INITIAL ELECTRICAL ASSESSMENT REPORT (EAR) Factory Name: Gramtech Knitting & Dyeing Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj Dhaka Bangladesh Assessor: Bureau Veritas Date: 29 Mar 2014 Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com. The Alliance for Bangladesh Worker Safety Page 1/37

INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

INITIAL ELECTRICAL ASSESSMENT REPORT(EAR)

 

Factory Name: Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. NarayanganjNarayanganj Dhaka Bangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

 

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 1/37

Page 2: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

 Introduction to the Report

The following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by theAlliance for Bangladesh Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment wasconducted against the Alliance for Bangladesh Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard,which is harmonized with the factory assessment guidelines developed by Bangladesh University of Engineering and Technology (BUET) forthe Bangladesh National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technicalrequirements by which Bangladeshi Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairlyevaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used byRMG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on actionsteps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements throughtechnical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wagesupport for workers if factories are closed for remediation.

The contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute orcontinued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to providea non-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF northe Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report.

For more information and report feedback please go to: www.bangladeshworkersafety.org. 

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 2/37

Page 3: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

GENERAL INFORMATION 

General Information

Factory Name: Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj Dhaka Bangladesh

Country: Bangladesh

Province: Dhaka

City: Narayanganj

Zip Code:

Audit Duration: 1 Days

Re-Audit: Re-Audit After 0 Months

Draft Report Date : 04/09/2014

Final Report Date : 05/10/2014

Are all action items fromprevious assessmentcomplete? :

N/A

Buildings in Complex : 8 nos, 1. Main Factory Building of Gramtech Knit Dyeing Finishing and Garments Ind. Ltd (Building-01)-6Storied 2. Dyeing shed 3. Waiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generatorshed 8. ETP Building (2 storied)

Is the building(s) ownedor rented by theFactory?:

Owned

Number of BuildingLevels (Stories) :

1. Main Factory Building: height: 22.40 m (73.51 ft) (6 storied). stories above grade: 6 stories below grade: 0Occupied levels: 6 2. Dyeing shed: height: 8.15 m (26.75 ft) (Single storied with mezzanine floor). storiesabove grade: 1 stories below grade: 0 Occupied levels: 1

Approximate BuildingArea (SF) :

1. Main Factory Building : 1,61,010 SF

Date of BuildingConstruction :

1st phase: 2006-2007 (Up to 3 storied); 2nd phase: 2011-2012 (3rd to 5th floor)

Date of Last BuildingRenovation/Addition :

2012

Ancillary Structures inComplex :

07 nos, 1. Generator shed 2. Compressor shed 3. Boiler shed-01 4. Boiler shed-02 5. Waiting shed 6. ETPBuilding (2 storied) 7. Water Treatment plant [WTP]

Approximate Ancillary 7593

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 3/37

Page 4: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Structures Area (SF) :

Number of Occupants : Total occupant: 1738, 1. Main Factory Buildings: 40 (ground floor), 250 (1st floor), 450 (2nd floor), 450 (3rdfloor), 250 (4th floor), 40 (5th floor). 2. Dyeing shed: 250 3. Ancillary structures: 8

 

 

 

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 4/37

Page 5: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

ASSESSMENT FINDINGS 

Electrical System Information

Question: Are as-built electrical drawings indicating information such as panel and circuitlocations throughout the building(s) available for review?

 

Priority Level: High

Non-Compliance Level: 2

Description: They have electrical drawing but not as-built. Proper Working or “as built”electrical diagram of main distribution circuit and floor levels circuitsconnecting electrical loads (machines/lights/cooling system etc.) are notavailable at site.

Source of Findings: Document Review: No as-built electrical drawing was found.

Suggested Plan ofAction:

Prepare an approved “as built” electrical diagram.

Suggested DeadlineDate:

02 Jun 2014

Standard: Alliance Standard Part 10 Section 10.3.7

Question: Provide brief description of the electrical system for each building.  

Priority Level:

Non-Compliance Level:

Description: 3x50 KVA REB Pole mounted X-Former, 90KVAr-PFI-1, (GG1 & GG2-2x770KW), 450KVAr-PFI-2, (DG-360KVA) connected to REB with 11KV line.LT Panels. Then each floor having MDB/DB/SDB.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Include the number of services, redundancy, capacity, and general condition ofthe electrical system.

Electrical System Maintenance

Question: Is a periodical Insulation Resistance Measurement Program established andrecorded?

 

Priority Level: Medium

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 5/37

Page 6: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Non-Compliance Level: 3

Description: No periodical Insulation Resistance Measurement Program established.

Source of Findings: Document Review: No periodical Insulation Resistance MeasurementProgram.

Suggested Plan ofAction:

Develop an Insulation Resistance Measurement Program that ensuresdeterioration of insulation resistance will be identified quickly. Testing shouldbe in compliance with InterNational Electrical Testing Association (NETA). Alltransformers, switchgears etc. shall be subject to an insulation resistancemeasurement test to ground after installation but before any wiring isconnected. Insulation tests shall be made between open contacts of circuitbreakers, switches etc. and between each phase and earth

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard Part 10 Section 10.13.4 Insulation Tests and 10.13.8Electrical Inspections

Question: Are records concerning the testing and inspection of the electrical systemsmaintained on site and up to date?

 

Priority Level: Medium

Non-Compliance Level: 3

Description: Records concerning the testing and inspection of the electrical systems are notmaintained on site.

Source of Findings: Document Review: No testing and inspection records of the electrical systems

Suggested Plan ofAction:

Develop an electrical maintenance program that includes inspections andtesting of the electrical systems. Reference NFPA 70 for example programrequirements

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.13.8 Electrical Inspections

Question: Are thermographic scans of electrical equipment completed at least everythree years?

 

Priority Level: Medium

Non-Compliance Level: 3

Description: Thermographic scans of electrical equipment are not completed.

Source of Findings: Document Review: No thermographic scans for electrical equipment.

Suggested Plan ofAction:

Complete thermographic scans at least on a three year cycle. Thermographicscans should be completed in accordance with the Standard for InfraredInspection of Electrical Systems & Rotating Equipment and NFPA70B or a

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 6/37

Page 7: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

comparable standard.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.13.8 Electrical Inspections

Question: Have items identified in previous thermographic inspection reports beenaddressed?

 

Priority Level: Medium

Non-Compliance Level:

Description: No thermographic scans for electrical equipments.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Not Applicable

Question: A transformer oil analysis is routinely completed on main service transformers.  

Priority Level: Low

Non-Compliance Level:

Description: The factory does not own transformer.The main service connection was takenfrom REB/PBS. Transformer bank (3x50KVA)-pole mounted.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standard Part 10 Section 10.13.8 Electrical Inspections

Question: Transformers do not contain harmful substances such as PCBs.  

Priority Level: Medium

Non-Compliance Level:

Description: The factory have no own transformer.The main service connection was takenfrom REB/PBS. Transformer bank (3x50KVA)-pole mounted.

Source of Findings:

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 7/37

Page 8: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Not Applicable

Question: Have workers that operate and maintain the electrical system receivedelectrical safety training? Is training documentation on site?

 

Priority Level: High

Non-Compliance Level: 3

Description: Workers that operate and maintain the electrical system have not receivedelectrical safety training.

Source of Findings: Worker Interviews: No electrical safety training

Suggested Plan ofAction:

Develop and implement an electrical safety program. Include key topes suchas lock out tag out procedures, personal protective equipment requirements,etc. Reference NFPA 70e for example program requirements.

Suggested DeadlineDate:

02 Jul 2014

Standard: Reference NFPA 70e for example

Question: Are periodic safety inspections of the electrical system components completedand documented?

 

Priority Level: Medium

Non-Compliance Level: 3

Description: No periodic safety inspections of the electrical system components iscompleted.

Source of Findings: Document Review: No periodic safety inspections of the electrical system.

Suggested Plan ofAction:

Establish a periodic inspection program to ensure the electrical systems arefree from damage, debris, dirt, lint, etc. Maintain records concerninginspections and follow up actions.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard Part 10 Section 10.13 Inspection and Testing and Part 13Section 13.6 Housekeeping

Question: Is the electrical switchgear and panel boards inspected on an annual basis toensure that the equipment is installed in accordance with the listed ratings?

 

Priority Level: Medium

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 8/37

Page 9: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Non-Compliance Level: 3

Description: The electrical switch-gear and panel boards are not inspected on an annualbasis to ensure that the equipment is installed in accordance with the listedratings.

Source of Findings: Document Review: No annual inspection record for electrical switch-gear andpanel boards.

Suggested Plan ofAction:

Inspect electrical switch-gear and panel boards on an annual basis to ensurethat the equipment is in good working condition.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.13.8 Electrical Inspections

Electrical System Conditions

Question: Are electrical insulation mats provided in front of substation, switchboardsand/or distribution boards?

 

Priority Level: Low

Non-Compliance Level: 1

Description: Electrical insulation mats provided are not sufficient (graded but inadequatesize) in front of substation and distribution boards.

Source of Findings: Photograph: Insufficient mats provided in front of distribution boards andsubstation.

Suggested Plan ofAction:

Provide electrical insulation mats in front of distribution boards.

Suggested DeadlineDate:

04 Jun 2014

Standard: Alliance Standard Part 10 Section 10.13.7 Inspection of the Installation.

Question: Are overhead service connections achieved with covered conductors?  

Priority Level: High

Non-Compliance Level:

Description: Overhead service connections are achieved with covered conductors.

Source of Findings: Visual Assessment: Covered conductors for overhead service connections.

Suggested Plan ofAction:

Suggested DeadlineDate:

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 9/37

Page 10: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Standard: Alliance Standards Part 10 Section 10.3.10 Service Entry

Question: Power and telecommunication or antenna cables are led in separately.  

Priority Level: Medium

Non-Compliance Level: 2

Description: Power and telecommunication or antenna cables are not led in separately.Location: Boiler Room-Outside corner-CCTV

Source of Findings: Photograph: Power and telecommunication cables are not separated.

Suggested Plan ofAction:

Led telecommunication or antenna cables separately to the main point ofservice. Power and telecommunications cables must have separate entrance.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3.10 Service Entry

Question: Underground service cables are laid in conformity with the requirements ofconcealed wiring.

 

Priority Level: High

Non-Compliance Level:

Description: There is no underground service cable in the factory.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 10 Section 10.3.10 Service Entry

Question: Physical location of Substation?  

Priority Level:

Non-Compliance Level:

Description: Ancillary building attached with Generator room.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 10/37

Page 11: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Standard:

Question: No foreign utilities are routed through the substation room (wet pipes).  

Priority Level: High

Non-Compliance Level:

Description: Foreign utilities (Gas Line/ Water Line/ etc.) are not routed through thesubstation room.

Source of Findings: Visual Assessment: Foreign utilities were not found in the substation room.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standard Part 10 Part 10.3.4 External Influences

Question: The substation room is clean and free from dirt, lint, water, oil, and debris.  

Priority Level: Medium

Non-Compliance Level: 2

Description: Substation room is not clean and free from dirt, lint, debris. Location:Substation room

Source of Findings: Photograph: Substation room is not clean.

Suggested Plan ofAction:

Remove all dirt, debris, lint, water, oil, and improperly stored materials from thesubstation room.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard Part 13 Section 13.6.2

Question: The substation room has adequate ventilation.  

Priority Level: Medium

Non-Compliance Level:

Description: Sufficient window type air condition is installed.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 11/37

Page 12: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Standard: Alliance Standard Part 10 Section 10.13.7.1 Inspection of SubstationInstallations.

Question: The substation room has the required fire rating/protection and is physicallyseparated from the remainder of the building.

 

Priority Level: High

Non-Compliance Level: 2

Description: The substation room is physically separated from the remainder of the buildingbut has no required fire rating and protection.

Source of Findings: Photograph: No fire rating and protection.

Suggested Plan ofAction:

Provide adequate fire rating and protection for substation room and make itseparated from rest of the building.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard Part 3 Section 3.4.2.1.4

Question: Combustible materials are not stored within the substation room.  

Priority Level: High

Non-Compliance Level: 3

Description: Combustible materials are stored within the substation room.

Source of Findings: Photograph: Combustible materials found in substation room.

Suggested Plan ofAction:

Remove all combustible materials within the substation room.

Suggested DeadlineDate:

08 May 2014

Standard: Not Applicable

Question: Required equipment and safety signage is posted within the room.  

Priority Level: Low

Non-Compliance Level: 3

Description: Required equipment and safety signage is not posted within the room.

Source of Findings: Visual Assessment: Required equipment and safety signage is not foundwithin the room.

Suggested Plan ofAction:

Make sure required equipment and safety signage is posted within the room.

Suggested Deadline 07 Jun 2014

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 12/37

Page 13: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Date:

Standard: Alliance Standard Part 10 Section 10.3.7, Section 10.7.3, and 10.13.7, NFPA70 Chapter 1 Article 110.21, and Bangladesh Electricity Rules of 1937 Rule 46

Question: An instruction board for first aid and artificial respiration is located in thegenerator room and substation room.

 

Priority Level: Low

Non-Compliance Level: 3

Description: Instruction board for first aid and artificial respiration is not located insubstation room.

Source of Findings: Photograph: No instruction board for first aid and artificial respiration.

Suggested Plan ofAction:

Provide Instruction board for first aid and artificial respiration in substationroom.

Suggested DeadlineDate:

04 Jun 2014

Standard: A sign detailing electrical shock first aid procedures should be installed inthese rooms.

Question: The substation room has adequate illumination levels.  

Priority Level: Medium

Non-Compliance Level:

Description: The substation room is illuminated properly.

Source of Findings: Photograph: The substation room is illuminated properly.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standard Part 10 Section 10.13.7.1 Inspection of SubstationInstallations.

Question: The substation room has adequate means of security.  

Priority Level: Medium

Non-Compliance Level:

Description: The substation room is properly secured.

Source of Findings: Photograph: The substation room is properly secured.

Suggested Plan of

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 13/37

Page 14: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Action:

Suggested DeadlineDate:

Standard: Alliance Standard Part 10 Section 10.13.7.1 Inspection of SubstationInstallations.

Question: Transformers are properly grounded (earthed).  

Priority Level: Medium

Non-Compliance Level:

Description: The factory does not own the transformer. The main service connection wastaken from REB/PBS. Transformer bank (3x50KVA)-pole mounted.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 10 Section 10.5 Substation

Question: All equipment is efficiently earthed and properly connected to the requirednumber of earth electrodes.

 

Priority Level: High

Non-Compliance Level: 2

Description: Electrical equipment is not efficiently earthed and properly connected to therequired number of earth electrodes. Location: Substation Room, inside theCable trench.

Source of Findings: Photograph: Inadequate equipment earthing.

Suggested Plan ofAction:

Provide earthing of equipment at required locations and connect to requirednumber of electrodes. Refer to the BNBG for required number of electrodes.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard Part 10 Section 10.13.7.1 Inspection of SubstationInstallations.

Question: Wet type transformers are not leaking and have appropriate levels.  

Priority Level: High

Non-Compliance Level:

Description: The factory does not own the transformer. The main service connection was

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 14/37

Page 15: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

taken from REB/PBS. Transformer bank (3x50KVA)-pole mounted.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 10 Section 10.5 Substation

Question: Transformers with large oil content are provided with soak pits.  

Priority Level: Medium

Non-Compliance Level:

Description: The factory does not own the transformer. The main service connection wastaken from REB/PBS. Transformer bank (3x50KVA)-pole mounted.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 10 Section 10.5 Substation

Question: Is a readily accessible single point of disconnect provided for each mainelectrical service feed?

 

Priority Level: High

Non-Compliance Level:

Description: Readily accessible single point of disconnect is provided for each mainelectrical service feed.

Source of Findings: Photograph: Readily accessible single point of disconnect is provided for eachmain electrical service feed.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: BNBC 2.7.5 Main Switch and Switchboards

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 15/37

Page 16: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Question: Are meters and other electrical devices (Ammeter, Voltmeter, PFI AutoController, etc) installed on the main electrical equipment operational?

 

Priority Level: Low

Non-Compliance Level: 1

Description: Meters and other electrical devices (Ammeter, Voltmeter, PFI Auto Controlleretc) are not installed on the main electrical equipment. Location: 5th floor-Sample Sec-MDB-15, GF-Knitting-MDB-11, MDB-03-Pump-Generator room

Source of Findings: Photograph: No meters and other electrical devices (Ammeter, Voltmeter, PFIAuto Controller etc) are installed.

Suggested Plan ofAction:

Ensure meters and other electrical devices installed on the main electricalequipment are operational.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard 10.13.7 Inspection of the Installation

Question: Do switchboards and/or distribution boards have a minimum clearance of 1 m(39 in) in front?

 

Priority Level: High

Non-Compliance Level:

Description: Distribution boards are provided with adequate clearance.

Source of Findings: Photograph: Distribution boards are provided with adequate clearance.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 16/37

Page 17: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Question: Are all switchboards and/or distribution boards metal enclosed with a deadfront construction?

 

 

Priority Level: High

Non-Compliance Level: 1

Description: Distribution boards are not metal enclosed and without dead front construction.Locations: Left-Side wall Sub-Station room, LT Garments-GF.

Source of Findings: Photograph: 1) No metal enclosure. 2) No dead front construction.

Suggested Plan ofAction:

Ensure Distribution boards are not metal enclosed with a dead frontconstruction.

Suggested DeadlineDate:

04 Jun 2014

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Are all internal components of switchboards and/or distribution boards properlyconcealed (No missing circuit breaker or knockout covers)?

 

Priority Level: Medium

Non-Compliance Level: 1

Description: Internal components of distribution boards are not properly concealed.Locations: PFI- Substation room, DB13-12-Second floor-Sewing.

Source of Findings: Photograph: Internal components are not properly concealed.

Suggested Plan ofAction:

Provide covers or blanks to conceal all live internal components of distributionboards.

Suggested DeadlineDate:

04 Jun 2014

Standard: Alliance Standard Part 10 Section 10.3.9 Sub-Distribution Boards

Question: Are all switchboards and/or distribution boards properly grounded (earthed)?  

Priority Level: Medium

Non-Compliance Level:

Description: Distribution boards are properly grounded (earthed).

Source of Findings: Photograph: Distribution boards are properly grounded (earthed).

Suggested Plan ofAction:

Suggested DeadlineDate:

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 17/37

Page 18: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Standard: Alliance Standard Part 10 Section 10.10.2 Circuit and System Earthing

Question: Do switchboards and/or distribution boards have clear identification markings?  

Priority Level: Medium

Non-Compliance Level: 3

Description: Distribution boards have no adequate clear identificationmarkings.Identification marks are not painted. Locations: All DBs

Source of Findings: Photograph: No adequate clear identification markings.

Suggested Plan ofAction:

As per BNBC section 2.11.5.4 ensure clear and permanent identificationmarks are painted in all distribution boards, switchboards, sub main boardsand switches.

Suggested DeadlineDate:

04 Jun 2014

Standard: Alliance Standard Part 10 Section 10.7 BNBC Part 8 Section 2.11.5.4

Question: Do switchboards and/or distribution boards have capacity information labels?  

Priority Level: Medium

Non-Compliance Level: 3

Description: Distribution boards have no capacity information labels. MDB-05-DyeingFinishing & All Panel boards.

Source of Findings: Photograph: No DB capacity information labels.

Suggested Plan ofAction:

Provide capacity information labels for distribution boards.

Suggested DeadlineDate:

18 Jun 2014

Standard: Alliance Standard Part 10 Section 10.7 Main Switch, Switchboards And MetalClad Switchgear and 10.13.7 Inspection of the Installation

Question: Are switchboards and/or distribution boards installed in compliant locations?  

Priority Level: High

Non-Compliance Level:

Description: Distribution boards are installed in compliant locations.

Source of Findings: Photograph: Distribution boards are installed in compliant locations.

Suggested Plan ofAction:

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 18/37

Page 19: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Suggested DeadlineDate:

Standard: Alliance Standard Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Are switchboards and/or distribution boards free of dust and debris?  

Priority Level: Medium

Non-Compliance Level: 1

Description: Distribution boards are not clean. Location: LT- Garments-GF, LT-SubStation

Source of Findings: Photograph: Dirt and debris found in distribution boards.

Suggested Plan ofAction:

Ensure distribution boards free of dirt and debris.

Suggested DeadlineDate:

04 Jun 2014

Standard: Alliance Standard Part 10 Section 10.3.9.1 Enclosures

Question: Switchboards and/or panelboards are not installed above gas stoves or sinksor within 2.5m of any washing unit in washing rooms or laundries.

 

Priority Level: High

Non-Compliance Level: 1

Description: Panel-boards are installed near sink. Location: 3rd floor-Sewing-Left side wall

Source of Findings: Photograph: Panel boards installed in improper location.

Suggested Plan ofAction:

Ensure panelboard are not installed above gas stoves or sinks or within 2.5mof any washing unit in washing rooms or laundries.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: Are switchboards and/or distribution boards provided with physical means toprevent the installation of more over current devices than that number forwhich the panel board was designed, rated, and listed.

 

Priority Level: Medium

Non-Compliance Level: 3

Description: Distribution boards are not provided with physical means to prevent theinstallation of more over current devices than that number for which the panelboard was designed, rated, and listed. Locations: All DBs

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 19/37

Page 20: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Source of Findings: Photograph: No means to prevent the installation of more over currentdevices.

Suggested Plan ofAction:

Ensure distribution boards provided with physical means to prevent theinstallation of more over current devices than that number for which the panelboard was designed, rated, and listed.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.7 Main Switch, Switchboards and MetalClad Switchgear

Question: No circuits are drawn for loads without the incorporation of a overcurrentprotection device (circuit breaker).

 

Priority Level: High

Non-Compliance Level: 1

Description: Circuits are drawn for loads without the incorporation of over-current protectiondevice (circuit breaker). Location: SDB-5/11-1st floor Finishing

Source of Findings: Photograph: No protection device.

Suggested Plan ofAction:

Ensure over-current protection device (circuit breaker) for each and everyloads.

Suggested DeadlineDate:

18 Jun 2014

Standard: Alliance Standards Part 10 Section 10.9 Protection of Circuits

Question: Indications of overheating, overloading, or signs of burning were not observed.  

 

 

Priority Level: High

Non-Compliance Level: 1

Description: 1. Indications of overheating (critical temperature more than 90° C). location:(1) SS, COS-Gen (2) Boiler Room, SDB-Sub (3) Boiler Room, MDB-4(left) (4)Compressor Room, SDB-Compressor (5) Garments Building/GF, LT-2 (6) 1stFloor/Finishing Sec, SDB-02/11 (7) 1st Floor/Finishing Sec, SDB-03/11 (8) 1stFloor/Finishing Sec, SDB-06/11 (9) 2nd Floor/Sewing Sec, SDB-01/12 (10)2nd Floor/Sewing Sec, SDB-03/12 (11) 2nd Floor/Sewing Sec, SDB-04/12(12) 2nd Floor/Sewing Sec, SDB-12/12 (13) 2nd Floor/Sewing Sec, SDB-14/12 (14) 3rd Floor/Sewing Sec, MDB-13 (15) 4th Floor/Cutting Sec, MDB-14(16) 4th Floor/Cutting Sec, SDB-02/14 (17) 4th Floor/Cutting Sec, SDB-03/142. Signs of burning were observed. Location: Second floor, Sewing section

Source of Findings: Photograph: Indications of overheating and signs of burning.

Suggested Plan ofAction:

Findout the cause of overheating, overloading, or signs of burning and takeproper action.

Suggested Deadline 08 May 2014

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 20/37

Page 21: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Date:

Standard: Alliance Standard Part 10 Section 10.3.5

Question: Each circuit is provided with a dedicated neutral.  

Priority Level: Medium

Non-Compliance Level: 3

Description: Each circuit is not provided with a dedicated neutral. Locations: All DBs

Source of Findings: Photograph: No dedicated neutral.

Suggested Plan ofAction:

Provide dedicated neutral for each circuit.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3 Electrical Wiring and Cabling

Question: Are lighting and receptacle (socket) circuits segregated?  

Priority Level: Medium

Non-Compliance Level: 1

Description: Lighting and socket are not separated. Location: Boiler Room; 5th floor , officearea, Garments Building; office area, mezzanine floor, Dyeing shed.

Source of Findings: Photograph: Lighting and socket are not separated.

Suggested Plan ofAction:

Lighting and socket circuits must be separated at the noted locations. Have aqualified electrician separate the lighting and sockets into separate circuits.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard Part 10 Section 10.3.7.2

Question: Are electrical wiring/cables properly identified?  

Priority Level: Medium

Non-Compliance Level: 3

Description: Electrical cables are not properly identified. All DBs

Source of Findings: Photograph: Electrical cables are not identified.

Suggested Plan ofAction:

Identify electrical cables properly.

Suggested DeadlineDate:

02 Jul 2014

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 21/37

Page 22: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Standard: Bangladesh Electricity Rules 1937 Rule 51 and 56

Question: Is electrical wiring/cables sized according to capacity of circuit breakers (Nohigher rated circuit breakers with lower rated wiring)?

 

Priority Level: High

Non-Compliance Level: 1

Description: Electrical cables are not sized according to capacity of circuit breakers.Location: LT-Garments-GF

Source of Findings: Photograph: Higher rated circuit breakers with lower rated cables.

Suggested Plan ofAction:

Consult with a qualified Electrical Engineer and ensure electrical cables aresized according to capacity of circuit breakers.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard Part 10 Section 10.3.1 Electrical Connections.

Question: No multi looping of wiring/cables observed at circuit breakers withinswitchboards and/or distribution boards.

 

Priority Level: High

Non-Compliance Level: 1

Description: Multi looping of cables observed at circuit breakers within distribution boards.Location: Boiler Room-Control Panel

Source of Findings: Photograph: Multi looping of cables at circuit breakers.

Suggested Plan ofAction:

Remove multi looping of wiring/cables at circuit breakers within switchboardsand/or distribution boards.

Suggested DeadlineDate:

18 Jun 2014

Standard: Alliance Standard Part 10 Section 10.3 Electrical Wiring and Cabling

Question: Phase separators are provided between terminals on circuit breakers.  

Priority Level: Low

Non-Compliance Level: 1

Description: Phase separators are not provided between terminals on circuit breakers.Location: LT Panel -Sub Station Room

Source of Findings: Photograph: No phase separators.

Suggested Plan ofAction:

Install phase separators between terminal connections at the noted locations.

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 22/37

Page 23: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard Part 10 Section 10.3.1 Electrical Connections

Question: A wire/cable shaft is provided for the whole building. Wiring and cables arearranged in shaft for ease of inspection and maintenance.

 

Priority Level: Medium

Non-Compliance Level:

Description: Building is five storied. No need to provide wire/cable shaft.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: BNBC Part 8 Section 2.5.6.1

Question: Conduit expansion fittings are used for conduit runs that span a buildingexpansion joint.

 

Priority Level: Medium

Non-Compliance Level:

Description: No expansion to another building.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 10 Section 10.3.8.5 Expansion Joints

Question: Electrical wiring and conduit is properly supported.  

Priority Level: Medium

Non-Compliance Level: 1

Description: Electrical wiring and conduit is not properly supported. Location: Checkingtable area, Dyeing Shed; Compressor Room.

Source of Findings: Photograph: Inadequate cable support.

Suggested Plan of Provide adequate supports for electrical wiring and conduit.

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 23/37

Page 24: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Action:

Suggested DeadlineDate:

18 Jun 2014

Standard: Alliance Standard Part 10 Section 10.3.2, 10.3.4.3, and 10.3.5

Question: Stranded conductors having a nominal cross-sectional area 6mm2 or greaterare provided with cable sockets. Conductors below 6 mm2 without cablesockets, all strands at the exposed ends are soldered together or are crimpedusing suitable sleeve or ferrules.

 

Priority Level: Medium

Non-Compliance Level: 1

Description: Cable sockets are not provided for stranded conductors. location: MDB7-2ndfloor Sewing section.

Source of Findings: Photograph: No cable socket.

Suggested Plan ofAction:

Provide cable sockets for stranded conductors having a nominal cross-sectional area 6mm2 or greater.

Suggested DeadlineDate:

18 Jun 2014

Standard: Alliance Standards Part 10 Section 10.3.8.3 Cable Ends

Question: Cable joints are through porcelain/PVC connectors with PIB tape woundaround joint.

 

Priority Level: Medium

Non-Compliance Level: 1

Description: Improper cable joints were found. Location: ETP-1st floor Pump1, ETP-1stfloor Pump2.

Source of Findings: Photograph: Improper cable joint.

Suggested Plan ofAction:

Ensure cable joints through porcelain/PVC connectors with PIB tape woundaround joint.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3.8.4 Cable Joints

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 24/37

Page 25: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Question: All metal in the building is connected to the building earthing/grounding systemsuch as metal rebar in concrete, metal frame of building, or metal water pipe.

 

Priority Level: High

Non-Compliance Level: 3

Description: Not all metal in the building is connected to the building earthing/groundingsystem such as metal rebar in concrete, metal frame of building, or metalwater pipe. Location: Roof -Garments Building

Source of Findings: Photograph: Not all metal in the building is connected to the building earthing.

Suggested Plan ofAction:

Connect all metal in the building to the building earthing/grounding systemsuch as metal rebar in concrete, metal frame of building, or metal water pipe.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard Part 10 Section 10.10 Earthing

Question: Lighting fixtures are supported from the structure and seismic bracing isinstalled as required.

 

Priority Level: Medium

Non-Compliance Level:

Description: Lighting fixtures are supported properly.

Source of Findings: Photograph: Lighting fixtures are supported properly.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 10 Section 10.3.6 Lighting Fittings

Question: Signage indicating the prohibition of light fixtures without protective covers isinstalled at required locations.

 

Priority Level: Low

Non-Compliance Level: 1

Description: No signage indicating the prohibition of light fixtures without protective coversis installed at required locations. Location: 5th floor, Storage Section.

Source of Findings: Photograph: No signage indicating the prohibition of installation of naked lightfixtures

Suggested Plan ofAction:

Ensure Signage indicating the prohibition of light fixtures without protectivecovers is installed at required locations.

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 25/37

Page 26: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Suggested DeadlineDate:

04 Jun 2014

Standard: Alliance Standards Part 10 Section 10.15 Naked Lights

Question: Light fixtures without protective covers are not installed in storage areas or inany area where the Inspector of the Factories Rules (1.5.3.5) Part 53 disallowsthese fixtures.

 

Priority Level: High

Non-Compliance Level: 1

Description: Light fixtures without protective covers are installed in storage areas. Location:5th floor, Storage Section.

Source of Findings: Photograph: Naked light fixtures installed in storage areas.

Suggested Plan ofAction:

Ensure electrical connections at equipment, fixtures, etc are properly secured.

Suggested DeadlineDate:

08 May 2014

Standard: Alliance Standards Part 10 Section 10.15 Naked Lights

Question: Electrical connections at equipment, fixtures, etc are properly secured.  

Priority Level: Medium

Non-Compliance Level: 1

Description: Electrical connections at equipment, fixtures, etc are not properly secured.Location: Compressor room -EF Connection

Source of Findings: Photograph: Electrical connections are not secured.

Suggested Plan ofAction:

Ensure electrical connections at equipment, fixtures, etc are properly secured.

Suggested DeadlineDate:

18 Jun 2014

Standard: Alliance Standards Part 10 Section 10.3.1 Electrical Connections

Question: Is all electrical wiring/cable properly terminated at its point of termination (Noun-terminated wires, lugs are provided at terminals, etc)?

 

Priority Level: Medium

Non-Compliance Level: 1

Description: Electrical cable is not properly terminated. Location: ETP-1st floor-Pump2

Source of Findings: Photograph: Un-terminated cables.

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 26/37

Page 27: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Suggested Plan ofAction:

Ensure all electrical cable properly terminated at its point of termination.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.3.9.2 Wiring of Sub-distribution Boards

Question: Are earthing connections provided at electrical equipment?  

Priority Level: High

Non-Compliance Level:

Description: Earthing connections provided at electrical equipment.

Source of Findings: Photograph: Earthing connections provided at electrical equipment.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standard Part 10 Section 10.7.9 and 10.10 Earthing.

Question: Shielding or additional insulation is provided for wiring exposed to externalheat sources.

 

Priority Level: High

Non-Compliance Level: 1

Description: No additional insulation is provided for wiring exposed to external heatsources. Location: Boiler Room.

Source of Findings: Photograph: Inadequate insulation.

Suggested Plan ofAction:

Provide Shielding/ additional insulation for wiring exposed to external heatsources.

Suggested DeadlineDate:

18 Jun 2014

Standard: Alliance Standards Part 10 Section 10.3.4.2 External heat sources.

Question: Wiring systems are selected and erected so that no damage is caused by theingress of water.

 

Priority Level: High

Non-Compliance Level: 1

Description: Wiring systems are not selected and erected considering the effect of damagecaused by ingress of water. Location: Out side wall, ETP; Wall, Main Gate; outside wall, Compressor room.

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 27/37

Page 28: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Source of Findings: Photograph: Damage due to ingress of water.

Suggested Plan ofAction:

Ensure wiring systems are selected and erected so that no damage is causedby the ingress of water.

Suggested DeadlineDate:

18 Jun 2014

Standard: Alliance Standards Part 10 Section 10.3.4.3 Presence of Water

Question: Are junction boxes and other electrical devices provided with covers?  

Priority Level: Medium

Non-Compliance Level:

Description: Junction boxes and other electrical devices are provided with covers.

Source of Findings: Visual Assessment: Adequate electrical cover.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standard Part 10 Section 10.3.5 and 13.6.2

Question: Mechanical guards are provided for electrical equipment and wiring wherenecessary.

 

Priority Level: Medium

Non-Compliance Level: 1

Description: No mechanical guards are provided for electrical equipment where necessary.Location: Air Compressor room.

Source of Findings: Photograph: No mechanical guards.

Suggested Plan ofAction:

Provide mechanical guards for electrical equipment where necessary.

Suggested DeadlineDate:

04 Jun 2014

Standard: Alliance Standard Part 10 Section 10.3 Electrical Wiring and Cabling, 10.6.5Cables, and 10.7 Main Switch, Switchboards And Metal Clad Switchgear

Question: Are there additional areas of non-compliance to report?  

Priority Level: Medium

Non-Compliance Level:

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 28/37

Page 29: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Description: There is no additional area of non-compliance to report.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Not Applicable

Emergency Power System

Question: Is the building provided with an emergency power generator?  

Priority Level: High

Non-Compliance Level:

Description: The building is provided with two emergency power generators.

Source of Findings: Visual Assessment: Two emergency power generators.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard:

Question: Are inspection, maintenance, and testing procedures of the emergencygenerator being completed and documented?

 

Priority Level: Low

Non-Compliance Level:

Description: Inspection, maintenance, and testing procedures of the emergency generatorare being completed and documented.

Source of Findings: Document Review: Inspection, maintenance, and testing procedures of theemergency generator are being completed and documented.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: NFPA 110 Chapter 8

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 29/37

Page 30: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Question: Is the generator room properly rated and physically separated from theremainder of the building?

 

Priority Level: High

Non-Compliance Level: 3

Description: The generator room physically separated from the remainder of the buildingbut no fire rated wall.

Source of Findings: Photograph: Generator room is not rated.

Suggested Plan ofAction:

Ensure the generator room properly rated and physically separated from theremainder of the building.

Suggested DeadlineDate:

18 Jun 2014

Standard: Alliance Standards Part 10 Section 10.8.4 Generator Room

Question: Is the generator room clean and free of dirt, debris, and improperly storedmaterials?

 

Priority Level: High

Non-Compliance Level:

Description: Generator room is clean.

Source of Findings: Photograph: Generator room is clean.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 10 Section 10.8.4 Generator Room

Question: Is the generator exhaust discharged to the exterior of the building in a safelocation

 

Priority Level: High

Non-Compliance Level:

Description: The generator exhaust discharged to the exterior of the building in a safelocation.

Source of Findings: Photograph: The generator exhaust discharged to the exterior of the buildingin a safe location.

Suggested Plan ofAction:

Suggested Deadline

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 30/37

Page 31: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Date:

Standard: Alliance Standards Part 3 Section 3.4.2.1.3 Generators

Question: Is the generator frame earthing (grounding) provided at two separate points?  

Priority Level: Medium

Non-Compliance Level:

Description: The generator frame earthing (grounding) provided at two separate points.

Source of Findings: Photograph: Generator frame earthing.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standard 10.8.2.2

Question: Is the generator room properly ventilated  

Priority Level: High

Non-Compliance Level:

Description: The generator room is properly ventilated.

Source of Findings: Photograph: Proper ventilation in generator room.

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 10 Section 10.8.4 Generator Room

Question: Is the generator room properly illuminated?  

Priority Level: Medium

Non-Compliance Level:

Description: The generator room is properly illuminated.

Source of Findings: Photograph: The generator room is properly illuminated.

Suggested Plan ofAction:

Suggested DeadlineDate:

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 31/37

Page 32: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Standard: Alliance Standards Part 10 Section 10.8.4 Generator Room

Question: Is the appropriate type and number of firefighting equipment installed insidethe generator room?

 

Priority Level: Low

Non-Compliance Level: 2

Description: No sufficient number(one) of firefighting equipment installed inside thegenerator room.

Source of Findings: Visual Assessment: No sufficient number of firefighting equipment

Suggested Plan ofAction:

Install appropriate number of firefighting equipment inside the generator room.

Suggested DeadlineDate:

04 Jun 2014

Standard: Is the appropriate type and number of firefighting equipment installed insidethe generator room?

Question: Do changeover switch(es) have interlocking capabilities?  

Priority Level: Medium

Non-Compliance Level:

Description: Changeover switch(es) have interlocking capabilities.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standard Part 10 Section 10.6.1.2 and 10.7.3.4

Question: Is the generator room appropriately sized in order to properly access thegenerator to perform routine maintenance activities?

 

Priority Level: Medium

Non-Compliance Level:

Description: The size of generator room is appropriate.

Source of Findings:

Suggested Plan ofAction:

Suggested Deadline

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 32/37

Page 33: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Date:

Standard: Alliance Standard Part 10 Section 10.8.4 Generator Room

Question: Are cable trenches properly covered?  

Priority Level: High

Non-Compliance Level:

Description: Cable trenches are covered properly.

Source of Findings: Visual Assessment: Adequate cable trench cover

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standard Part 10 Section 10.13.7 Inspection of the Installation

Question: Fuel storage tanks located within the building have a maximum combinedcapacity of 2500L (660 gal) or less.

 

Priority Level: High

Non-Compliance Level:

Description: Gas generator. No need to provide fuel tank.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 3 Section 3.4.2.1.3 Generators

Question: Are emergency power switchboards, distribution boards, and circuits properlyidentified?

 

Priority Level: High

Non-Compliance Level: 1

Description: Emergency power switchboards, distribution boards, and circuits are notproperly identified. Location: 1st floor Finishing-MDB11

Source of Findings: Visual Assessment: No identification of emergency DBs/CKTs

Suggested Plan ofAction:

Ensure proper identification of emergency power switchboards, distributionboards, and circuits.

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 33/37

Page 34: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Suggested DeadlineDate:

04 Jun 2014

Standard: NFPA 70 Chapter 7 Article 700.10 Wiring, Emergency System

Question: Is an uninterruptable power supply (UPS) provided?  

Priority Level: High

Non-Compliance Level:

Description: An instant power supply (IPS- 2.5 KVA) is provided.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Not Applicable

Question: Are inspection, maintenance, and testing procedures of the UPS beingcompleted and documented?

 

Priority Level: Low

Non-Compliance Level: 3

Description: Inspection, maintenance, and testing procedures of the UPS are notcompleted.

Source of Findings: Document Review: No documentation on UPS testing and maintenance.

Suggested Plan ofAction:

Ensure inspection, maintenance, and testing procedures of the UPS are notcompleted and documented.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standard Part 13 Section 13.11 NFPA 111 Chapter 8 NFPA 70BChapter 28

Question: Are life safety loads (fire alarm, fire pump, elevators, emergency lighting, exitsignage, etc) connecting to the emergency power system?

 

Priority Level: High

Non-Compliance Level:

Description: Life safety loads are (fire alarm, emergency lighting, exit signage,CCTV etc)connected to the emergency power system.

Source of Findings: Visual Assessment: Emergency power for life safety loads.

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 34/37

Page 35: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standard Part 10 Section 10.8 Standby Power

Question: What equipment/loads does the UPS serve?  

Priority Level:

Non-Compliance Level:

Description: Life safety loads are (fire alarm, emergency lighting, exit signage,CCTV etc)connected to the emergency power system.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Not Applicable

Lightning Protection System

Question: Is a lightning protection system installed on the building?  

Priority Level: High

Non-Compliance Level:

Description: A lightning protection system is installed on the building.

Source of Findings:

Suggested Plan ofAction:

Suggested DeadlineDate:

Standard: Alliance Standards Part 10 Section 10.11 Lightning Protection. Calculate RiskIndex to determine if required.

Question: The air termination network vertical and horizontal conductors areappropriately spaced.

 

Priority Level: Medium

Non-Compliance Level: 1

Description: The air termination network vertical and horizontal conductors are not

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 35/37

Page 36: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

adequately spaced. Location: Garments building Roof area (19000 SF), 02numbers air terminal.

Source of Findings: Photograph: Inadequate spacing.

Suggested Plan ofAction:

Ensure the air termination network vertical and horizontal conductors areappropriately spaced.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.11 Lightning Protection

Question: The appropriate number of down conductors are installed based on thebuilding size.

 

Priority Level: Medium

Non-Compliance Level: 1

Description: The appropriate number of down conductors are not installed based on thebuilding size.

Source of Findings: Photograph: Inadequate down conductor

Suggested Plan ofAction:

Ensure appropriate number of down conductors are installed based on thebuilding size.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.11 Lightning Protection

Question: The lightning protection ground terminals are bonded to the building orstructure grounding.

 

Priority Level: Medium

Non-Compliance Level: 3

Description: The lightning protection ground terminals are not bonded to the building orstructure grounding.

Source of Findings: Visual Assessment: Ground terminals are not bonded to the building structuregrounding.

Suggested Plan ofAction:

Make sure ground terminals are bonded to the building or structure grounding.

Suggested DeadlineDate:

02 Jul 2014

Standard: Alliance Standards Part 10 Section 10.11 Lightning Protection

 

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 36/37

Page 37: INITIAL ELECTRICAL ASSESSMENT REPORTaccord.fairfactories.org/accord_bgd_files/1/Audit_Files/60769.pdfWaiting shed 4. Compressor shed 5. Boiler shed-01 6. Boiler shed-02 7. Generator

 

FactoryName:

Gramtech Knitting & Dyeing

Address: Dahorgaon, Rupgonj,Narayangonj. Narayanganj Narayanganj DhakaBangladesh

Assessor: Bureau Veritas

Date: 29 Mar 2014

Created with EO.Pdf for .NET trial version. http://www.essentialobjects.com.

The Alliance for Bangladesh Worker Safety Page 37/37