28
NA FIS TD UPDATE 2010 1 INTERNATIONAL SKI FEDERATION Timing & Data

INTERNATIONAL SKI FEDERATION

Embed Size (px)

DESCRIPTION

INTERNATIONAL SKI FEDERATION. Timing & Data. Timing and Data Report Form Instructions. Equipment Race Level: NorAm Cup. Sys Timer A Sys Timer B Start Gate Finish Cell A Finish Cell B. Brand Name. Model or Type. Serial Number. Homologation #. Equipment. Software. Software & - PowerPoint PPT Presentation

Citation preview

NA FIS TD UPDATE 2010 1

INTERNATIONAL SKI FEDERATION

Timing & Data

NA FIS TD UPDATE 2010 2

Timing and Data Report FormInstructions

NA FIS TD UPDATE 2010 3

Equipment Race Level: NorAm Cup

Sys Timer ASys Timer BStart GateFinish Cell AFinish Cell B

• Brand Name • Model or Type• Serial Number

• Homologation #

NA FIS TD UPDATE 2010 4

Equipment

NA FIS TD UPDATE 2010 5

Software

Software &ResultsPreparation

BrandVersionDateResults=Tapes

dTrisRev. 1.99-1.448/8/2008yes

NA FIS TD UPDATE 2010 6

Connections

NA FIS TD UPDATE 2010 7

Check BEFORE the race(before Arrival at the venue)

Connections

How do we communicate signals/data from Start to Finish?

How is voice communication handled between Start and Finish?

CableRadioSnowmobileSki LiftSkier??

NA FIS TD UPDATE 2010 8

Timing Data

NA FIS TD UPDATE 2010 9

Warm-up and Synchronization

At what time is the run scheduled to start?

--Is there a rule about Synchronization?

--What is the minimum recommended warm up time?

Is there a Maximum?

NA FIS TD UPDATE 2010 10

What’s the Problem?

NA FIS TD UPDATE 2010 11

What’s the Problem?

NA FIS TD UPDATE 2010 12

Synchronization and Synch + 1 Minute

• Are Systems A and B synchronized?

– How close are they?

• What is the maximum difference acceptable?– So what?• What about Hand Times?

– So what?

NA FIS TD UPDATE 2010 13

NA FIS TD UPDATE 2010 14

What Would you Do?

NA FIS TD UPDATE 2010 15

What Would you Do?

NA FIS TD UPDATE 2010 16

What Would you Do?

NA FIS TD UPDATE 2010 17

NA FIS TD UPDATE 2010 18

Start and Finish InstallationsVarious Race Levels – You Guess

NA FIS TD UPDATE 2010 19

What’s the Race Level?Start Posts and Ramps

World Cup Regional FIS

NA FIS TD UPDATE 2010 20

What’s the Race Level?Start Posts and Ramps

World Cup

NA FIS TD UPDATE 2010 21

What’s the Race Level?Start Posts and Ramps

Regional FIS

NA FIS TD UPDATE 2010 22

Start Posts and RampsName the Problems

Wiring should be neat and not easily disturbed

Start should not easily obstruct the athlete and should be closer to the start posts

Start Posts Should be closer to the break over

Some kind of crowd control to separate the start area from the preparation area

Separation between end of wand and start post

NA FIS TD UPDATE 2010 23

NA FIS TD UPDATE 2010 24

What’s the Race Level?Finish Photocells, Posts and Areas

World Cup Regional FIS

NA FIS TD UPDATE 2010 25

What’s the Race Level?Finish Photocells, Posts and Areas

Regional FIS

NA FIS TD UPDATE 2010 26

Name the ProblemsFinish Photocells, Posts and Areas

Regional FIS

Fiberglass Start Posts(they last a long time, but OUCH)

No Notches

Horizontal Separation

No Finish Line

Metal Spool mounted on metal stake behind finish pad

NA FIS TD UPDATE 2010 27

NA FIS TD UPDATE 2010 28