se upotrijebiti treba prije popravka odobriti nadzorni inženjer.

ZIDARSKI RADOVI

Opći uvjeti:

Materijal koji se upotrebljava za zidarske radove mora biti ispravan, kvalitetan, a na zahtjev

nadzornog inženjera, izvođač mora predočiti važeće ateste ili materijal dati ispitati prema važećim standardima. Ispitivanje pada na teret izvoditelja.

Materijal koji je uporabljen mora zadovoljiti slijedeće standarde:

- puna pečena opeka od gline HRN B.D1.010

- radijalna opeka od pečene gline HRN B.D1.011

HRNB.D1.011

- fasadna opeka od pečene gline HRN B.Dl.013

- šuplja fasadna opeka i blokovi HRN B.Dl .014

- šuplje opeke i blokovi od pečene gline HRN B.D l .015

- metode ispitivanja opeke, blokova i ploča od gline HRσ B.D8.011

- zidni blokovi HRNU.M1.058

- šuplji zidni blokovi od pečene gline HRN B.D 1.020

- šuplje ploče od gline za pregradne zidove HRN B.D l .022

- betonski puni blokovi od lakog betona HRN B.N1.011

- porolit ploče od gline HRN B.D l .024

- betonski šuplji blokovi od lakog betona HRN U.Nl .020,100

- ploče od gipsa za pregradne zidove HRN U.N2.010

- opeke od granulirane zgure visokih peći HRN U.N1.020

ČELIČNA KONSTRUKCIJA OBJEKTA

Za osiguranje kvalitete čelične konstrukcije kojom se osigurava stabilitet konstruktivnih elemenata treba osigurati:

Konstrukcija je predviđena od čelika kvalitete S 235.

Radionička izrada

- izradu na temelju ovjerene radioničke dokumentacije, - korištenje materijala propisane kvalitete potvrđene atestima, - vođenje tehničkog dnevnika izrade, - obavezno provesti probnu montažu u radionici,

Page 19: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

- provesti osnovnu antikorozivnu zaštitu, - osigurati sve elemente za prijevoz bez oštećenja i deformacija.

Montaža na gradilištu

- osiguranje prijevoza i skladištenja na gradilištu, - montažu na gradilištu uz vođenje dnevnika montaže, - osiguranje kvalificiranih radnika s odgovarajućim atestima, - provesti potpunu antikorozivnu zaštitu.

Antikorozivna zaštita čelika

Antikorozivna zaštita čelične dijela konstrukcije izvest će se naličem i to sa dva osnovna i dva pokrovna premaza a dio konstrukcije će se vruče cinčati.

Svi radovi na zaštiti čelične konstrukcije od korozije vrše se u skladu s "PRAVILσIKτM τ TEHσIČKIM MJERAMA I UVJETIMA ZA ZAŠTITU ČELIČσIH KτσSTRUKCIJA τD KτRτZIJE".

Zaštita čeličnih konstrukcija od korozije

τpće odredbe, izrada čeličnih konstrukcija, priprema površina

Propisuju se tehničke mjere i uvjeti za zaštitu od korozije čelične konstrukcije nadstrešnice.

Čelične konstrukcije su svrstane u 1. klasu.

Čelične konstrukcije su oblikovane tako da budu što otpornije prema koroziji. Izbjegavana su udubljenja i mrtvi uglovi u kojima bi se zadržavala nečistoća i voda. Svi dijelovi čeličnih konstrukcija su lako pristupačni.

Sa svih dijelova čeličnih konstrukcija voda mora brzo otjecati, a konstrukcije nemaju površinu i prostore na kojima se može gomilati atmosferski talog ili nečistoća.

S površina čeličnih konstrukcija treba ukloniti masnoće, nečistoće, rđu i strane materije.

Za pripremu čeličnih površina, radi primjene postupka zaštite od korozije provode se slijedeće tehnološke operacije: - odmašćivanje

- čišćenje

- otprašivanje

- prethodna zaštita.

Za čišćenje čeličnih površina primjeniti postupak čišćenja kemijskim sredstvima.

τdmah poslije čišćenja čeličnih površina, mora se izvršiti njihovo otprašivanje, usisavanjem ili otpuhivanjem prašine mlazom suhog komprimiranog zraka.

τčišćene čelične površine treba pokriti sredstvom zaštite od korozije, najkasnije u roku od 8 sati od završene pripreme površine.

Page 20: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

Ako ne može početi izvođenje zaštite u gornjem roku, treba površinu privremeno zaštititi, a ako protekne 8 sati i ne izvrši se prethodna zaštita, čelična površina se mora pregledati i oksidirano mjesto ponovo očistiti.

Završni premazi

Predviđena je zaštitu dijela čelične konstrukcije sa dva osnovna premaza debljina suhog filma za svaki sloj iznosi 40 μ i dva pokrovna premaza debljine 40 μ svaki, a dijela konstrukcije vručim pocinčavanjem.

Svi slojevi izvest će se na propisani način tako da na gotovim površinama nema izbočina, rupa ili oštećenja, bez vidljivih tragova od podljevanja bojom a sve u skladu sa PRAVILNIKOM.

Kontrola izvođenja, prijem radova i održavanje

Za izvedbu radova na zaštiti od korozije mogu se upotrebljavati materijali s atestom izdanim od stručne radne organizacije registrirane za djelatnost u koju spada ispitivanje kvalitete tih materijala.

U toku izvedbe radova na zaštiti od korozije mora se kontrolirati svaka radna operacija i rad u cjelini.

Prije nanošenja svakog premaza mora se kontrolirati podobnost pripremljene čelične površine

Za vrijeme izvedbe radova na zaštiti od korozije, uzimati povremeno uzorke materijala

koji se upotrebljavaju za zaštitu od korozije.

Čelična konstrukcija i dijelovi čelične konstrukcije ne mogu se staviti u upotrebu prije nego se utvrdi da su zaštićeni od korozije na način kako je ovdje propisano.

Zaštita od korozije čeličnih konstrukcija i njihovih dijelova mora se održavati u ispravnom stanju, a povremenim pregledima utvrđuje se stanje zaštite.

Transport i uskladištenje konstrukcije

Čelična konstrukcija prevozi se u skladu s odredbama propisa o gabaritima i prometnim uvjetima transporta u cestovnom i željezničkom prometu.

Mjesta za pričvršćenje opreme za dizanje na konstrukciji moraju se nalaziti na dijelovima konstrukcije koji neće izazvati deformacije i oštećenja konstrukcije. U slučaju da može doći do oštećenja, mjesta prihvaćanja obilježavaju se bojom ili po potrebi pomoćnim dijelovima (rupe, kuke i sl.). Za vrijeme prijevoza i skladištenja potrebno je osigurati nalijeganje konstrukcije na drvenim podmetačima kao i položaj konstrukcije koji neće izazvati deformacije ili oštećenja elemenata.

Dijelovi konstrukcije koji su uslijed prijevoza, utovara ili istovara lakše oštećeni obavezno se popravljaju i potom pregledaju od strane nadzornog inženjera investitora i odgovorne stručne osobe izvođača radova na montaži. τštećene elemente koji se ne

mogu potpuno sanirati prema ocjeni stručnog nadzornog inženjera treba zamijeniti novim.

Page 21: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

Za vrijeme uskladištenja konstrukcije dijelove konstrukcije treba postaviti tako da se: osigura stabilnost konstrukcije, spriječi direktno nalijeganje na tlo i spriječi deformiranje dijelova. Za radove transporta, utovara i istovara vrijede odredbe propisa

o zaštiti na radu pri prijevozu, utovaru i istovaru tereta motornim vozilima.

Ostali detalji i eventualni zahtjevi moraju biti u skladu s odredbama navedenog

PRAVILNIKA.

Montaža konstrukcije

Montažu konstrukcije obaviti prema Pravilniku o tehničkim mjerama i uvjetima za montažu čeličnih konstrukcija.

Pregledati ateste ugrađenog materijala, elektrode, ateste varioca kao i kvalitetu gotove

konstrukcije kao cjeline.

ISPITIVANJE IZVEDENIH RADOVA ODNOSNO MATERIJALA I OPREME

U tijeku građenja po ovom projektu treba pratiti i izvršiti ispitivanja: - svih konstruktivnih dijelova betona i montažne armirano-betonske konstrukcije i armature

- za ugrađene građevinske materijale potrebno je imati ateste, deklaracije ili druge odgovarajuće certifikate - instalacije odvodnje predviđene ovim projektom mogu se izvoditi materijalima koji zadovoljavaju važeće standarde

- izvođač radova dužan je za sav ugrađeni materijal priložiti odgovarajuće ateste i certifikate od proizvođača , kojima se dokazuje kvaliteta ugrađenog materijala i opreme

Ispitivanje instalacija obrađeno je projektu instalacija

- iz građevinskog dnevnika treba biti vidljivo da je nadzorni inženjer izvršio potrebne preglede

( armature, oplate i izolacije te razna ispitivanja koja se naknadnim pregledom ne mogu

utvrditi )

- izvršiti pregled ugrađene opreme i materijala

Po završetku radova a prilikom preuzimanja objekta, izvođač je dužan predati pismene dokaze o kvaliteti ovjerene od strane nadzornog inženjera.

Investitor je dužan navedenu dokumentaciju trajno čuvati.

σadzorni inženjer će na temelju predočene dokumentacije dati Završno mišljenje o kvaliteti materijala i opreme ugrađenih u građevinu.

PROJEKTANT KONSTRUKCIJE:

Marko Večerić, dipl. ing. građ.

Page 22: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

INVESTITOR: GRAD GRUBIŠNO POLJE (OIB: 13918656679)

Trg bana J. Jelačića 1,

GRUBIŠNO POLJE

GRAĐEVINA: PROIZVODNO – PODUZETNIČKI INKUBATOR

GRUBIŠNO POLJE

ZAHVAT: GRADNJA

LOKACIJA: GRUBIŠNO POLJE, Ulica Ivana σepomuka Jemeršića

k.č.br. 984/12, k.o.Grubišno Polje

(z.k.č.br. 1102/5, k.o.Grubišno Polje)

Z.O.P.: GRAD GRUBIŠNO POLJE

T.D. : 310/16

II) GRAFIČKI DIO

PROJEKTANT IZVEDBENOG PROJEKTA:

Marko Večerić, dipl. ing. građ.

za "B-PROJEKT" direktor:

Igor Barberić,dipl.ing.građ.

Page 23: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

INVESTITOR: GRAD GRUBIŠNO POLJE (OIB: 13918656679) Trg bana J. Jelačića 1,

GRUBIŠNO POLJE

GRAĐEVINA: PROIZVODNO – PODUZETNIČKI INKUBATOR

GRUBIŠNO POLJE

ZAHVAT: GRADNJA

LOKACIJA: GRUBIŠNO POLJE, Ulica Ivana σepomuka Jemeršića

k.č.br. 984/12, k.o.Grubišno Polje

(z.k.č.br. 1102/5, k.o.Grubišno Polje)

Z.O.P.: GRAD GRUBIŠNO POLJE

T.D. : 310/16

SVEUKUPNA REKAPITULACIJA

ARMATURE I MREŽA

PROJEKTANT IZVEDBENOG PROJEKTA:

Marko Večerić, dipl. ing. građ.

za "B-PROJEKT" direktor:

Igor Barberić,dipl.ing.građ.

Page 24: IZVEDBENI PROJEKT

B-PROJEKT

d.o.o. za graditeljstvo, trgovinu i usluge – Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

Ured: Bjelovar, Franjevačka 19; tel/fax: 043/225-091;

mob:098-530-503; MB 2473607; OIB 54648399349

T.D.

310/16

List br:

INVESTITOR: GRAD GRUBIŠNO POLJE (OIB: 13918656679) Trg bana J. Jelačića 1,

GRUBIŠNO POLJE

GRAĐEVINA: PROIZVODNO – PODUZETNIČKI INKUBATOR

GRUBIŠNO POLJE

ZAHVAT: GRADNJA

LOKACIJA: GRUBIŠNO POLJE, Ulica Ivana σepomuka Jemeršića

k.č.br. 984/12, k.o.Grubišno Polje

(z.k.č.br. 1102/5, k.o.Grubišno Polje)

Z.O.P.: GRAD GRUBIŠNO POLJE

T.D. : 310/16

REKAPITULACIJA kg

ŠIPKE 12391,40

MREŽE

17863,20

SVEUKUPNO: 30254,60

PROJEKTANT IZVEDBENOG PROJEKTA:

Marko Večerić, dipl. ing. građ.

za "B-PROJEKT" direktor:

Igor Barberić,dipl.ing.građ.

Page 25: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Šipke - specifikacija

ozn

oblik i mjere [cm]

Ø

lg [m]

n [kom]

lgn [m]

noname (1 kom)

1 1200

10 12.00 138 1656.00

2 1200

12 12.00 224 2688.00

3 1200

14 12.00 102 1224.00

4

9.

45

55

45

55

8 2.18 390 850.20

5

9.

20

85

20

85

8 2.28 210 478.80

6

9.

15

85

15

85

8 2.18 180 392.40

7

9.

45

85

45

85

8 2.78 92 255.76

8

9.

25

85

25

85

8 2.38 56 133.28

9

160

30

14 1.90 124 235.60

10

30

55

95

55

30

10 2.65 20 53.00

11 95

10 0.95 36 34.20

12

25

63

35

110

15

52

8 3.00 380 1140.00

13

50

55

175

55

50

10 3.85 108 415.80

14 175

10 1.75 198 346.50

Page 26: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Šipke - specifikacija

ozn

oblik i mjere [cm]

Ø

lg [m]

n [kom]

lgn [m]

15

40

55

135

55

40

10 3.25 144 468.00

16 135

10 1.35 270 364.50

17

20

110

50

14 1.80 144 259.20

18 11

24

50

24

50

10 1.70 144 244.80

19

11

1720

9.

30

9.

9.

17

19

10 0.87 529 460.23

20

35

10

35

10 0.80 664 531.20

21

11

1720

12

30

12

9.

17

19

10 0.93 1330 1236.90

22

40

13

40

10 0.93 630 585.90

23

515

15

14 5.30 48 254.40

24

9.

20

20

20

20

8 0.98 978 958.44

25

9.

20

15

20

15

8 0.88 529 465.52

Page 27: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Šipke - specifikacija

ozn

oblik i mjere [cm]

Ø

lg [m]

n [kom]

lgn [m]

26 20

255

20

12 2.95 6 17.70

27

9.

20

25

20

25

8 1.08 27 29.16

28

375

15

14 3.90 56 218.40

29 220

12 2.20 4 8.80

30 300

12 3.00 4 12.00

31

470

15

14 4.85 10 48.50

32 515

14 5.15 10 51.50

33 40

585

40

16 6.65 6 39.90

34 40

585

40

14 6.65 3 19.95

35 11

20

45

20

45

10 1.52 40 60.80

36

9.

15

15

15

15

8 0.78 154 120.12

37 30

255

30

14 3.15 7 22.05

38

9.

15

35

15

35

8 1.18 77 90.86

39

9.

6.

64

6.

64

8 1.58 127 200.66

Page 28: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Šipke - specifikacija

ozn

oblik i mjere [cm]

Ø

lg [m]

n [kom]

lgn [m]

40 30

470

14 5.00 4 20.00

41 500

14 5.00 4 20.00

42

30

270

14 3.00 4 12.00

43

30

520

14 5.50 2 11.00

44 600

14 6.00 2 12.00

45

320

30

14 3.50 2 7.00

46

9.

20

35

20

35

8 1.28 111 142.08

47 20

200

20

12 2.40 6 14.40

48

9.

15

25

15

25

8 0.98 11 10.78

49 20

240

20

12 2.80 6 16.80

50 30

380

30

14 4.40 21 92.40

51 320

12 3.20 2 6.40

52 250

12 2.50 2 5.00

53 200

8 2.00 71 142.00

54

9.

35

63

35

63

8 2.14 132 282.48

Page 29: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Šipke - specifikacija

ozn

oblik i mjere [cm]

Ø

lg [m]

n [kom]

lgn [m]

55

15

110

15

12 1.40 40 56.00

56

9.

9.

19

9.

19

8 0.74 80 59.20

57

9.

25

352

5

35

8 1.38 78 107.64

Page 30: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Šipke - rekapitulacija

Ø [mm]

lgn [m]

Jedinična težina [kg/m']

Težina [kg]

RA1

8 5859.38 0.41 2396.49

10 6457.83 0.65 4191.13

12 2825.10 0.92 2599.09

14 2508.00 1.25 3140.02

16 39.90 1.62 64.68

Ukupno 12391.40

Page 31: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Mreže - specifikacija

Pozicija

Oznaka mreže

B [cm]

L [cm]

n

Jedinična težina [kg/m2]

Ukupna težina [kg]

noname (1 kom)

I Q-257 215 605 58 4.02 3032.83

I-1 Q-257 215 411 3 4.02 106.57

I-2 Q-257 55 411 1 4.02 9.09

I-3 Q-257 215 565 3 4.02 146.50

I-4 Q-257 99 565 1 4.02 22.49

I-5 Q-257 170 235 1 4.02 16.06

I-6 Q-257 215 235 5 4.02 101.56

I-7 Q-257 200 235 1 4.02 18.89

I-8 Q-257 215 415 10 4.02 358.68

I-9 Q-257 80 415 2 4.02 26.69

I-10 Q-257 60 415 2 4.02 20.02

I-11 Q-257 130 415 2 4.02 43.38

I-12 Q-257 215 317 2 4.02 54.80

I-13 Q-257 215 360 13 4.02 404.49

I-14 Q-257 170 360 1 4.02 24.60

I-15 Q-257 215 325 4 4.02 112.36

I-16 Q-257 118 325 2 4.02 30.83

I-17 Q-257 155 317 2 4.02 39.50

I-18 Q-257 155 235 1 4.02 14.64

I-19 Q-257 65 360 1 4.02 9.41

I-20 Q-257 80 360 1 4.02 11.58

I-21 Q-257 60 360 1 4.02 8.68

I-22 Q-257 130 360 1 4.02 18.81

I-23 Q-257 215 267 4 4.02 92.48

I-24 Q-257 45 177 1 4.02 3.20

I-25 Q-257 129 267 1 4.02 13.87

I-26 Q-257 215 464 24 4.02 962.48

I-27 Q-257 54 464 1 4.02 10.07

I-28 Q-257 54 605 3 4.02 39.40

I-29 Q-257 215 200 9 4.02 155.57

I-30 Q-257 49 200 3 4.02 11.82

I-31 Q-257 200 283 1 4.02 22.71

I-32 Q-257 200 260 1 4.02 20.86

I-33 Q-257 200 160 1 4.02 12.82

I-34 Q-257 200 148 1 4.02 11.86

I-35 Q-257 215 605 14 4.02 732.06

I-36 Q-257 65 605 3 4.02 47.43

I-37 Q-257 65 464 1 4.02 12.12

II Q-188 215 605 13 2.96 500.53

II-1 Q-188 215 489 5 2.96 155.60

II-2 Q-188 215 239 1 2.96 15.21

Page 32: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Mreže - specifikacija

Pozicija

Oznaka mreže

B [cm]

L [cm]

n

Jedinična težina [kg/m2]

Ukupna težina [kg]

II-3 Q-188 215 239 1 2.96 15.21

II-4 Q-188 215 239 1 2.96 15.21

II-5 Q-188 215 239 1 2.96 15.21

II-6 Q-188 215 239 1 2.96 15.21

II-7 Q-188 215 239 1 2.96 15.21

II-8 Q-188 215 239 1 2.96 15.21

II-9 Q-188 215 239 1 2.96 15.21

II-10 Q-188 64 239 1 2.96 4.53

II-11 Q-188 64 605 1 2.96 11.46

II-12 Q-188 129 150 1 2.96 5.73

II-13 Q-188 215 150 1 2.96 9.55

II-14 Q-188 215 150 1 2.96 9.55

II-15 Q-188 215 150 1 2.96 9.55

II-16 Q-188 215 150 1 2.96 9.55

II-17 Q-188 144 150 1 2.96 6.39

II-18 Q-188 215 150 28 2.96 267.29

II-19 Q-188 64 150 1 2.96 2.84

II-20 Q-188 90 150 1 2.96 4.00

II-21 Q-188 49 150 1 2.96 2.18

III Q-424 215 605 58 6.66 5024.54

III-1 Q-424 215 464 24 6.66 1594.56

III-2 Q-424 54 464 1 6.66 16.69

III-3 Q-424 54 605 3 6.66 65.27

III-4 Q-424 215 605 14 6.66 1212.82

III-5 Q-424 65 605 3 6.66 78.57

III-6 Q-424 65 464 1 6.66 20.09

IV-1 Q-335 215 411 3 5.26 139.44

IV-2 Q-335 55 411 1 5.26 11.89

IV-3 Q-335 215 565 3 5.26 191.69

IV-4 Q-335 99 565 1 5.26 29.42

V-1 R-335 215 200 4 3.25 55.90

V-2 R-335 187 200 1 3.25 12.16

V-3 R-335 209 200 1 3.25 13.58

Ukupno 16368.28

Page 33: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Mreže - rekapitulacija

Oznaka mreže

B [cm]

L [cm]

n

Jedinična težina [kg/m2]

Ukupna težina [kg]

Q-257 215 605 144 4.02 7529.78

Q-188 215 605 31 2.96 1193.57

Q-424 215 605 99 6.66 8576.37

Q-335 215 605 7 5.26 478.94

R-335 215 605 2 3.25 84.55

Ukupno 17863.20

Page 34: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Mreže - plan rezanja

noname

Q-257

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

1x

I-35 215 x 605

I-35

3x

I-3 215 x 565

I-3

1x

I-26 215 x 464I-30 49 x 200I-30 49 x 200

I-26

I-30

I-30

1x

I-26 215 x 464I-30 49 x 200I-24 45 x 177

I-26

I-30

I-24

1x

I-26 215 x 464

I-26

Page 35: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Mreže - plan rezanja

1x

I-26 215 x 464

I-26

9x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-26 215 x 464

I-26

1x

I-8 215 x 415I-33 200 x 160

I-8 I-33

1x

I-8 215 x 415I-34 200 x 148

I-8 I-34

8x

I-8 215 x 415

I-8

3x

I-1 215 x 411

I-1

5x

I-13 215 x 360I-6 215 x 235

I-13

I-6

1x

I-13 215 x 360I-7 200 x 235

I-13 I-7

7x

I-13 215 x 360I-29 215 x 200

I-13

I-29

Page 36: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Mreže - plan rezanja

3x

I-15 215 x 325I-23 215 x 267

I-15

I-23

1x

I-15 215 x 325I-23 215 x 267

I-15

I-23

1x

I-12 215 x 317I-31 200 x 283

I-12 I-3

1

1x

I-12 215 x 317I-32 200 x 260

I-12 I-3

2

1x

I-14 170 x 360I-29 215 x 200

I-14

I-29

1x

I-4 99 x 565I-36 65 x 605

I-4

I-36

1x

I-11 130 x 415I-36 65 x 605I-11

I-36

1x

I-11 130 x 415I-36 65 x 605I-11

I-36

1x

I-17 155 x 317I-29 215 x 200

I-17

I-29

1x

I-17 155 x 317I-5 170 x 235

I-17

I-5

1x

I-22 130 x 360I-18 155 x 235I-20 80 x 360

I-22I-1

8

I-20

1x

I-16 118 x 325I-25 129 x 267I-16

I-25

1x

I-16 118 x 325I-9 80 x 415I-16

I-9

1x

I-9 80 x 415I-28 54 x 605I-28 54 x 605

I-9

I-28

I-28

1x

I-28 54 x 605I-37 65 x 464I-27 54 x 464

I-28

I-37

I-27

1x

I-10 60 x 415I-10 60 x 415I-19 65 x 360

I-10

I-10

I-19

1x

I-2 55 x 411I-21 60 x 360

I-2

I-21

Page 37: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Mreže - plan rezanja

Q-188

1x

II-1 215 x 489II-20 90 x 150

II-1

II-2

0

1x

II-1 215 x 489II-19 64 x 150II-21 49 x 150

II-1

II-1

9

II-2

1

2x

II-1 215 x 489

II-1

1x

II-1 215 x 489

II-1

1x

II-2 215 x 239II-3 215 x 239

II-2

II-3

1x

II-4 215 x 239II-5 215 x 239

II-4

II-5

1x

II-6 215 x 239II-7 215 x 239

II-6

II-7

1x

II-8 215 x 239II-9 215 x 239

II-8

II-9

1x

II-11 64 x 605II-13 215 x 150II-14 215 x 150II-17 144 x 150

II-11

II-13

II-14

II-17

1x

II-15 215 x 150II-16 215 x 150II-18 215 x 150II-18 215 x 150II-

15

II-16

II-18

II-18

6x

II-18 215 x 150II-18 215 x 150II-18 215 x 150II-18 215 x 150II-

18

II-18

II-18

II-18

1x

II-18 215 x 150II-18 215 x 150II-12 129 x 150II-10 64 x 239II-

18

II-18

II-12

II-10

Q-424

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

Page 38: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Mreže - plan rezanja

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-4 215 x 605

III-4

1x

III-1 215 x 464

III-1

10x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

Page 39: IZVEDBENI PROJEKT

ArmCAD 2005 [Build 1775] Registered to b Radimpex - www.radimpex.rs

Mreže - plan rezanja

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-1 215 x 464

III-1

1x

III-5 65 x 605III-5 65 x 605III-5 65 x 605

III-5

III-5

III-5

1x

III-3 54 x 605III-3 54 x 605III-3 54 x 605

III-3

III-3

III-3

1x

III-6 65 x 464III-2 54 x 464

III-6

III-2

Q-335

3x

IV-3 215 x 565

IV-3

3x

IV-1 215 x 411

IV-1

1x

IV-4 99 x 565IV-2 55 x 411

IV-4

IV-2

R-335

1x

V-1 215 x 200V-1 215 x 200V-1 215 x 200

V-1

V-1

V-1

1x

V-1 215 x 200V-3 209 x 200V-2 187 x 200

V-1 V-3 V-2

Page 40: IZVEDBENI PROJEKT

5629

5638

156

295656

2935

2138

19

4729

479

63 35 20 63

180

661

661

6161

411

4970

9

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILODETALJ TEMELJNE GREDE TG1prosinac 2016.

Page 41: IZVEDBENI PROJEKT

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

2

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

3

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

4

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

5

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

6

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

7

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

8

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

9

Q

-

1

8

8

2

3

9

x

2

1

5

II-

1

0

Q

-

1

8

8

2

3

9

x

6

4

II-11

Q-188

605x64

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I-27

Q

-257

464x54

I-28

Q-2

57

605

x54

I-28

Q-2

57

605x54

I-28

Q-2

57

605

x54

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I-36

Q-257

605x65

I-36

Q-257

605x65

I-36

Q-257

605x65

I-37

Q

-257

464x65

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:100MJERILOprosinac 2016.

Page 42: IZVEDBENI PROJEKT

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

2

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

3

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

4

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

5

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

6

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

7

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

8

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

9

Q

-

1

8

8

2

3

9

x

2

1

5

II-

1

0

Q

-

1

8

8

2

3

9

x

6

4

II-11

Q-188

605x64

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I-27

Q

-257

464x54

I-28

Q-2

57

605

x54

I-28

Q-2

57

605x54

I-28

Q-2

57

605

x54

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I-36

Q-257

605x65

I-36

Q-257

605x65

I-36

Q-257

605x65

I-37

Q

-257

464x65

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:100MJERILOprosinac 2016.

Page 43: IZVEDBENI PROJEKT

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

2

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

3

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

4

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

5

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

6

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

7

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

8

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

9

Q

-

1

8

8

2

3

9

x

2

1

5

II-

1

0

Q

-

1

8

8

2

3

9

x

6

4

II-11

Q-188

605x64

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I-27

Q

-257

464x54

I-28

Q-2

57

605

x54

I-28

Q-2

57

605x54

I-28

Q-2

57

605

x54

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I-36

Q-257

605x65

I-36

Q-257

605x65

I-36

Q-257

605x65

I-37

Q

-257

464x65

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:100MJERILOprosinac 2016.

Page 44: IZVEDBENI PROJEKT

I

-

1

Q

-

2

5

7

4

1

1

x

2

1

5

I

-

1

Q

-

2

5

7

4

1

1

x

2

1

5

I

-

1

Q

-

2

5

7

4

1

1

x

2

1

5

I-2

Q

-257

411

x55

I

-

3

Q

-

2

5

7

5

6

5

x

2

1

5

I

-

3

Q

-

2

5

7

5

6

5

x

2

1

5

I

-

3

Q

-

2

5

7

5

6

5

x

2

1

5

I-4

Q

-2

5

7

5

6

5

x9

9

I

-

5

Q

-

2

5

7

2

3

5

x

1

7

0

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

7

Q

-

2

5

7

2

3

5

x

2

0

0

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-9

Q

-2

5

7

4

1

5

x

8

0

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-10

Q

-257

415

x60

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-

1

1

Q

-

2

5

74

1

5

x

1

3

0

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

4

Q

-

2

5

7

3

6

0

x

1

7

0

I

-

1

5

Q

-

2

5

7

3

2

5

x

2

1

5

I

-

1

5

Q

-

2

5

7

3

2

5

x

2

1

5

I

-

1

6

Q

-

2

5

7

3

2

5

x

1

1

8

I

-

1

2

Q

-

2

5

7

3

1

7

x

2

1

5

I

-

1

7

Q

-

2

5

7

3

1

7

x

1

5

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

III-2

Q

-424

464x54

III-3Q

-424

605x54

III-3Q

-424

605

x54

III-3Q

-424

605x54

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

4

Q

-

4

2

4

6

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

-

1

Q

-

4

2

4

4

6

4

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

I

I

I

Q

-

4

2

46

0

5

x

2

1

5

III-5

Q-424

605x65

III-5

Q-424

605x65

III-5

Q-424

605x65

III-6

Q

-424

464

x65

broj komada: 292

l= 66,46 m2 2R 12

20 R 10/20

20 R 10 L=80 (664)

35

10

35

2 2R 12 L=1200 (224)

1200

19 R 10 L=87 (529)

2

0

9

30

91

9

broj komada: 1330l= 125,96 m

2 2R 12

21 R 10 L=93 (1330)

2

0

12

30

12

1

9

22 R 10/20

22 R 10 L=93 (630)

40

13

40

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:100MJERILOprosinac 2016.

Page 45: IZVEDBENI PROJEKT

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

1

Q

-

1

8

8

4

8

9

x

2

1

5

I

I

-

2

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

3

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

4

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

5

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

6

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

7

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

-

8

Q

-

1

8

8

2

3

9

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

Q

-

1

8

86

0

5

x

2

1

5

I

I

-

9

Q

-

1

8

8

2

3

9

x

2

1

5

II-

1

0

Q

-

1

8

8

2

3

9

x

6

4

II-11

Q-188

605x64

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I-27

Q

-257

464x54

I-28

Q-2

57

605

x54

I-28

Q-2

57

605x54

I-28

Q-2

57

605

x54

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

3

5

Q

-

2

5

7

6

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

-

2

6

Q

-

2

5

7

4

6

4

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I

Q

-

2

5

76

0

5

x

2

1

5

I-36

Q-257

605x65

I-36

Q-257

605x65

I-36

Q-257

605x65

I-37

Q

-257

464x65

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:100MJERILOprosinac 2016.

Page 46: IZVEDBENI PROJEKT

180x140x60kom 18

TS2

a-a b-b

tlocrt-armatura donja zona tlocrt-armatura gornja zona

14 R 10/25

13 R 10/25

14 R 10/25

15 8R 10/25

16 7R 10/25

16 8R 10/25

15 R 10/25

16 R 10/25

16 R 10/25

13 6R 10/25

14 6R 10/25

14 5R 10/25

15 8R 10/25

a a

bb

13

6R

10

/2

5

14 6R 10/25

16 8R 10/25

a a

bb

14 6R 10/25

16 8R 10/25

14 R 10 L=175 (198)

175

13 R 10 L=385 (108)

50

55

175

55

50

14 R 10 L=175 (198)

175

16 R 10 L=135 (270)

135

15 R 10 L=325 (144)

40

55

135

55

40

16 R 10 L=135 (270)

135

18 RU 10/15

18

8R

U1

0/1

5

18

8R

U1

0/1

5

18 8RU 10/15 L=170 (144)

24

50

24

50

11

11

17 (3+2+3)R 14

17

3R

14 L

=1

80 (1

44

)

20

11

0

50

17 (3+2+3)R 14

17 8R 14

100x100x60kom 2

TS1

a-a b-b

a a

bb

10 5R 10/25

11 4R 10/25

11 5R 10/25

10 R 10/25

11 R 10/25

11 R 10/25

10 5R 10/25

11 4R 10/25

11 5R 10/25

10 R 10/25

11 R 10/25

11 R 10/25

tlocrt-armatura donja zona tlocrt-armatura gornja zona10 5R 10/25

10

5R

10

/2

5

11 5R 10/25

11 5R 10/25

a ab

b11 5R 10/25

11 5R 10/25

11 R 10 L=95 (36)

95

10 R 10 L=265 (20)

30

55

95

55

30

11 R 10 L=95 (36)

95

11 R 10 L=95 (36)

95

10 R 10 L=265 (20)

30

55

95

55

30

11 R 10 L=95 (36)

95

93

R1

4 L

=1

90 (1

24)

16

0

30

9 (3+2+3)R 149 (3+2+3)R 14

9 8R 14

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - TEM. STOPEprosinac 2016.

Page 47: IZVEDBENI PROJEKT

TT1-Btemelj: 45,07 m

TT2temelj: 23,05 m

TT3temelj: 14,10 m

TT1-Atemelj: 53,26 m

2 4R 12

2 4R 12

2 2R 12

4 RU 8/25

U 8/25

1 2R 10

4 RU 8/25

1 2R 10

2 4R 12

2 2R 12

2 4R 12

2 4R 12

2 4R 12

1 2R 10

1 2R 10

7 RU 8/25

8 RU 8/25

1 3R 10

1 3R 10

1 2R 10

1 2R 10

4 RU 8 L=218 (390)

45

55

45

55

99

5 RU 8 L=228 (210)

20

85

20

85

99

4 RU 8 L=218 (390)

45

55

45

55

99

6 RU 8 L=218 (180)

15

85

15

85

99

7 RU 8 L=278 (92)

45

85

45

85

99

8 RU 8 L=238 (56)

25

85

25

85

99

1 2R 10 L=1200 (138)

1200

2 4R 12 L=1200 (224)

1200

9 2x2R 14

92

R1

4 L

=1

90 (1

24)

16

0

30

9 2x2R 14

92

R1

4 L

=1

90 (1

24)

16

0

30

9 2x2R 14

92

R1

4 L

=1

90 (1

24)

16

0

30

TG1-Atemelj: 94,92 m

12 R 8/25

3 4R 14

3 4R 14

2 2R 12

1 2R 10

1 2R 10

1 2R 10

12

R8

L

=3

00

(3

80

)

25

63

35

11

0

15

52

1 2R 10 L=1200 (138)

1200

2 2R 12 L=1200 (224)

1200

3 4R 14 L=1200 (102)

1200

TG1-Btemelj: 32,88 m

3 4R 14

3 4R 14

1 2R 10

1 2R 10

54 RU 8 L=214 (132)

35

63

35

63

99

54 RU 8/25

TG2temelj: 19,55 m

57 RU 8/25

1 2R 10

2 3R 12

2 3R 12

57 RU 8 L=138 (78

25

35

25

35

99

Detalj spoja sekundarnog stupa i temeljne grede

56

8R

U8/1

5

56 RU 8/15

55 2x2R 12

55 4R 12

55

2R

12

L

=1

40 (4

0)

15

11

0

15

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE -prosinac 2016.

TEM. TRAKE I GREDE

Page 48: IZVEDBENI PROJEKT

ZID U OSI 1

24

33

RU

8/16

24

33

RU

8/16

23

(3+

2+

3)R

14

23

(3+

2+

3)R

14

25

33

RU

8/16

23

2x2

R14

23

3R

14

L=

530

(48)

515

15

24 42RU 8/20

2 2x2R 12

24 42RU 8/20

2 2x2R 12

24 30RU 8/20

27 14RU 8/20

26 (2+4)R 12

1-1

R=1:100

11

2-2

R=1:100

22

2 2x2R 12

2 2R 12 L=1200 (224)

1200

23

3R

14

L=

530

(48

)

515

15

26 2R 12 L=295 (6)

20

255

20

26 4R 12 L=295 (6)

20

25520

24 33RU 8/16 L=98 (978)

20

20

20

20

99

27 14RU 8/20 L=108 (27)

20

25

20 2599

25 33RU 8/16 L=88 (529)

20

15

20

15

99

25

25

2 4R 12

24 RU 8/20

30

2526 4R 12

26 2R 12

27 RU 8/20

24 RU 8/16

23 8R 14

24 RU 8/16

23 8R 14

23 4R 14

25 RU 8/16

3-3

R=1:100

33

4-4

R=1:100

44

25

25

2 4R 12

24 RU 8/20 25

25

2 4R 12

24 RU 8/20

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 1prosinac 2016.

Page 49: IZVEDBENI PROJEKT

ZID U OSI 2

24

33

RU

8/1

6

23

2x2

R1

4

25

24

RU

8/1

6

28

2x2

R1

4

25

24

RU

8/1

6

28

2x2

R1

4

25

24

RU

8/1

6

28

2x2

R1

4

P=100 P=100 P=100 P=100

120

160

120

160

120

250

120

250

23

2R

14

L

=5

30

(4

8)

51

5

15

24 74RU 8/20

24 74RU 8/20

2 2x2R 12

2 2x2R 122 2x2R 12

2 2x2R 12

28 4R 14 28 4R 14 28 4R 14

25 RU 8/1625 RU 8/16

25 RU 8/16

28 4R 14

24 RU 8/16 24 RU 8/16

24

30

RU

8/1

6

31

2R

14

32

2R

14

32 2R 1431 2R 14

28

2R

14

L

=3

90

(5

6)

37

5

15

31

2R

14 L

=4

85

(1

0)

47

0

15

32

2R

14

L

=5

15

(1

0)

51

5

2 2R 12 L=1200 (224)

1200

24 33RU 8/16 L=98 (978)

20

20

20

20

99

25 24RU 8/16 L=88 (529)

20

15

20

15

99

1-1

R=1:100

11

2-2

R=1:100

22

25

25

2 4R 12

24 RU 8/2025

25

24 RU 8/20

2 2R 12

2 4R 12

2 2R 12

2 2R 12

29 2R 12

2 2R 12

2 2R 12

29 2R 12

2 2R 12

2 2R 12

30 2R 12

2 2R 12

2 2R 12

30 2R 12

29 2R 12 L=220 (4)

220

29 2R 12 L=220 (4)

220

30 2R 12 L=300 (4)

300

30 2R 12 L=300 (4)

300

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 2prosinac 2016.

Page 50: IZVEDBENI PROJEKT

ZID U OSI 2

24

33

RU

8/1

6

23

2x2

R1

4

25

24

RU

8/1

6

28

2x2

R1

4

25

24

RU

8/1

6

28

2x2

R1

4

25

24

RU

8/1

6

28

2x2

R1

4

P=100 P=100 P=100 P=100

120

160

120

160

120

250

120

250

23

2R

14

L

=5

30

(4

8)

51

5

15

24 74RU 8/20

24 74RU 8/20

2 2x2R 12

2 2x2R 122 2x2R 12

2 2x2R 12

28 4R 14 28 4R 14 28 4R 14

25 RU 8/1625 RU 8/16

25 RU 8/16

28 4R 14

24 RU 8/16 24 RU 8/16

24

30

RU

8/1

6

31

2R

14

32

2R

14

32 2R 1431 2R 14

28

2R

14

L

=3

90

(5

6)

37

5

15

31

2R

14 L

=4

85

(1

0)

47

0

15

32

2R

14

L

=5

15

(1

0)

51

5

2 2R 12 L=1200 (224)

1200

24 33RU 8/16 L=98 (978)

20

20

20

20

99

25 24RU 8/16 L=88 (529)

20

15

20

15

99

1-1

R=1:100

11

2-2

R=1:100

22

25

25

2 4R 12

24 RU 8/2025

25

24 RU 8/20

2 2R 12

2 4R 12

2 2R 12

2 2R 12

29 2R 12

2 2R 12

2 2R 12

29 2R 12

2 2R 12

2 2R 12

30 2R 12

2 2R 12

2 2R 12

30 2R 12

29 2R 12 L=220 (4)

220

29 2R 12 L=220 (4)

220

30 2R 12 L=300 (4)

300

30 2R 12 L=300 (4)

300

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 2prosinac 2016.

Page 51: IZVEDBENI PROJEKT

ZID U OSI 2

24

33

RU

8/1

6

23

2x2

R1

4

25

24

RU

8/1

6

28

2x2

R1

4

25

24

RU

8/1

6

28

2x2

R1

4

25

24

RU

8/1

6

28

2x2

R1

4

P=100 P=100 P=100 P=100

120

160

120

160

120

250

120

250

23

2R

14

L

=5

30

(4

8)

51

5

15

24 74RU 8/20

24 74RU 8/20

2 2x2R 12

2 2x2R 122 2x2R 12

2 2x2R 12

28 4R 14 28 4R 14 28 4R 14

25 RU 8/1625 RU 8/16

25 RU 8/16

28 4R 14

24 RU 8/16 24 RU 8/16

24

30

RU

8/1

6

31

2R

14

32

2R

14

32 2R 1431 2R 14

28

2R

14

L

=3

90

(5

6)

37

5

15

31

2R

14 L

=4

85

(1

0)

47

0

15

32

2R

14

L

=5

15

(1

0)

51

5

2 2R 12 L=1200 (224)

1200

24 33RU 8/16 L=98 (978)

20

20

20

20

99

25 24RU 8/16 L=88 (529)

20

15

20

15

99

1-1

R=1:100

11

2-2

R=1:100

22

25

25

2 4R 12

24 RU 8/2025

25

24 RU 8/20

2 2R 12

2 4R 12

2 2R 12

2 2R 12

29 2R 12

2 2R 12

2 2R 12

29 2R 12

2 2R 12

2 2R 12

30 2R 12

2 2R 12

2 2R 12

30 2R 12

29 2R 12 L=220 (4)

220

29 2R 12 L=220 (4)

220

30 2R 12 L=300 (4)

300

30 2R 12 L=300 (4)

300

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 2prosinac 2016.

Page 52: IZVEDBENI PROJEKT

ZID U OSI 3

34 3R 14

1 2R 10

33 6R 16

35 RU 10/20/10

35 11RU 10/10 35 18RU 10/20 35 11RU 10/10

25

24

RU

8/1

6

24

24

RU

8/1

6

28

(3

+2

+3

)R

14

34 3R 14 L=665 (3)

40

585

40

33 6R 16 L=665 (6)

40

585

40

1 2R 10 L=1200 (138)

1200

28

3R

14

L

=3

90

(5

6)

37

5

15

28

3R

14 L

=3

90

(5

6)

37

5

15

25 24RU 8/16 L=88 (529)

20

15

20

15

99

35 40RU 10/10/20/10 L=152 (40)

20

45

20

45

11

11

24 24RU 8/16 L=98 (978)

20

20

20

20

99

1-1

R=1:100

11

33 6R 16

34 3R 14

1 2R 10

24 RU 8/16

28 8R 14

25 RU 8/16

28 8R 14

28

(3

+2

+3

)R

14

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 3prosinac 2016.

Page 53: IZVEDBENI PROJEKT

ZID U OSI 3

34 3R 14

1 2R 10

33 6R 16

35 RU 10/20/10

35 11RU 10/10 35 18RU 10/20 35 11RU 10/10

25

24

RU

8/1

6

24

24

RU

8/1

6

28

(3

+2

+3

)R

14

34 3R 14 L=665 (3)

40

585

40

33 6R 16 L=665 (6)

40

585

40

1 2R 10 L=1200 (138)

1200

28

3R

14

L

=3

90

(5

6)

37

5

15

28

3R

14 L

=3

90

(5

6)

37

5

15

25 24RU 8/16 L=88 (529)

20

15

20

15

99

35 40RU 10/10/20/10 L=152 (40)

20

45

20

45

11

11

24 24RU 8/16 L=98 (978)

20

20

20

20

99

1-1

R=1:100

11

33 6R 16

34 3R 14

1 2R 10

24 RU 8/16

28 8R 14

25 RU 8/16

28 8R 14

28

(3

+2

+3

)R

14

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 3prosinac 2016.

Page 54: IZVEDBENI PROJEKT

ZID U OSI 3

34 3R 14

1 2R 10

33 6R 16

35 RU 10/20/10

35 11RU 10/10 35 18RU 10/20 35 11RU 10/10

25

24

RU

8/1

6

24

24

RU

8/1

6

28

(3

+2

+3

)R

14

34 3R 14 L=665 (3)

40

585

40

33 6R 16 L=665 (6)

40

585

40

1 2R 10 L=1200 (138)

1200

28

3R

14

L

=3

90

(5

6)

37

5

15

28

3R

14 L

=3

90

(5

6)

37

5

15

25 24RU 8/16 L=88 (529)

20

15

20

15

99

35 40RU 10/10/20/10 L=152 (40)

20

45

20

45

11

11

24 24RU 8/16 L=98 (978)

20

20

20

20

99

1-1

R=1:100

11

33 6R 16

34 3R 14

1 2R 10

24 RU 8/16

28 8R 14

25 RU 8/16

28 8R 14

28

(3

+2

+3

)R

14

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 3prosinac 2016.

Page 55: IZVEDBENI PROJEKT

ZID U OSI 4

36

24

RU

8/1

6

28

2x2

R1

4

36

24

RU

8/1

6

28

2x2

R1

4

36

24

RU

8/1

6

28

2x2

R1

4

36

24

RU

8/1

6

28

2x2

R1

4

25

30

RU

8/1

6

31

2R

14

32

2R

14

36 RU 8/20

2 (2+3)R 12

36 9RU 8/20

2 (2+3)R 12

36 9RU 8/20

2 (2+3)R 12

36 9RU 8/20

2 2x2R 12

25 58RU 8/20

37 3R 14

1 2R 10

37 4R 14

38 8RU 8/1038 5RU 8/2038 8RU 8/10

28

2R

14 L

=3

90

(5

6)

37

5

15

31

2R

14 L

=4

85

(1

0)

47

0

15

28

2R

14

L

=3

90

(5

6)

37

5

15

32

2R

14

L

=5

15

(1

0)

51

5

2 2R 12 L=1200 (224)

1200

1 2R 10 L=1200 (138)

1200

37 3R 14 L=315 (7)

30

255

30

37 4R 14 L=315 (7)

30

255

30

36 9RU 8/20 L=78 (154)

15

15

15

15

99

25 58RU 8/20 L=88 (529)

20

15

20

15

99

38 21RU 8/10/20/10 L=118 (77)

15

35

15

35

99

1-1

R=1:100

11

2-2

R=1:100

22

3-3

R=1:100

33

25

20

2 4R 12

25 RU 8/20

20

20

2 2R 12

2 3R 12

40

20

38 RU 8/20/10

37 3R 14

37 4R 14

1 2R 10

36 RU 8/16

28 4R 14

36 RU 8/16

28 4R 14

36 RU 8/16

28 4R 14

36 RU 8/16

28 4R 14

25 RU 8/16

32 2R 1431 2R 14

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 4prosinac 2016.

Page 56: IZVEDBENI PROJEKT

ZID U OSI 4

36

24

RU

8/1

6

28

2x2

R1

4

36

24

RU

8/1

6

28

2x2

R1

4

36

24

RU

8/1

6

28

2x2

R1

4

36

24

RU

8/1

6

28

2x2

R1

4

25

30

RU

8/1

6

31

2R

14

32

2R

14

36 RU 8/20

2 (2+3)R 12

36 9RU 8/20

2 (2+3)R 12

36 9RU 8/20

2 (2+3)R 12

36 9RU 8/20

2 2x2R 12

25 58RU 8/20

37 3R 14

1 2R 10

37 4R 14

38 8RU 8/1038 5RU 8/2038 8RU 8/10

28

2R

14 L

=3

90

(5

6)

37

5

15

31

2R

14 L

=4

85

(1

0)

47

0

15

28

2R

14

L

=3

90

(5

6)

37

5

15

32

2R

14

L

=5

15

(1

0)

51

5

2 2R 12 L=1200 (224)

1200

1 2R 10 L=1200 (138)

1200

37 3R 14 L=315 (7)

30

255

30

37 4R 14 L=315 (7)

30

255

30

36 9RU 8/20 L=78 (154)

15

15

15

15

99

25 58RU 8/20 L=88 (529)

20

15

20

15

99

38 21RU 8/10/20/10 L=118 (77)

15

35

15

35

99

1-1

R=1:100

11

2-2

R=1:100

22

3-3

R=1:100

33

25

20

2 4R 12

25 RU 8/20

20

20

2 2R 12

2 3R 12

40

20

38 RU 8/20/10

37 3R 14

37 4R 14

1 2R 10

36 RU 8/16

28 4R 14

36 RU 8/16

28 4R 14

36 RU 8/16

28 4R 14

36 RU 8/16

28 4R 14

25 RU 8/16

32 2R 1431 2R 14

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 4prosinac 2016.

Page 57: IZVEDBENI PROJEKT

ZID U OSI 4

36

24

RU

8/1

6

28

2x2

R1

4

36

24

RU

8/1

6

28

2x2

R1

4

36

24

RU

8/1

6

28

2x2

R1

4

36

24

RU

8/1

6

28

2x2

R1

4

25

30

RU

8/1

6

31

2R

14

32

2R

14

36 RU 8/20

2 (2+3)R 12

36 9RU 8/20

2 (2+3)R 12

36 9RU 8/20

2 (2+3)R 12

36 9RU 8/20

2 2x2R 12

25 58RU 8/20

37 3R 14

1 2R 10

37 4R 14

38 8RU 8/1038 5RU 8/2038 8RU 8/10

28

2R

14 L

=3

90

(5

6)

37

5

15

31

2R

14 L

=4

85

(1

0)

47

0

15

28

2R

14

L

=3

90

(5

6)

37

5

15

32

2R

14

L

=5

15

(1

0)

51

5

2 2R 12 L=1200 (224)

1200

1 2R 10 L=1200 (138)

1200

37 3R 14 L=315 (7)

30

255

30

37 4R 14 L=315 (7)

30

255

30

36 9RU 8/20 L=78 (154)

15

15

15

15

99

25 58RU 8/20 L=88 (529)

20

15

20

15

99

38 21RU 8/10/20/10 L=118 (77)

15

35

15

35

99

1-1

R=1:100

11

2-2

R=1:100

22

3-3

R=1:100

33

25

20

2 4R 12

25 RU 8/20

20

20

2 2R 12

2 3R 12

40

20

38 RU 8/20/10

37 3R 14

37 4R 14

1 2R 10

36 RU 8/16

28 4R 14

36 RU 8/16

28 4R 14

36 RU 8/16

28 4R 14

36 RU 8/16

28 4R 14

25 RU 8/16

32 2R 1431 2R 14

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 4prosinac 2016.

Page 58: IZVEDBENI PROJEKT

ZID U OSI 5

36

24R

U8/1

6

28

2x2

R1

4

36 24RU 8/16 L=78 (154)

15

15

15

15

99

28

2R

14

L

=3

90

(5

6)

37

5

15

25

33R

U8/1

6

23

2x2

R1

4

25 33RU 8/16 L=88 (529)

20

15

20

15

99

25 18RU 8/20

2 2x2R 12

1-1

R=1:100

11

25

20

2 4R 12

25 RU 8/20

23

2R

14 L

=5

30

(4

8)

51

5

15

2 2R 12 L=1200 (224)

1200

36 RU 8/16

28 4R 1423 4R 14

25 RU 8/16

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 5prosinac 2016.

Page 59: IZVEDBENI PROJEKT

ZID U OSI 5

36

24R

U8/1

6

28

2x2

R1

4

36 24RU 8/16 L=78 (154)

15

15

15

15

99

28

2R

14

L

=3

90

(5

6)

37

5

15

25

33R

U8/1

6

23

2x2

R1

4

25 33RU 8/16 L=88 (529)

20

15

20

15

99

25 18RU 8/20

2 2x2R 12

1-1

R=1:100

11

25

20

2 4R 12

25 RU 8/20

23

2R

14 L

=5

30

(4

8)

51

5

15

2 2R 12 L=1200 (224)

1200

36 RU 8/16

28 4R 1423 4R 14

25 RU 8/16

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 5prosinac 2016.

Page 60: IZVEDBENI PROJEKT

ZID U OSI 5

36

24R

U8/1

6

28

2x2

R1

4

36 24RU 8/16 L=78 (154)

15

15

15

15

99

28

2R

14

L

=3

90

(5

6)

37

5

15

25

33R

U8/1

6

23

2x2

R1

4

25 33RU 8/16 L=88 (529)

20

15

20

15

99

25 18RU 8/20

2 2x2R 12

1-1

R=1:100

11

25

20

2 4R 12

25 RU 8/20

23

2R

14 L

=5

30

(4

8)

51

5

15

2 2R 12 L=1200 (224)

1200

36 RU 8/16

28 4R 1423 4R 14

25 RU 8/16

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 5prosinac 2016.

Page 61: IZVEDBENI PROJEKT

ZID U OSI 6

24

33

RU

8/1

6

23

2x2

R1

4

24

33

RU

8/1

6

23

2x2

R1

4

24

33

RU

8/1

6

23

(3

+2

+3

)R

14

25

33

RU

8/1

6

23

2x2

R1

4

23

3R

14 L

=5

30

(4

8)

51

5

15

23

2R

14

L

=5

30

(4

8)

51

5

15

24 115RU 8/20

2 2x2R 12

2 2x2R 12

2 2x2R 12

24 41RU 8/20

1 2R 10

2 4R 12

1 2R 10

1 2R 10 L=1200 (138)

1200

2 2R 12 L=1200 (224)

1200

1-1

R=1:100

11

2-2

R=1:100

22

24 33RU 8/16 L=98 (978)

20

20

20

20

99

25 33RU 8/16 L=88 (529)

20

15

20

15

99

25

2544

69

25

25

2 4R 12

24 RU 8/20

24 RU 8/16

23 8R 14

24 RU 8/16

23 4R 14

24 RU 8/16

23 4R 14

23 4R 14

25 RU 8/16

24 74RU 8/20

1 2R 10

24 RU 8/20

39 RU 8/20

39 74RU 8/20

2 2R 12

1 1R 10

2 2R 12

1 1R 10

1 2R 10

1 2R 10

39 74RU 8/20 L=158 (127)

6

64

6

64

99

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 6prosinac 2016.

Page 62: IZVEDBENI PROJEKT

ZID U OSI 6

24

33

RU

8/1

6

23

2x2

R1

4

24

33

RU

8/1

6

23

2x2

R1

4

24

33

RU

8/1

6

23

(3

+2

+3

)R

14

25

33

RU

8/1

6

23

2x2

R1

4

23

3R

14 L

=5

30

(4

8)

51

5

15

23

2R

14

L

=5

30

(4

8)

51

5

15

24 115RU 8/20

2 2x2R 12

2 2x2R 12

2 2x2R 12

24 41RU 8/20

1 2R 10

2 4R 12

1 2R 10

1 2R 10 L=1200 (138)

1200

2 2R 12 L=1200 (224)

1200

1-1

R=1:100

11

2-2

R=1:100

22

24 33RU 8/16 L=98 (978)

20

20

20

20

99

25 33RU 8/16 L=88 (529)

20

15

20

15

99

25

2544

69

25

25

2 4R 12

24 RU 8/20

24 RU 8/16

23 8R 14

24 RU 8/16

23 4R 14

24 RU 8/16

23 4R 14

23 4R 14

25 RU 8/16

24 74RU 8/20

1 2R 10

24 RU 8/20

39 RU 8/20

39 74RU 8/20

2 2R 12

1 1R 10

2 2R 12

1 1R 10

1 2R 10

1 2R 10

39 74RU 8/20 L=158 (127)

6

64

6

64

99

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 6prosinac 2016.

Page 63: IZVEDBENI PROJEKT

ZID U OSI 6

24

33

RU

8/1

6

23

2x2

R1

4

24

33

RU

8/1

6

23

2x2

R1

4

24

33

RU

8/1

6

23

(3

+2

+3

)R

14

25

33

RU

8/1

6

23

2x2

R1

4

23

3R

14 L

=5

30

(4

8)

51

5

15

23

2R

14

L

=5

30

(4

8)

51

5

15

24 115RU 8/20

2 2x2R 12

2 2x2R 12

2 2x2R 12

24 41RU 8/20

1 2R 10

2 4R 12

1 2R 10

1 2R 10 L=1200 (138)

1200

2 2R 12 L=1200 (224)

1200

1-1

R=1:100

11

2-2

R=1:100

22

24 33RU 8/16 L=98 (978)

20

20

20

20

99

25 33RU 8/16 L=88 (529)

20

15

20

15

99

25

2544

69

25

25

2 4R 12

24 RU 8/20

24 RU 8/16

23 8R 14

24 RU 8/16

23 4R 14

24 RU 8/16

23 4R 14

23 4R 14

25 RU 8/16

24 74RU 8/20

1 2R 10

24 RU 8/20

39 RU 8/20

39 74RU 8/20

2 2R 12

1 1R 10

2 2R 12

1 1R 10

1 2R 10

1 2R 10

39 74RU 8/20 L=158 (127)

6

64

6

64

99

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI 6prosinac 2016.

Page 64: IZVEDBENI PROJEKT

ZID U OSI A

24

24

RU

8/1

6

28

(3

+2

+3

)R

14

28

3R

14

L

=3

90

(5

6)

37

5

15

41 4R 14 L=500 (4)

500

43 2R 14 L=550 (2)

30

520

40 4R 14 L=500 (4)

30

470

42 4R 14 L=300 (4)

30

270

45 2R 14 L=350 (2)

320

3044 2R 14 L=600 (2)

600

46 11RU 8/1046 11RU 8/20 46 19RU 8/10 46 11RU 8/20 46 31RU 8/10

46 83RU 8/10/20/10/20/10 L=128 (111)

20

35

20

35

99

24 24RU 8/16 L=98 (978)

20

20

20

20

99

1-1

R=1:100

11

2-2

R=1:1002

2

3-3

R=1:100

33

4-4

R=1:100

44

40

25

43 2R 14

1 2R 10

40 4R 14

43 2R 14

44 2R 14

1 2R 10

40 4R 14

43 2R 14

44 2R 14

1 2R 10

41 4R 14

44 2R 14

1 2R 10

41 4R 14

45 2R 14

44 2R 14

1 2R 10

41 4R 14

45 2R 14

44 2R 14

1 2R 10

42 4R 14

45 2R 14

1 2R 10

42 4R 14

43 2R 14

40 4R 14

1 2R 10

46 RU 8/20/1040

25

43 2R 14

40 4R 14

1 2R 10

46 RU 8/20/10 40

25

44 2R 14

41 4R 14

1 2R 10

46 RU 8/20/10

44 2R 14

5-5

R=1:100

55

7-7

R=1:100

77

6-6

R=1:100

66

40

25

43 2R 14

41 4R 14

1 2R 10

46 RU 8/20/10

44 2R 14

40

25

45 2R 14

41 4R 14

1 2R 10

46 RU 8/20/10

44 2R 14

40

25

45 2R 14

42 4R 14

1 2R 10

46 RU 8/20/10

44 2R 14

40

25

45 2R 14

42 4R 14

1 2R 10

46 RU 8/20/10

28 8R 14

24 RU 8/16

1 2R 10 L=1200 (138)

1200

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI Aprosinac 2016.

Page 65: IZVEDBENI PROJEKT

ZID U OSI B

2 (2+3)R 12

36 7RU 8/20

25 53RU 8/20

2 2x2R 12

47 (2+4)R 12

48 11RU 8/20

2 2R 12 L=1200 (224)

1200

47 2R 12 L=240 (6)

20

200

20

47 4R 12 L=240 (6)

20

200

20

1-1

R=1:100

11

2-2

R=1:100

22

3-3

R=1:100

33

25

20

2 4R 12

25 RU 8/2036 RU 8/20

20

20

2 2R 12

2 3R 12

48 RU 8

2 4R 12

2 2R 12

30

20

25 53RU 8/20 L=88 (529)

20

15

20

15

99

36 7RU 8/20 L=78 (154)

15

15

15

15

99

48 11RU 8/20 L=98 (11)

15

25

15 2599

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI Bprosinac 2016.

Page 66: IZVEDBENI PROJEKT

ZID U OSI C

24 34RU 8/20

27 13RU 8/20

2 2x2R 12

49 (2+4)R 12

50 3R 14

1 2R 10

50 4R 14

46 9RU 8/1046 10RU 8/2046 9RU 8/10

1-1

R=1:100

11

2-2

R=1:100

22

3-3

R=1:100

33

4-4

R=1:100

44

1 2R 10 L=1200 (138)

1200

2 2R 12 L=1200 (224)

1200

50 3R 14 L=440 (21)

30

380

30

50 4R 14 L=440 (21)

30

380

30

24 34RU 8/20 L=98 (978)

20

20

20

20

99

27 13RU 8/20 L=108 (27)

20

25

20 2599

46 28RU 8/10/20/10 L=128 (111)

20

35

20

35

99

1 2R 10

2 4R 12

1 2R 10

25

2544

69

25

25

2 4R 12

24 RU 8/20

30

2549 4R 12

49 2R 12

27 RU 8/20

4025

50 2R 14

50 4R 14

1 2R 10

46 RU 8/20/10

190

280

1 2R 10

24 RU 8/20

39 RU 8/20

24 53RU 8/20

39 53RU 8/20

2 2R 12

1 1R 10

2 2R 12

1 1R 10

1 2R 10

1 2R 10

39 53RU 8/20 L=158 (127)

6

64

6

64

99

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI Cprosinac 2016.

Page 67: IZVEDBENI PROJEKT

ZID U OSI D

25

30

RU

8/1

6

32

2R

14

31

2R

14

25 RU 8/16

31 2R 1432 2R 14

31

2R

14

L

=4

85

(1

0)

47

0

15

32

2R

14 L

=5

15 (1

0)

51

5

50 3R 14

1 2R 10

50 4R 14

38 9RU 8/1038 10RU 8/2038 9RU 8/10

1-1

R=1:100

11

25 22RU 8/20

2 2x2R 12

2-2

R=1:100

22

50 3R 14 L=440 (21)

30

380

30

50 4R 14 L=440 (21)

30

380

30

25 22RU 8/20 L=88 (529)

20

15

20

15

99

38 28RU 8/10/20/10 L=118 (77)

15

35

15

35

99

25

20

2 4R 12

25 RU 8/20

40

20

38 RU 8/20/10

50 3R 14

50 4R 14

1 2R 10

1 2R 10 L=1200 (138)

1200

2 2R 12 L=1200 (224)

1200

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI Dprosinac 2016.

Page 68: IZVEDBENI PROJEKT

ZID U OSI E

25 RU 8/16

31 2R 1432 2R 14

25

30

RU

8/1

6

32

2R

14

31

2R

14

31

2R

14

L

=4

85

(1

0)

47

0

15

32

2R

14

L

=5

15

(1

0)

51

5

50 3R 14

1 2R 10

50 4R 14

38 9RU 8/1038 10RU 8/2038 9RU 8/1025 22RU 8/20

2 2x2R 12

1-1

R=1:100

11

2-2

R=1:100

22

50 3R 14 L=440 (21)

30

380

30

50 4R 14 L=440 (21)

30

380

30

25 22RU 8/20 L=88 (529)

20

15

20

15

99

38 28RU 8/10/20/10 L=118 (77)

15

35

15

35

99

25

20

2 4R 12

25 RU 8/20

40

20

38 RU 8/20/10

50 3R 14

50 4R 14

1 2R 10

1 2R 10 L=1200 (138)

1200

2 2R 12 L=1200 (224)

1200

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI Eprosinac 2016.

Page 69: IZVEDBENI PROJEKT

ZID U OSI F

25 RU 8/16

31 2R 14 32 2R 14

25

30

RU

8/1

6

32

2R

14

31

2R

14

31

2R

14

L

=4

85

(1

0)

47

0

15

32

2R

14

L

=5

15

(1

0)

51

5

25 41RU 8/20

2 2x2R 12

1-1

R=1:100

11

2 2R 12 L=1200 (224)

1200

25 22RU 8/20 L=88 (529)

20

15

20

15

99

25

20

2 4R 12

25 RU 8/20

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI Fprosinac 2016.

Page 70: IZVEDBENI PROJEKT

ZID U OSI G24 41RU 8/20

2 2x2R 12

24 41RU 8/20

2 2x2R 12

24 41RU 8/20

2 2x2R 12

2 2x2R 12

1-1

R=1:100

11

2-2

R=1:100

22

3-3

R=1:100

33

4-4

R=1:100

44

2 2R 12 L=1200 (224)

1200

24 41RU 8/20 L=98 (978)

20

20

20

20

99

25

25

2 4R 12

24 RU 8/202525

2 4R 12

24 RU 8/2025

25

2 4R 12

24 RU 8/2025

25

24 RU 8/20

2 2R 12

2 4R 12

2 2R 12

2 2R 12

52 2R 12

2 2R 12

2 2R 12

51 2R 12

51 2R 12 L=320 (2)

320

52 2R 12 L=250 (2)

250

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - ZID U OSI Gprosinac 2016.

Page 71: IZVEDBENI PROJEKT

TT1-Btemelj: 45,07 m

0,00_+

25

- 0,15

- 0,30

- 1,25

- 0,50

- 1,05

- 1,10

1515

2055

51515

9515

50

TT2temelj: 23,05 m

- 1,25

12

TT3temelj: 14,10 m

1515

2055

51515

9515

30

- 0,15

- 0,50- 0,30

- 1,05

- 1,10

0,00_+

- 0,50- 0,30

- 0,15

- 1,05

- 1,25- 1,10

0,00_+

25

50

1515

2055

515 15

560

1515

1595

15

TT1-Atemelj: 53,26 m

15

- 1,05

- 1,25- 1,10

50

0,00_+

- 0,50- 0,30

- 0,15

1515

2055

51515

560

1515

151595

15

20

100x100x60kom 2

TS1

a-a b-b

a

b

38 25 38100

3825

3810

0

- 1,05

- 1,25

- 0,50

- 0,15

- 1,10

- 0,30- 0,45

0,00_+

25

100

155

6015

1515

- 1,05

- 1,25

- 0,50

- 0,15

- 1,10

- 0,30

0,00_+

25

100

1595

15

- 0,45

155

6015

1515

1595

15

TG1-A

- 1,25

- 1,05

- 1,10

- 0,08

- 0,47

- 0,26

- 0,87

- 0,374768

515

115

15

40

20

5

1551

840

1011

1810

215

temelj: 94,92 mTG1-B

- 1,25

- 1,05

- 1,10

- 0,08

- 0,47

- 0,26

- 0,87

- 0,37

685

1515

40

40

73

1551

840

1011

1810

215

temelj: 32,88 m

180x140x60kom 18

TS2

a

b

63 40 78180

5629

5614

0

- 1,05

- 1,25- 1,10

- 0,08- 0,26

- 0,47

- 0,37

- 0,87

- 0,37

155

6055

120

15

180

1551

840

1011

1810

215

55

63 20 20 78

a-a b-b

140

- 1,05

- 1,25- 1,10

- 0,08- 0,26

- 0,47

- 0,37

- 0,87

+ 0,10

1551

840

1011

1810

21515

560

5512

015

TG2

- 1,07

- 0,08

- 0,47

- 0,26- 0,37

405

1515

30

30

45

155

4010

1118

8415

temelj: 19,55 m

- 0,87

- 0,92

Detalj spoja sekundarnog stupa i temeljne grede

- 1,25

- 1,05

- 1,10

- 0,08

- 0,47

- 0,26

- 0,87

- 0,374768

515

115

15

40

24

5

1551

840

1011

1810

215

14

16242020

38

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE -prosinac 2016.

TEM. STOPE, TRAKE I GREDE

Page 72: IZVEDBENI PROJEKT

ZID U OSI 1

255452021525830

235

2515

535

1515

2511

553

5

+ 5,05

+ 2,80

_

+ 3,10

0,00+- 0,15

+ 3,65

+ 3,40

25

+ 5,05

+ 4,80

140

25

+ 2,45

+ 2,20

2595

3030

280

P=0255452021525

25

280

215

830

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 1prosinac 2016.

Page 73: IZVEDBENI PROJEKT

ZID U OSI 2

365

1515

395

+ 2,45

+ 2,20

+ 1,00

- 0,15

+ 3,65

+ 3,40

+ 2,45

+ 2,20

+ 1,00

+ 2,45

+ 2,20

+ 1,00

+ 2,45

+ 2,20

+ 1,00

- 0,20

+ 3,65

- 0,15

+ 5,05

+ 4,61

25 305 20 280 20 380 20 400 25 215 20 545 25

1511

512

025

952525

355

1553

5

25 60 160 85 20 60 160 60 20 70 250 60 20 70 250 80 25 215 20 545 25

+ 5,05

140

140

P=100 P=100 P=100 P=100

120

160

120

160

120

250

120

250

25

25545202152540020380202802030525

85 160 165 160 150 250 150 250 105 805

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 2prosinac 2016.

Page 74: IZVEDBENI PROJEKT

ZID U OSI 2

365

1515

395

+ 2,45

+ 2,20

+ 1,00

- 0,15

+ 3,65

+ 3,40

+ 2,45

+ 2,20

+ 1,00

+ 2,45

+ 2,20

+ 1,00

+ 2,45

+ 2,20

+ 1,00

- 0,20

+ 3,65

- 0,15

+ 5,05

+ 4,61

25 305 20 280 20 380 20 400 25 215 20 545 25

1511

512

025

952525

355

1553

5

25 60 160 85 20 60 160 60 20 70 250 60 20 70 250 80 25 215 20 545 25

+ 5,05

140

140

P=100 P=100 P=100 P=100

120

160

120

160

120

250

120

250

25

25545202152540020380202802030525

85 160 165 160 150 250 150 250 105 805

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 2prosinac 2016.

Page 75: IZVEDBENI PROJEKT

ZID U OSI 2

365

1515

395

+ 2,45

+ 2,20

+ 1,00

- 0,15

+ 3,65

+ 3,40

+ 2,45

+ 2,20

+ 1,00

+ 2,45

+ 2,20

+ 1,00

+ 2,45

+ 2,20

+ 1,00

- 0,20

+ 3,65

- 0,15

+ 5,05

+ 4,61

25 305 20 280 20 380 20 400 25 215 20 545 25

1511

512

025

952525

355

1553

5

25 60 160 85 20 60 160 60 20 70 250 60 20 70 250 80 25 215 20 545 25

+ 5,05

140

140

P=100 P=100 P=100 P=100

120

160

120

160

120

250

120

250

25

25545202152540020380202802030525

85 160 165 160 150 250 150 250 105 805

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 2prosinac 2016.

Page 76: IZVEDBENI PROJEKT

ZID U OSI 2

365

1515

395

+ 2,45

+ 2,20

+ 1,00

- 0,15

+ 3,65

+ 3,40

+ 2,45

+ 2,20

+ 1,00

+ 2,45

+ 2,20

+ 1,00

+ 2,45

+ 2,20

+ 1,00

- 0,20

+ 3,65

- 0,15

+ 5,05

+ 4,61

25 305 20 280 20 380 20 400 25 215 20 545 25

1511

512

025

952525

355

1553

5

25 60 160 85 20 60 160 60 20 70 250 60 20 70 250 80 25 215 20 545 25

+ 5,05

140

140

P=100 P=100 P=100 P=100

120

160

120

160

120

250

120

250

25

25545202152540020380202802030525

85 160 165 160 150 250 150 250 105 805

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 2prosinac 2016.

Page 77: IZVEDBENI PROJEKT

ZID U OSI 3

330

5015

395

- 0,15

+ 3,65

+ 3,50

- 0,20

+ 3,65

+ 5,05

+ 4,61

25 305 20 280 20 380 20 400 25 215 20 545 25

1536

515

- 0,15

+ 3,65

+ 3,15

2280

535

+ 5,05

140

+ 4,80

25

255452021525400203802028020305252280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 3prosinac 2016.

Page 78: IZVEDBENI PROJEKT

ZID U OSI 3

330

5015

395

- 0,15

+ 3,65

+ 3,50

- 0,20

+ 3,65

+ 5,05

+ 4,61

25 305 20 280 20 380 20 400 25 215 20 545 25

1536

515

- 0,15

+ 3,65

+ 3,15

2280

535

+ 5,05

140

+ 4,80

25

255452021525400203802028020305252280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 3prosinac 2016.

Page 79: IZVEDBENI PROJEKT

ZID U OSI 3

330

5015

395

- 0,15

+ 3,65

+ 3,50

- 0,20

+ 3,65

+ 5,05

+ 4,61

25 305 20 280 20 380 20 400 25 215 20 545 25

1536

515

- 0,15

+ 3,65

+ 3,15

2280

535

+ 5,05

140

+ 4,80

25

255452021525400203802028020305252280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 3prosinac 2016.

Page 80: IZVEDBENI PROJEKT

ZID U OSI 4

365

1515

395

- 0,15

+ 3,65

+ 3,40

- 0,20

+ 3,65

+ 5,05

+ 4,61

1536

515

535

- 0,15

+ 3,65

+ 3,50

25 305 20 280 20 380 20 400 25 215 20 545 252280

+ 2,20

+ 2,10

25 305 20 80 30 100 30 40 20 180 30 100 30 40 20 40 30 100 30 200 25 215 20 545 25

_ 0,00+

+ 2,20

+ 2,10

_ 0,00+

+ 2,20

+ 2,10

_ 0,00+- 0,15

+ 3,65

+ 3,25

4034

015

+ 5,05

140

+ 4,80

210

100

210

100

210

100

20

25 305 20 280 20 380 20 400 25 215 20 545 251060100160100300100460

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 4prosinac 2016.

Page 81: IZVEDBENI PROJEKT

ZID U OSI 4

365

1515

395

- 0,15

+ 3,65

+ 3,40

- 0,20

+ 3,65

+ 5,05

+ 4,61

1536

515

535

- 0,15

+ 3,65

+ 3,50

25 305 20 280 20 380 20 400 25 215 20 545 252280

+ 2,20

+ 2,10

25 305 20 80 30 100 30 40 20 180 30 100 30 40 20 40 30 100 30 200 25 215 20 545 25

_ 0,00+

+ 2,20

+ 2,10

_ 0,00+

+ 2,20

+ 2,10

_ 0,00+- 0,15

+ 3,65

+ 3,25

4034

015

+ 5,05

140

+ 4,80

210

100

210

100

210

100

20

25 305 20 280 20 380 20 400 25 215 20 545 251060100160100300100460

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 4prosinac 2016.

Page 82: IZVEDBENI PROJEKT

ZID U OSI 4

365

1515

395

- 0,15

+ 3,65

+ 3,40

- 0,20

+ 3,65

+ 5,05

+ 4,61

1536

515

535

- 0,15

+ 3,65

+ 3,50

25 305 20 280 20 380 20 400 25 215 20 545 252280

+ 2,20

+ 2,10

25 305 20 80 30 100 30 40 20 180 30 100 30 40 20 40 30 100 30 200 25 215 20 545 25

_ 0,00+

+ 2,20

+ 2,10

_ 0,00+

+ 2,20

+ 2,10

_ 0,00+- 0,15

+ 3,65

+ 3,25

4034

015

+ 5,05

140

+ 4,80

210

100

210

100

210

100

20

25 305 20 280 20 380 20 400 25 215 20 545 251060100160100300100460

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 4prosinac 2016.

Page 83: IZVEDBENI PROJEKT

ZID U OSI 5

365

1515

395

- 0,15

+ 3,65

+ 3,50

- 0,20

+ 3,65

+ 5,05

+ 4,61

2535

515

535

- 0,15

+ 3,65

+ 3,50

25 305 20 280 20 380 20 400 25 215 20 545 252280

+ 3,40

+ 3,25

1525

340

15

+ 5,05

140

25 305 20 280 20 380 20 400 25 215 20 545 25

20

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 5prosinac 2016.

Page 84: IZVEDBENI PROJEKT

ZID U OSI 5

365

1515

395

- 0,15

+ 3,65

+ 3,50

- 0,20

+ 3,65

+ 5,05

+ 4,61

2535

515

535

- 0,15

+ 3,65

+ 3,50

25 305 20 280 20 380 20 400 25 215 20 545 252280

+ 3,40

+ 3,25

1525

340

15

+ 5,05

140

25 305 20 280 20 380 20 400 25 215 20 545 25

20

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 5prosinac 2016.

Page 85: IZVEDBENI PROJEKT

ZID U OSI 5

365

1515

395

- 0,15

+ 3,65

+ 3,50

- 0,20

+ 3,65

+ 5,05

+ 4,61

2535

515

535

- 0,15

+ 3,65

+ 3,50

25 305 20 280 20 380 20 400 25 215 20 545 252280

+ 3,40

+ 3,25

1525

340

15

+ 5,05

140

25 305 20 280 20 380 20 400 25 215 20 545 25

20

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 5prosinac 2016.

Page 86: IZVEDBENI PROJEKT

ZID U OSI 6

355

2515

535

- 0,15

+ 3,65

+ 3,40

- 0,20

2535

515

535

25 305 20 280 20 380 20 400 25 215 20 545 252280

+ 5,05

+ 4,36

+ 5,05

7169

- 0,15

+ 3,65

+ 3,40

+ 5,05

+ 4,80

140

25

+ 2,45

+ 2,20

25 305 20 280 20 380 20 400 25 215 20 545 25

25

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 6prosinac 2016.

Page 87: IZVEDBENI PROJEKT

ZID U OSI 6

355

2515

535

- 0,15

+ 3,65

+ 3,40

- 0,20

2535

515

535

25 305 20 280 20 380 20 400 25 215 20 545 252280

+ 5,05

+ 4,36

+ 5,05

7169

- 0,15

+ 3,65

+ 3,40

+ 5,05

+ 4,80

140

25

+ 2,45

+ 2,20

25 305 20 280 20 380 20 400 25 215 20 545 25

25

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 6prosinac 2016.

Page 88: IZVEDBENI PROJEKT

ZID U OSI 6

355

2515

535

- 0,15

+ 3,65

+ 3,40

- 0,20

2535

515

535

25 305 20 280 20 380 20 400 25 215 20 545 252280

+ 5,05

+ 4,36

+ 5,05

7169

- 0,15

+ 3,65

+ 3,40

+ 5,05

+ 4,80

140

25

+ 2,45

+ 2,20

25 305 20 280 20 380 20 400 25 215 20 545 25

25

2280

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI 6prosinac 2016.

Page 89: IZVEDBENI PROJEKT

ZID U OSI A

- 0,20

+ 5,05

4034

015

535

+ 3,65

_ 0,00+

+ 3,25

105525 391 25 391 25 173 25

- 0,15

+ 5,05

1534

040

140

535

140

P=0 P=0 P=0

391

325

391

325

173

325

25

25 391 25 391 25 173 251055

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI Aprosinac 2016.

Page 90: IZVEDBENI PROJEKT

ZID U OSI B

- 0,20

2535

515

535

_ 0,00+1055

25 391 25 229 20 340 25

+ 5,05+ 5,05

140

25

+ 2,40

+ 3,65

+ 3,40

- 0,15_ 0,00+

+ 2,05

+ 2,25

+ 3,65

+ 3,40

- 0,15

211 30 150 25 229 20 152 30 70 30 58 25

+ 2,20

150

220

70 205

25 391 25 229 20 340 25

20

113804461502661055

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI Bprosinac 2016.

Page 91: IZVEDBENI PROJEKT

ZID U OSI C

- 0,20

2529

515

535

_ 0,00+1055

25 190 25 370 20 340 25

+ 5,05+ 5,05

71

+ 3,65

+ 3,25

- 0,15

+ 3,65

+ 3,40

+ 3,10

+ 2,80

+ 5,05

+ 4,36

69

60

3030

190

280 25

25 225 25 395 20 340 25840215

1055

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI Cprosinac 2016.

Page 92: IZVEDBENI PROJEKT

ZID U OSI D

+ 3,65

+ 3,25

- 0,15

+ 3,65

- 0,15

+ 3,40

80525 395 20 340 25

1535

525

395

15

+ 5,05

+ 4,41

340

4096

4453

5

ZID U OSI E

80525 395

1535

525

395

25 395 20 340 25

20

805

39525805

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI Dprosinac 2016.

Page 93: IZVEDBENI PROJEKT

ZID U OSI E

25

+ 3,65

+ 3,25

- 0,15

+ 3,65

- 0,15

+ 3,40

80525 395 20 340

1535

525

395

15

+ 5,05

+ 4,41

340

4096

4453

5

20

253402039525805

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI Eprosinac 2016.

Page 94: IZVEDBENI PROJEKT

+ 5,05

ZID U OSI F

+ 3,65

- 0,15

+ 3,65

- 0,15

+ 3,40

80525 395 20 23 20 297 25

1535

525

395

15

+ 4,41

9634

040

4453

5

+ 3,40

2515

235

535

115

2525

95

20

252952039525803

2023

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI Fprosinac 2016.

Page 95: IZVEDBENI PROJEKT

+ 3,65

ZID U OSI G

- 0,15

535

438

+ 3,40

80529725 2520

2515 15

235

535

115

25

+ 4,80

+ 5,05

340

40

+ 5,05

2511

5

+ 2,45

+ 2,20

+ 1,00

_ 0,00+ _ 0,00+

25 95 160 100 83 20 100 92 105 25

+ 3,65

- 0,15

+ 3,40

+ 5,05

+ 4,80

+ 2,45

+ 2,20

2595

P=100 P=100

160

120

100

220

100

220

92 120

25 438 20 297 25

25

120 160 100 103 100 92 130805

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN OPLATE - ZID U OSI Gprosinac 2016.

Page 96: IZVEDBENI PROJEKT

POZ 100 - donja zona

broj komada: 237l= 66,46 m

2 2R 12

20 R 10/2020 R 10 L=80 (664)

35

10

35

2 2R 12 L=1200 (224)

1200

19 R 10 L=87 (529)

2

0

9

30

9

1

9

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

1

8

Q

-

2

5

7

2

3

5

x

1

5

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-9

Q

-2

5

7

4

1

5

x

8

0

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-10

Q

-257

415x60

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-

1

1

Q

-

2

5

74

1

5

x

1

3

0

I

-

1

5

Q

-

2

5

7

3

2

5

x

2

1

5

I

-

1

5

Q

-

2

5

7

3

2

5

x

2

1

5

I

-

1

6

Q

-

2

5

7

3

2

5

x

1

1

8

I

-

1

2

Q

-

2

5

7

3

1

7

x

2

1

5

I

-

1

7

Q

-

2

5

7

3

1

7

x

1

5

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I-1

9

Q

-2

5

7

3

6

0

x

6

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I-2

0

Q

-2

5

7

3

6

0

x

8

0

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I-2

1

Q

-2

5

7

3

6

0

x6

0

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

2

2

Q

-

2

5

7

3

6

0

x

1

3

0

I

V

-

1

Q

-

3

3

5

4

1

1

x

2

1

5

I

V

-

1

Q

-

3

3

5

4

1

1

x

2

1

5

I

V

-

1

Q

-

3

3

5

4

1

1

x

2

1

5

IV

-2

Q

-335

411x55

I

V

-

3

Q

-

3

3

5

5

6

5

x

2

1

5

I

V

-

3

Q

-

3

3

5

5

6

5

x

2

1

5

I

V

-

3

Q

-

3

3

5

5

6

5

x

2

1

5

IV

-4

Q

-3

3

5

5

6

5

x

9

9

53 16R 8/20

53 16R 8/20 L=200 (71)

200

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - POZ 100 DZprosinac 2016.

Page 97: IZVEDBENI PROJEKT

POZ 100 - donja zona

broj komada: 237l= 66,46 m

2 2R 12

20 R 10/2020 R 10 L=80 (664)

35

10

35

2 2R 12 L=1200 (224)

1200

19 R 10 L=87 (529)

2

0

9

30

9

1

9

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

1

8

Q

-

2

5

7

2

3

5

x

1

5

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-9

Q

-2

5

7

4

1

5

x

8

0

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-10

Q

-257

415x60

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-

1

1

Q

-

2

5

74

1

5

x

1

3

0

I

-

1

5

Q

-

2

5

7

3

2

5

x

2

1

5

I

-

1

5

Q

-

2

5

7

3

2

5

x

2

1

5

I

-

1

6

Q

-

2

5

7

3

2

5

x

1

1

8

I

-

1

2

Q

-

2

5

7

3

1

7

x

2

1

5

I

-

1

7

Q

-

2

5

7

3

1

7

x

1

5

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I-1

9

Q

-2

5

7

3

6

0

x

6

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I-2

0

Q

-2

5

7

3

6

0

x

8

0

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I-2

1

Q

-2

5

7

3

6

0

x6

0

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

2

2

Q

-

2

5

7

3

6

0

x

1

3

0

I

V

-

1

Q

-

3

3

5

4

1

1

x

2

1

5

I

V

-

1

Q

-

3

3

5

4

1

1

x

2

1

5

I

V

-

1

Q

-

3

3

5

4

1

1

x

2

1

5

IV

-2

Q

-335

411x55

I

V

-

3

Q

-

3

3

5

5

6

5

x

2

1

5

I

V

-

3

Q

-

3

3

5

5

6

5

x

2

1

5

I

V

-

3

Q

-

3

3

5

5

6

5

x

2

1

5

IV

-4

Q

-3

3

5

5

6

5

x

9

9

53 16R 8/20

53 16R 8/20 L=200 (71)

200

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - POZ 100 DZprosinac 2016.

Page 98: IZVEDBENI PROJEKT

POZ 100 - donja zona

broj komada: 237l= 66,46 m

2 2R 12

20 R 10/2020 R 10 L=80 (664)

35

10

35

2 2R 12 L=1200 (224)

1200

19 R 10 L=87 (529)

2

0

9

30

9

1

9

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

6

Q

-

2

5

7

2

3

5

x

2

1

5

I

-

1

8

Q

-

2

5

7

2

3

5

x

1

5

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-9

Q

-2

5

7

4

1

5

x

8

0

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-10

Q

-257

415x60

I

-

8

Q

-

2

5

7

4

1

5

x

2

1

5

I-

1

1

Q

-

2

5

74

1

5

x

1

3

0

I

-

1

5

Q

-

2

5

7

3

2

5

x

2

1

5

I

-

1

5

Q

-

2

5

7

3

2

5

x

2

1

5

I

-

1

6

Q

-

2

5

7

3

2

5

x

1

1

8

I

-

1

2

Q

-

2

5

7

3

1

7

x

2

1

5

I

-

1

7

Q

-

2

5

7

3

1

7

x

1

5

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I-1

9

Q

-2

5

7

3

6

0

x

6

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I-2

0

Q

-2

5

7

3

6

0

x

8

0

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I-2

1

Q

-2

5

7

3

6

0

x6

0

I

-

1

3

Q

-

2

5

7

3

6

0

x

2

1

5

I

-

2

2

Q

-

2

5

7

3

6

0

x

1

3

0

I

V

-

1

Q

-

3

3

5

4

1

1

x

2

1

5

I

V

-

1

Q

-

3

3

5

4

1

1

x

2

1

5

I

V

-

1

Q

-

3

3

5

4

1

1

x

2

1

5

IV

-2

Q

-335

411x55

I

V

-

3

Q

-

3

3

5

5

6

5

x

2

1

5

I

V

-

3

Q

-

3

3

5

5

6

5

x

2

1

5

I

V

-

3

Q

-

3

3

5

5

6

5

x

2

1

5

IV

-4

Q

-3

3

5

5

6

5

x

9

9

53 16R 8/20

53 16R 8/20 L=200 (71)

200

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - POZ 100 DZprosinac 2016.

Page 99: IZVEDBENI PROJEKT

POZ 100 - gornja zona

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

2

Q

-

1

8

8

1

5

0

x

1

2

9

I

I

-

1

3

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

4

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

5

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

6

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

7

Q

-

1

8

8

1

5

0

x

1

4

4

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

9

Q

-

1

8

8

1

5

0

x

6

4

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

2

0

Q

-

1

8

8

1

5

0

x

9

0

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

2

1

Q

-

1

8

81

5

0

x

4

9

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

2

R

-

3

3

5

2

0

0

x

1

8

7

53 17R 8/20

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I-2

4

Q

-2

5

7

1

7

7

x

4

5

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I

-

2

5

Q

-

2

5

7

2

6

7

x

1

2

9

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I-3

0

Q

-2

5

7

2

0

0

x

4

9

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I-3

0

Q

-2

5

7

2

0

0

x

4

9

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I-3

0

Q

-2

5

7

2

0

0

x

4

9

I

-

3

1

Q

-

2

5

7

2

8

3

x

2

0

0

I

-

3

2

Q

-

2

5

7

2

6

0

x

2

0

0

I

-

3

3

Q

-

2

5

7

1

6

0

x

2

0

0

I

-

3

4

Q

-

2

5

7

1

4

8

x

2

0

0

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

3

R

-

3

3

5

2

0

0

x

2

0

9

53 38R 8/20

53 38R 8/20 L=200 (71)

200

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - POZ 100 GZprosinac 2016.

Page 100: IZVEDBENI PROJEKT

POZ 100 - gornja zona

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

2

Q

-

1

8

8

1

5

0

x

1

2

9

I

I

-

1

3

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

4

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

5

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

6

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

7

Q

-

1

8

8

1

5

0

x

1

4

4

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

9

Q

-

1

8

8

1

5

0

x

6

4

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

2

0

Q

-

1

8

8

1

5

0

x

9

0

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

2

1

Q

-

1

8

81

5

0

x

4

9

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

2

R

-

3

3

5

2

0

0

x

1

8

7

53 17R 8/20

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I-2

4

Q

-2

5

7

1

7

7

x

4

5

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I

-

2

5

Q

-

2

5

7

2

6

7

x

1

2

9

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I-3

0

Q

-2

5

7

2

0

0

x

4

9

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I-3

0

Q

-2

5

7

2

0

0

x

4

9

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I-3

0

Q

-2

5

7

2

0

0

x

4

9

I

-

3

1

Q

-

2

5

7

2

8

3

x

2

0

0

I

-

3

2

Q

-

2

5

7

2

6

0

x

2

0

0

I

-

3

3

Q

-

2

5

7

1

6

0

x

2

0

0

I

-

3

4

Q

-

2

5

7

1

4

8

x

2

0

0

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

3

R

-

3

3

5

2

0

0

x

2

0

9

53 38R 8/20

53 38R 8/20 L=200 (71)

200

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - POZ 100 GZprosinac 2016.

Page 101: IZVEDBENI PROJEKT

POZ 100 - gornja zona

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

2

Q

-

1

8

8

1

5

0

x

1

2

9

I

I

-

1

3

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

4

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

5

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

6

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

7

Q

-

1

8

8

1

5

0

x

1

4

4

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

9

Q

-

1

8

8

1

5

0

x

6

4

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

2

0

Q

-

1

8

8

1

5

0

x

9

0

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

1

8

Q

-

1

8

8

1

5

0

x

2

1

5

I

I

-

2

1

Q

-

1

8

81

5

0

x

4

9

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

2

R

-

3

3

5

2

0

0

x

1

8

7

53 17R 8/20

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I-2

4

Q

-2

5

7

1

7

7

x

4

5

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I

-

2

3

Q

-

2

5

7

2

6

7

x

2

1

5

I

-

2

5

Q

-

2

5

7

2

6

7

x

1

2

9

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I-3

0

Q

-2

5

7

2

0

0

x

4

9

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I-3

0

Q

-2

5

7

2

0

0

x

4

9

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I

-

2

9

Q

-

2

5

7

2

0

0

x

2

1

5

I-3

0

Q

-2

5

7

2

0

0

x

4

9

I

-

3

1

Q

-

2

5

7

2

8

3

x

2

0

0

I

-

3

2

Q

-

2

5

7

2

6

0

x

2

0

0

I

-

3

3

Q

-

2

5

7

1

6

0

x

2

0

0

I

-

3

4

Q

-

2

5

7

1

4

8

x

2

0

0

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

1

R

-

3

3

5

2

0

0

x

2

1

5

V

-

3

R

-

3

3

5

2

0

0

x

2

0

9

53 38R 8/20

53 38R 8/20 L=200 (71)

200

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:50MJERILOPLAN ARMATURE - POZ 100 GZprosinac 2016.

Page 102: IZVEDBENI PROJEKT

snjegobrani snjegobrani

601

5

15

15

10

5

532

2

15

15

35

01

5

10

53

50

35

IPE 160

150x100x5

601

5

15

15

10

5

75

30

10

5

120x80x4

120x80x4

IPE 160XP

S -5

cm

6

6

32

52

51

5

35

03

5

35

01

52

01

20

35

03

51

20

20

35

01

47

74

02

4

35

03

51

20

39

91

26

52

5

39

91

26

52

5

52

5

POD NA TLU

0,50 cm

(2200 kg/m3) 5.00 cm-polietilenska folija (1000 kg/m3) 0,02 cm-Izolacija EPS 100 debljine 8+EPS T debljine 2 10,00 cm-polietilenska folija (1000 kg/m3) 0,02 cm

tkanine, dva sloja 1,00 cm-hladni bitumenski prednamaz

15,00 cm

STROP-polietilen 0,025 cm-Knauf Insulation DP5 15,00 cm-polietilen 0,025 cm

15,00 cm 2,00 cm

VANJSKI ZID OD OPEKE 25 CM2,00 cm25,00 cm

-polimerno cementno ljepilo 0,50 cm-EPS 10,0 cm-polimerno cementno ljepilo 0,50 cm

0,20 cm

KOSI KROV-termoizolirani lim 6,00 cm

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:100MJERILOPRESJECIprosinac 2016.

Page 103: IZVEDBENI PROJEKT

2

100

210

1

190

220+60

1

80

210

1

80

210

2

100

210

2

215

280

5

250

120

5

250

120

6

160

120

6

160

120

7

100

220

6

160

120

7

100

220

8

92

120

1

80

210

1

70

205

4

325

178

3

150

220

2

100

210

2

100

210

3

391

325

3

391

325

P=100P=100P=100P=100

P=0

P=

0P

=0

P=

10

0P

=1

00

P=

0

1x30

2x10

10

75

35

39

12

53

91

20

17

83

5

35

39

12

53

91

20

17

83

5

10

75

1

35 545 20 215 35 390 20 380 20 280 20 305 35

600 105 250 150 250 150 160 165 160 95

850 1450

2300

135

21

53

53

95

20

15

01

21

78

25

230 100 702070 100 210 2070 100 110

150 65 100 413 80 98 80 274

35

43

82

02

97

35

10

75

13

01

60

10

31

00

25

08

25

21

53

5

25

19

03

51

00

92

14

0

2 2

3 3

4 4

6 6

A

A

B

B

C

C

D

D

E

E

F

F

G

G

215

5 5

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:100MJERILOTLOCRT PRIZEMLJAprosinac 2016.

Page 104: IZVEDBENI PROJEKT

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B

A B

52

15

21

25

52

15

21

52

15

21

52

15

21

70

20

52

73

82

53

83

41

12

.5

25

12

.5

50

90 2135 90

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

26

14

055

05

27

10

03

41

50

180 1955 180

6320

20

78

56

29

55

2315

70

52

15

21

52

15

21

52

15

21

52

15

21

442

52

57

15

20

15

41

01

2.5

37

20

01

2.52

51

2.5

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

26

14

03

12

50

41

05

02

00

50

42

56

51

06

8

12.5 25 12.5 518 15 2015 187

12.5

25 12.5 373 15 20 15 350 15 20 15 250 15 20 15 278 12.52512.5

50 518 50 187 50 373 50 350 50 250 50 278 50

855 1450

2305

12

.5

25

12

.5

36

71

52

0

15

12

69

12

91

44

25

25

25

20

21

31

2.52

51

2.5

50

20

05

03

68

50

12

63

01

44

50

45

180

14

0

63 55 63 1955 63 55 63

180 1955 180

38

15

62

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

26

11

12

9

5

552

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

26

11

12

9

5

63 55 63 1955 63 55 63

25

12.5

2525 467

040

20

15

25

12.5

255025 467 255025

100 467 100

306 14 342 14 357 14 357 3535

35 306 14 342 14 357 14 357 14 342 14 306 35

180

16

4

20

14 342 14 306

553

05

5

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:100MJERILOTLOCRT TEMELJAprosinac 2016.

Page 105: IZVEDBENI PROJEKT

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B

A B

52

15

21

25

52

15

21

52

15

21

52

15

21

70

20

52

73

82

53

83

41

12

.5

25

12

.5

50

90 2135 90

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

26

14

055

05

27

10

03

41

50

180 1955 180

6320

20

78

56

29

55

2315

70

52

15

21

52

15

21

52

15

21

52

15

21

442

52

57

15

20

15

41

01

2.5

37

20

01

2.52

51

2.5

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

26

14

03

12

50

41

05

02

00

50

42

56

51

06

8

12.5 25 12.5 518 15 2015 187

12.5

25 12.5 373 15 20 15 350 15 20 15 250 15 20 15 278 12.52512.5

50 518 50 187 50 373 50 350 50 250 50 278 50

855 1450

2305

12

.5

25

12

.5

36

71

52

0

15

12

69

12

91

44

25

25

25

20

21

31

2.52

51

2.5

50

20

05

03

68

50

12

63

01

44

50

45

180

14

0

63 55 63 1955 63 55 63

180 1955 180

38

15

62

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

26

11

12

9

5

552

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

26

11

12

9

5

63 55 63 1955 63 55 63

25

12.5

2525 467

040

20

15

25

12.5

255025 467 255025

100 467 100

306 14 342 14 357 14 357 3535

35 306 14 342 14 357 14 357 14 342 14 306 35

180

16

4

20

14 342 14 306

553

05

5

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT:

1:100MJERILOTLOCRT TEMELJAprosinac 2016.

Page 106: IZVEDBENI PROJEKT

1

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B

A B

52

15

21

25

52

15

21

52

15

21

52

15

21

70

20

52

73

82

53

83

41

12

.5

25

12

.5

50

90 2135 90

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

26

14

055

05

27

10

03

41

50

180 1955 180

6320

20

78

56

29

55

2315

70

52

15

21

52

15

21

52

15

21

52

15

21

442

52

57

15

20

15

41

01

2.5

37

20

01

2.52

51

2.5

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

81

14

03

26

14

03

12

50

41

05

02

00

50

42

56

51

06

8

12.5 25 12.5 518 15 2015 187

12.5

25 12.5 373 15 20 15 350 15 20 15 250 15 20 15 278 12.52512.5

50 518 50 187 50 373 50 350 50 250 50 278 50

855 1450

2305

12

.5

25

12

.5

36

71

52

0

15

12

69

12

91

44

25

25

25

20

21

31

2.52

51

2.5

50

20

05

03

68

50

12

63

01

44

50

45

180

14

0

63 55 63 1955 63 55 63

180 1955 180

38

15

62

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

26

11

12

9

5

552

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

81

562

95

63

26

11

12

9

5

63 55 63 1955 63 55 63

25

12.5

2525 467

040

20

15

25

12.5

255025 467 255025

100 467 100

306 14 342 14 357 14 357 3535

35 306 14 342 14 357 14 357 14 342 14 306 35

180

16

4

20

14 342 14 306

553

05

5

T.D. List br.310/16

d.o.o. za graditeljstvo, trgovinu i usluge - Bjelovar,

Tr. Markovac, Trojstvena ulica 15,

B-PROJEKT

INVESTITOR

LOKACIJA

DATUM

PROJEKTANT: