99
GOVERNMENT OF RAJASTHAN OFFICE OF ASSISTANT ENGINEER (PIA) I.W.M.P PANCHYAT SAMITI- ARAIN (AJMER) IWMP (2009-10) - I (BHAMOLAV) Block :- Arain District :- Ajmer Project Area :- 5840 ha. Project Cost :- Rs. 700.80 Lacs Convergence Cost :- 364.89 Rs. Total Cost :- 1065.64 Rs. Lacs -SUBMITTED BY- PROJECT MANAGER DISTRICT WATERSHED DEVELOPMENT UNIT AJMER (Rajasthan) 305901

IWMP (2009-10) - I (BHAMOLAV)

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IWMP (2009-10) - I (BHAMOLAV)

GOVERNMENT OF RAJASTHAN

OFFICE OF ASSISTANT ENGINEER (PIA) I.W.M.P

PANCHYAT SAMITI- ARAIN (AJMER)

IWMP (2009-10) - I (BHAMOLAV) Block :- Arain District :- Ajmer Project Area :- 5840 ha.

Project Cost :- Rs. 700.80 Lacs Convergence Cost :- 364.89 Rs.

Total Cost :- 1065.64 Rs. Lacs -SUBMITTED BY-

PROJECT MANAGER

DISTRICT WATERSHED DEVELOPMENT UNIT

AJMER (Rajasthan) 305901

Page 2: IWMP (2009-10) - I (BHAMOLAV)

1111 Introduction Cheptar :-Introduction Cheptar :-Introduction Cheptar :-Introduction Cheptar :-1.1 Project Back ground

Name of Project:- BhamolavMacro No:- 3&4

Micro No:- 14,15,16,17,18 &1,2,

Table No 1.1.1 :- Project Beck groundDigree Minut Digree Minut

Latitude:- 26 5 To 27 58

Longitude:- 74 27 To 74 29

Total Project Area 5840 Ha.

Total Project area 5840 Ha is Proposed to be treated under Intrigated watershed Menagement Programme

Location:-

Nearest town:- Arain

Tahesil:- Kishangarh

Distt:- Ajmer

Social:-

Major cast:- Jat ,Gujar ,Rajput, Other

The livelihood of these people is based on rainfed agriculture,dairy, and

Distance from watershed

8 Km

28 Km

65 Km

The livelihood of these people is based on rainfed agriculture,dairy, and

sheep rearing,

1.2 Detail of Area covered

Table No 1.1.2 :- Basic Project InformationName of Gram

Panchyat

Bhamolav Arain Sandolia Chota lamba

Area covered 2555 685 1395 1205

Cost in Lakhs 306.60 82.20 167.40 144.60

Bhamolav

Arain

Sandolia

Chota lamba

Page 3: IWMP (2009-10) - I (BHAMOLAV)

1.31.31.31.3 Detail of Area to be treated in different Grampanchyat wise and village wiseDetail of Area to be treated in different Grampanchyat wise and village wiseDetail of Area to be treated in different Grampanchyat wise and village wiseDetail of Area to be treated in different Grampanchyat wise and village wise

Name Census code

1 Bhamolav Bhamolav 2498000 Kishangarh Ajmer 20322 Bhamolav Dang 2498200 Kishangarh Ajmer 523

Bhamolav Total GP 2555 306.603 Arain Arain 2497100 Kishangarh Ajmer 685

Arain Total GP 685 82.20

4 Sandolia Sandolia 2498400 Kishangarh Ajmer 1395Sandolia Total GP 1395 167.40

5 Chota lamba Chota lamba 2497000 Kishangarh Ajmer 1205Chota lamba Total GP 1205 144.60

5840 700.80

DistVillage

Table No 1.1.3 :- Basic Project InformationTable No 1.1.3 :- Basic Project InformationTable No 1.1.3 :- Basic Project InformationTable No 1.1.3 :- Basic Project Information

PIA

Total

Project

cost

So.NoName of

Project

AEN PS

ARAIN

Tahesil

Area

Proposed

to be treted

Total IWMP- Ist (BHAMOLAV) PROJECT

Name of gram

panchayat

IWMP

Bhamolav

5840 700.80

So.NoName of

Project

Name of gram

panchayatVillage Macro No Micro no

Proposed

for

Treatment

Bhamolav Bhamolav 4 1 1512

Bhamolav Bhamolav 4 2 520

Bhamolav Dang 3 18 523

Total Macro 4/1,2,3/18 2555

Arain Arain 3 14 200

Arain Arain 3 15 485

Total Macro 3/14,15 685

Chota lamba Chota lamba 3 16 1205

Total Macro 3/16 1205

Sandolia Sandolia 3 17 1395

Total Macro 3/17 1395

Total Watershed Area 5840

IWMP

BHAMOLAV

1

Table No 1.1.4:- Macro Micro InformationTable No 1.1.4:- Macro Micro InformationTable No 1.1.4:- Macro Micro InformationTable No 1.1.4:- Macro Micro Information

Total IWMP- Ist (BHAMOLAV) PROJECT

Total Watershed Area 5840

Page 4: IWMP (2009-10) - I (BHAMOLAV)

Table No 1.1.5:- Mecro Micro Information Village Wise

4/1 4/2 3/18 3/14 3/15 3/16 3/17 Total

1 Bhamolav Bhamolav 1512 1512 1512

2 Bhamolav Bhamolav 520 520 520

3 Bhamolav Dang 523 523 523

2555 1512 520 523 0 0 0 0 2555

4 Arain Arain 200 200 200

5 Arain Arain 485 485 485

685 0 0 0 200 485 0 0 685

6 Chota lamba Chota lamba 1205 1205 1205

1205 0 0 0 0 0 1205 0 1205

7 Sandolia Sandolia 1395 1395 1395

1395 0 0 0 0 0 0 1395 1395

5840 1512 520 523 200 485 1205 1395 5840

S.No. Gram

Panchya

Name of

Village

Area Area Covered in Macro/Micro

Table No 1.1.6 Detail of Area Macro/Micro wise

GP Bhamolav

GP Arain

GP Chota lamba

GP Sandolia

G Total

Macro/Micro 4/1 4/2 3/18 3/14 3/15 3/16 3/17 TotalArea 1512 520 523 200 485 1205 1395 5840

Digram :- 1.1.1 Micro Wise

26%

9%

9%

3%8%

21%

24%

0%

Detail of Area Macro/Micro Watershed4/1 4/2 3/18 3/14 3/15 3/16 3/17

Page 5: IWMP (2009-10) - I (BHAMOLAV)

1.2 Institutional arrangements 1.2 Institutional arrangements 1.2 Institutional arrangements 1.2 Institutional arrangements 1.2.1 State leval nodal agency (SLNA) :-

As per guide line pera no.- 4.4 state Govt.of Rajasthan constituted. State level Nodal agency (SLNA).

chairman of SLNA is Aditional chief Secretary (dovelopment) & member Secretary is Director watershed (CEO).

SLNA

Member secretary Post :- CEO

Designation & Address :- Director watershed dovelopment & Soil Conservation

Teliphone No. :- 0141 - 2227189

Fax No. :- 0141 - 2227858

E - mail :- dir_ wdsc @ dataone.in.

Page 6: IWMP (2009-10) - I (BHAMOLAV)

1.2.2 Dristict watershed development unit (DWDU) :-As per guide line pera no. 4.5 / 29 SLNA appointed District watershed development unit

at District level. Project menager of DWDU is XEn watershed at district level.

Detailes of DWDU

Designation & Address Project menager DWDU X En. Watershed Ajmer

(ii) Telephone 1452641329

(iii) Fax

(iv) E-mail [email protected].

1.2.3 Project Implementing agency

Tabel no. 1.2.1 :- Detaile of PIATabel no. 1.2.1 :- Detaile of PIATabel no. 1.2.1 :- Detaile of PIATabel no. 1.2.1 :- Detaile of PIA

Sr. No. Names of projectIWMP Bhamolav Designation & Address A.En. watershed

development & soil

consvetion Arain

(Ajmer).

(ii) Telephone 01463281123

(iii) Fax 01463281123

(iv) E-mail [email protected]

1.2.4 1.2.4 1.2.4 1.2.4 Watershed Development Team (WDT)

The WDT is an integral part of PIA and was been set up by the PIA.

Tabal no. 1.2.2 Staff at PIA level

Sr.no. Name Age Sex Designation Qualificatiion Specilization Job assigned Monthly

remuneration

1 Mukesh Lohar 24 M WDT( Eng.) Diploma in civil Engineer Eng.measures 10000

2 Maloo Ram Meena 25 M Wdt (Agri) M.sc. (Ag) AgricultureAgri.

Development10000

3Smt. Rekha

Choudhary32 F WDT(Sociology) M.A.(Sociology) Social

Community

Development8000

4 Jogendra Singh 31 M WDT(Vetinary)LSA Diploma 2

YearVeterinary

Veterinary

Development8000

Details of PIA

Page 7: IWMP (2009-10) - I (BHAMOLAV)

1.2.5 Watershed Committee (WC)Watershed Committee (WC)Watershed Committee (WC)Watershed Committee (WC)

Total area of the watershed 5840 ha. Comprise of seven Gram Panchayat namely Bhamolav, Arain, Sandolia, Chota Lamba

A separate watershed committee constituted for each Gram Panchayat.

As per circular F 18 (I 38) IWMP / WC 2009-10 / 78-248 Dated 28-4-10 Watershed dept. Directed that watershed committee

will be formed on basis of gram panchayat not village level.

The Gram sabha of each Garam Panchayat constituted users groups, slef-help groups and watershed committee.

Table 1.2.3Table 1.2.3Table 1.2.3Table 1.2.3

Sr.no.

1

2

3

4

1 2 3 4 5 6 7 8 9 10 11

S.N.

Name of

the

Districts

Name of

projects

Name of

WCs

Date of

Registration

as a Society

(dd/mm/yyyy

Designation Name M/F Category UG/SHGEducational

qualification

1 Ajmer Chairman Sh.Satya Narayan Batesar/ Sh. Ram karan M OBC SHG 8Th

Secy Sh. Brijraj Singh / Sh. Madan Singh M GEN Other BA

Member Sh. Uda Ram / Sh. Gopi Gurjar M OBC UG Litreate

Member Sh Shiv Raj / Sh. Ram karan Khatik M SC UG Litreate

Member Sh. Shambhoo Singh / Sh. Ratan Singh M GEN UG Litreate

Member Sh. Jugdish / Sh. Ram Lal Khati M OBC UG Litreate

Member Sh. Bhagwan Singh / Sh. Ganga Singh M GEN UG Litreate

Member Sh. Prahlad / Sh. Nahru Gurjar M OBC SHG Litreate

Member Sh. Kailash / Sh. Ram Nivas Sharma M GEN SHG Litreate

Member Sh. Hari Ram / Sh. Chandra Jat M OBC SHG Litreate

Member Sh. Lala / Sh. Ram Chandra Bairwa M OBC SHG Litreate

Member Sh. Mahaveer / Sh. Bansi Das Sadhu M OBC UG Litreate

Member Smt. Canda / Sh. Mangi Lal Bairwa F SC SHG Litreate

Member Smt. Teeja / Sh.Ram Pal Gusai F SC SHG Litreate

Member Smt. Kamla / Sh. Dhanna Jat F OBC SHG Litreate

Member Smt. Kishni / Sh. Ramdev Jat F OBC SHG Litreate

Member Sh. Jogendra Singh /Sh. Ganpat Singh M GEN Other 12 th

Gram Panchayat Date of Gram Sabha

Sandolia 16/06/2010

Chota lamba 25/06/2010

Bhamolav 17/6/2010

Arain 21/06/2010

Table- 1.2.4 :- Details of Watershed Committees (ws) BhamolavTable- 1.2.4 :- Details of Watershed Committees (ws) BhamolavTable- 1.2.4 :- Details of Watershed Committees (ws) BhamolavTable- 1.2.4 :- Details of Watershed Committees (ws) Bhamolav

BHAMOLAV

IWMP WS BHAMOLAV

342/Ajmer/

2010-11

Date 24-02-

2011

Page 8: IWMP (2009-10) - I (BHAMOLAV)

1 2 3 4 5 6 7 8 9 10

S.N. Name of

the Districts

Name of

projects

Name of

WCs

Date of

Registration as a

Society

Designation Name M/F

Category Name of UG/SHG

Chairman Sh. Ram dev / Sh.Chittar mali M OBC SHG

Secratary Sh. Kamlesh / Sh. Mahaveer Gaur M GEN Other

Member Sh. Om Prakash / Sh. Ramdhan Mali M OBC UG

Member Sh. Ratan Lal / SH. Ridh Karan Bhil M ST UG

Member Sh. Banwari / Sh. Raju Puri M OBC UG

Member Smt. Arti / Sh. Raghvendra F GEN SHG

Member Sh. Hanuman / Sh. Nanda Jat M OBC SHG

Member Sh. Prahlad / Sh. Narayan Jat M OBC SHG

Member Sh. Damodar / Sh Dhanna Regar M SC UG

Member Smt. Ratni / Sh. Gheesa Regar F OBC SHG

Member Smt Kamla /Sh Kalu Keer F SC SHG

Member Sh.Jogendra Singh / Sh.Ganpat Singh M GEN Other

1 2 3 4 5 6 7 8 9 10

S.N. Name of

the

Districts

Name of

projects

Name of

WCs

Date of

Registration

as a Society

Designatio

n

Name M/F

CategoryName of

UG/SHG

Chairman Sh. Ramgopal / Sh. Ramnath Jat M OBC SHG

Secratary Sh. Dinesh Chand / Sh. Ram Lal Soni M OBC Secretery

Member Sh. Prakash Chandra / Sh.Trilok Chandra Jain M GEN UG

Member Sh. Rama / Sh. Ladu Balia M SC UG

Member Smt. Guman / Sh.Narayan Goswami F OBC SHG

Member Sh. Ramdev /Sh. Raghunath Jat M OBC UG

Member Sh. Vishram / Ramkaram Jat M OBC UG

Member Smt. Geeta / Sh Deva Gurjar F OBC SHG

Member Smt Lada / Sh. Hari Bagria F ST SHG

Member Sh.Ganesh / Sh. Chotu Jat M OBC SHG

Member Sh. Madan / Sh. Bhima Harijan M SC SHG

Member Sh. Jogendra Singh / Sh. Ganpat Singh M GEN Others

Table- 1.2.5 :- Details of Watershed Committees (ws) ArainTable- 1.2.5 :- Details of Watershed Committees (ws) ArainTable- 1.2.5 :- Details of Watershed Committees (ws) ArainTable- 1.2.5 :- Details of Watershed Committees (ws) Arain

1 AjmerIWMP WS

BhamolavARAIN

183/Ajmer/

2010-11

Date 18-09-

2010

Table- 1.2.6 :- Details of Watershed Committees (ws) Chota LambaTable- 1.2.6 :- Details of Watershed Committees (ws) Chota LambaTable- 1.2.6 :- Details of Watershed Committees (ws) Chota LambaTable- 1.2.6 :- Details of Watershed Committees (ws) Chota Lamba

1 AjmerIWMP WS

Bhamolav

Chota

Lamba

182/Ajmer/

2010-11

Date

15-09-2010

Page 9: IWMP (2009-10) - I (BHAMOLAV)

11

Educational

qualification

8th

12th

10th

5th

Litreate

10 th

Litreate

Litreate

Litreate

Litreate

Litreate

12 th

11

Education

al

qualificatio

n12Th

12 th

12 th

5Th

8Th

5Th

BA

8 Th

Litreate

Litreate

5th

12 th

Page 10: IWMP (2009-10) - I (BHAMOLAV)

1 2 3 4 5 6 7 8 9 10 11

S.N. Name of

the

Districts

Name of

projects

Name of

WCs

Date of

Registration as

a Society

Designation Name M/F

Category Name of UG/SHG

Educational

qualification

Chairman Sh. Sajjan Singh/ Sh Mangal Singh M Gen. SHG 12Th

Secratary Sh. Ramraj/ Sh Ridh Karan Jat M OBC Others 12Th

Member Sh Shri Kishan / Sh Bhagirath Jat M OBC UG 12Th

Member Sh Ramesh / Sh Ram Gopal Shahu F OBC SHG 10Th

Member Smt. Hema / SH Ramdhan Balai F SC SHG 5th

Member Smt. Lali / SH Mani Ram Chunia F OBC SHG 4Th

Member Smt. Kamla / Sh Madan Lal Riyad M OBC UG 3rd

Member Sh. Kasra / Sh Ladu Berwa M SC UG 8 Th

Member Sh. Rameshwar / Sh Ramkaran M SC SHG Litreate

Member Sh. Hari Ram / Sh Deva Ram Jat M OBC SHG 12Th

Member Sh. Umrao / Sh Ramdhan M OBC UG 4Th

Member Sh. Raghunath / Sh Ram Chandra M OBC UG 4Th

Member Sh Jogendra Singh / SH Ganpat Singh M Gen. Others 12 TH

Table- 1.2.7 :- Details of Watershed Committees (ws) SANDOLIATable- 1.2.7 :- Details of Watershed Committees (ws) SANDOLIATable- 1.2.7 :- Details of Watershed Committees (ws) SANDOLIATable- 1.2.7 :- Details of Watershed Committees (ws) SANDOLIA

1

AjmerIWMP WS

BhamolavSandolia

128/Ajmer/

2010-11

Page 11: IWMP (2009-10) - I (BHAMOLAV)

1.2.61.2.61.2.61.2.6 Secretary Watershed CommitteesSecretary Watershed CommitteesSecretary Watershed CommitteesSecretary Watershed Committees

1 Convening meeting of the Gram Sabha, Gram Panchayat, Watershed Committee for facilitating the decision making processes in the

context of Watershed Development Project.

2 Taking follow up action on all decisions.

3 Maintaining all the records of project activities and proceedings of the meetings of gram panchayat, WC, and other institutions for watershed

development project.

4 Ensuring payments and other financial transactions.

5 Signing the cheques jointly with the WDT nominee on behalf of the watershed Committee.

1.3 :-1.3 :-1.3 :-1.3 :- Present status of land usePresent status of land usePresent status of land usePresent status of land useOut of 5840 ha. Of watershed area cultivators are farming on only 4649 Ha.for Production. Govt. land and Panchayat land

1191 Ha.not used for cultivation & pasture development.

Table No 1.3.1 :- Present status of land useTable No 1.3.1 :- Present status of land useTable No 1.3.1 :- Present status of land useTable No 1.3.1 :- Present status of land use

Non arable land TotalName of Arabel Land

Irrigated UnIrrigated Total DLT Pasture communi

ty land

Other Total

Ha. Ha. Ha. Ha. Ha. Ha.

BHAMOLAV 2692.00 1767.00 4459.00 190.00 1191.00 0.00 0.00 1381.00 5840.00

Non arable land TotalName of

Project

Arabel Land

0

500

1000

1500

2000

2500

3000

3500

4000

4500

Arabel Land Non arable

land

Series1

Series2

Series3

Page 12: IWMP (2009-10) - I (BHAMOLAV)

Table No 1.3.2:- Present status of land useTable No 1.3.2:- Present status of land useTable No 1.3.2:- Present status of land useTable No 1.3.2:- Present status of land use

Total

Irrigated UnIrrigated Total DLT Pasture

community

land Other

Ha. Ha. Ha. Ha. Ha. Ha. Ha.

1 Bhamolav Bhamolav 4 1 652.00 435.00 1087.00 60.00 365.00 0.00 0.00 425.00 1512.00

2 Bhamolav Bhamolav 4 2 287.00 190.00 477.00 0.00 43.00 0.00 0.00 43.00 520.00

3 Bhamolav Dang 3 18 272.00 181.00 453.00 0.00 70.00 0.00 0.00 70.00 523.00

1211.00 806.00 2017.00 60.00 478.00 0.00 0.00 538.00 2555.00

4 Arain Arain 3 14 30.00 23.00 53.00 10.00 137.00 0.00 0.00 147.00 200.00

5 Arain Arain 3 15 60.00 50.00 110.00 120.00 255.00 0.00 0.00 375.00 485.00

90.00 73.00 163.00 130.00 392.00 0.00 0.00 522.00 685.00

6 Chotalamba Chotalamba 3 16 655.00 437.00 1092.00 0.00 113.00 0.00 0.00 113.00 1205.00

655.00 437.00 1092.00 0.00 113.00 0.00 0.00 113.00 1205.00

7 Sandolia Sandolia 3 17 736.00 451.00 1187.00 0.00 208.00 0.00 208.00 1395.00

736.00 451.00 1187.00 0.00 208.00 0.00 0.00 208.00 1395.00

2692.00 1767.00 4459.00 190.00 1191.00 0.00 0.00 1381.00 5840.00

Arabel Land Non arable land

Total non

arable

S.N.

Name of

villageMacro no Micro noName of GP

Page 13: IWMP (2009-10) - I (BHAMOLAV)

1 Bhamolav Bhamolav 2032

2 Bhamolav Dang 523

3 Arain Arain 685

4 Chota Lamba Chota Lamba 1205

Detail of Area covered by Different Villages

Name of gram

panchayatName of Village

Area Covered in

Ha.S.No.

Bhamolav

35%

Dang

9%Arain

12%

Chota Lamba

20%

Sandolai

24%

Area Covered in Ha.

5 Sandoliia Sandolai 1395

Total 5840

1.4 :- Rain water storage1.4 :- Rain water storage1.4 :- Rain water storage1.4 :- Rain water storageThere is no water body except Nadi for water harvesting.Nadi in watershed area is not well maintained and not meneged

by the villegers.NREGS planed to excavated but water menegement is required.

Table No 1.4.1 :- Rain water storegeTable No 1.4.1 :- Rain water storegeTable No 1.4.1 :- Rain water storegeTable No 1.4.1 :- Rain water storege

S.N.Name of Gram

PanachyatName of village No of Nadi Anicut Khadeen Talab

Check

damDam

Common

Well

No. of

Hand

Pump

1 BHAMOLAV BHAMOLAV 5 1 0 1 0 0 5 9

2 BHAMOLAV DANG 2 0 0 1 0 0 2 4

3 ARAIN ARAIN 3 0 0 1 0 0 5 19

4 CHOTA LAMBA CHOTA LAMBA 5 0 0 1 0 0 4 8

5 SANDOLIA SANDOLIA 3 1 0 1 0 0 4 6

Total 18 2 0 5 0 0 20 46

Page 14: IWMP (2009-10) - I (BHAMOLAV)
Page 15: IWMP (2009-10) - I (BHAMOLAV)

1.5 :- Erosion status in project Area1.5 :- Erosion status in project Area1.5 :- Erosion status in project Area1.5 :- Erosion status in project AreaProject Area is effected by water erosion & wind erosion both.such that loss of soil fertility take place every year.

Production depleting year by year.

It is major problem of watershed

a Sheet 4700

b Rill 1000

c Gully 140

0 NA

23547

Table no.1.5.1 :- Erosion status in project Area

Cause

Type of

erosion

Average

soil loss

(Tonnes/

ha/ year)

Run

off(mm/

year)

Total for project

Wind erosion

Sub-Total

Water erosion

Area

affecte

d (ha)

Page 16: IWMP (2009-10) - I (BHAMOLAV)

1.6 Socio economic status :-1.6 Socio economic status :-1.6 Socio economic status :-1.6 Socio economic status :- Economy of farmers of project area is based on cultivation. Due to erosion & scanity of rainfall.

economic condition of farmers are very poor.

Table no. 1.6.1 Socio economic status and Population

APL BPL SC ST Total Male Female Child Total

1 BHAMOLAV BHAMOLAV 478 58 141 0 536 1201 1171 594594594594 2966

2 BHAMOLAV DANG 191 26 28 0 217 514 507 264264264264 1285

669 84 169 0 753 1715 1678 858 4251

3 ARAIN ARAIN 1024 165 273 86 1189 2817 2746 1034103410341034 6597

1024 165 273 86 1189 2817 2746 1034 6597

4 SANDOLIA SANDOLIA 352 42 86 0 394 1241 1097 638638638638 2976

352 42 86 0 394 1241 1097 638 2976

5 CHOTA LAMBA CHOTA LAMBA 607 74 134 0 681 2203 2161 871871871871 5235

607 74 134 0 681 2203 2161 871 5235

2652 365 662 86 3017 7976 7682 3401 19059

Total FamilyName of GP PopulationS.No. Name of Village

Page 17: IWMP (2009-10) - I (BHAMOLAV)

No Area No Area No Area No. Total

1 BHAMOLAV BHAMOLAV 112 174 0 0 370 1390 482 1564

2 BHAMOLAV DANG 22 34 0 0 171 419 193 453

134 208 0 0 541 1809 675 2017

3 ARAIN ARAIN 68 37 21 16 267 110 356 163

68 37 21 16 267 110 356 163

4 SANDOLIA SANDOLIA 68 105 0 0 270 1082 338 1187

68 105 0 0 270 1082 338 1187

5 CHOTA LAMBA CHOTA LAMBA 107 166 0 0 478 926 585 1092

107 166 0 0 478 926 585 1092

Total 377 516 21 16 1556 3927 1954 4459

Name of Gram

panchyat

SC STName of village TotalGeneralS.No

Page 18: IWMP (2009-10) - I (BHAMOLAV)

Big

farmer Area MF Area

Small

farmer Area

1 BHAMOLAV BHAMOLAV 6 96 216 1036 260 432

2 BHAMOLAV DANG 3 52 65 260 125 141

9 148 281 1296 385 573

3 ARAIN ARAIN 2 12 37 88 317 63

2 12 37 88 317 63

4 SANDOLIA SANDOLIA 4 32 174 942 160 213

4 32 174 942 160 213

5 CHOTA LAMBA CHOTA LAMBA 4 41 263 715 318 336

4 41 263 715 318 336

19 233 755 3041 1180 1185

farmers of unirrigated land. Education status of villegers are very poor.

S.No Name of Gram

panchyat

Name of village Detail Of Farmers category

Page 19: IWMP (2009-10) - I (BHAMOLAV)

Digrame no :- 1.6.1 No. Hausehold CultivatorsDigrame no :- 1.6.1 No. Hausehold CultivatorsDigrame no :- 1.6.1 No. Hausehold CultivatorsDigrame no :- 1.6.1 No. Hausehold Cultivators Digrame no :- 1.6.2 Total Area CultivatorsDigrame no :- 1.6.2 Total Area CultivatorsDigrame no :- 1.6.2 Total Area CultivatorsDigrame no :- 1.6.2 Total Area CultivatorsSC ST General SC ST General

377 21 1556 516 16 3927

1.71.71.71.7 Village wise Land Holding Pattern in Project areaVillage wise Land Holding Pattern in Project areaVillage wise Land Holding Pattern in Project areaVillage wise Land Holding Pattern in Project area

Table no. 1.7.1 :- IWMP Bhamolav

Irrigated (source) Rainfed Total Generel SC. ST. OBC. BPL

1 Large Farmer

Sr.no. Type of Farmer

Land holding (ha.) irrigation source wise Land holding (ha.) Social group wise

IWMP

BHAMOLAV

IWMP

Bhamolav

IWMP

BHAMOLAV

100%SC

19%

ST

1%

General

80%

Chart Title 51616

3927

SC

ST

General

1 Large Farmer

2 Small Farmer

3 Marginal Farmer

4 Landless Person

5 No. of BPL Household

Total 0 0 0 0 0 0 0 0

1.8 Problems1.8 Problems1.8 Problems1.8 Problems1 Land topography Land topography Land topography Land topography

Project area is micro & mecro basis SRSAC countour map & field visit during PRA shows that slope is very high in area.Erosion in land resulting low productivity of crops.

2 Lack of awarenessLack of awarenessLack of awarenessLack of awareness

Farmers of project area are not aware about Govt. schemes &do not have knowledge about letest technics of farming, horticulture plantation,drip irrigation or any outher

water saving technics.Like drip irrigation or any outher water saving technics.

3 Lack of water menegmentLack of water menegmentLack of water menegmentLack of water menegment

Farmers do not know to harvest surface runoff. They do not have much money to check runoff by making anicuts, earthenbunds and LSCD

4 Poor vegitation in pasture areaPoor vegitation in pasture areaPoor vegitation in pasture areaPoor vegitation in pasture area

5 Absence of micro interprisesAbsence of micro interprisesAbsence of micro interprisesAbsence of micro interprises

There is not a single small scale industry to support lively hood

6 Lack of capacity building programmes.Lack of capacity building programmes.Lack of capacity building programmes.Lack of capacity building programmes.

Farmers do not belive in latest technology becouse there is no demonstration activities to improve there capacity or to menage thenselves with avalable sources in better way.

There is not any managed pasture area, even there is a Govt. & community land in in Ramgarh, Jaswantpura etc. village. Such that farmers can not menage live stock for there daily

need of milk

Page 20: IWMP (2009-10) - I (BHAMOLAV)
Page 21: IWMP (2009-10) - I (BHAMOLAV)
Page 22: IWMP (2009-10) - I (BHAMOLAV)

2.12.12.12.1 Basic Features : - Basic Features : - Basic Features : - Basic Features : - As per page no. 6 Land use perterns is as follows

Land use & land classificationLand use & land classificationLand use & land classificationLand use & land classificationTotal

Irrigated UnIrrigated fellow DLT Pasture

community

land Other

Ha. Ha. Ha. Ha. Ha. Ha.

2692.00 1767.00 0.00 190.00 1191.00 0.00 0.00 5840.00

Digrame no :- 2.1.1 IWMP BhamolavDigrame no :- 2.1.1 IWMP BhamolavDigrame no :- 2.1.1 IWMP BhamolavDigrame no :- 2.1.1 IWMP Bhamolav

Cheptar II Cheptar II Cheptar II Cheptar II

Arabel Land Non arable land

IWMP BHAMOLAV

1191.00

IWMP BHAMOLAV

Arabel Land Irrigated Ha.

Arabel Land UnIrrigated Ha.

Non arable land fellow Ha.

2692.00

1767.00

190.00Non arable land fellow Ha.

Non arable land DLT Ha.

Non arable land Pasture

Non arable land community land Ha.

Non arable land Other Ha.

Page 23: IWMP (2009-10) - I (BHAMOLAV)

2.2 Net sown Area2.2 Net sown Area2.2 Net sown Area2.2 Net sown Area There is no source of irrigation other then wells.

Table No 2.2.1 :-Table No 2.2.1 :-Table No 2.2.1 :-Table No 2.2.1 :- Net sown AreaNet sown AreaNet sown AreaNet sown Area

One time Two times Three times

1 Bhamolav Bhamolav 1564.00 1564.00 280.00 Nil

2 Bhamolav Dang 453.00 453.00 62.00 Nil

Total 2017.00 2017.00 342.00

3 Arain Arain 163.00 163.00 61.00 Nil

Total 163.00 163.00 61.00

4 Sandolia Sandolia 1187.00 1187.00 140.00 Nil

Total 1187.00 1187.00 140.00

5 Chota Lamba Chota Lamba 1092.00 1092.00 136.00 Nil

Total 1092.00 1092.00 136.00

Total 4459.00 4459.00 679.00

Result:-

Total area of Watershed is 5840Ha out of which 4459ha is cultivated area accoroding

to revenue record . 4459ha area is been sown Remaining area 1381 Ha is Pasture land

and DLT.

Name of

Gram

panchyat

Name of

village Total cultiveted

Land

Net sown area (Ha)S.No

and DLT.

Page 24: IWMP (2009-10) - I (BHAMOLAV)

2.3 Crop productivity2.3 Crop productivity2.3 Crop productivity2.3 Crop productivity

Table No 2.3.2:- Crop details (Kharif)Table No 2.3.2:- Crop details (Kharif)Table No 2.3.2:- Crop details (Kharif)Table No 2.3.2:- Crop details (Kharif)

Area Ha

Productiv

ity

(Qt/Ha)

Prouction

Tonne Area Ha

Producti

vity

(Qt/Ha)

Prouction

Tonne

Area

Ha

Producti

vity

(Qt/Ha)

Prouction

Tonne Area Ha

Productivity

(Qt/Ha)

Prouction

Tonne Area Ha

Productiv

ity

(Qt/Ha)

Prouction

Tonne

1 Bhamolav Bhamolav 1564 422 6 2321 813 3 2033 93 7 605 156 4 546 80 2 160 1564

2 Bhamolav Dang 453 122 6 671 235 3 588 27 7 176 45 4 158 24 2 48 453

2017 544 2992 1048 2620 120 780 201 704 104 208 2017

3 Arain Arain 163 44 6 242 84 3 210 10 7 65 16 4 56 9 2 18 163

163 44 242 84 210 10 65 16 56 9 18 163

4 Sandolia Sandolia 1187 320 6 1760 617 3 1543 71 7 462 118 4 413 61 2 122 1187

1187 320 1760 617 1543 71 462 118 413 61 122 1187

5 Chota Lamba Chota Lamba 1092 294 6 1617 567 3 1418 65 7 423 109 4 382 57 2 114 1092

1092 294 1617 567 1418 65 423 109 382 57 114 1092

Total 4459 1202 0 6611 2316 0 5790 266 0 1729 444 0 1554 231 0 462 4459

MoongMaizeBajra othersS.no. G.P.

Jawar Village

Total

Sown

Area

Kharif (Mansoon)

Arble

Page 25: IWMP (2009-10) - I (BHAMOLAV)

Table No 2.3.3 :- Crop details (Rabi)Table No 2.3.3 :- Crop details (Rabi)Table No 2.3.3 :- Crop details (Rabi)Table No 2.3.3 :- Crop details (Rabi)

Area Ha

Productiv

ity

(Qt/Ha)

Prouction

Tonne Area Ha

Producti

vity

(Qt/Ha)

Prouction

Tonne

Area

Ha

Producti

vity

(Qt/Ha)

Prouction

Tonne Area Ha

Productivity

(Qt/Ha)

Prouction

Tonne

1 Bhamolav Bhamolav 939 281 12 3372 422 3 1266 187 4 655 49 11 539 939

2 Bhamolav Dang 272 81 12 972 122 3 366 54 4 189 15 11 165 272

1211 362 4344 544 6 1632 241 7 844 64 22 704 1211

3 Arain Arain 90 27 12 324 40 3 120 18 4 63 5 11 55 90

90 27 324 40 120 18 4 63 5 11 55 90

4 Sandolia Sandolia 736 220 12 2640 331 3 993 147 4 515 38 11 418 736

736 220 2640 331 993 147 4 515 38 11 418 736

5 Chota Lamba Chota Lamba 655 196 12 2352 294 3 882 131 4 459 34 11 374 655

655 196 2352 294 882 131 4 459 34 11 374 655

2692 805 0 9660 1209 6 3627 537 18 1880 141 55 1551 2692

s. noGram

panchyat

Gram

Village

Total

Area

sown in

Rabi

Irrigated

area

Rabi (Winter)

otherWheat Musterd

Page 26: IWMP (2009-10) - I (BHAMOLAV)

Net sown Area in watershed Net sown Area in watershed Net sown Area in watershed Net sown Area in watershed

Crop wiseCrop wiseCrop wiseCrop wise Kharif CropsKharif CropsKharif CropsKharif Crops Crop wiseCrop wiseCrop wiseCrop wise Rabi cropsRabi cropsRabi cropsRabi cropsCrop Bajra Jawar Maize Moong Other Crop wheat Gram Musterd Other

Area 1202 2316 266 444 231 Area 805 1209 537 141

Digrame no :- 2.3.1 Kharif crops (Net sown Area)Digrame no :- 2.3.1 Kharif crops (Net sown Area)Digrame no :- 2.3.1 Kharif crops (Net sown Area)Digrame no :- 2.3.1 Kharif crops (Net sown Area) Digrame no :- 2.3.2 Rabi crops (Net sown Area)Digrame no :- 2.3.2 Rabi crops (Net sown Area)Digrame no :- 2.3.2 Rabi crops (Net sown Area)Digrame no :- 2.3.2 Rabi crops (Net sown Area)

Bajra

Jawar Maize

Kharif Crop Detail

wheat

Gram

Musterd

Other

Result:- Low productivity

Reason low firtility of land,erosion of land,slope in land area & using traditional croping peterns. Page no. 11Page no. 11Page no. 11Page no. 11

x

Page 27: IWMP (2009-10) - I (BHAMOLAV)

2.42.42.42.4 Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Digrame no :- 2.4.1 Agriculture status.Digrame no :- 2.4.1 Agriculture status.Digrame no :- 2.4.1 Agriculture status.Digrame no :- 2.4.1 Agriculture status.

Cotton Productivity (Kg/Ha) Bajara Productivity (Kg/Ha)Botenical Name Gossipium species Botenical Name Pennisetum americanum

Family Malvaceae Family Gramineae

Origen India Origen India / Africa

India Rajasthan Ajmer Bhamolav India Rajasthan Ajmer Bhamolav

362 317 258 206 802 655 507 490

Mung Productivity (Kg/Ha) Moth Productivity (Kg/Ha)

0

100

200

300

400

India Rajasthan Ajmer BhamolavSeries1

0

100

200

300

400

500

600

700

800

900

India Rajasthan Ajmer Bhamolav Series1

Mung Productivity (Kg/Ha) Moth Productivity (Kg/Ha)Botenical Name Vigna radiata Botenical Name Phaseolus sconlitifolious

Family Leguminaceae Family Leguminaceae

Origen India Origen India

India Rajasthan Ajmer Bhamolav India Rajasthan Ajmer Bhamolav

317 159 200 186 144 122 271 200

Ref. :- VITAL Ag. Statistics & base line survey. Study by Amardeep Singh

0

50

100

150

200

250

300

350

India Rajasthan Ajmer BhamolavSeries1

0

50

100

150

200

250

300

India Rajasthan Ajmer BhamolavSeries1

Page 28: IWMP (2009-10) - I (BHAMOLAV)

Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops

Digrame no :- 2.4.2 Agriculture status.Digrame no :- 2.4.2 Agriculture status.Digrame no :- 2.4.2 Agriculture status.Digrame no :- 2.4.2 Agriculture status.

Wheat Productivity (Kg/Ha) Gram Productivity (Kg/Ha)Botenical Name Triticum species Botenical Name Cice arietinum

Family Gramineae Family Leguminaceae

Origen India Origen South West Asia

India Rajasthan Ajmer Bhamolav India Rajasthan Ajmer Bhamolav

2619 2762 2292 1975 808 443 905 710

0

500

1000

1500

2000

2500

3000

India Rajasthan Ajmer Bhamolav Series1

0

200

400

600

800

1000

India Rajasthan Ajmer Bhamolav Series1

Sesamum Productivity (Kg/Ha) Musterd Productivity (Kg/Ha)Botenical Name Sesamum indicum Botenical Name Brassica compestries

Family Pedaliaceae Family Cruferae

Origen Africa Origen India

India Rajasthan Ajmer Bahmaolav India Rajasthan Ajmer Bhamolav

310 149 172 140 1177 1232 1320 1170

Ref. :- VITAL Ag. Statistics & base line survey. Study by Amardeep Singh

India Rajasthan Ajmer Bhamolav Series1 India Rajasthan Ajmer Bhamolav

0

50

100

150

200

250

300

350

India Rajasthan Ajmer Bahmaolav Series1

1050

1100

1150

1200

1250

1300

1350

India Rajasthan Ajmer Bhamolav Series1

Page 29: IWMP (2009-10) - I (BHAMOLAV)

Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops Comparative Study of Agriculture Productivity for various crops

Digrame no :- 2.4.3 Agriculture status.Digrame no :- 2.4.3 Agriculture status.Digrame no :- 2.4.3 Agriculture status.Digrame no :- 2.4.3 Agriculture status.

Cumin Productivity (Kg/Ha)India Rajasthan Ajmer Bhamolav

285 387 292 174

0

100

200

300

400

India Rajasthan Ajmer Bhamolav

Series1

Ref. :- VITAL Ag. Statistics & base line survey. Study by Omprakash Ahalavat

2.5

M F Ch Total No. of h.h. Members No. of h.h. Members No. of h.h. Members

1 2 3 4a 4b 4c 4d 5a 5b 6a 6b 7a 7b

(i) cultivators 3017 7976 7682 3401 19059 674 4680 84 647 758 5327

(ii) Dairying Nill

(iii) Poultry Nill

(iv) Piggery Nill

(v) Landless Agri.

Labourers

0 74 396 7 39 81 477

(vi) Artisans 0

(vii) BPL 399 184 576 13 74 197 650

(viii) Others(specify) Nill

Total 3416 7976 7682 3401 19059 932 5652 20 113 1036 6454

Page no. 14Page no. 14Page no. 14Page no. 14

Socio-Economic ParametersSocio-Economic ParametersSocio-Economic ParametersSocio-Economic ParametersTable no. 2.5.1Table no. 2.5.1Table no. 2.5.1Table no. 2.5.1

Total

M= Male, F=Female, Ch=Children (below 14 years) h.h.=house hold

S.No.

Indicate against the occupation with income more than 50%

Household and Economic ActivityHousehold and Economic ActivityHousehold and Economic ActivityHousehold and Economic ActivityDescription

of Households

Total

No.of

household

Population in No. SC ST

Indicate only households with main occupation in the case of more than one occupation in a household .

Page 30: IWMP (2009-10) - I (BHAMOLAV)

Sr. no.Name of

VillageName of SHG Name of Chair man Members Activity involved Monthly income Fund available

Assistance

available

Source of

assistance

1 Bhamolav Luxmi Bai Mahila

SHG

Smt. Ramti /

Shabudin

12 Sweing 20 1200 watershed Watershed

2 Bhamolav Maha Laxmi Smt.Pani Devi /

Bhawar lal

12 Sweing 20 3000 watershed Watershed

3 Bhamolav Dev Maharaj Smt. Shayri / Bhanwar

singh

12 Sweing 20 watershed Watershed

4 Bhamolav Laxmi Mahila

SHG

Miss Manju / bhagu

singh

12 Sweing 50 watershed Watershed

5 Dand Jai mata di Smt Heeru / SavarLal 13 Sweing 50 1650 watershed Watershed

6 Dand Jai Maa Durga

SHG

Smt. Ramti /

Shabudin

11 Sweing 50 watershed Watershed

7 Dand Parvti Raj SHG Smt.Pani Devi /

Bhawar lal

11 Sweing 20 watershed Watershed

8 Dand Jai Ambey Mahil

SHG

Smt. Shayri / Bhanwar

singh

11 Sweing 20 1400 watershed Watershed

9 Sandolia Tejaji Maharaj

Mahila SHG

Miss Manju / bhagu

singh

11 Sweing 50 watershed Watershed

10 Sandolia Chand Mahila

SHG

Smt Ladi/ Madu ram 15 Sweing 50 1350 watershed Watershed

11 Sandolia ShivJi mahila

SHG

Smt Rukma/ Debi lal 10 Sweing 50 watershed Watershed

12 Sandolia Balaji mahila

SHG

Smt Dudi / Rama 11 Kasida Work 20 watershed Watershed

13 Chota Lamba Bhawani SHG Smt Jethi / Hathi Ram 13 Sweing 50 watershed Watershed

14 Chota Lamba Durga mahila

SHG

Smt Heeru / SavarLal 13 Kasida Work 50 watershed Watershed

15 Chota Lamba Laxmi Mahila

SHG

Smt Budhi / Naryan 12 Kasida Work 50 2500 watershed Watershed

16 Chota Lamba Jai Ambe Maa

Mahil SHG

Smt Rukma/ Debi lal 13 Kasida Work 50 2500 watershed Watershed

17 Arain Bheru baba Mahil

SHG

Smt Dudi / Rama 13 Sweing 50 ICDS ICDS

18 Arain Jai Ambey Mahil

SHG

Smt Jethi / Hathi Ram 12 Pashu palan 100 watershed Watershed

19 Arain Bajrang Bali Smt Heeru / SavarLal 12 Sweing 50 ICDS ICDS

20 Arain Balaji mahila

SHG

Smt Budhi / Naryan 12 Sweing 50 watershed Watershed

Tabel no. 2.5.2 Existing SHGTabel no. 2.5.2 Existing SHGTabel no. 2.5.2 Existing SHGTabel no. 2.5.2 Existing SHG

Page 31: IWMP (2009-10) - I (BHAMOLAV)

Training

received

No

Page 32: IWMP (2009-10) - I (BHAMOLAV)

2.6 Horticulture status & fuel avilability :-2.6 Horticulture status & fuel avilability :-2.6 Horticulture status & fuel avilability :-2.6 Horticulture status & fuel avilability :-No project of horticulture had been started last year by agriculture ext.deparment under Rastriya bagwani mission programme.

area. There is no plantation work done to provide fuel wood at lower cost.

Source/ Name

of report

Year of

referen

ce

Area

already

under

horticulture

Source/ Name

of report

Year of

reference

Area

already

under fuel-

wood

Source/

Name of

report

Year of

reference

NRHM 2009 2.60 ha.

2.7 Live stock status :-2.7 Live stock status :-2.7 Live stock status :-2.7 Live stock status :-In the Jaswantpura IWMP project, there are cows, buffalos, goats, sheeps, bullock & is as below. Mainly cows & buffaloes

are of local breeds like Nagouri & Murra respectively. Avalability of surface watar, fodder and pasture for these animals reducing day by day. Less noumber

of animals surveive by eating crop reduces. No parnanent pasture is there. This leads to heavy migration of villagers for grazing sheeps rearing to out of state.

Milk production is low in area. There is some dairy co-operative in project area. Where the Cultivator sale the milk at Dairy but milk is Insufficent in Quantity

production of milk leads poor health to children.

Sr.no. Name of GP Name of Village

No. Milk No. Milk No. Milk No. Milk

1 Bhamolav Bhamolav 130 39 126 38 496 149 752 226 380 27 1159

2 Bhamolav Dang 46 14 84 26 458 138 588 178 210 16 814

176 53 210 64 954 287 404 590 43 0 1973

3 Arain Arain 106 32 246 74 410 123 762 229 317 4 1083

106 32 246 74 410 123 229 317 4 0 1083

4 Sandolia Sandolia 94 29 78 24 217 66 389 119 396 2 787

94 29 78 24 217 66 119 396 2 0 787

5 Chota Lamba Chota lamba 72 22 57 18 206 62 335 102 306 2 643

72 22 57 18 206 62 102 306 2 0 643

Total 448 136 591 180 1787 538 0 854 1609 51 0 4486

2.8 Other infrastructure fascility avalable :-2.8 Other infrastructure fascility avalable :-2.8 Other infrastructure fascility avalable :-2.8 Other infrastructure fascility avalable :-t Had

Quarter

InBhamolav watershed all gram panchyat Head Quarter is connected to Road and has at least Sr. Sec school in Bhamolav and Arain senior secondy school in

other villages Primary school is available ,Bank, Telephone facility is available as per table given below. Electricty is avilable in all villages

Buffalo Cow Goat Sheep BullockTotal Total Live

stock

Other

1.60 Ha Govt . Land avalable

No pasture

maneged by

villagers, purposed

In Narega

Tabel no. 2.7.1 Live stock statusTabel no. 2.7.1 Live stock statusTabel no. 2.7.1 Live stock statusTabel no. 2.7.1 Live stock status

Tabel no. 2.6.1 Horticulture & fuel avilabilityTabel no. 2.6.1 Horticulture & fuel avilabilityTabel no. 2.6.1 Horticulture & fuel avilabilityTabel no. 2.6.1 Horticulture & fuel avilabilityExisting area under horticulture (ha) Existing area under fuel-wood (ha) Existing area

Page 33: IWMP (2009-10) - I (BHAMOLAV)

Sr.no. Name of GP Name of Village

No. Milk No. Milk No. Milk No. Milk

Buffalo Cow Goat Sheep BullockTotal Total Live

stock

Other

Tabel no. 2.8.1 Other infrastructure fascility avalable Tabel no. 2.8.1 Other infrastructure fascility avalable Tabel no. 2.8.1 Other infrastructure fascility avalable Tabel no. 2.8.1 Other infrastructure fascility avalable Name of GP Name of village School Road Co-Operative societyMedical facility Bank / Post officeTelephone

Bhamolav Bhamolav Sr.SecondaryBT No. Yes No. Yes

Bhamolav Dang Middle Gravel No No. Yes

Arain Arain Sr. Sec Gravel No. Yes Yes Yes

Chota Lamba Chota lamba Sr.SecondaryBT No. Yes No. Yes

Sandolia Sandolia Secondary Gravel No. Yes No. Yes

Page 34: IWMP (2009-10) - I (BHAMOLAV)

2.9 NREGA Status :-2.9 NREGA Status :-2.9 NREGA Status :-2.9 NREGA Status :-Tabel no. 2.9.1 NREGA Status Tabel no. 2.9.1 NREGA Status Tabel no. 2.9.1 NREGA Status Tabel no. 2.9.1 NREGA Status

Total Project

area

Total Project area Total Project

area

1 Bhamolav Bhamolav 1096 0 0 4 16

2 Bhamolav Dang 342 0 0 2 6

3 Arain Arain 460 0 0 3 6

4 Chota Lamba Chota lamba 1080 0 0 4 13

5 Sandolia Sandolia 847 0 0 3 8

3825 0 0 16 49 0 0

2.10 Development Indicators :-2.10 Development Indicators :-2.10 Development Indicators :-2.10 Development Indicators :-1 Stop surface runoff flowing out side from watershed area.

2 Develope pasture land for villagers to full fill there need of fuel, fodder & stop migration.

3 Increase productivity per Ha.

4 Stablise livelihood supporting activities to support land less labours.

5 Divert croping patterns form traditional system to horticulture and modern agriculture practices.

6 Improve water use efficiency by drip & sprinkler irrigation

7 Provide potable water for drinking purpose.

8 Rise in water table at down stream side to the harvesting structure.

Part II - Technical featurePart II - Technical featurePart II - Technical featurePart II - Technical feature2.11 Revenue Maps :-Revenue Maps :-Revenue Maps :-Revenue Maps :- Revenue maps is based on scale 1 : 10000 . Revenue records like khasra maps, khasra list has been collected

and printed.All records are avable at PIA level. Ridge line & contour line has been marked by SRSAC.

2.12 Topo Maps / Maps with drainage line :-Topo Maps / Maps with drainage line :-Topo Maps / Maps with drainage line :-Topo Maps / Maps with drainage line :- Revenue maps traced on plastic sheets and scaned by SRSAC. SRSAC marked

all topography, D.L.T. It has been atteched to DPR anuxure.

2.13 Ground water status and prospect maps :-Ground water status and prospect maps :-Ground water status and prospect maps :-Ground water status and prospect maps :- Watershed area falls under region of under masuda Panchyat samiti

measured data of water leval 45 to 60 mtr. In 1987. But now tubewell in area shows ground water is at 180 to 220 mtr. Hence ground water depliting

day by day. Well perameters type TW and proposed depth is 180 to 220 mtr. Or more discharge caculated 200 - 400 cum / day. in 1997.But now

discharge is very poor. No. of tubewell is decreasing year by year. EC of water is less then 4*103 µ

Sm. / cm.Development prospect is over exploited.

Such that Govt. declare dark zone to this area. Anuxure -------- As per anuxure --------- SRSAC change in water leval is ( - 7 to - 15) from 1984 to1997

Such that check the surface runoff and rechage the water aquifer is most.

Page no.Page no.Page no.Page no.

Total no.of job

cards

Name of GPSr. no. Activity taken in plan 2011-12

Categary 4 -25 Nadi Anicut

Name of village

Page 35: IWMP (2009-10) - I (BHAMOLAV)

2.152.152.152.15 Slope of watershed areaSlope of watershed areaSlope of watershed areaSlope of watershed areaTabel no. 2.15.1 Slope detailsTabel no. 2.15.1 Slope detailsTabel no. 2.15.1 Slope detailsTabel no. 2.15.1 Slope details

Macro No. Micro No. Name of Village Area Highest contour level Lowest contour level Level difference Length of treval % slope

20 379 371 8 600 1.33

180 378 371 7 1200 0.58

3 15 Arain 485 385 373 12 2200 0.55

Chota lamba 100 414 408 6 400 1.50

Chota lamba 120 408 399 9 650 1.38

Chota lamba 450 399 384 15 2000 0.75

Chota lamba 535 391 377 14 1500 0.93

Sandolia 150 405 395 10 1000 1.00

Sandolia 50 404 397 7 300 2.33

Sandolia 1195 401 377 24 2900 0.83

Dang 60 395 391 4 100 4.00

Dang 40 418 396 22 300 7.33

Dang 423 385 378 7 700 1.00

4 1 Bhamolav 1512 377 360 17 2200 0.77

4 2 Bhamolav 520 381 360 21 2500 0.84

It is average slope Maximum slope identified is 0.80 % in micro no 3/18 There is area shown slope more then 3% in table 2.16.2

Tabel no. 2.15.2 Area shown in table more then 3% slopeTabel no. 2.15.2 Area shown in table more then 3% slopeTabel no. 2.15.2 Area shown in table more then 3% slopeTabel no. 2.15.2 Area shown in table more then 3% slopeMicro no Total Area Slope <3% Slope>3%

3/14 200 200 0

3/15 485 485 0

3/16 1205 1205 0

3/17 1395 1395 0

3/18 523 423 100

4/1 1512 1512 0

4/2 520 520 0

5840 5740 100

Page no.Page no.Page no.Page no.

Small Hills are present

3 18

Location of land having more then 3% slope

3 14Arain

3 16

3 17

Page 36: IWMP (2009-10) - I (BHAMOLAV)

2.162.162.162.16 Avable surface runoff Based on average rainfallAvable surface runoff Based on average rainfallAvable surface runoff Based on average rainfallAvable surface runoff Based on average rainfallIt has been calculated on the basis of Streng's table . Maximum rain fall intencity of area is 10 cm/hr

Total mansoon rainfall 325 mm. per year

Tabel no. 2.16.1 Total runoff avableTabel no. 2.16.1 Total runoff avableTabel no. 2.16.1 Total runoff avableTabel no. 2.16.1 Total runoff avable

Micro no AreaTotal runoff

avable

Type of

catchment

3\14 200 1895 Average

3\15 485 4596 Average

3\16 1205 11420 Average

3\17 1395 23503 Good

3\18 523 8812 Good

4\1 1512 25474 Good

0 Good

5320 Total 75700

Result :- Total avable runoff 75700 Cum

2.172.172.172.17 Run off tapped in existing structureRun off tapped in existing structureRun off tapped in existing structureRun off tapped in existing structure

According to Base line survey of field only three structure fullfilled in last 10 years such that remaining structure do not require waste

weir. So nadi no 10 in micro 6,nadi no 3 in micro no1 & dam in micro 8 considered on basis of time of concentration.

Tabel no. 2.17.1 Net runoff tapped Tabel no. 2.17.1 Net runoff tapped Tabel no. 2.17.1 Net runoff tapped Tabel no. 2.17.1 Net runoff tapped

Name of GPExisting

structureNo. Area

% of

runoff to

rainfall

yield of runoff

from

catchment

per ha.(cum.)

Total runoff

tapped in

existing

structure

Type of

catchment

Submergence

area

average

depth

(mtr.)

Capacity of

structure

Net runoff

tapped in

existing

structure

Bhamolav Nadi /Talab 22 120 7.2 234 2022 Good 120 3 360 67

Arain Nadi /Talab 35 7.2 234 590 Good 35 2.5 87.5 84

Chota Lamba Nadi /Talab 25 7.2 234 421 Good 25 2.5 62.5 3255

Sandolia Nadi /Talab 15 7.2 234 253 Good 15 2.5 37.5 3406

Total runoff tapped

Page no. 19Page no. 19Page no. 19Page no. 19

7.2 234

5.4 175.5

7.2 234

7.2 234

% of runoff to rainfallyield of runoff from

catchment per ha.(cum.)

5.4 175.5

5.4 175.5

Page 37: IWMP (2009-10) - I (BHAMOLAV)

2.182.182.182.18Name of Agroclimatic Zone IWDP

1 2

s.no. YearAverage Annual

Rainfall(mm)

S.No

.Year June july Aug Sept

Total in four

month

1 2001 298 1 2001 29 195 61 13 298

2 2002 160 2 2002 32 35 69 24 160

3 2003 322 3 2003 25 121 148 28 322

4 2004 387 4 2004 31 103 240 13 387

5 2005 314 5 2005 85 114 7 108 314

6 2006 240 6 2006 44 89 68 39 240

7 2007 386 7 2007 53 208 94 31 386

8 2008 407 8 2008 106 106 122 73 407

9 2009 222 9 2009 19 45 88 70 222

10 2010 527 10 2010 18 195 204 110 527

3 4

Average Annual Rainfall(mm)

Maximum rainfall intensity Temperatue (Degree C)

Monthly rain fall in rainy seasion

Climatic and Hydrological information Climatic and Hydrological information Climatic and Hydrological information Climatic and Hydrological information

Table no.2.18.1 :- Climatic & Hydrological

3 4

s.no. Durationrainfall

intensity(mm)s.no. Max Min

(i) 15 minute

duration

66 mm(i) 49 31

(ii) 30 minute

duration

74 mm(ii) 29 4

(iii)60 minute

duration

109 mm(iii) 37 14

Page no. Page no. Page no. Page no.

Winter Season

Rainy Season

Season

Summer Season

Maximum rainfall intensity Temperatue (Degree C)

Page 38: IWMP (2009-10) - I (BHAMOLAV)

Problem demand and scope for comprehensive area development Problem demand and scope for comprehensive area development Problem demand and scope for comprehensive area development Problem demand and scope for comprehensive area development

2.19 NRM ( Netural resource menegement) :- watershed project require natural resource managament activities. To chack all runoff of project DPR comprises activities

like earthan bunds with waste weir, only waste weir where Bund had made by farmers in arable and

nonarable land to stop sheet & gully erosion. Productivity of watershed is low due to erosion hence earthenbund with

weste weir are proposed

DPR also comprisesKhadeen and Farm Ponds for Storage water and gully pluge.

Khettalai and Tanka activity taken to conserve water and harvest water for production of fruit plants.

2.21 Agriculture and horticulture productivity gap analysis :- Farmers of area using tradional metherds for croping & productivity

is below averege. They are not using drip & sprinkalar irrigation fascility to save water and using chemical fertilizer

for production. Project facilates to farmers for sprinklar & drip irrigation fascility by convergence with Agriculture

extention dept. and fascility also by vermicompost unit to replace chemical fertilizer.

The Neel gay is major problem to improve horticultuer plantation so that project fascilite

farmer for barbed wire fencing of 6 feet hight in production measurs.

Post for barbed wire fencing will be mamufactured in watershed area through livelihood activities.

2.22 livestock - gap or fodder avability :-Project area don' t have managed pasture area to ensure about fodder. From Narega Project Area comprises

two pasture of 10 Ha. each to meet requirment of fodder. Such that number milky animal can increase. Milk production of area

will increase.

Project will also run breed improvement programme and timely care of animals by veccination. A WDT member

is working for this.

2.23 Livelihood & micro interprises :-To overall development of area project connects farmers for various activities to earn money

in there free time or regularly. This activity fullfill there regular need as well as earn money by working in microinterprises.

Page 39: IWMP (2009-10) - I (BHAMOLAV)

A

S.No,

1

2

3

4

5

For preapering Development plan Following steps are follws1

2

3

4

5

6

7

8

9

10

11

CHAPTER - III CHAPTER - III CHAPTER - III CHAPTER - III

PROPOSED DEVELOPMENT PLANPROPOSED DEVELOPMENT PLANPROPOSED DEVELOPMENT PLANPROPOSED DEVELOPMENT PLAN

4/5/2010

2 Arain

The Activities are indicative addition /deletion in activities will be as per local

conditions

Preparatory phase activities Capacity Building Trainings and EPA

The IEC activities Group meetings, door to door campaign, slogans and wall writings etc.

were carried out in all the habitations of 3/14,15,16,17,18 & 4/1,4/2 Micro Watershed. A series of meetings

were conducted with GP members, community and discussed about the implementation of IWMP

programme. Self help Group and User groups were also formed.

17/6/2010

The PRA exercise was carried out in all the villages on the dates shown below:

4/5/2010

Arain

Chotalamba

Name of Village

Base maps (transport network, village/boundaries, and settlements).

Contours at 1 meter interval, slope map

Land Use / Land cover map.

Digitised Khasara maps of the villages falling in project area.

Network of Drainage lines, existing water bodies, falling in the project area.

Transict walk were carried out involving the community for Social mapping, Resource

mapping. Detailed discussions and deliberations with all the primary stakeholders were carried out.

Socio-economic survey was carried out during (dates) period

covering all the households and primary data on demography, Land holdings, Employment status,

Community activities etc. was collected as mentioned in chapter 2.

Various thematic layers provided by SRSAC are :

30/12/09

Date of PRA

16/12/09

18/12/09

3 Chotalamba

24/12/09

28/12/09

Sandolia

Chotalamba

Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as

discussed in chapter 2) final Treatment plan on revenue map for implementation has been framed. Thus

each intervention identified has been marked on Gram panchyat wise contour map with super imposed

Revenue village Khasra map provided by SRSAC in DPR as annexure------).The GIS based intervention

map, PRA based intervention map are annexed as ------.

State remote sensing department was assigned the work of preparing various

thematic layers using Cartosat-1 and LISS-3 imageries for Creation, development and management of

geo-spatial database depicting present conditions of land (terrain), water and vegetation with respect to

watershed under different ownerships at village level

Name of Grm

Bhamolav

Bhamolav

1 Bhamolav

Sandolia

Grama Sabhas were conducted for approval of EPA (Village), for selecting the

watershed committee and approval of DPR.

19/04/2010

Dang

Delineation of Macro/Micro watershed boundaries.

4

Sandolia

Bhamolav

Arain

S.No Name of the

Gram

Panchayat

Date on which Grama

Sabha approved EPA

Page 40: IWMP (2009-10) - I (BHAMOLAV)
Page 41: IWMP (2009-10) - I (BHAMOLAV)

(A) Preparatory phase activities capacity building trainings & EPA

Phy Fin. No Total Cost Phy Fin. Phy Fin. No Total Cost

Admn. 10 30.66 8.22 16.74 14.46 70.08

Monitoring 1 3.07 0.82 1.67 1.45 7.01

Evaluation 1 3.07 0.82 1.67 1.45 7.01

EPA 4 12.26 3.29 6.70 5.78 28.03

I & CB 5 15.33 4.11 8.37 7.23 35.04

DPR 1 3.07 0.82 1.67 1.45 7.01

Total (A) 67.45 18.08 36.83 31.81 154.18

(B)(B)(B)(B) Natural resource management

A Conservation measures for arable

land2555 685 1395 1205 5840

1 Earthen Bund for Block A Ha 100 43.50 31 11.68 65 23.79 54 20.54 250 99.51

2 Earthen Bund for Block B Ha 8 1.83 16 2.90 32 5.92 27 5.11 83 15.76

3 Earthen Bund for Block C Ha 40 6.28 32 5.37 49 10.94 39 9.45 160 32.04

4 Earthen Bund for Block D Ha 40 9.46 29 6.60 47 13.45 42 11.62 158 41.13

6 Stone wall Terrace (PRT) Ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

7 Khadin in Arable Land No. 18 86.09 3 12.90 7 26.25 7 22.68 35 147.92

Total Conservation arable Land 147.16 39.45 80.35 69.40 336.36

B

Conservation measures for non arable

land 0 0.00

8 V - dich Ha 40 3.17 10 0.85 16 1.73 15 1.49 81 7.24

9 Staggered Trenches Ha 45 4.43 16 1.18 19 2.42 10 2.09 90 10.12

10 Pasture development Ha 45 23.92 9 6.41 26 13.06 0 11.28 80 54.67

Drainage line treatment 0 0.00

11 Farm pond/ New Nadi No. 6 5.28 3 1.43 3 2.88 3 2.50 15 12.09

12 Loose stone check Dam No. 32 0.00 0 0.00 0 0.00 15 0.00 47 0.00

13 Small Masonary Structure No. 6 0.00 0 0.00 0 0.00 0 0.00 6 0.00

14 Small pond No. 0 0.00 0 0.00 8 0.00 12 0.00 20 0.00

15 Medium Masonary structure No. 1 0.00 0 0.00 0 0.00 0 0.00 1 0.00

Total Non arable Conservation and DLT

(A+B) 36.80 9.87 20.09 17.36 84.12

Total (B) NRM 183.96 49.32 100.44 86.76 420.48

Proposed Development Plan

Proposed Development Plan of Project WC /Gram Panchyat wise

S.No. Activity Unit

GP Bhamolav GP Arain GP Sandolia GP Chota lamba Total

Page 42: IWMP (2009-10) - I (BHAMOLAV)

Phy Fin. No Total Cost Phy Fin. Phy Fin. No Total CostS.No. Activity Unit

GP Bhamolav GP Arain GP Sandolia GP Chota lamba Total

( C )( C )( C )( C ) Production System and micro enterprise

Production measures for arable land

1 Agroforestry For Arable Ha 230 4.95 80 1.32 40 2.71 20 2.33 370 11.31

2 Only Horticulture 0.5Ha 15 10.48 4 2.80 5 5.74 5 4.94 29 23.96

3 Vermi compost No. 4 3.78 2 1.01 1 1.11 2 1.78 9 7.68

4 Crop / Fodder Demostration No. 361 6.53 100 1.75 42 3.59 50 3.08 553 14.95

5 Kitchen Garden Kit demonstration Unit No. 184 3.38 82 0.92 40 2.75 50 1.60 356 8.65

Total Production Measures for Arable 29.12 7.80 15.90 13.73 66.55

House hold Production System

6 Tool Kit for land less and SHG No. 36 5.57 43 1.49 11 3.07 7 2.63 97 12.76

7

Agricultural Machinary for Agricultural

activity No. 79 4.05 40 1.09 25 2.18 0 1.91 144 9.23

Total House hold Production System 9.62 2.58 5.25 4.54 0 21.99

Live stock Development 0 0.00

8 Vetinary Camp No. 14 3.16 6 0.85 10 1.72 2 1.49 32 7.22

9 Manger for Cattel No. 200 1.98 75 0.53 60 1.08 27 1.00 362 4.59

10 Bull Distribution No. 1 0.70 1 0.00 1 0.00 0 0.00 3 0.70

11 Mineral mixture 200 1.36 53 0.55 60 1.13 20 0.98 333 4.02

Total live stock Development 7.20 1.93 3.93 3.47 16.53

Total (C) 45.94 12.31 25.08 21.74 105.07

(D) Consolidation 9.25 2.39 5.06 4.37 21.07

Grand Total 306.60 82.10 167.41 144.68 700.80

Action plan prepaired on the basis of SRSAC contour mep of area & field visit in PRA . It dovelopment on need & demand basis.

Page 43: IWMP (2009-10) - I (BHAMOLAV)

Table-M(PA)A1: Entry point activities (EPA) as on

(All financial figures in lakh Rs.)1 2 3 4 5 6 7 8 9 10 11

S.

No.State District

Names of

projects

Amount

earmarked

for EPA

Entry Point Activities planned No.Estimated

cost

Expendi

ture

incurred

BalanceExpected

outcome

Actual

outcome

1. Street Solar Light - 32 32 8.00 8.00 0.00

2. Water Supply (Kheli Kota) 1 0.75 0.50 0.25

3. Samsan ghat Tinshed-4 4 4.00 0.80 3.20

4. Samsan ghat Bethak-5 5 12.10 1.50 10.60

5. Water Hut With Water coolar 1 0.80 0.50 0.30

6. Sulabh Complex No.1 1 0.88 0.00 0.88

7. Hatai No.1 1 0.50 0.00 0.50

8. Water supply Tube well No.1 1 1.00 0.00 1.00

28.03 28.03 11.30 16.73

-

Chapter IV. Project Activities

IV. A. Preparatory phase

1 Raj AjmerIWMP-I

Bhamolav

Useful for

Benifeciarys28.03

Page 44: IWMP (2009-10) - I (BHAMOLAV)

Covergence :-Covergence :-Covergence :-Covergence :-

Convergence With Mahatma Ghandi National Rural Employment Gurrante Scheme (MNREGA)Convergence With Mahatma Ghandi National Rural Employment Gurrante Scheme (MNREGA)Convergence With Mahatma Ghandi National Rural Employment Gurrante Scheme (MNREGA)Convergence With Mahatma Ghandi National Rural Employment Gurrante Scheme (MNREGA)

Phy Fin. Phy Fin. Phy Fin. Phy Fin. Phy Fin.

1

Farm pond/ New Nadi in Arable

Category IV Ha 26 13.00 18 9.00 48 24.00 38 19.00 130 65.00

2 Khadin in Arable Land No. 16 16.00 5 5.00 8 8.00 5 5.00 34 34.00

3 V - dich Ha 50 7.50 0 0.00 20 3.00 30 4.50 100 15.00

4 Staggered Trenches Ha 40 5.00 40 5.00 40 5.00 40 5.00 160 20.00

5 Pasture development Ha 40 40.00 40 40.00 40 40.00 40 40.00 160 160.00

6 Nadi Disiliting No. 6 25.00 3 12.00 2 8.00 2 8.00 13 53.00

Total MNREGA in IWMP Total MNREGA in IWMP Total MNREGA in IWMP Total MNREGA in IWMP

BhamolavBhamolavBhamolavBhamolav106.50 71.00 88.00 81.50 347.00

Convergence With Agrivultural DepartmentConvergence With Agrivultural DepartmentConvergence With Agrivultural DepartmentConvergence With Agrivultural DepartmentProduction measures for arable

land

1 Crop / Fodder Demostration Ha 60 1.20 30 0.60 15 0.30 20 0.40 125 2.50

2 Only Horticulture 0.5Ha 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

3

Organic Manure and Micro

Organisims No. 150 0.30 150 0.30 150 0.30 150 0.30 600 1.20

4

Agricultural Machinary for Agricultural

activity No. 10 0.20 6 0.12 5 0.10 5 0.10 26 0.52

5 HDPE Pipe for Irrigation Rm 300 0.50 150 0.25 100 0.15 100 0.15 650 1.05

6 Sprinkler System No. 5 0.85 3 0.50 3 0.50 2 0.35 13 2.20

7 Water kund/ Farm Pond No. 5 3.50 2 1.40 1 0.70 1 0.70 9 6.30

Total Agrivultural Total Agrivultural Total Agrivultural Total Agrivultural

Department in IWMP Department in IWMP Department in IWMP Department in IWMP

BhamolavBhamolavBhamolavBhamolav

6.55 3.17 2.05 2.00 13.77

Total

CONVERGECE PLAN FOR IWMP PROJECT BHAMOLAVCONVERGECE PLAN FOR IWMP PROJECT BHAMOLAVCONVERGECE PLAN FOR IWMP PROJECT BHAMOLAVCONVERGECE PLAN FOR IWMP PROJECT BHAMOLAV

For over all development of watershed area in all field Social, Economic, financial Agricutural, Live

stock management , Living status , Employment generation some actvities will done by other Deparment such as

MNREGS,Agicultura, Vetinary , Rural Development, Water resources (Irrigation) etc is included with project

Actvities So over all development of Watershed area can be achived

S.No. Activity UnitGP Bhamolav GP Arain GP Sandolia GP Chota Lamba

Page 45: IWMP (2009-10) - I (BHAMOLAV)

Phy Fin. Phy Fin. Phy Fin. Phy Fin. Phy Fin.

TotalS.No. Activity Unit

GP Bhamolav GP Arain GP Sandolia GP Chota Lamba

Convergence With Vetinary DepartmentConvergence With Vetinary DepartmentConvergence With Vetinary DepartmentConvergence With Vetinary Department 0 0.00

1 Vetinary Camp No. 10 0.80 10 0.80 10 0.80 10 0.80 40 3.20

2 Castration No. 10 0.01 10 0.01 10 0.01 10 0.01 40 0.04

3 AI No. 25 0.02 25 0.02 25 0.02 25 0.02 100 0.08

4 Deworming No. 250 0.00 250 0.00 250 0.00 250 0.00 1000 0.00

5 Fodder Demonstration No. 100 0.20 100 0.20 100 0.20 100 0.20 400 0.80

6 Mineral mixture No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

Total Vetinary Department Total Vetinary Department Total Vetinary Department Total Vetinary Department

in IWMP Jaswantpurain IWMP Jaswantpurain IWMP Jaswantpurain IWMP Jaswantpura 1.03 1.03 1.03 1.03 4.12

TotalTotalTotalTotal ConvegenceConvegenceConvegenceConvegence PlanPlanPlanPlan inininin

IWMP BhamolavIWMP BhamolavIWMP BhamolavIWMP Bhamolav114.08 75.20 91.08 84.53 364.89

Page 46: IWMP (2009-10) - I (BHAMOLAV)

STATE RAJASTHAN

BLOCK Arain

AGROCLIMATIC ZONE III A

Name of Watersed Bhamolav

Macro /Micro No 4/1,4/2,3/14,15,16,17,18

Gram Panchyat

GEOGRAPHICAL AREA 5840 Ha

Effective area 5840 Ha

Arable Area 4459 Ha

Non Arable Area 1381 Ha

Total Cost 700.8 Lacs

Unit Cost 0.12 Lacs

(A)

Phy Fin

A I Administration cost 10% 70.08

II Monitoring 1% 7.01

III Evaluation 1% 7.01

Total 84.10B I Preparatory Phase (Entry Point 4% 28.03

II Institution And Capacity Building 5% 35.04

III Preparation of Detailed Project 1% 7.01

Total 70.08Total (A) 22% 154.18

CCCC

C1 Conservation measures for arable land60%

1 Earthen Bund for Block A 250 99.51

2 Earthen Bund for Block B 83 15.76

3 Earthen Bund for Block C 160 32.04

4 Earthen Bund for Block D 158 41.13

6 Khadin in Arable Land 35 147.92

8 Farm pond/ New Nadi in arable Category IV

Total Conservation arable Land 336.36

C2

Conservation measures for non arable

land

8 Staggered Trenches 90 10.12

9 Pasture development 80 54.67

10 V-dich 81 7.24

C3 Drainage line treatment 0 0.00

10 Farm pond/ New Nadi 15 12.09

11 Nadi Disilting

Total Non arable Conservation and DLT

(A+B) 84.12

Total (C) NRM 420.48

By ProjectS.No. Activity

CHAPTER - IV CHAPTER - IV CHAPTER - IV CHAPTER - IV

Activity wise Abstract of cost By ProjectActivity wise Abstract of cost By ProjectActivity wise Abstract of cost By ProjectActivity wise Abstract of cost By Project

Bhamolav,Sandolia, Chota Lamba, Arain

Page 47: IWMP (2009-10) - I (BHAMOLAV)

DDDD 15%

D1 Production measures for arable land

1 Agroforestry For Arable 370 11.31

2 Only Horticulture 29 23.96

3 Vermi compost 9 7.68

4 Crop / Fodder Demostration 553 14.95

5 Kitchen Garden Kit demonstration Unit 356 8.65

6 Organic Manure and Micro Organisim

7 HDPE Pipe for Irrigation

8 Water Kund Farm Pond

9 Sprinkler System

Total Production Measures for Arable 66.55

D2 House hold Production System

9 Tool Kit for land less and SHG 97 12.76

10 Agricultural Machinary for Agricultural activity 144 9.23

Total House hold Production System 21.99

D3 Live stock Development

8 Vetinary Camp 32 7.22

9 Manger for Cattel 362 4.59

10 Bull Distribution 1 0.70

11 Mineral mixture 333 4.02

12 Castration 0 0.00

13 AI 0 0.00

14 Deworming 0 0.00

15 Foder Demonstration 0 0.00

Total live stock Development 16.53

Total (D) 105.07

E (E) Consolidation 3% 21.07

Grand Total 700.80

Page 48: IWMP (2009-10) - I (BHAMOLAV)

(A)

Phy Fin Phy Fin Phy Fin

A I Administration cost 0.00 0.00 0.00 0.00 0.00 0.00

II Monitoring 0.00 0.00 0.00 0.00 0.00 0.00

III Evaluation 0.00 0.00 0.00 0.00 0.00 0.00

Total 0.00

B I Preparatory Phase (Entry Point

Activity) 0.00 0.00 0.00 0.00 0.00 0.00

II Institution And Capacity Building 0.00 0.00 0.00 0.00 0.00 0.00

III Preparation of Detailed Project

Report (DPR) 0.00 0.00 0.00 0.00 0.00 0.00

Total 0.00

Total (A) 0.00 0.00 0.00CCCC

C1 Conservation measures for arable land

1 Earthen Bund for Block A 0 0.00 0 0.00 0 0.00

2 Earthen Bund for Block B 0 0.00 0 0.00 0 0.00

3 Earthen Bund for Block C 0 0.00 0 0.00 0 0.00

4 Earthen Bund for Block D 0 0.00 0 0.00 0 0.00

5 Earthen Bund for Block E 0 0.00 0 0.00 0 0.00

6 Stone wall Terrace (PRT) 0 0.00 0 0.00 0 0.00

7 Khadin in Arable Land 0 0.00 34 34.00 34 34.00

8 Farm pond/ New Nadi in arable Category IV 0 0.00 130 65.00 130 65.00

Total Conservation arable Land 0.00 99.00 99.00

C2

Conservation measures for non arable

land

8 V - dich 0 0.00 100 15.00 100 15.00

9 Staggered Trenches 0 0.00 160 20.00 160 20.00

10 Pasture development 0 0.00 160 160.00 160 160.00

C3 Drainage line treatment 0 0.00 0 0.00 0 0.00

11 Farm pond/ New Nadi 0 0.00 0 0.00 0 0.00

12 Loose stone check Dam 0 0.00 0 0.00 0 0.00

13 Small Masonary Structure 0 0.00 0 0.00 0 0.00

14 Small pond 0 0.00 0 0.00 0 0.00

15 Medium Masonary structure 0 0.00 0 0.00 0 0.00

16 Nadi Disilting 0 0.00 13 53.00 13 53.00

Total Non arable Conservation and DLT

(A+B) 0.00 248.00 248.00

Total (C) NRM 0.00 347.00 347.00

DDDD

D1 Production measures for arable land

1 Agroforestry For Arable 0 0.00 0 0.00 0 0.00

2 Only Horticulture 0 0.00 0 0.00 0 0.00

3 Vermi compost 0 0.00 0 0.00 0 0.00

4 Crop / Fodder Demostration 0 0.00 125 2.50 125 2.50

5 Kitchen Garden Kit demonstration Unit 0 0.00 0 0.00 0 0.00

6 Organic Manure and Micro Organisim 0 0.00 600 1.20 600 1.20

7 HDPE Pipe for Irrigation 0 0.00 650 1.05 650 1.05

8 Water Kund Farm Pond 0 0.00 9 6.30 9 6.30

9 Sprinkler System 0 0.00 13 2.20 13 2.20

Total Production Measures for Arable 0.00 13.25 13.25

D2 House hold Production System

9 Tool Kit for land less and SHG 0 0.00 0 0.00 0 0.00

10 Agricultural Machinary for Agricultural activity 0 0.00 26 0.52 26 0.52

Total House hold Production System 0.00 0.52 0.52

By Convergence Total

Activity wise Abstract of cost by Convergenceof ProjectActivity wise Abstract of cost by Convergenceof ProjectActivity wise Abstract of cost by Convergenceof ProjectActivity wise Abstract of cost by Convergenceof Project

S.No. ActivityBy Convergence

Page 49: IWMP (2009-10) - I (BHAMOLAV)

D3 Live stock Development

8 Vetinary Camp 0 0.00 40 3.20 40 3.20

9 Manger for Cattel 0 0.00 0 0.00 0 0.00

10 Bull Distribution 0 0.00 0 0.00 0 0.00

11 Mineral mixture 0 0.00 0 0.00 0 0.00

12 Castration 0 0.00 40 0.04 40 0.04

13 AI 0 0.00 100 0.08 100 0.08

14 Deworming 0 0.00 1000 0.00 1000 0.00

15 Foder Demonstration 0 0.00 400 0.80 400 0.80

Total live stock Development 0.00 4.12 4.12

Total (D) 0.00 17.89 17.89

E (E) Consolidation

Grand Total 0.00 364.89 364.89

Page 50: IWMP (2009-10) - I (BHAMOLAV)

STATE RAJASTHAN Dist Ajmer

BLOCK ARAIN

AGROCLIMATIC ZONE III A

Name of Watersed Bhamolav

Macro /Micro No 4/1,2& 3/14,15,16,17,18

Gram Panchyat

GEOGRAPHICAL AREA 5840 Ha

Effective area 5840 Ha

Arable Area 4459 Ha

Non Arable Area 1381 Ha

Total Cost 700.8 Lacs

Unit Cost 0.12 Lacs

(A)

Phy Fin Phy Fin Phy Fin

A I Administration cost 10% 70.08 0.00 0.00 0.10 70.08

II Monitoring 1% 7.01 0.00 0.00 0.01 7.01

III Evaluation 1% 7.01 0.00 0.00 0.01 7.01

Total 84.10 84.10

B I Preparatory Phase (Entry Point

Activity)

4%

28.03 0.00 0.00 0.04 28.03

II Institution And Capacity Building 5% 35.04 0.00 0.00 0.05 35.04

III Preparation of Detailed Project

Report (DPR)

1%

7.01 0.00 0.00 0.01 7.01

Total 70.08 70.08

Total (A) 22% 154.18 0.00 154.18CCCC

C1 Conservation measures for arable land60%

1 Earthen Bund for Block A 250 99.51 0 0.00 250 99.51

2 Earthen Bund for Block B 83 15.76 0 0.00 83 15.76

3 Earthen Bund for Block C 160 32.04 0 0.00 160 32.04

4 Earthen Bund for Block D 158 41.13 0 0.00 158 41.13

5 Khadin in Arable Land 35 147.92 34 34.00 69 181.92

6 Farm pond/ New Nadi in arable Category IV 130 65.00 130 65.00

Total Conservation arable Land 336.36 99.00 435.36

C2

Conservation measures for non arable

land

8 V - dich 81 7.24 100 15.00 181 22.24

9 Staggered Trenches 90 10.12 160 20.00 250 30.12

10 Pasture development 80 54.67 160 160.00 240 214.67

C3 Drainage line treatment 0 0.00 0 0.00 0 0.00

11 Farm pond/ New Nadi 15 12.09 0 0.00 15 12.09

12 Loose stone check Dam 0 0.00 0 0.00 0 0.00

13 Small Masonary Structure 0 0.00 0 0.00 0 0.00

14 Small pond 0 0.00 0 0.00 0 0.00

15 Medium Masonary structure 0 0.00 0 0.00 0 0.00

16 Nadi Disilting 13 53.00 13 53.00

Total Non arable Conservation and DLT

(A+B) 84.12 248.00 332.12

Total (C) NRM 420.48 347.00 767.48

ACTIVITY WISE ABSTRACT OT COST TOTAL BY PROJECT AND ACTIVITY WISE ABSTRACT OT COST TOTAL BY PROJECT AND ACTIVITY WISE ABSTRACT OT COST TOTAL BY PROJECT AND ACTIVITY WISE ABSTRACT OT COST TOTAL BY PROJECT AND

CONVERGENCECONVERGENCECONVERGENCECONVERGENCE

S.No. ActivityBy Project By Covergence Total

Bhamolav, Arain, Sandolia, Chota Lamba

Page 51: IWMP (2009-10) - I (BHAMOLAV)

Phy Fin Phy Fin Phy FinS.No. Activity

By Project By Covergence Total

DDDD

D1 Production measures for arable land 15%1 Agroforestry For Arable 370 11.31 0 0.00 370 11.31

2 Only Horticulture 29 23.96 0 0.00 29 23.96

3 Vermi compost 9 7.68 0 0.00 9 7.68

4 Crop / Fodder Demostration 553 14.95 125 2.50 678 17.45

5 Kitchen Garden Kit demonstration Unit 356 8.65 0 0.00 356 8.65

6 Organic Manure and Micro Organisim 600 1.20 600 1.20

7 HDPE Pipe for Irrigation 650 1.05 650 1.05

8 Water Kund Farm Pond 9 6.30 9 6.30

9 Sprinkler System 13 2.20 13 2.20

Total Production Measures for Arable 66.55 13.25 79.80

D2 House hold Production System

9 Tool Kit for land less and SHG 97 12.76 0 0.00 97 12.76

10 Agricultural Machinary for Agricultural activity 144 9.23 26 0.52 170 9.75

Total House hold Production System 21.99 0.52 22.51

D3 Live stock Development

8 Vetinary Camp 32 7.22 40 3.20 72 10.42

9 Manger for Cattel 362 4.59 0 0.00 362 4.59

10 Bull Distribution 1 0.70 0 0.00 1 0.70

11 Mineral mixture 333 4.02 0 0.00 333 4.02

12 Castration 0 0.00 40 0.04 40 0.04

13 AI 0 0.00 100 0.08 100 0.08

14 Deworming 0 0.00 1000 0.00 1000 0.00

15 Foder Demonstration 0 0.00 400 0.80 400 0.80

Total live stock Development 16.53 4.12 20.65

Total (D) 105.07 17.89 122.96

E (E) Consolidation 3% 21.07 21.02

Grand Total 700.80 364.89 1065.64

Page 52: IWMP (2009-10) - I (BHAMOLAV)

STATE RAJASTHAN DIST. AJMER

BLOCK ARAIN GEOGRAPHICAL AREA 6058 Ha

AGROCLIMATIC ZONE III A Effective area 5840 Ha

Name of Watersed BHAMOLAV Arable Area 4459 Ha

Macro /Micro No 4/1,23/14,15,16,17,18 Non Arable Area 1381 Ha

Gram Panchyat BHAMOLAV, CHOTA LAMBA, ARAIN, SANDOLIA Total Cost 700.8 Lacs

Unit Cost 0.12 Lacs

(A) Preparatory phase activities capacity building trainings & EPA

% % Fin % Fin % Fin % Fin % Fin % FinAdmn.Admn.Admn.Admn. 10.00 70.08 1.00 7.01 2.00 14.02 2.00 14.02 2.00 14.02 2.00 14.02 1.00 7.01MonitoringMonitoringMonitoringMonitoring 1.00 7.01 0.10 0.70 0.20 1.40 0.20 1.40 0.20 1.40 0.20 1.40 0.10 0.70EvaluationEvaluationEvaluationEvaluation 1.00 7.01 0.00 0.00 0.30 2.10 0.00 0.00 0.35 2.45 0.00 0.00 0.35 2.45EPAEPAEPAEPA 4.00 28.03 4.00 28.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00I & CBI & CBI & CBI & CB 5.00 35.04 1.50 10.51 1.50 10.51 0.50 3.50 1.00 7.01 0.00 0.00 0.50 3.50DPRDPRDPRDPR 1.00 7.01 1.00 7.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00TotalTotalTotalTotal 22.0022.0022.0022.00 154.18 7.607.607.607.60 53.2653.2653.2653.26 4.004.004.004.00 28.0328.0328.0328.03 2.702.702.702.70 18.9218.9218.9218.92 3.553.553.553.55 24.8824.8824.8824.88 2.202.202.202.20 15.4215.4215.4215.42 1.951.951.951.95 13.6713.6713.6713.67

(B) Natural resource management

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

A

Conservation measures for

arable land

1 Earthen Bund for Block A Ha 250 99.51 0 0 0 0 63 24.88 88 34.83 63 24.88 38 14.93

2 Earthen Bund for Block B Ha 83 15.76 0 0 0 0 21 3.94 29 5.52 21 3.94 12 2.36

3 Earthen Bund for Block C Ha 160 32.04 0 0 0 0 40 8.01 56 11.21 40 8.01 24 4.81

4 Earthen Bund for Block D Ha 158 41.13 0 0 0 0 40 10.28 55 14.40 40 10.28 24 6.17

6 Stone wall Terrace (PRT) Ha 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00

7 Khadin in Arable Land No. 35 147.92 0 0 0 0 9 36.98 12 51.77 9 36.98 5 22.19

Total Conservation arable Land 336.36 0.00 0.00 84.09 117.73 84.09 50.45

CHAPTER- V

TOTAL ANNUAL ACTION PLAN

1st year 2nd year 3rd year

Unit

6th year5th year4th year

5th year

1st year 2nd year

4th year

Fin

3rd yearYearwise

COMPONENT WISE & YEARWISE BREAKUP OF WATERSHED ACTIVITIES

Total Provision

6th year

Activity

ActivityActivityActivityActivity

YearwiseYearwiseYearwiseYearwise

Total

Page 53: IWMP (2009-10) - I (BHAMOLAV)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinUnit

6th year5th year4th year1st year 2nd year 3rd yearYearwise

Total Provision

Activity

B

Conservation measures for non

arable land

8 V - dich Ha 81 7.24 0 0 0 0 20 1.81 28 2.53 20 1.81 12 1.09

9 Staggered Trenches Ha 90 10.12 0 0 0 0 23 2.53 32 3.54 23 2.53 14 1.52

10 Pasture development Ha 80 54.67 0 0 0 0 20 13.67 28 19.13 20 13.67 12 8.20

Drainage line treatment 0 0 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00

11 Farm pond/ New Nadi No. 15 12.09 0 0 0 0 4 3.02 5 4.23 4 3.02 2 1.81

12 Loose stone check Dam No. 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00

13 Small Masonary Structure No. 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00

14 Small pond No. 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00

15 Medium Masonary structure No. 0 0.00 0 0 0 0 0 0.00 0 0.00 0 0.00 0 0.00

Total Non arable Conservation

and DLT (A+B) 84.12 0.00 0.00 21.03 29.44 21.03 12.62

Total (B) NRM 420.48 0.00 0.00 105.12 147.17 105.12 63.07

( C )( C )( C )( C ) Production System and micro enterprise

Production measures for arable

land 0.00 0.00

1 Agroforestry For Arable Ha 370 11.31 0 0 0 0 93 2.83 130 3.96 93 2.83 56 1.70

2 Only Horticulture 0.5Ha 29 23.96 0 0 0 0 7 5.99 10 8.39 7 5.99 4 3.59

3 Vermi compost No. 9 7.68 0 0 0 0 2 1.92 3 2.69 2 1.92 1 1.15

4 Crop / Fodder Demostration No. 553 14.95 0 0 0 0 138 3.74 194 5.23 138 3.74 83 2.24

5

Kitchen Garden Kit demonstration

Unit No. 356 8.65 0 0 0 0 89 2.16 125 3.03 89 2.16 53 1.30

Total Production Measures for

Arable 66.55 0.00 0.00 16.64 23.29 16.64 9.98

House hold Production System

6 Tool Kit for land less and SHG No. 97 12.76 0 0 0 0 24 3.19 34 4.47 24 3.19 15 1.91

7

Agricultural Machinary for

Agricultural activity No. 144 9.23 0 0 0 0 36 2.31 50 3.23 36 2.31 22 1.38

Total House hold Production

System 21.99 0.00 0.00 5.50 7.70 5.50 3.30

Live stock Development

8 Vetinary Camp No. 32 7.22 0 0 0 0 8 1.81 11 2.53 8 1.81 5 1.08

9 Manger for Cattel No. 362 4.59 0 0 0 0 91 1.15 127 1.61 91 1.15 54 0.69

10 Bull Distribution No. 1 0.70 0 0 0 0 0 0.18 0 0.25 0 0.18 0 0.11

11 Mineral mixture 333 4.02 0 0 0 0 83 1.01 117 1.41 83 1.01 50 0.60

Total live stock Development 16.53 0.00 0.00 4.13 5.79 4.13 2.48

Total (C) 105.07 0.00 0.00 26.27 36.77 26.27 15.76

(D) Consolidation 21.07 0.00 0.00 0.00 0.00 0.00 21.07

Page 54: IWMP (2009-10) - I (BHAMOLAV)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinUnit

6th year5th year4th year1st year 2nd year 3rd yearYearwise

Total Provision

ActivityGrand Total 700.80 53.26 28.03 150.31 208.82 146.81 113.57

Page 55: IWMP (2009-10) - I (BHAMOLAV)

STATE RAJASTHAN DIST. AJMER

BLOCK ARAIN GEOGRAPHICAL AREA 2773 Ha

AGROCLIMATIC ZONE III A Effective area 2555 Ha

Name of Watersed Bhamolav Arable Area 2017 Ha

Macro /Micro No 4/1,2 3/18 Non Arable Area 538 Ha

Gram Panchyat Bhamolav Total Cost 306.6 Lacs

Watershed Committee Bhamolav Unit Cost 0.12 Lacs

(A) Preparatory phase activities capacity building trainings & EPA

% % Fin % Fin % Fin % Fin % Fin % FinAdmn. 10.00 30.66 1.00 3.07 2.00 6.13 2.00 6.13 2.00 6.13 2.00 6.13 1.00 3.07

Monitoring 1.00 3.07 0.10 0.31 0.20 0.61 0.20 0.61 0.20 0.61 0.20 0.61 0.10 0.31Evaluation 1.00 3.07 0.00 0.00 0.30 0.92 0.00 0.00 0.35 1.07 0.00 0.00 0.35 1.07

EPA 4.00 12.26 4.00 12.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00I & CB 5.00 15.33 1.50 4.60 1.50 4.60 0.50 1.53 1.00 3.07 0.00 0.00 0.50 1.53DPR 1.00 3.07 1.00 3.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total 22.0022.0022.0022.00 67.45 7.607.607.607.60 23.3023.3023.3023.30 4.004.004.004.00 12.2612.2612.2612.26 2.702.702.702.70 8.288.288.288.28 3.553.553.553.55 10.8810.8810.8810.88 2.202.202.202.20 6.756.756.756.75 1.951.951.951.95 5.985.985.985.98

(B) Natural resource management

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

A

Conservation measures for

arable land

1 Earthen Bund for Block A Ha 100 43.50 0.00 0.00 25 10.88 35 15.23 25 10.88 15 6.53

2 Earthen Bund for Block B Ha 8 1.83 0.00 0.00 2 0.46 3 0.64 2 0.46 1 0.27

3 Earthen Bund for Block C Ha 40 6.28 0.00 0.00 10 1.57 14 2.20 10 1.57 6 0.94

4 Earthen Bund for Block D Ha 40 9.46 0.00 0.00 10 2.37 14 3.31 10 2.37 6 1.42

5 Earthen Bund for Block E Ha 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00

6 Stone wall Terrace (PRT) Ha 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00

7 Khadin in Arable Land No. 18 86.09 0.00 0.00 5 21.52 6 30.13 5 21.52 3 12.91

Total Conservation arable Land 147.16 0.00 0.00 36.79 51.51 36.79 22.07

FinTotal 1st year

Village Covered

6th year2nd year 3rd year 4th year

COMPONENT WISE & YEARWISE BREAKUP OF WATERSHED ACTIVITIES

GRAM PANCHYAT BHAMOLAV

Activity

Yearwise5th year 6th year

Bhamolav, Dang

2nd year 3rd year 4th year

Activity Unit

Total ProvisionYearwise

1st year 5th year

Page 56: IWMP (2009-10) - I (BHAMOLAV)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

6th year2nd year 3rd year 4th year

Activity Unit

Total ProvisionYearwise

1st year 5th year

B

Conservation measures for non

arable land

8 V - dich Ha 40 3.17 10 0.79 14 1.11 10 0.79 6 0.48

9 Staggered Trenches Ha 45 4.43 11 1.11 16 1.55 11 1.11 7 0.66

10 Pasture development Ha 45 23.92 11 5.98 16 8.37 11 5.98 7 3.59

Drainage line treatment 0 0.00 0 0.00 0 0.00 0 0.00

11 Farm pond/ New Nadi No. 6 5.28 2 1.32 2 1.85 2 1.32 1 0.79

12 Loose stone check Dam No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

13 Small Masonary Structure No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0

14 Small pond No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

15 Medium Masonary structure No. 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00

Total Non arable Conservation

and DLT (A+B) 36.80 0.00 0.00 9.20 12.88 9.20 5.52

Total (B) NRM 183.96 0.00 0.00 45.99 64.39 45.99 27.59

( C )( C )( C )( C ) Production System and micro enterprise

Production measures for arable

land

1 Agroforestry For Arable Ha 230 4.95 58 1.24 81 1.73 58 1.24 35 0.74

2 Only Horticulture 0.5Ha 15 10.48 4 2.62 5 3.67 4 2.62 2 1.57

3 Vermi compost No. 4 3.78 1 0.95 1 1.32 1 0.95 1 0.57

4 Crop / Fodder Demostration No. 361 6.53 90 1.63 126 2.29 90 1.63 54 0.98

5

Kitchen Garden Kit demonstration

Unit No. 184 3.38 46 0.85 64 1.18 46 0.85 28 0.51

Total Production Measures for

Arable 29.12 0.00 0.00 7.28 10.19 7.28 4.37

House hold Production System 0 0.006 Tool Kit for land less and SHG No. 36 5.57 9 1.39 13 1.95 9 1.39 5 0.84

7

Agricultural Machinary for

Agricultural activity No. 79 4.05 20 1.01 28 1.42 20 1.01 12 0.61

Total House hold Production

System 9.62 0.00 0.00 2.41 3.37 2.41 1.44

Live stock Development

8 Vetinary Camp No. 14 3.16 4 0.79 5 1.11 4 0.79 2 0.47

9 Manger for Cattel No. 200 1.98 50 0.50 70 0.69 50 0.50 30 0.30

10 Bull Distribution No. 1 0.70 0 0.18 0 0.25 0 0.18 0 0.11

11 Mineral mixture 200 1.36 50 0.34 70 0.48 50 0.34 30 0.20

Total live stock Development 7.20 0.00 0.00 1.80 2.52 1.80 1.08

Total (C) 45.94 0.00 0.00 11.49 16.08 11.49 6.89

(D) Consolidation 9.25 0.00 0.00 0.00 0.00 0.00 9.25

Grand Total 306.60 23.30 12.26 65.75 91.35 64.22 49.71

Page 57: IWMP (2009-10) - I (BHAMOLAV)

STATE RAJASTHAN DIST. AJMER

BLOCK ARAIN GEOGRAPHICAL AREA 685 Ha

AGROCLIMATIC ZONE III A Effective area 685 Ha

Name of Watersed BHAMOLAV Arable Area 163 Ha

Macro /Micro No 3/14,15 Non Arable Area 522 Ha

Gram Panchyat ARAIN Total Cost 82.2 Lacs

Watershed Committee ARAIN Unit Cost 0.12 Lacs

(A) Preparatory phase activities capacity building trainings & EPA

% % Fin % Fin % Fin % Fin % Fin % FinAdmn. 10.00 8.22 1.00 0.82 2.00 1.64 2.00 1.64 2.00 1.64 2.00 1.64 1.00 0.82

Monitoring 1.00 0.82 0.10 0.08 0.20 0.16 0.20 0.16 0.20 0.16 0.20 0.16 0.10 0.08Evaluation 1.00 0.82 0.00 0.00 0.30 0.25 0.00 0.00 0.35 0.29 0.00 0.00 0.35 0.29

EPA 4.00 3.29 4.00 3.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00I & CB 5.00 4.11 1.50 1.23 1.50 1.23 0.50 0.41 1.00 0.82 0.00 0.00 0.50 0.41DPR 1.00 0.82 1.00 0.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total 22.0022.0022.0022.00 18.08 6.256.256.256.25 3.293.293.293.29 2.222.222.222.22 2.922.922.922.92 1.811.811.811.81 1.601.601.601.60

(B) Natural resource management

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

A

Conservation measures for

arable land

1 Earthen Bund for Block A Ha 31 11.68 0.00 0.00 8 2.92 10.85 4.09 7.75 2.92 4.65 1.75

2 Earthen Bund for Block B Ha 16 2.90 0.00 0.00 4 0.73 5.60 1.02 4.00 0.73 2.40 0.44

3 Earthen Bund for Block C Ha 32 5.37 0.00 0.00 8 1.34 11.20 1.88 8.00 1.34 4.80 0.81

4 Earthen Bund for Block D Ha 29 6.60 0.00 0.00 7 1.65 10.15 2.31 7.25 1.65 4.35 0.99

5 Earthen Bund for Block E Ha 0 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

6 Stone wall Terrace (PRT) Ha 0 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7 Khadin in Arable Land No. 3 12.90 0.00 0.00 1 3.23 1.05 4.52 0.75 3.23 0.45 1.94

Total Conservation arable Land 39.45 0.00 0.00 9.86 13.81 9.86 5.92

Village Covered

Activity Unit

Total ProvisionYearwise

1st year 5th year 6th year

COMPONENT WISE & YEARWISE BREAKUP OF WATERSHED ACTIVITIES

GRAM PNACHYAT ARAIN

Activity

Yearwise5th year 6th year

FinTotal 1st year 2nd year 4th year

ARAIN

2nd year 3rd year 4th year

3rd year

Page 58: IWMP (2009-10) - I (BHAMOLAV)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinActivity Unit

Total ProvisionYearwise

1st year 5th year 6th year2nd year 3rd year 4th year

B

Conservation measures for non

arable land

8 V - dich Ha 10 0.85 3 0.21 3.50 0.30 2.50 0.21 1.50 0.13

9 Staggered Trenches Ha 16 1.18 4 0.30 5.60 0.41 4.00 0.30 2.40 0.18

10 Pasture development Ha 9 6.41 2 1.60 3.15 2.24 2.25 1.60 1.35 0.96

Drainage line treatment 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11 Farm pond/ New Nadi No. 3 1.43 1 0.36 1.05 0.50 0.75 0.36 0.45 0.21

12 Loose stone check Dam No.

13 Small Masonary Structure No.

14 Small pond No.

15 Medium Masonary structure No.

Total Non arable Conservation

and DLT (A+B) 9.87 0.00 0.00 2.47 3.45 2.47 1.48

Total (B) NRM 49.32 0.00 0.00 12.33 17.26 12.33 7.40

( C )( C )( C )( C ) Production System and micro enterprise

Production measures for arable

land

1 Agroforestry For Arable Ha 80 1.32 20 0.33 28.00 0.46 20.00 0.33 12.00 0.20

2 Only Horticulture 0.5Ha 4 2.80 1 0.70 1.40 0.98 1.00 0.70 0.60 0.42

3 Vermi compost No. 2 1.01 1 0.25 0.70 0.35 0.50 0.25 0.30 0.15

4 Crop / Fodder Demostration No. 100 1.75 25 0.44 35.00 0.61 25.00 0.44 15.00 0.26

5

Kitchen Garden Kit demonstration

Unit No. 82 0.92 21 0.23 28.70 0.32 20.50 0.23 12.30 0.14Total Production Measures for

Arable 7.80 0.00 0.00 1.95 2.73 1.95 1.17

House hold Production System 0 0.006 Tool Kit for land less and SHG No. 43 1.49 11 0.37 15.05 0.52 10.75 0.37 6.45 0.22

7

Agricultural Machinary for

Agricultural activity No. 40 1.09 10 0.27 14.00 0.38 10.00 0.27 6.00 0.16Total House hold Production

System 2.58 0.00 0.00 0.65 0.90 0.65 0.39

Live stock Development

8 Vetinary Camp No. 6 0.85 2 0.21 2.10 0.30 1.50 0.21 0.90 0.13

9 Manger for Cattel No. 75 0.53 19 0.13 26.25 0.19 18.75 0.13 11.25 0.08

10 Bull Distribution No. 0 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11 Mineral mixture 53 0.55 13 0.14 18.55 0.19 13.25 0.14 7.95 0.08

Total live stock Development 1.93 0.00 0.00 0.48 0.68 0.48 0.29

Total (C) 12.31 0.00 0.00 3.08 4.31 3.08 1.85

(D) Consolidation 2.39 0.00 0.00 0.00 0.00 0.00 2.392.392.392.39Grand Total 82.10 6.25 3.29 17.63 24.49 17.22 13.24

Page 59: IWMP (2009-10) - I (BHAMOLAV)

STATE RAJASTHAN DIST. AJMER

BLOCK ARAIN GEOGRAPHICAL AREA 1395 Ha

AGROCLIMATIC ZONE III A Effective area 1395 Ha

Name of Watersed BHAMOLAV Arable Area 1187 Ha

Macro /Micro No 3\17 Non Arable Area 208 Ha

Gram Panchyat SANDOLIA Total Cost 167.4 Lacs

Watershed Committee SANDOLIA Unit Cost 0.12 Lacs

(A) Preparatory phase activities capacity building trainings & EPA

% % Fin % Fin % Fin % Fin % Fin % FinAdmn. 10.00 16.74 1.00 1.67 2.00 3.35 2.00 3.35 2.00 3.35 2.00 3.35 1.00 1.67

Monitoring 1.00 1.67 0.10 0.17 0.20 0.33 0.20 0.33 0.20 0.33 0.20 0.33 0.10 0.17Evaluation 1.00 1.67 0.00 0.00 0.30 0.50 0.00 0.00 0.35 0.59 0.00 0.00 0.35 0.59

EPA 4.00 6.70 4.00 6.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00I & CB 5.00 8.37 1.50 2.51 1.50 2.51 0.50 0.84 1.00 1.67 0.00 0.00 0.50 0.84DPR 1.00 1.67 1.00 1.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total 22.0022.0022.0022.00 36.83 12.7212.7212.7212.72 6.706.706.706.70 4.524.524.524.52 5.945.945.945.94 3.683.683.683.68 3.263.263.263.26

(B) Natural resource management

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

A

Conservation measures for

arable land

1 Earthen Bund for Block A Ha 65 23.79 0.00 0.00 16 5.95 23 8.33 16 5.95 10 3.57

2 Earthen Bund for Block B Ha 32 5.92 0.00 0.00 8 1.48 11 2.07 8 1.48 5 0.89

3 Earthen Bund for Block C Ha 49 10.94 0.00 0.00 12 2.74 17 3.83 12 2.74 7 1.64

4 Earthen Bund for Block D Ha 47 13.45 0.00 0.00 12 3.36 16 4.71 12 3.36 7 2.02

5 Earthen Bund for Block E Ha 0 0.00 0.00 0.0 0 0.00 0 0.00 0 0.00 0 0.00

6 Stone wall Terrace (PRT) Ha 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00

7 Khadin in Arable Land No. 7 26.25 0.00 0.00 2 6.56 2 9.19 2 6.56 1 3.94

Total Conservation arable Land 80.35 0.00 0.00 20.09 28.12 20.09 12.05

B

Conservation measures for non

arable land

8 V - dich Ha 16 1.73 0.00 0.00 4 0.43 6 0.61 4 0.43 2 0.269 Staggered Trenches Ha 19 2.42 0.00 0.00 0 0.00 0 0.00 0 0.00 19 2.4210 Pasture development Ha 26 13.06 0.00 0.00 0 0.00 0 0.00 0 0.00 26 13.06

2nd year 3rd year 4th year 5th year 6th year

Total 1st year 2nd year 3rd year 4th year

Activity Unit

Total ProvisionYearwise

1st year

Village Covered

SANDOLIA

5th year 6th yearFin

COMPONENT WISE & YEARWISE BREAKUP OF WATERSHED ACTIVITIES

GRAM PNACHYAT SANDOLIA

Activity

Yearwise

Page 60: IWMP (2009-10) - I (BHAMOLAV)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

2nd year 3rd year 4th year 5th year 6th year

Activity Unit

Total ProvisionYearwise

1st year

Drainage line treatment

11 Farm pond/ New Nadi No. 3 2.88 0.00 0.00 1 0.72 1.05 1.01 0.75 0.72 0.45 0.43

12 Loose stone check Dam No.

13 Small Masonary Structure No.

14 Small pond No.

15 Medium Masonary structure No.

Total Non arable Conservation

and DLT (A+B) 20.09 0.00 0.00 1.15 1.61 1.15 16.17

Total (B) NRM 100.44 0.00 0.00 21.24 29.74 21.24 28.22

( C )( C )( C )( C ) Production System and micro enterprise

Production measures for arable

land

1 Agroforestry For Arable Ha 40 2.71 0.00 0.00 10 0.68 14 0.95 10 0.68 6 0.41

2 Only Horticulture 0.5Ha 5 5.74 0.00 0.00 1 1.44 2 2.01 1 1.44 1 0.86

3 Vermi compost No. 4 1.11 0.00 0.00 1 0.28 1 0.39 1 0.28 1 0.17

4 Crop / Fodder Demostration No. 42 3.59 0.00 0.00 11 0.90 15 1.26 11 0.90 6 0.54

5

Kitchen Garden Kit demonstration

Unit No. 40 2.75 0.00 0.00 10 0.69 14 0.96 10 0.69 6 0.41Total Production Measures for

Arable 15.90 0.00 0.00 3.98 5.57 3.98 2.39

House hold Production System 0 0.006 Tool Kit for land less and SHG No. 11 3.07 0.00 0.00 3 0.77 4 1.07 3 0.77 2 0.46

7

Agricultural Machinary for

Agricultural activity No. 25 2.18 0.00 0.00 6 0.55 9 0.76 6 0.55 4 0.33Total House hold Production

System 5.25 0.00 0.00 1.31 1.84 1.31 0.79

Live stock Development

8 Vetinary Camp No. 10 1.72 0.00 0.00 3 0.43 4 0.60 3 0.43 2 0.26

9 Manger for Cattel No. 60 1.08 0.00 0.00 15 0.27 21 0.38 15 0.27 9 0.16

10 Bull Distribution No. 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00

11 Mineral mixture 60 1.13 0.00 0.00 15 0.28 21 0.40 15 0.28 9 0.17

Total live stock Development 3.93 0.00 0.00 0.98 1.38 0.98 0.59

Total (C) 25.08 0.00 0.00 6.27 8.78 6.27 3.76

(D) Consolidation 5.06 0.00 0.00 0.00 0.00 0.00 5.065.065.065.06Grand Total 167.41 12.72 6.70 32.03 44.46 31.19 40.31

Page 61: IWMP (2009-10) - I (BHAMOLAV)

STATE RAJASTHAN DIST. AJMER

BLOCK ARAIN GEOGRAPHICAL AREA 1205 Ha

AGROCLIMATIC ZONE III A Effective area 1205 Ha

Name of Watersed BHAMOLAV Arable Area 1092 Ha

Macro /Micro No 3\16 Non Arable Area 113 Ha

Gram Panchyat CHOTA LAMBA Total Cost 144.6 Lacs

Watershed Committee CHOTA LAMBA Unit Cost 0.12 Lacs

(A) Preparatory phase activities capacity building trainings & EPA

% % Fin % Fin % Fin % Fin % Fin % FinAdmn. 10.00 14.46 1.00 1.45 2.00 2.89 2.00 2.89 2.00 2.89 2.00 2.89 1.00 1.45

Monitoring 1.00 1.45 0.10 0.14 0.20 0.29 0.20 0.29 0.20 0.29 0.20 0.29 0.10 0.14Evaluation 1.00 1.45 0.00 0.00 0.30 0.43 0.00 0.00 0.35 0.51 0.00 0.00 0.35 0.51

EPA 4.00 5.78 4.00 5.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00I & CB 5.00 7.23 1.50 2.17 1.50 2.17 0.50 0.72 1.00 1.45 0.00 0.00 0.50 0.72DPR 1.00 1.45 1.00 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Total 22.0022.0022.0022.00 31.81 10.9910.9910.9910.99 5.785.785.785.78 3.903.903.903.90 5.135.135.135.13 3.183.183.183.18 2.822.822.822.82

(B) Natural resource management

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin

A

Conservation measures for

arable land

1 Earthen Bund for Block A Ha 54 20.54 0.00 0.00 14 5.14 19 7.19 14 5.14 8 3.08

2 Earthen Bund for Block B Ha 27 5.11 0.00 0.00 7 1.28 9 1.79 7 1.28 4 0.77

3 Earthen Bund for Block C Ha 39 9.45 0.00 0.00 10 2.36 14 3.31 10 2.36 6 1.42

4 Earthen Bund for Block D Ha 42 11.62 0.00 0.00 11 2.91 15 4.07 11 2.91 6 1.74

5 Earthen Bund for Block E Ha 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00

6 Stone wall Terrace (PRT) Ha 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00

7 Khadin in Arable Land No. 7 22.68 0.00 0.00 2 5.67 2 7.94 2 5.67 1 3.40

Total Conservation arable Land 69.40 0.00 0.00 17.35 24.29 17.35 10.41

B

Conservation measures for non

arable land

8 V - dich Ha 15 1.49 0.00 0.00 4 0.37 5 0.52 4 0.37 2 0.22

9 Staggered Trenches Ha 10 2.09 0.00 0.00 0 0.00 5 0.65 5 0.60 0 0.84

10 Pasture development Ha 30 11.28 0.00 0.00 0 0.00 0 0.00 0 0.00 30 11.28

COMPONENT WISE & YEARWISE BREAKUP OF WATERSHED ACTIVITIES

GRAM PANCHYAT CHOTA LAMBA

Activity

YearwiseTotal 1st year 2nd year

Fin3rd year

Activity Unit

Total ProvisionYearwise

1st year 6th year

4th year 5th year 6th year

Village Covered

Chota lamba

2nd year 3rd year 4th year 5th year

Page 62: IWMP (2009-10) - I (BHAMOLAV)

Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy FinActivity Unit

Total ProvisionYearwise

1st year 6th year2nd year 3rd year 4th year 5th year

Drainage line treatment

11 Farm pond/ New Nadi No. 3 2.50 0.00 0.00 1 0.63 1 0.88 1 0.63 0 0.38

12 Loose stone check Dam No.

13 Small Masonary Structure No.

14 Small pond No.

15 Medium Masonary structure No.

Total Non arable Conservation

and DLT (A+B) 17.36 0.00 0.00 1.00 2.05 1.60 12.72

Total (B) NRM 86.76 0.00 0.00 18.35 26.34 18.95 23.13

( C )( C )( C )( C ) Production System and micro enterprise

Production measures for arable

land

1 Agroforestry For Arable Ha 20 2.33 0.00 0.00 5 0.58 7 0.82 5 0.58 3 0.35

2 Only Horticulture 0.5Ha 5 4.94 0.00 0.00 0 0.00 2 0.45 3 0.47 0 4.02

3 Vermi compost No. 2 1.78 0.00 0.00 0 0.00 1 0.30 0 0.00 1 1.48

4 Crop / Fodder Demostration No. 50 3.08 0.00 0.00 10 0.12 20 0.18 12 0.20 8 2.58

5

Kitchen Garden Kit demonstration

Unit No. 50 1.60 0.00 0.00 0 0.00 20 0.18 20 0.18 10 1.24Total Production Measures for

Arable 13.73 0.00 0.00 0.70 1.93 1.43 9.67

House hold Production System 0.00

6 Tool Kit for land less and SHG No. 7 2.63 0.00 0.00 2 0.66 2 0.92 2 0.66 1 0.39

7

Agricultural Machinary for

Agricultural activity No. 20 1.91 0.00 0.00 0 0.00 0 0.00 0 0.00 20 1.91Total House hold Production

System 4.54 0.00 0.00 0.66 0.92 0.66 2.30

Live stock Development

8 Vetinary Camp No. 12 1.49 0.00 0.00 3 0.37 4 0.52 3 0.37 2 0.22

9 Manger for Cattel No. 35 1.00 0.00 0.00 9 0.25 12 0.35 9 0.25 5 0.15

10 Bull Distribution No. 0 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00

11 Mineral mixture 20 0.98 0.00 0.00 5 0.25 7 0.34 5 0.25 3 0.15

Total live stock Development 3.47 0.00 0.00 0.87 1.21 0.87 0.52

Total (C) 21.74 0.00 0.00 2.23 4.06 2.96 12.49

(D) Consolidation 4.37 0.00 0.00 0.00 0.00 0.00 4.37

Grand Total 144.68 10.99 5.78 24.48 35.53 25.09 42.81

Page 63: IWMP (2009-10) - I (BHAMOLAV)

Table-M(PA)A1: Entry point activities (EPA) as on

(All financial figures in lakh Rs.)1 2 3 4 5 6 7 8 9 10 11

S. No. State DistrictNames of

projects

Amount

earmark

ed for

EPA

Entry Point Activities plannedEstimated

cost

Expendit

ure

incurred

BalanceExpected

outcome

Actual

outcome

1. Street Solar Light - 32 Unit 8.00 8.00 0.00

2. Samsan Ghat Tinshed -4 Nos. 4.00 0.80 3.20

3. Samsan Ghat Bethak -5 Nos. 12.10 1.50 10.60

4. Water Supply Tube well - 1 Nos. 1.00 0.00 1.00

5. Water coolar with purify with water

Hut- 1 Nos.0.80 0.50 0.30

6.Kheli Kota - 1 Nos. 0.75 0.50 0.25

7.Sulabh Complex 0.88 0.00 0.88

8 Hatai No-1 0.50 0.00 0.50

28.03 28.03 11.30 16.23

Chapter IV. Project Activities

IV. A. Preparatory phase

1 Raj Ajmer

IWMP-I

(Bhamolav)

P.S. Arain

28.03Useful for

Benifeciarys-

Page 64: IWMP (2009-10) - I (BHAMOLAV)

Name of site Bhamolav

5.22 1.5

5

77

10

2.5

2

1

10

2

20

Page 65: IWMP (2009-10) - I (BHAMOLAV)

Je dqy Je dqy

1-

6 2 2 2.5 60.000 /ku QhV60.000 /ku QhV1.699 /ku eh- 91.00 91.00 154.59 154.59

2-

v HW 6 2.00 2.00 0.50 12.000 /ku QhV0.340 /ku eh- 320.00 1597.00 108.72 542.60

3

6 2.00 2.00 1.50 36.000 /ku QhV2 16.25 1.00 1.00 32.500 /ku QhV2 10.00 1.00 1.00 20.000 /ku QhV

Pillar 6 1.25 1.25 7.00 65.625 /ku QhV154.125 /ku QhV4.364 /ku eh- 357.00 1273.00 1557.88 5555.12

6-

6 5.00 7.00 210.000 oxZQhV2 16.25 3.00 97.500 oxZQhV2 10.00 3.00 60.000 oxZQhV

367.500 oxZQhV10.405 oxZ eh- 69.90 122.00 727.32 1269.43

Model EstimateModel EstimateModel EstimateModel EstimateVermi CompostVermi CompostVermi CompostVermi Compost

jkf'k

uhao esa 1-5 xgjkbZ rd feVVh dh [kqnkbZ djuk] ry dks dwVuk] ikuh Mkyuk] cxy dkslaokjuk] [kqnh feêh dks ckgj fudkyuk] uhao Hkjus ds ckn [kkyh LFkkuksa dks iqu% feêh lsHkjuk rFkk cph gqbZ feêh dks 50 ehVj dh nwjh rd fuLrkj.k djukA (Item no. 2b, 190c, 2c

)

lhesUV daØhV uhao ;k Q'kZ esa 40 fe- eh- ukHkh; eki dh iRFkj fxÍh@bZV fxÍh] lhesUVjsr elkyk esa 1 lhesUV % 4 jsr % 8 fxÍh vuqikr eas feykdj Mkyuk rFkk dqVkbZ djuk]rjkbZ lesrA Jfed fefJrA (Item No. 192)

dz-la- y- pkS- Åa-

csj}k iRFkj dh fpukbZ 1%6 vuqikr lhesaV&ctjh elkys esaAuhao esa (Item No. 191a)

ek=k bdkbZnj

fooj.k la-

lhesaV IykLVj nhokj ij 1%6 vuqikr es lhesaV&ctjh feykdj dj tksMksa dks dqjsnus rFkkrjkbZ lfgr 20 fe-eh-A (Item no. 73a)

Page 66: IWMP (2009-10) - I (BHAMOLAV)

7-

150.000 fdxkz 9.20 58.30 1380.00 8745.00

8

14 14 6.00 3.00 252.000 oxZQhV252.000 oxZQhV

23.412 oxZ eh- 20.00 343.00 468.23 8030.17

82.500 Vu 800.00 2000.00

930.000 fdxkz 80.00 2400.00

10

20.00 Bed 250.00 5000.00

4396.74 33696.91

4396.74 33696.91

1010.91

34708

12.7% 4400

87.3% 30310

34710

6 fe-eh- eksVkbZ es ukyhnkj ,LosLVl lhesaV dh pnjksa dks bLikr ds ts ;k,y gqd rFkk uV oksYV ls yxkuk o vkiwfÙkZ djukA dSph rFkk ijfyu dhHkqxrku vyx ls gksxkA

Cow dung

;ksx

;ksx

tksM+ 3 % dfUVu tsalhdqy ;ksx dqy ;ksx dqy ;ksx dqy ;ksx

ykxr Je en esa ------------------------------

ykxr lkexzh en esa ---------------------------

dqy ;ksx dqy ;ksx dqy ;ksx dqy ;ksx

fxzy@xsV vkfn es yksgs dk dk;Z ftlesa likV] dksfu;k] Vh rFkk ukyhnkj¼psuy½] dks dkVuk] p<+kuk rFkk yxkuk vkfnA

Worms @ 3 kg per ton

Formation of vermin bed with agro-waste, cow dung and

worms

Page 67: IWMP (2009-10) - I (BHAMOLAV)

4.5.2 Khakhara making

Technical Details

Sr. No. Total cost

1 15000

2 5000

3 20000

4 60

Table No. 4.7.5 : Kitchen garden Technical details:

Sr. No. Quantity Unit Total cost

1 5 Packet 100

2 1 Nos. 700

3 Fertilizers and

pesticides, Weeding

100 100

900

Activity Rate

Vegetable seeds 20

Bucket drip kits 700

6 Packaging cost 100

260

Total cost 40260

b. Variable cost

Raw material

(Wheat) per day

4 kg 15

5 Labour, Electricity 100

Khakhara making

machine

10 2000

40000

Milling Machine 1 15000

Dough making

machine

1 5000

Particulars Quantity Rate

a. Fixed cost

Page 68: IWMP (2009-10) - I (BHAMOLAV)

4.5.8 Tailoring work

“Garment and Tailor made the gentleman” these English proverbs for tailoring work importance. Clothes are important for human being. In this business Trainee and knowledge of tailoring work is easily helpful to get employment.

i. Market management: In tailoring work there is no problem of marketing of readymade cloths. Generally making clothes persons buy clothes and give to Taylor and take the ready clothes.

ii. Production process: Necessary of customer for clothes takes map for markings and then cutting. Then on tailoring machine fitting button, clip chain.

iii. Production capacity: Daily production capacity is of Rs.700. Considering 50 per cent production at start daily production capacity will be Rs. 350.

iv. Following things are required for getting licence

1. One who is having tailoring as family business can apply.

2. Required Diploma in tailoring and cutting Course (It should be government recognized.)

3. Widow/Person should be applying in special case.

4. Training should be cleared from government approved training centre.

It is self employment work so salary will be calculated as a net profit 1900 Rs per month

Sr. No. Total

Cost (Rs.)

1 35000/-

2 8000/-

3 3000/-

4 2000/-

5 3000/-

6 5000/-

1 4500/-

2 1000/-

3 150/-

4 100/-

5 500/-

6 150/-

6400/- 6400/-

Total 62400 ≈ 65000

Lease house 1 500/-

Friction cost 1 150/-

Power fuel cost 1 150/-

Repair cost 1 100/-

Variable cost Raw Material 1 4500/-

Salary cost per one

person

1 1000/-

Others 1 5000/-

Total 17500/- 56000/-

Scissors tap, Iron or

Other Equipments

1 2000/-

Furniture 1 3000/-

Electric Motor ¼

H.P.

10 800/-

Cutting table /board 1 3000/-

Details No. Price Rs.

Fixed cost

Tailoring Machine 10 3500/-

Page 69: IWMP (2009-10) - I (BHAMOLAV)

Table No. 4.7.4 : Chaff cutter

Sr. No. Activity Quantity Unit Rate Total cost

1 Chaff

cutter

1 Nos. 20000 20000

4.5.10 Papad making

Table No. 4.7.9 : Papad making

Sr. No Prices Rs.

1 12000/-

2 8000/-

3 -

4 1000/-

5 1000/-

6 Installatio

n,Founda

3000/-

Total 25000

Equipments

Rake,Different Size

Of Jars

Papad Preparation

Set

-

Details No

Milling Machine

With Electric Motor

1

Pastearize Dasta

Machine With

Electric Motor

1

50nos. chap cutter

benifisheriese dist. X 2000 =

1,00,000.

Page 70: IWMP (2009-10) - I (BHAMOLAV)

Garment and Tailor made the gentleman” these English proverbs for tailoring work importance. Clothes are important for human being. In this business Trainee and knowledge of tailoring work is easily helpful to get employment.

In tailoring work there is no problem of marketing of readymade cloths. Generally making clothes persons buy clothes and give to Taylor and take the ready clothes.

Necessary of customer for clothes takes map for markings and then cutting. Then on tailoring machine fitting button, clip chain.

Daily production capacity is of Rs.700. Considering 50 per cent production at start daily production capacity will be Rs. 350.

2. Required Diploma in tailoring and cutting Course (It should be government recognized.)

It is self employment work so salary will be calculated as a net profit 1900 Rs per month

Page 71: IWMP (2009-10) - I (BHAMOLAV)
Page 72: IWMP (2009-10) - I (BHAMOLAV)

Garment and Tailor made the gentleman” these English proverbs for tailoring work importance. Clothes are important for human being. In this business Trainee and knowledge of tailoring work is easily helpful to get employment.

In tailoring work there is no problem of marketing of readymade cloths. Generally making clothes persons buy clothes and give to Taylor and take the ready clothes.

Page 73: IWMP (2009-10) - I (BHAMOLAV)

Table 4.8.1 : Model for A Vermi-compost Unit

Sr. No Amount

(Rs.)

1 1000

2 1500

3 3125

4 1000

5 2000

2500

7 2000

8 8000

9 2400

10 5000

Cost for 8 cycles Rs. 2,28,200

Formation of vermin

bed with agro-

waste, cow dung

and worms

20 bed 250

11 Miscellaneous

Total cost Rs. 28,525

Cow dung 10 ton 800

Worms @ 3 kg per

ton

30 kg 80

6 Shovels, spades, crowbars, iron baskets,

Weighing scale (100

kg capacity)

1 2000

Binding wire for

tying wooden ballies

& mats

20 Kg 50

Labour charges for

erection of sheds

20 100

Wooden (4 m long) 25 60

Shade mats for

covering the roof

125 25

Particulars Quantity Rate (Rs.)

Wooden ballies (3 m

long)

20 50

Page 74: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 8

tyxzg.k {ks= ds lalk/ku

¼v½ yksx ,ao mudk jgu-lgu %&

tyxzg.k {ks= esa jgus okys yksx T;knkrj vf’kf{kr ,ao xjhch dh js[kk ls uhps

thou&;kiu djrs gSA bu yksaxksa dh vkfFkZd fLFkfr vPNh ugha gksus ds dkj.k T;knkrj

yksx Ñf"k ,ao i'kq/ku ls viuh vkthfodk pykrs gSA

¼Ck½ Hkwfe ,ao mldk mi;ksx %&

tyxzg.k {ks= esa miyC/k vf/kdrj Hkwfe catj ]iFkjhyh] o vuqi;ksxh gSA Hkwfe dk

fooj.k vyx ls n’kkZ;k x;k gSA bl Hkwfe dk mi;ksx Ñf"k] i'kq/ku] pkjkxkg] ty

laj{k.k] jkLrs] vkcknh ds mi;ksx esa fd;k tkrk gSA

¼l½ ikuh dk cgko ,ao mldk mi;ksx %&

tyxzg.k {ks= esa xSj eqefdu lery Hkwfe ij ikuh ds cgko dks jksdus ds fy, dksbZ

ty laxzg.k dk;Z ugha djok;s x;s gSA Hkwfe dk <yku yxHkx 1 ls 4 izfr’kr gS vr%

vf/kdrj ikuh cgqr rsth ls cgdj vius lkFk [ksr dh mitkÅ feV̀Vh ysdj pyk

tkrk gSA blh dkj.k ifj;kstuk dh vf/kdre Hkwfe catj gSA ifj;kstuk {kS= es d`f"k o

vd`f"k ;ksX; Hkwfe ij Hkwlaj{k.k ds dk;Z ugh djok;s x;s gSA vr% bl {ks= es e`nk dk

dVko lokZf/kd gSA dqN ikuh fdlkuksa ds [ksr esa ls xqtjrk gS] ftllss mi;ksxh Hkwfe

dk dVko gksrk gS D;ksafd [ksrksa esa fdlh izdkj ds tyxzg.k fodkl dk;Z ugha fd;s x;s

gSA

Page 75: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 9

¼n½ izkÑfrd ouLifr ,ao mldk ?kuRo %&

izkÑfrd :i ls miyC/k ouLifr;ksa esa nwj nwj rd QSyh gqbZ foyk;rh ccwy ]dSj]

vkdM+s] cSj [kstM+h] bR;knh gSa] ,ao mudk ?kuRo 'kwU; ds yxHkx gSA

¼;½ Qlysa ,ao mudk mRiknu %&

;gk¡ ij flQZ o"kkZ ij vk/kkfjr Qlysa [kjhQ esa cktjk] Xokj] eDdk] ewax mxkbZ tkrh

gS ftudh izfr gSDVs;j mRiknu {kerk cgqr gh de gSA o"kkZ ds le; ij ugha gksus

vf/kdk’kr;k Qlysa pkSiV gks tkrh gS rFkk vdky dh fLFkfr mRiUu gks tkrh gSA

fdlkuks dks oSKkfud tkudjh de gkus ds dkj.k vPNs cht o [kkn ds mi;ksx dk

izpyu bl {kS= es de gSA vHkh Hkh ikjEikfjd :i ls [ksrh dh tkrh gSA

¼j½ i'kq/ku ,ao mudk mRiknu %&

i'kq/ku esa HkSal] xk;] cSy] HksM+] cdjh vkfn ikys tkrs gS] ftudh o`f} cgqr gh de

ek=k esa gksrh gS ,oa muls gksus okyk nw/k o Åu dk mRiknu Hkh cgqr de gS] D;ksafd

xkao okys ns”kh uLy ds i'kq j[krs gSA pkjs dh leqfpr O;oLFkk u gksus ls i'kq/ku dkQh

fucZy ,ao vLoLFk ik;k tkrk gSA xkao es vkoxeu ds lk/kuks dk vHkko gSA i”kq

fpfdRlky; xkao ls dkQh nwj gSA vr% tkuoj fpfdRlk ds vHkko ds dkj.k vDlj

chekj jgrs gSA

AA tyxzg.k viukvks ] le`f}

ykvksAA

Page 76: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 10

mRiknu esa vkus okyh leL;kvksa dk fo1ys"k.k

¼v½ feÍh laca/kh leL;k;sa %&

{kS= esa ouLifr cgqr de gS] vf/kdk’k Hkwfe iFkjhyh o catj gSA tehu es <yko 3

ls 5 izfr”kr gksus ds dkj.k o’kkZ dk ikuh cgwr rsth ls cgdj tkrk gS cgrk ikuh

vius lkFk mitkm fefÍ dks cgkdj ys tkrk gSA o"kZ Hkj rst gokvksa dk nkSj pyrk

jgrk gS ftlls feV~Vh dk gok }kjk {kj.k Hkh a gksrk g]S o"kkZ ds ikuh dk laj{k.k ugha

gksus ls Hkwfe dk dVko gksrk gS] ftlls mijh ijr dh mi;ksxh feV~Vh cgdj pyh tkrh

gSA xk¡o ds lehi Hkwfe ij ouLifr ugha gksus ds dkj.k feÍh dk {kj.k gks x;k gS ,ao

Hkwfe ,dne catj gks xbZ gSA

¼c½ ikuh laca/kh leL;k;sa %&

Hkw ty bl {ks= es cgqr xgjk gS rFkk vyx vyx tehu ds vuqlkj {ks= esa dsoy

[kkjk ikuh gh miyC/k gSA xk¡o esa clh vkcknh ds fy;s tynk; foHkkx }kjk ikuh dh

gksnh cukbZ gqbZ gS] ftlesa ikuh dHkh dHkkj vkrk gSA ftlls fd eos”kh rks I;kls ejrs gS

lkFk lkFk turk dks Hkh dkQh nwjh ls iqjkus dqvksa o gS.MiEia ls ikuh ykuk iM+rk gSA

xk¡o esa gj le; ikuh dh leL;k cuh jgrh gSA xfeZ;ks es ihus ds ikuh dh leL;k

lokZf/kd jgrh gSA

¼l½ ouLifr laca/kh leL;k;sa %&

xk¡o esa tykÅ ydM+h dh vko”drk] tula[;k o`f} ds lkFk lkFk c<+usa ls o

i'kq/ku dk ncko c<us ls ouLifr dk ?kuRo ?kV x;k gSA mldh mRiknu {kerk u"V gks

x;h gSA

Page 77: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 11

¼n½ Ñf"k] i'kq/ku ,ao vU; mRiknu laca/kh leL;k;sa %&

{ks= esa o"kkZ de gksus] mUur fdLe ds chtksa dk mi;ksx ugha djus ukMh dk lj{k.k

ugha djus vkSj moZjdks] [kkn ,oa fdVuk”kd dk mi;ksx ugh djus ls Ñf"k mit dh

ek=k dkQh de gSA mUur uLy ds i'kq/ku ds vHkko ,ao mRiknu {kerk o xk¡o esa i'kqvksa

dh la[;k ds vuqlkj larqyu ugha gksus ls i'kq/ku dh mRikndrk esa foifjr vlj iM+rk

gSA xk¡o esa f”k{kk dk vHkko ,ao vkfFkZd fLFkfr detksj gksus ls xzkeokfl;ksa dk vius

iq”rSuh /ka/ks dks NksM+dj jkstxkj ds lk/kuksa dh [kkst esa 'kgj dh vkSj iyk;u gks jgk

gSA

mRiknu esa vkus okyh leL;kvksa ds fujkdj.k ds rduhdh

mik;

¼v½ feÍh laca/kh leL;kvksa ds fujkdj.k ds mik; %&

feV~Vh dk laj{k.k djus ds fy, ,oe~ gok dh xfr ds izHkko dks de djus ds fy;s

ouLifr] o`{kkjksi.k dj c<+kbZ tkosxhA rFkk ikuh ls Hkwfe ds dVko dks jksdus ds fy,

ikuh dh <ky ds foijhr cUM cuk;s tk;saxs tkss Hkwfe dk dVko jksdus es lgk;d gksxsA

Hkwfe ij tgk¡ fdlh Hkh izdkj dh Qly dk”rdkj ugha mxk ikrk gS] esa o`{kkjksi.k dj

?kkl dk chtkjksi.k dj feV~Vh dks cgus ls jksduk ,ao mldk LFkk;h :i ls fLFkjhdj.k

djus ds iz;kl fd;s tk;saxsA iFkjhyh o <ykonkj Hkwfe ij LVªsxMZ VªsUpst cukdj Hkwfe

dk dVko jksdus dk iz;kl fd;k tk;sxkA vd`f’k ;ksX; Hkwfe ij <yko ds foifjr oh

fMp cuk;h tksxh rkfd Hkwfe dk dVko jksdk tk ldsA ukyks es txg txg ywt LVksu

psd Mse ] iDds psd Mse] cuk;s tk;sxs] ukys ds fLFkjhdj.k dk;Z djok;k tk;sxk rkfd

ukyks es ikuh dh xfr de jgs o e`nk dk dVko ugh gksA bl izdkj ¼[ksr dk ikuh

[ksr es ]dqM dk ikuh dqM es o xkao dk ikuh xko es ½ dh dgkor dks pfjrkFkZ djus

dk iz;kl bl ifj;kstuk de ek/;e ls fd;k tk;sxkA

Page 78: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 12

[ksr dk ikuh [ksr esa A dqM dk ikuh dqM

esaAA xkao dk ikuh xko esaAA

¼c½ ikuh laca/kh leL;kvksa ds fujkdj.k ds mik; %&

o"kkZ ds ikuh dk vf/kdre~ mi;ksx djus ds fy, dk”rdkjksa ds [ksrksa esa cUMhx dk

dk;Z rFkk tgk¡ ij ikuh dk <ky de gS rFkk tehu lery gS ogk¡ ij [kMhu dk

fuekZ.k djok;k tk;sxk ftlls [ksr dk ikuh [ksr esa dgkor pfjrkFkZ gks ldsA blds

vfrfjDr bl {ks= esa cuh ukfM;ksa dks xgjk djok;k tkdj mudh Hkjko {kerk dks

c<k;k tk;sxkA ukMh ds tyxzg.k {ks= esa Hkw laj{k.k dk;Z lEiUu djok;s tk;saxs ftlls

ml ukMh esa feV~Vh vkus dh j¶rkj de gks ldsA ifj;kstuk {kS= es fLFkr ukyks es ywt

LVksu psd Mse ] eslujh psd Mse] ,fudV]ukyk fLfFkjhdj.k dk dk;Z djok;k tkosxkA

blh izdkj d`f’k o vd`f’k Hkwfe es fLFkr ukyks es ladu iks.M ] feÍh ds c.M bR;kfn

cuok;s tkosxsA

¼l½ ouLifr laca/kh leL;kvksa ds fujkdj.k ds mik; %&

c<+rh gqbZ tula[;k dh ekax dh iwfrZ gsrq ljdkjh ,ao futh Hkwfe ij l?ku

o`{kkjksi.k djok;k tkdj ouLifr dh mRiknu {kerk c<+kbZ tk ldrh gSA pkjkxkgksa ds

fodkl ds fy, ?kkl dk chtkjksi.k futh Hkwfe ,ao ljdkjh Hkwfe ij fd;k tk;sxkA

dk”dkjks dks le; le; ij izf”k{k.k ds ek/;e ls vPNk pkjk mxkus gsrq iszfjr fd;k

tk;sxkA

¼n½ Ñf"k] i'kq/ku ,ao vU; mRiknu lacaf/kr leL;kvksa ds fujkdj.k ds

mik; %&

Page 79: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 13

mUur fdLe ds chtksa dk mi;ksx ,ao o"kkZ ds ikuh dk iw.kZ lnqi;ksx gsrq cUMhx

dk dk;Z djok;k tk;saxkA mUur [kkn] moZjd ,ao dhVuk”kd nokvksa ds mi;ksx gsrq

dk”rdkjksa dks iszfjr fd;k tk;sxkA mUur uLy ds i'kq/ku gsrq xk¡o esa detksj uj

i'kqvksa dk cU/;kdj.k djok;k tk;sxk ,oa vPNh uLy ds uj i'kqvksa dh [kjhn djokbZ

tk;sxhA pkjk mRiknu gsrq vPNs fdLe dh ?kkl tsls lsou ?kkl ds chtksa dk mi;ksx]

xkspj ,ao futh Hkwfe ij fd;k tk;sxkA xkao esa f”k{kk dk izlkj] cpr izksRlkgu ,ao

ifjokj dY;k.k ;kstukvksa dk izpkj izlkj fd;k tkdj xkaookfl;ksa dh vKkurk ,ao

fu/kZurk dks nwj djus ds iz;kl bl ;kstuk ds ek/;e ls fd;k tk;sxkA ftlls

xkWooklh vius iq”rSuh /kU/kksa ds lkFk lkFk vU; mRiknd dk;ksZa esa tqM+ ldsA o xkoa

okfl;ks dk i”kqvks ds pkjs ikuh dh O;oLFkk o jkstxkj dh ryk”k es iyk;u de gksA

ty gh thou gSA

Page 80: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 14

tyxzg.k fodkl

dk;Zdze

Page 81: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 15

,d ifjp;

tyxzg.k {kS= D;k gS

tylaxzg.k {kS= ;k tyxzg.k {kS= ,d Hkw& tyh; bZdkbZ gS] ftles ty cgdj ,d

fuf”pr LFkku ij vkrk gSA ty laxzg.k i}fr ifj;kstuk vk/kkfjr gS vkSj ;g ;Fkk

LFkku e`nk tFkk ty laj{k.k + ouhdj.k vkfn ds ioZr f”k[kj ls /kkVh dh vksj cgko

iz.kkyh gSA tylaxzg.k ifj;kstuk es fodkl dh ,d bZdkb es lkekU;r% yxHkx 500

gSDVs;j dk tylaxzg.k ¼okVj “ksM½ “kkfey gksxk A rFkkfi HkkSxksfyd fLFkfr ] xkao

ds vkdkj vkfn dks /;ku es j[krs gq;s ifj;kstuk ds okLrfod {kS= es fHkUurk gks

ldrh gSA ty lxzg.k {kS= ds p;u ds fy;s Hkwfe mi;ksx @Hkwfe vkPNknu ] ty Hkw

vkd`fr ] e`nk vkfn tSls fofHkUu fo’k;ks ds lac/k es mixzg vkdMks ls rS;kj ekufp=

dks dke es yk;k tkrk gSaA ifj;kstuk dk eq[; y{; ousrj catj Hkwfe rFkk

lqfuf”pr lw[kk izo.k {kS= rFkk e:Hkwfe okys {kS=ks dks fodflr djuk gSA

tyxzg.k {ks= ds eq[; mís1;

tyxzg.k {ks= esa Hkw&lj{k.k dks jksdus ds fy;s Hkw laj{k.k dk;ksZa esa c.Mhx dk dk;Z

djk;k tk;saxkA blds lekukUrj o`{kkjksi.k djuk] pkjk mRiknu djuk] is;ty ds

ikjEifjd Jksrksa dks lq/kkj dj o"kkZ ds ikuh dk iw.kZ lnqi;ksx djuk ,ao i;kZoj.k lUrqyu

Page 82: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 16

cuk;s j[kuk ;kstuk dk eq[; m}s”; gSA blds vfrfjDr xzkeokfl;ksa ds vkfFkZd Lrj esa

lq/kkj] f”k{kk eas lq/kkj] [ksrh dks oSKkfud rjhds ls djuk] vPNh uLy ds i'kq/ku dks

viukuk] xzkeokfl;ksa esa cpr dh Hkkouk tkxzr djuk ,ao ifjokj dY;k.k rFkk lekt

dY;k.k dk;ksZ esa lkewfgd :i ls xk¡o esa cSBdsa vk;ksftr dj dk;Z ;kstuk dks eatwjh nsuk

vkfn Tkyxzg.k {ks= dk eq[; m}s”; gSA

bl ;kstuk ds vUrxZr jkstxkj ds vf/kd volj iSnk djuk] izkÑfrd lalk/kuksa dk

leqfpr mi;ksx djuk ,ao vk; ds u;s lk/ku mRiUu djuk m}s’; esa 'kkfey gSA

;kstuk dh ikWp lky dh vof/k ds nkSjku mRiUu gq, lalk/kuksa dk xzke okfl;ksa }kjk

Hkfo"; esa Lo;a }kjk la/kkfjr fd;k tkuk ,ao fodkl dh vklku ,ao de [kphZyh rduhdh]

xk¡o esa miyC/k lalk/kuksa ls fodflr djuk bl ifj;kstuk ds m}s’;ksa esa 'kkfey gSA bl

;kstuk ds lQy fdz;kUo;u ls fu%lUnsg Hkwfe dk lq/kkj ,ao xzke dk lexz fodkl gksxkA

xkao dk ikuh xkao es A

dqM dk ikuh dqM esA

[ksr dk ikuh [ksr esaAA

Page 83: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 17

&% ifj;kstuk dk;kZUo;u laLFkk ds drZO; %&

ifj;kstuk dk;kZUo;u laLFkk pkj lnL;h ty xzg.k fodkl ny dks dk;Z ij

yxk;sxh ] xkze iapk;r dks yksxks }kjk va”knku gsrq vko”;d izLrko ikfjr djus

ds fy;s izfjr djsxh] xkzeh.k lgHkkfxrk ewY;kdau djsxh] tylaxzg.k fodkl dh

;kstuk rS;kj djus lkeqnkf;d laxBu rFkk xkzeh.k leqnk; ds fy;s izf”k{k.k dh

O;oLFkk djus tu laxzg.k fodkl ls lacf/kr dk;ksZ ds fy;s rdfudh ekxZn”kZu

rFkk i;Zos{k.k lqfo/kk miyC/k djkus ] ifj;kstuk ys[kks dh tkWp djus rFkk mUgs

izekf.kr djus de ykxr okyh izks/kksfxdh dks viukus ds fy;s vuqla/kku gsrw

dk;Zokgh vkjEHk djus vkSj Lons”khs rdfudh izkIr djus mUgs viukus ] lexz

ifj;kstuk dk;ZUo;u ij fuxjkuh j[kus rFkk leh{kk djus ,ao ifj;kstuk vof/k ds

nksSjku l`ftr ifjlEifr;ks ds ifj;kstuk iqjh gksus ds i”pkr lapkyu rFkk j[k

j[kko vksj fodkl ds fy;s laLFkxr iazc/k LFkkfir djus dk dk;Z djsxhA

ty taxy tehu vksj thouA

Page 84: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 18

bu pkjks dk j[kks larqyuAA

&% ifj;kstuk fd;kUo;u izfdz;k %&

1 tyxzg.k {ks= esa miyC?k HkkSfrd lalk?kuksa ds vk/kkj ij lkekftd ,ao vkfFkZd

mRFkku dh :ijs[kk xzke iapk;r o ykHkkfFkZ;ks ds }kjk tyxzg.k fodkl ny ds

lnL;ks ds lg;ksx ls rS;kj djuk rS;kj djukA

2 tyxzg.k {ks= esa fofHkUu leqnk;ksa ds lkFk ifj;kstuk fdz;kUo;u ds lEcU?k esa

tkudkjh dk vknku iznku ekfld cSBd djds djuk A

3 Hkw&losZ{k.k }kjk Hkwfe dk oxhZdj.k djuk rFkk Hkwfe dk mipkj djukA

4 de ykxr dh izHkkodkjh ,ao nksgjkbZ tk ldus okyh mRiknu iz.kkyh dk izpkj

izlkj izf”k{k.k ,oe~ ckgz; Hkze.k }kjk djukA

5 losZ{k.k ds vk?kkj ij vk/kkjHkwr lqfo?kkvksa dks miyC/k djokukA

6 tyxzg.k {ks= fodkl Iyku rS;kj djukA

mijksDr izfdz;k,a viukrs gq, ljdkjh ,ao iapk;r Hkwfe ij xzkeiapk;r ds ek?;e ls

rFkk futh Hkwfe ij Lo;a Ñ"kd @ miHkksDrk leqg }kjk ifj;kstuk dk;Z lEikfnr djk;s

tk;saxsA

tu lgHkkfxrk

ifj;kstuk dk Åns'; tu lgHkkfxrk ds ek?;e ls ;kstuk rS;kj djuk] fdz;kfUofr

djuk ,ao lkeqnkf;d lalk?kuksa ds izcU?k ,ao vuqorhZ dk;ksZ dk nkf;Ro xzkeLrjh; tyxzg.k

desVh@xkze iapk;r dks lkSiuk gSA blds vUrxZr xzke lHkk vk;ksftr dj miHkksDrk lewg

Page 85: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 19

o Loa; lgk;rk lewg dk p;u rFkk tyxzg.k ykHkkfFkZ;ks dh ekfld cSBd o o"kZ esa nks

ckj xkze lHkk vk;ksftr fd;k tkuk Hkh lfEefyr gSA ifj;kstuk dh xfrfof/k;ksa esa ;kstuk

cukus rFkk izca/k forj.k vkfn esa efgykvksa dh lgHkkfxrk lqfuf”pr djus ds fy;s efgyk

psruk tkxzr djus ds iz;kl Hkh ifj;kstuk esa 'kkfey fd;s x;s gSaA

Page 86: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 20

tyxzg.k fodkl ny

rdfudh Kku dks vke turk rd igq¡pkus o ifj;kstuk ds dk;Z rdfudh n`f"V ls Bhd

,ao izHkkoh cukus ds fy;s ljdkj dh vksj ls rdfudh fo’ks”kKksa dks bl ny esa 'kkfey fd;k

x;k gSA blesa ls ,d fo’ks”kK dks ny dk yhMj fu;qDr fd;k x;k gSA tyxzg.k fodkl ny esa

fuEukuqlkj pkj fo"k; fo’ks”kK gSa tks fd le; le; ij dk;ksZa ds fdz;kUo;u esa rdfudh

ekxZn”kZu nsrs jgsaxs A

1- vfHk;kaf=dh fo”ks’kK

2- ikS/k fo”ks’kK

3- lekt 'kkL=h

4- i'kq fo”ks’kK

ty xzg.k laLFkk o tyxzg.k desVh

¼leku dk;Z funsZf1kdk o’kZ 2008½

ekxZfunZf”kdk o’kZ 2008 ds vuqlkj tyxzg.k milfefr gh tyxzg.k {ks= ds

lokZxh.k fodkl gsrq gh tyxzg.k laLFkk o tyxzg.k desVh dk dk;Z djsxh {kS= ds lHkh

miHkksDrk leqgksa] Lo;a lgk;rk leqgksa ,ao ykHkkfFkZ;ks ds vkeaf=r lnL;ksa dks feykdj

Tkyxzg.k {ks= dk euksu;u fd;k x;k gSA ;g laLFkk {kS= esa djk;sa tkus okys dk;ksZa dks

vfUre :i nsdj dk;Z djkus ds fy;s miHkksDrk lewg o Lao; lgk;rk lewg dks funsZf”kr

djsxh rFkk djk;s x;s dk;ksZ dk le;&le; ij fufj{k.k dj lq>ko Hkh nsrh jgsxhA blds

vykok Tkyxzg.k {ks= ij dk;ksZa dh ns[k js[k djus] izxfr ,ao fglkc vuqeksnu] miHkksDrk

leqgksa @ Lo;a lgk;rk leqgksa dk xBu djus dk nkf;Ro gksxkA

Page 87: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 21

miHkksDrk leqg o Loa; lgk;rk lewg }kjk djok;s x;s dk;ksZ dk Hkqxrku

tyxzg.k mi lfefr lfpo }kjk dk;Z dk ewY;kadu dj fd;k tk;sxkA Hkqxrku tyxzg.k

{kS= ds fudVre jk’Vªh;d`r cSad esa la;qDr [kkrk [kksyokdj ,ao lapkyu xkze iapk;r

lajiap] tyxzg.k milfer lfpo o dfu’B vfHk;Urk@ lgk;d vfHk;Urk ds la;qDr

gLrk{kjksa }kjk fd;k tkuk gSA tyxzg.k milfefr dk;ksZ dk fdz;kUo;u djk,xh ,ao

izfrfnu dk;ksZa dh ns[k js[k djsxh rFkk le; le; ij ifj;kstuk fdzz;kUo;u ,tsUlh dks

izxfr ds ckjs esa voxr djk;sxhA o le; le; ij ekfld cSBd ifj;kstuk {kS= ds

ykHkkfFkZ;ks dh cqykdj dk;ksZ dh izxfr ls voxr djk;sxh o cSBd es fy;s x;s dk;ksZ ds

izLrko ds vuqlkj dk;Z djok;sxhA

tylaxzg.k lfpo rFkk Loa; lsod %&

tylaxzg.k lfpo Hkkjr ljdkj ds }kjk tkjh gfj;kyh ekxZfunZf”kdk ds vuqlkj

xkze iapk;r lfpo gh tylaxzg.k lfpo dk dk;Z djsxkA tylaxzg.k lfpo ifj;kstuk

dk;Zdykiks ds lHkh fjdkMksZ dk la/kkj.k djsxk tyxzg.k {ks= es djok;s tkys okys dk;ksZ dk

izLrko ds vuqlkj fdz;kUo;u djok;sxk djok;s x;s dk;Z dk eki dj Hkqxrku dh dk;Zokgh

iw.kZ ikjnf”kZrk ds lkFk djsxkA le; le; ij tyxzg.k ykHkkfFkZ;ks dh cSBd dk vk;kstu

djsxk rFkk ys[ks dk la/kkj.k djsxkA ;fn xkze iapk;r vko”;d le>s rks lfpo dh

lgk;rk ds fy;s vf/kdre nks Loa; lsod dks fu;qä fd;k tk ldrk gSA

ty laxzg.k ifj;kstuk [kkrk %&

tylaxzg.k lfefr fdlh Hkh jk’Vªh;d`r cSad dh LFkkuh; “kk[kk es ty xzg.k

lfefr xkze iapk;r ------- ds uke ls [kkrk [kksysxh A bl [kkrs dk lapkyu xkze iapk;r

lajiap] tyxzg.k milfer lfpo o dfu’B vfHk;Urk@ lgk;d vfHk;Urk l;qä :i ls

fd;k tk;sxkA

ty laxzg.k fodkl fuf/k [kkrk %&

ty laxzg.k fodkl fuf/k ds fy;s ykHkfFkZ;ks ls ikzIr va”knku dks tek djok;k

tk;sxkA o ifj;kstuk vof/k i”pkr ikzIr jkf”k dks ifj;kstuk ds nkSjku l`ftr

Page 88: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 22

ifjlEifr;ks dh j[k j[kko ds fy;s [kpZ fd;k tkosxkA ykHkkfFksZ;ks ls muds [ksr ij djok;s

dk;kZs dh ykxr dk 10 izfr”kr lkekU; tkfr ls o 5 izfr”kr vuqlwfpr tkfr o

vuqlwfpr tu tkfr ls v”kanku fy;k tkosxk A blh izdkj lkeqnkf;d Hkwfe ij fd;s x;s

dk;ksZ dh ykxr dk 5 izfr”kr va”knku fy;k tk;sxkA izkIr va”knku dks ty laxzg.k

fodkl fuf/k [kkrs es tek djok;k tkosxk A

ty taxy tehu vksj thouA

bu pkjks dk j[kks larqyuAA

Page 89: IWMP (2009-10) - I (BHAMOLAV)

IWMP-Bhamolav Karni Computer

P- 23

Page 90: IWMP (2009-10) - I (BHAMOLAV)

Model Estimate of Tool Kit

Household Production System ( for Marginal farmer and Land less labour )

Service sector- Tool Kit Specification Trade wise Detail of tools requirement in one set

1. One set of carpentry tools COST RS. 4000/ Kit

S.No. Name of tools Specification Quantity

1 Hand saw Size 15” 1 No

2 Hand saw Size 12” 1 No

3 Screw driver Size 8”x25mm 1 No

4 Combination pliers Size 8”Make – Taparia 1 No

5 Charsi with handle Size 25 mm 1 No

6 Charsi with handle Size 18 mm 1 No

7 Charsi with handle Size 10 mm 1 No

8 Wooden Randda Big- Made of Sagwan 1 No

9 Wooden Randda Small – Made of Sagwan 1 No

10 File half round Make JK 1 No

11 File regular Make JK 1 No

12 Tee Bar carpenter frame

(shikanja) for wooden frame

Size 4’x2” 1 No

13 Stone silly Size 6”- ISI Mark 1 No

14 Basola with handle Weight 800 gram 1 No

15 Ball peen harmmer Weight 300 gram Make Ambica 1 No

16 Cross peen hammer Weight 500 gram – Make Ambica 1 No

17 Measurement tape Size 10 feet- Make Freeman 1 No

18 Pincer Size 200 mm- 1 No

19 Girmit Size ½ “ 1 No

20 Tri Square Size 8” 1 No

21 Hand Operated drill Size ¼ “ 1 No

22 Steel box for Tools Size( 22”x11”) – G.I. sheet 1 No

2. One set of Mason tools COST RS. 2000/ Kit

S.No. Name of tools Specification Quantity

1 Karni Size – Big- 1 No

2 Karni Size – small 1 No

3 Mashtar wooden Size 36” Made of Sagwan 1 No

4 Mashtar wooden Size 24 “ Made of Sagwan 1 No

5 Mashtar wooden Size 15” Made of Sagwan 1 No

6 Gurmala 1 No

7 Soot 1 No

8 Sabbal Heavy iron 1 No

9 L shape measurement (Gunia) 1 No

10 Level pipe(25 foot) 5 mm 1 No

11 Chiesal Size 6” , 8” Make – Taparia 1 No

12 Ball pine hammer Weight 500 gm Make – Ambica 1 No

13 Cross pine hammer Weight 300 gm Make – Ambica 1 No

14 Aluminium rib Size 60” x 4”x 1.5” 1 No

15 Measurement tape Size 10 feet Make – Freemans 1 No

16 Canvas bag for above tools Made of Heavy canvas 1 No

Page 91: IWMP (2009-10) - I (BHAMOLAV)

3 . One set of Pottery Tools COST RS. 12000/ Kit

S.No. Name of tools Specification Quantity

1 Clay lump beating hammer MS pat. Size – D 100 – 120 mm

x T5-6mm. with iron pipe handle

1

2 Wooden hammer(Thapa) Sheesam Wood. Size – D6-7”x

T1.25”. handle- L6”

1

3 Tasla MS Sheet. Size- D15”. SWG-20

1

4 Spade (Phawda) MS sheet. Size L 10 “x w10”.

SWGT-20. fitted with Wooden

Handle

1

5 Kamdai Wooden Size- 2”x 1-1.25”

approx. Arc. Shap

6 Pindi Cement Various Sizes

3

7 Decoration tools MS (Banki, Sua. Piyali. Patti)

8

8 Decoration Wheel Size- H 16” x D 12-15”. Tripod

Structure. Fitted with double Ball

Bearing. Iron sheet 5 mm

1

9 Manual Potter Wheel Outer Dia- inner plate size – D-

300mm x T-20mm. T-WT- 17 kg

minimum (Casted iron body).

Tripod Casted Iron Structure with

Ball bearing. 2 nos. of outer rings

made of T or steal of 12 mm Dia.

Cross Wooden Support Structure.

1

10 Electric Potter wheel Structure dimension

(25”x16”x16”) iron angle (iron

angle structure 35-5) casted iron

wheel dia 23”. Ball bearing -2

(6206) sealed. Shaft dia 2”. V-

belt pully, WT 23-25 kg.

1

Page 92: IWMP (2009-10) - I (BHAMOLAV)

4. One set of Footwear(Mojari) Tools COST RS. 12000/ Kit

S.No. Name of tools Specification Quantity

1 Hummer Ball Pane Drop forged steel. Induction

hardened. Seasoned wood handle.

WT- 300 gms with wooden

handle. Nylon hammer (L 240

mm. head size L80x D300mm)

2 Wooden Block Size- L 18”x W4”x T 4” 1

3 Pincer Size – 8” 1

4 Scissors Size- 9”. Steel Body. Brass

Handle

1

5 Bodam / Shoe anvil Graded CI with 3 phases. WT – 4

kg . approx.

1

6 Cutting Blade Set (Ramp) Steel with Wooden Handle. Size-

L 150x W30X T6mm

set

7 Stitching Awl Steel with Sheesham Wood

Handle

1

8 Sharpening Stone Size- 150x50x25mm. 109 no. 1

9 Shoe measuring Tape Size—2’ fibre/ good quality

plastic material

1

10 Lock Punch Set Steel 1

11 Eye let setting tool Steel 1

12 Round whole punch set Steel, Size – L 100 Range- 1 to

10

1 set(10

pcs.)

13 Design punch Set En-9 steel. Size – L100 1 set(3

pcs.)

14 Zig zag Steel Scissors Steel, Size- 81/2”. Grooves on

cutting edge.

1

15 Pattern Cutting Knife Steel, Size – 6” 1

16 PP Block Size- L 6” x W 6” x T 20mm 1

17 Steel Scale Size-12” and 24” 1

18 Leather Scraping Brush Size- 8” with wooden Handle 1

19 Adhesive Brush Size- 10 mm. 12 mm. 25 mm 1

20 Spring Divider Steel- Size 9” 1

21 Sant Steel- H 6” WT – 1 kg. 1

22 Sizzeore Passing Steel- Size 8” 1

23 Thread Cutter Steel with plaste handle. Size- L

100 mm

1

24 Number sety Steel Set of 10

25 Capsol Punch Size (8-10-12-16) Set

26 Brush Size 10 mm. 12mm.25mm 1

Machine Tools 1

27 HD Flat Bad Swing Machine 31 K. Branded Company 1

Page 93: IWMP (2009-10) - I (BHAMOLAV)

5. One set of Blacksmith Tools COST RS. 6000/ Kit

S.No. Name of tools Specification Quantity

1 Big Hammer Ghon – 5 kg 1

2 Hammer Ghon – 1 kg 1

3 Hammer Ghon – ½ kg 1

4 Anvil- chouka Ghon – 10 kg 1

5 Chisel- 3 Nos Ghon – 1 kg,500 kg.

750gm

1

6 Meaurement tape 3 MTR 1

7 Tringle 6” 1

8 Plie Taparia 8” 1

9 Scra drive 10” Tapana 1

10 Tin 10” 1

11 Hand operated electric hand

drill

- 1

12 Sansasi- flat and round - 1

13 Table Vice - 1

14 Haksa Frame Poland type - 1

6 One set of Cycle Mechanic Tools COST RS. 6000/ Kit

S.No. Name of tools Specification Quantity

1 Hammer 500gm 60.00

2 Hammer 1 kg 100.00

3 Plies 8” Taparia 180.00

4 Screw driver Taparia 6”-8”-12” 250.00

5 Pincer- 6” 6” 100.00

6 Nose plier-6” 6” 100

7 Alignment equipment cycle wheel 1000

8 Anivil – Chowka 5 kg 500.00

9 Screw wrench 10” 150.00

10 Hexa Frame polaud type 120.00

11 Spanner Set fix type 8 pcs 8 pcs 380.00

12 Electric hand drill machine 2000.00

13 Hand Skipper 10” 100.00

14 Solution 50.00

15 Water Pump Plier 100.00

16 Punch 6” 50.00

17 Hand Scissors 8” 120.00

18 Oil cane 250 gm 80.00

Page 94: IWMP (2009-10) - I (BHAMOLAV)

1 20 gSDVj 1.90

2 2200 ehVj 1.10

3 1.485 oxZ eh-4 12000 ehVj 0.80 DCB

5 0.12 oxZ eh- 1.20

5 8000 la[;k 0.20

6 3300 la[;k

la[;k yEckbZ pkSM+kbZ xgjkbZek=k

Je lkexzh

lfgr1

100 ehVj 1 12000 12000 14.11 14.11

i 100 ehVj 2 2200 4400 56.43 56.43

ii 100 ehVj 2 12000 24000 56.43 56.43

i ?k-eh- 1 2200 1089 91.35 91.35

Contour Furrow

Mkx csfyax dk dk;Z 2-5 ls 5-0 lseh xgjkbZ

rdehuk

dk;Z fooj.k

dz-la- fooj.k

lhek Mksyh (Ditch cum Bund)

njbdkbZ

dUVwj Qjkslhek Mksyh (Ditch cum Bund) fuekZ.k gsrq uhao Vsªapsp es feêh dh[kqnkbZ dk dk;Z] [kqnh gqbZ feêh dk fuLrkj.k rFkk lery djukA

dBksj feV~Vh esa 0.50

ek=k

MEihysoy@,&Qzse }kjk 8&15 ehVj nwjh ij dUVwj ykbZu dk ysvkmV nsuk

dk;Z dk uke %&

2

3

iks/kksa dh la[;klhek Mksyh ij rhu drkjks es chtkjksi.k

pkjkxkg fodkl dk;Z

Hkwfe dk {ks=QyHkwfe dh lhek dh yEckbZlhek Mksyh (Ditch cum Bund)dk {ks=Qy ¼dzkWl lsD'ku½dUVwj Qjks dh yEckbZdUVwj Qjks dk {ks=Qy ¼dzkWl lsD'ku½

?k-eh- 1 2200 1089 91.35 91.35

ii fo?kfVr pV~Vku@eqjZe ?k-eh- 1 2200 2178 131.62 131.62

i ?k-eh- 1 12000 480 91.35 91.35

ii ?k-eh- 1 12000 960 131.62 131.62

5 la[;k 8000 8000 0 3.37

1

i la[;k 2000 2000 5.00 5.00

ii la[;k 6000 6000 9.90 9.90

2 1000 ikS/kksa8000 8000 0.00 334.00

3la[;k 8000 8000 0.27 0.27

3 la[;k

la[;k 2000 2000 2.20 2.97

la[;k 6000 6000 2.70 3.65

4

la[;k 2000 2000 1.76 1.76

la[;k 6000 6000 2.43 2.43

5 1000 yhVj

720000

720000 0 15.69

fo?kfVr pV~Vku@eqjZe

45x45x45 lsehs uki ds xM~<+s djuk

dBksj feV~Vh esa

ikS/kkjksi.k dk;Z

dBksj feV~Vh esa

Fkkoyk cukukA de ls de 50 ls- eh-v)ZO;kl dk

dBksj feV~Vh esa

dadj@ eqje feV~Vh esa

flMfyx dh p<+kbZ o mrjkbZ dk;Z D;kjh esa tekus lfgrA

dBksj feV~Vh esa

dBksj feV~Vh esa 0.50

0.99

dadj@ eqje feV~Vh esaikS/kks dk okgu }kjk ifjogu 10 fdeh- rd

ikS/kksa dh ykxr

0.04

0.08

dUVwj Qjks fuekZ.k gsrq uhao Vsªapsp es feêh dh [kqnkbZ dk dk;Z] [kqnh gqbZfeêh dk fuLrkj.k rFkk lery djukA

ikuh dk ifjogu

dadj@ eqje feV~Vh esa

ikS/kkjksi.k djuk

4

6

Page 95: IWMP (2009-10) - I (BHAMOLAV)

la[;k yEckbZ pkSM+kbZ xgjkbZek=k

Je lkexzh

lfgr

dz-la- fooj.k njbdkbZ ek=k

6 la[;k 48000 48000 1.76 1.76

7

la[;k 16000 16000 1.22 1.22

7 100 ukspst

3300 3300 126.97 126.97

8100 ehVj 12000 12000 70.54 70.54

9fd-xzk- 4.125 4.125 0 50.00

10 fd-xzk- 160 160 0 50.00

11 fd-xzk- 160 160 18.34 18.3412 1000 ukspst 1554000 1554000 105.81 105.81

13 Nos 3285 3285 135.00 135.00

?kkl cht dh fder ¼/kke.k] LVkbZyksa bR;kfn½ ¼cktkj nj ls½

cht mipkj isysV cukus ¼fNMdko½ cht nj 6& 8 fdyks @ gS-

iks/kksa fuMkbZ xqMkbZ djukA 15 ls-eh- xgjkbZ rd rFkk 45 ls- eh- v)ZO;kl rd ( two times )

lhek Mksyh (Ditch cum Bund) uksfpax }kjk okfudh ikS/kks dh cqokbZ

¼cht mipkj lfgr½ c.M @ QjksZ ij ?kkl chtks dh cqokbZ ¼?kkl ,oa okfudh cht izkslksfi;l@ ikfdWax lksfu;k vkfn½

ikS/kks dks miyC/k ikuh fiykuk

?kkl chtks dh cqokbZ @ ysX;qe cht uksfpax }kjk

okfudh cht dh fder¼cktkj nj ls½

pkSdhnkjh dk;Z ifj;kstuk lekfIr rd¼rhu o"kZ rd½

mi ;ksx

dUVhtsUlh 3 izfr'kr

dqy ;ksx

Page 96: IWMP (2009-10) - I (BHAMOLAV)

Je lkexzh lfgr

1693.20 1693.20

2482.92 2482.92

13543.20 13543.20

99480.15 99480.15

jkf'k ¼:-esa½

99480.15 99480.15

286668.36 286668.36

43848.00 43848.00

126355.20 126355.20

0.00 26960.00

10000.00 10000.00

59400.00 59400.00

0.00 2672.00

2160.00 2160.00

4400.00 5940.00

16200.00 21900.00

3520.00 3520.00

14580.00 14580.00

0.00 11296.80

Page 97: IWMP (2009-10) - I (BHAMOLAV)

Je lkexzh lfgrjkf'k ¼:-esa½

84480.00 84480.00

19520.00 19520.00

4190.01 4190.01

8464.80 8464.80

0.00 206.25

0.00 8000.00

2934.40 2934.40

164428.74 164428.74

443475.00 443475.00

1411823.98 1468199.03

44045.97

1411823.98 1512245.00

1512200

1411800

100400

1512200

lkexzh

;ksx

JeSay.Rs.

Page 98: IWMP (2009-10) - I (BHAMOLAV)

ABSTRACT OF COST Name of watershed – Bhamolav I (IWMP) Name of Work – Household Production & Micro Enterprises Name of Village : Area:

S.No. Name of Activity Quntity

Unit

Rate

Amount

1. Service sector :- 1. Carpenter

No.

4000

2. Black smith

No. 6000

3. Cycle repair

No. 6000

4.Potten

No. 12000

5. Mason No.

2000

6. Foot wear

No. 12000

2.

Small Live Stock (25+1=26 No) (i) Sheep(20+1=21No.) (ii) Goat(10+1=11No.)

No. No.

38000 28000

3.

Other Micro Enterprises.

No.

L.S.

TOTAL

Page 99: IWMP (2009-10) - I (BHAMOLAV)

ABSTRACT OF COST Name of watershed – BhamolavI(IWMP) Name of Work – Live Stock Management Name of Village : Area:

S.No. Name of Activity Quantity

Unit

Rate

Amount

1. Animal Health Camp(One Day) (Medicine, Doctor Honorariums, Vehicle and Publicity Charges ) 10 No. 10000 100000.00

2

Manger(For Cattle Feeding ) No.

500

3

Buffalo Bulls Distribution 1 No. 70000

Total No.

12000