IOSC Brief to ASFO IOSC Brief to ASFO WorkshopWorkshop

8-9 Oct 088-9 Oct 08

IOSC Brief ASFO Workshop

8-9 Oct 08

Capt Wesley Traill

IOSC Brief ASFO Workshop

8-9 Oct 08

Capt Wesley Traill

AimAim

• Provide overview of IOSC activities

OutlineOutline

• Background

• Process

• Status

• Issues

• Alert Icing Operations

• Phase I Gap Analysis

• Way Ahead

• Question

BackgroundBackground

• Informal survey – Wing icing operations

• ARB directed stand-up of IOSC Jun 05• Mandate

• Articulate gaps in current de-icing program

• Explore need to introduce anti-icing fluids & associated operational procedures

• Report to ARB• Composition

• Executive• Four Working Groups

ProcessProcess

• Education– SCOUIC, Forum, Info on Web

• Identify gaps– Wing Requirements– Aircraft Certification Requirements – Current de-icing/anti-icing

capabilities

• Formulate way ahead

StatusStatus

• WG TORs drafted (to be staffed for approval)

• 2005 Matrices require validation– CP140 certified for anti-icing fluids– CC130 AMAF for anti-icing fluids in

progress– CC115 TBD– Alert De-icing vehicle

• Gap Analysis Phase 1 conducted (MOU TC)– 14 Wing survey

• On Target

IssuesIssues

• Staff• Funding• Alert icing operations• Phase 1 Gap Analysis:

– Program– Training & Proficiency– Audits– Fluids– Pubs– Environment– Infrastructure and Equipment

Alert Icing OperationsAlert Icing Operations

• Nil capability at Alert

• Options:– FEs continue to de-ice using

portable – unsat– Wings provide qualified tech to do

icing ops

– Contract out

Phase 1 Gap AnalysisPhase 1 Gap Analysis

• Program• *Progress contracts

for surveys, AGIP

• Training & Proficiency• *Progress training

contract for Oct• Identify recurrent

requirements

• Audit Requirements• AMSET, DTAES,

AFSO, SETs

• DTAES, ATESS

• AF Trg, A4 Maint, TRSET

• DTAES, A4 Maint, A3 Staff

Phase 1 Gap AnalysisPhase 1 Gap Analysis

• Fluids– QA/QC, Standing offers

• Environment

• Publications– C-82; P06; MAPS

• Contract vs CF– CF wide & keep a

deployed capability?

• 14 Wing

• QETE, A4 Maint, A4 Log

• A4 CE

• QETE, A4 Maint

• A3 Staff, A4 Staff

• W Comd

Way AheadWay Ahead

• Alert Icing Operations – Pursue options

• Phase 1 Gap Analysis – Letter for Comd signature – TD for response NLT 24 Oct 08– Brief ARB 5 Nov

• LOE– Surveys and draft AGIP– Training– National Contract

Questions ?Questions ?