8
Status Report William Parker Dan Edwards April 1, 2010

Innovative Pathways / ACE

  • Upload
    ewan

  • View
    80

  • Download
    0

Embed Size (px)

DESCRIPTION

Innovative Pathways / ACE. Status Report William Parker Dan Edwards April 1, 2010. Alternative Education Programs 7 District Options + 1 Court Option. 100. 15. Griscom Juvenile Detention Center 6-12 Juvenile Court Assignments. 200. 150. 150. 150. 400. Capacity. 30. - PowerPoint PPT Presentation

Citation preview

Page 1: Innovative Pathways / ACE

Status ReportWilliam ParkerDan EdwardsApril 1, 2010

Page 2: Innovative Pathways / ACE

04/20/232St. Louis Public Schools

Griscom Juvenile

Detention Center6-12

Juvenile Court Assignments

150

30

400

150

200

15

150

100

Capacity

Page 3: Innovative Pathways / ACE

Conferences/Parent Contacts

Parent and Student Contacts and Conferences for services 950 +

School Referrals to Innovative Pathways 844

Students assigned to alternative programs 556

Short-term suspensions – returned to school of origin 154

Out of school suspensions through end-of-year, 2009-2010 23

Conferences pending 43

04/20/23St. Louis Public Schools 3

Page 4: Innovative Pathways / ACE

Enrollment is variable throughout the school year as students are exited to conventional settings, graduate or exit / re-enter programs.

04/20/23 4St. Louis Public Schools

2009-2010Innovative Concepts

Alternative South

ACE/Alternative

Central

MO Options –

Fresh Start

Big Picture @ NW

Elementary Education Alternative @ Mullanphy

GriscomTotals

Students Served

273 378 590 644 17618 (9)

pending340 2416

Current Enrollment

124 152 375 268 124 9 43 1095

Attendance Percentage

76.14 76.18 80.51 65.71 89.12 Under review 100 ---

Graduates (projected)

1 0 192

70-100(42 currently

certified122 awaiting examination)

20 ( NA ) 0 283

Page 5: Innovative Pathways / ACE

04/20/23 5St. Louis Public Schools

2009-2010Innovative Concepts

Alternative South

ACEAlternative

Central

MO Options-

Fresh Start

Big Picture @ NW

Elementary Education Alternative @ Mullanphy

Griscom

Students Served

130 152 590 88 644 12419

(9 pending)27

Total Grades

862 601 2239Under review

Non-SIS 728Non-SIS Under review

156

A -B 315 /36.5% 85 / 14.1% 990 / 44.2% --- NA 345 / 47.4% --- 55/35.3%

C-D 352 / 40.8% 373 / 72% 772 / 34.5% --- NA 295 / 40.5% --- 90/57.7%

F 189 / 21.9% 143 / 23.8% 0 --- NA 86 / 11.8% --- 11/7.1%

I 6 / 0.7% 0 / 0 % 467 / 20.9 --- NA 2 / 0.3% --- 0 / 0

Page 6: Innovative Pathways / ACE

  Capacity

Enrollment Enrollment        

Site YR 2008 YR 2009 Aug 08 Aug 09 Sept 08 Sept 09 Oct 08 Oct 09 Nov 08 Nov 09 Dec 08 Dec 09

Ashland (08)/Northwest(09) 78 75 54 52 71 63 68 62 66 64 61 66

Sears II 78 75 72 59 75 71 63 71 68 71 63 65

Adult Basic Ed 50 50 50 37 48 35 47 40 44 42 44 40

Gateway 75 75 65 58 62 64 72 72 71 72 70 70

Humboldt (08)/Roosevelt (09) 45 50 38 28 39 47 43 47 43 47 42 46

Blow 75 75 66 52 73 56 70 69 71 69 69 72

                         

Total 401 400 345 286 368 336 363 361 363 365 349 359

04/20/23St. Louis Public Schools 6

Page 7: Innovative Pathways / ACE

ACE Two- Year Graduate Totals

176192

100

120

140

160

180

200

'08- '09 '09- '10Projected

78% 88%

50%

60%

70%

80%

90%

100%

'08- '09 '09- '10Projected

Percentage of Seniors Who Graduated

Persistence to Graduation Rates

High School 08-09 09-10 Projected

Beaumont 29 24

Carnahan 0 4

Central VPA 16 17

Cleveland 11 11

Gateway 24 27

Miller CA 8 6

Northwest 0 1

Roosevelt 18 39

Soldan 7 7

Sumner 28 33

Vashon 35 23

Page 8: Innovative Pathways / ACE

ACE has had 300 slots during the 07-08 school year and 400 during the past two years.

ACE has occupied four sites during the 07-08 school year and six during the past two years. The six locations are geographically arranged to be accessible to all areas of the city.

During the current year, ACE has incorporated two sites into existing high schools. Three additional comprehensive high schools are requesting on-campus sites of their own.