State Preservation and Local Initiated Projects FY 2014 - 2017 Indiana Department of Transportation (INDOT) SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL CATEGORY PROGRAM PHASE FEDERAL MATCH Estimated Cost left to Complete Project* 2014 2015 2016 2017 STIP NAME Bartholomew County Indiana Department of Transportation 0800076 SR 7 Bridge Replacement, Concrete 1.81 miles S of US-31 over Little Sand Creek Seymour .01 On Federal Aid Bridge Construction CN $427,806.40 $106,951.60 $1,785,458.00 ($1,250,700.00) M 13 Comments: Move CN phase ($1,250,700) out of FY 2015 to FY 2016 and increase by $534,758 for total of $1,881,604 in FY 2016. Modified to CAMPO's TIP by Resolution 2015-1 on 3/9/15. Indiana Department of Transportation 1006438 SR 46 Other Intersection Improvement AT SR 9 Seymour 0 On Federal Aid Safety Construction CN -$791,830.40 -$197,957.60 ($989,788.00) M 13 Comments: Reduce CN phase in FY 2017 by $989,788 for new total of $127,212. Modification to the new and current TIP/STIP. Modified to CAMPO's TIP by Resolution 2014-11. Indiana Department of Transportation 1296717 SR 9 Bridge Deck Overlay 6.11 miles N of SR-46 over Haw Creek on SR-9 Seymour 0 On Federal Aid Bridge Construction CN -$353,560.80 -$88,390.20 ($441,951.00) M 13 Comments: Reduce CN Phase in FY 2017 by $441,951 for total CN of $376,049. Modified to CAMPO's TIP by Resolution 2015-1 on 3/9/15. Bartholomew County Total Federal: -$717,584.80 Match :-$179,396.20 2014: 2015: -$1,250,700.00 2016: $1,785,458.00 2017: -$1,431,739.00 *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes. Page 1 of 29 Report Created:4/1/2015 3:10:13PM

Indiana Department of Transportation (INDOT) - IN.gov · PDF fileIndiana Department of Transportation ... 1296567 SR 135 Small Structure ... Indiana Department of Transportation (INDOT)

Embed Size (px)

Citation preview

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Bartholomew County

Indiana Department

of Transportation

0800076 SR 7 Bridge Replacement,

Concrete

1.81 miles S of US-31 over

Little Sand Creek

Seymour .01 On Federal Aid Bridge

Construction

CN $427,806.40 $106,951.60 $1,785,458.00 ($1,250,700.00)M 13

Comments: Move CN phase ($1,250,700) out of FY 2015 to FY 2016 and increase by $534,758 for total of $1,881,604 in FY 2016. Modified to CAMPO's TIP by Resolution 2015-1 on 3/9/15.

Indiana Department

of Transportation

1006438 SR 46 Other Intersection

Improvement

AT SR 9 Seymour 0 On Federal Aid Safety

Construction

CN -$791,830.40 -$197,957.60 ($989,788.00) M 13

Comments: Reduce CN phase in FY 2017 by $989,788 for new total of $127,212. Modification to the new and current TIP/STIP. Modified to CAMPO's TIP by Resolution 2014-11.

Indiana Department

of Transportation

1296717 SR 9 Bridge Deck Overlay 6.11 miles N of SR-46 over

Haw Creek on SR-9

Seymour 0 On Federal Aid Bridge

Construction

CN -$353,560.80 -$88,390.20 ($441,951.00) M 13

Comments: Reduce CN Phase in FY 2017 by $441,951 for total CN of $376,049. Modified to CAMPO's TIP by Resolution 2015-1 on 3/9/15.

Bartholomew County Total

Federal: -$717,584.80 Match :-$179,396.20 2014: 2015: -$1,250,700.00 2016: $1,785,458.00 2017: -$1,431,739.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 1 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Brown County

Indiana Department

of Transportation

1296567 SR 135 Small Structure

Replacement

7.85 miles N of the N SR

-135/SR-58 junction

Seymour 0 On Federal Aid Bridge ROW RW $0.00 $0.00 ($10,000.00) $10,000.00M 13

Comments: Move $10,000 in RW from FY 2016 to FY 2015 and leave $13,000 in FY 2016. Total in both years of $23,000. Modification to the current STIP. No MPO.

Brown County Total

Federal: $0.00 Match :$0.00 2014: 2015: $10,000.00 2016: -$10,000.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 2 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Clark County

Clark County 0710003 IR 1024 Road Reconstruction

(3R/4R Standards)

Bethany Road; 2.73 mi from SR

62 to SR 403

Seymour 2.73 On Federal Aid Group IV Program RW -$117,200.00 $0.00 ($720,000.00) $500,000.00 $102,800.00M 13

100% Local

Funds

RW $0.00 -$55,000.00 ($180,000.00) $125,000.00 $0.00

Comments: Modify into 2014-2017 STIP. Increase ROW $102,800 (F) for total of $822,800. KIPDA MPO TIP dated 2/26/15.

Clark County Total

Federal: -$117,200.00 Match :-$55,000.00 2014: -$900,000.00 2015: $102,800.00 2016: $625,000.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 3 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Dearborn County

Aurora 1382774 ST 1001 Other Type Project

(Miscellaneous)

Sidewalk repair/replacement

various streets in City of

Aurora

Seymour 0 On Federal Aid Cincinnati MPO PE -$19,540.00 $0.00 ($37,600.00) $18,060.00M 13

100% Local

Funds

PE $0.00 -$4,885.00 ($9,400.00) $4,515.00

Comments: Modify 2014-2017 STIP. Add $18,060 (F) and $4,515 (L) for total of $55,660 (F) and $13,915 (L) for PE FY2015.. March 2015 OKI Administrative Modification signed 3/15/15.

Dearborn County Total

Federal: -$19,540.00 Match :-$4,885.00 2014: -$47,000.00 2015: $22,575.00 2016: 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 4 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Delaware County

Delaware County 0900990 IR 1022 Bridge Removal Bridge 226 on County Road

419 East over Bike/Ped. Trail

Greenfield 0 Off Federal Aid 100% Local

Funds

CN $0.00 -$80.00 ($80.00) M 13

Local Bridge

Program

PE $49,800.00 $0.00 $49,800.00

Local Bridge

Program

CN -$49,800.00 $0.00 ($49,800.00)

100% Local

Funds

PE $0.00 $12,400.00 $12,400.00

Comments: DMMPC - increase PE FY 15 from 100,720 to 150,520 increase of 49,800 Federal and Local from 25,210 increase to 37,630 increase of 12,400. Decrease CN FY 16 from 755,600 to 705,800

a reduction of 49,800 Federal and reduce Local from 188,980 to 188,900 a reduction of 80 ? resolution 15-3.

Delaware County 1382332 ST 1024 Bridge Rehabilitation

Or Repair

Bridge # 516 over White River

on Tillotson Avenue, 0.15 miles

north of SR32

Greenfield 0 On Federal Aid 100% Local

Funds

RW $0.00 $0.00 $2,000.00 ($2,000.00)M 13

Muncie MPO RW $0.00 $0.00 $8,000.00 ($8,000.00)

Comments: DMMPC - Move RW from FY 15 to FY 16 - resolution 15-3

Delaware County 9680560 IR 1000 Bridge Rehabilitation

Or Repair

Bridge #161 over White River

on CR 170S, 1.8 miles S of SR

32

Greenfield 0 On Federal Aid 100% Local

Funds

CN $0.00 $0.00 ($422,500.00) $422,500.00 M 13

Local Bridge

Program

CN $0.00 $0.00 ($1,690,000.00) $1,690,000.00

Comments: DMMPC - Move CN from FY 16 to FY 17 ? resolution 15-3

Delaware County Total

Federal: $0.00 Match :$12,320.00 2014: 2015: $52,200.00 2016: -$2,152,380.00 2017: $2,112,500.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 5 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Floyd County

New Albany 1173188 ST 1001 Signs, Lighting,

Signals And Markings

Sign inventory and MUTCD

upgrade/various locations in

New Albany

Seymour 0 Off Federal Aid 100% Local

Funds

PE $0.00 $11,250.00 $11,250.00M 13

Louisville MPO PE $45,000.00 $0.00 $45,000.00

Comments: Modify 2014-2017 STIP. Add $45,000 (F) to PE FY2015 and $11,250 (L) to PE FY2015 for total of $180,000 (F) and $26,250 (L). All PE in FY2015. KIPDA TIP Modification dated 2/26/15.

Indiana Department

of Transportation

1400473 I 265 Bridge Thin Deck

Overlay

0.25 mile East of I-64 over I-64

Ramp C

Seymour 0 Interstate Bridge Consulting PE $0.00 $0.00 $20,000.00($20,000.00)M 13

Comments: Move PE phase from FY 2015 to FY 2017. Modification to the current STIP/TIP. Modified to KIPDA's TIP by Modification #5 sent to Central Office 3/24/15.

Floyd County Total

Federal: $45,000.00 Match :$11,250.00 2014: 2015: $36,250.00 2016: 2017: $20,000.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 6 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Hamilton County

Fishers 1297563 ST 1055 Intersection

Improvement,

Roundabout

Intersection Improvement 106th

St & Cumberland Rd.

roundabout

Greenfield 0 Off Federal Aid 100% Local

Funds

CN $0.00 $0.00 ($273,000.00) $273,000.00 M 13

Indianapolis MPO CN $0.00 $0.00 ($1,092,000.00) $1,092,000.00

Comments: 16-00 - IRTIP - 0 2016-2019 move CN from FY 2016 to FY 2017

Carmel 1297166 ST 1060 Intersection

Improvement,

Roundabout

Intersection 116th ST & Gray

Road, Roundabout

Greenfield 0 On Federal Aid 100% Local

Funds

CN $0.00 $0.00 ($168,300.00) $168,300.00 M 13

Indianapolis MPO CN $0.00 $0.00 ($1,514,700.00) $1,514,700.00

Comments: 16-00 - IRTIP - 0 2016-2019 moved CN from FY 2016 to FY 2017.

Carmel 1296021 ST 1001 Intersection

Improvement,

Roundabout

Intersection of Carmel Dr and

Range Line Rd Roundabout

Greenfield 0 On Federal Aid Indianapolis MPO CN $0.00 $0.00 ($1,278,700.00) $1,278,700.00 M 13

Comments: 16-00 - IRTIP - 0 2016-2019 move CN from FY 2016 to FY 2017

Hamilton County Total

Federal: $0.00 Match :$0.00 2014: 2015: 2016: -$4,326,700.00 2017: $4,326,700.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 7 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Hancock County

Hancock County 1382083 VA

VARI

Bridge Inspections Inspection and Reinspection of

all bridges 20 feet and longer

Greenfield 0 Multiple 100% Local

Funds

PE $0.00 $0.00 ($15,560.00) $15,560.00M 13

Local Bridge

Program

PE -$3,200.00 $0.00 ($62,240.00) $59,040.00

Comments: 14-08.1 - ADMINISTRATIVE - Q2 2015 moved PE from FY 2016 to FY 2015

Hancock County Total

Federal: -$3,200.00 Match :$0.00 2014: 2015: $74,600.00 2016: -$77,800.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 8 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Hendricks County

Town of Avon 1173153 IR 1019 Bike/Pedestrian

Facilities

CR 625 E/ US 36- From Avon

Softball Park to Avon Town Hall

Crawfordsville 0 On Federal Aid 100% Local

Funds

CN $0.00 $200,000.00 $200,000.00 M 13

Indianapolis MPO CN $0.00 $0.00 ($86,072.00) $800,000.00($713,928.00)

Comments: TIP MOD 3-13-15 Remove CN and CE funds from FY 15 and 16. Add CN/CE funds to FY 17 in the amount of 800,000 federal

Hendricks County Total

Federal: $0.00 Match :$200,000.00 2014: 2015: -$713,928.00 2016: -$86,072.00 2017: $1,000,000.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 9 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Henry County

Henry County 1297939 IR 1007 Bridge Inspections County Bridge Inspections in

Henry County

Greenfield 0 Multiple 100% Local

Funds

PE $0.00 $0.00 ($16,799.00) $16,799.00M 13

Local Bridge

Program

PE $0.00 $0.00 ($67,194.00) $67,194.00

Comments: NO MPO - Move FY 16 PE to FY 15 Federal 67,194 and Local 16,799 no change in amount just FY.

Henry County Total

Federal: $0.00 Match :$0.00 2014: 2015: $83,993.00 2016: -$83,993.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 10 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Jackson County

Indiana Department

of Transportation

1296684 SR 58 Bridge Replacement,

Concrete

4.32 miles E of SR-258 over

Buck Creek on SR-58

Seymour 0 On Federal Aid Bridge ROW RW $0.00 $0.00 $35,000.00 ($35,000.00)M 13

Comments: Move RW phase from FY 2015 to FY 2016. Modification to the current STIP. No MPO.

Seymour 1297585 MS 0 Bike/Pedestrian

Facilities

City Center Trailhead - N. of

U.S. 50 between Jeffersonville

St. and Broadway St

Seymour 0 On Federal Aid Local

Transportation

Alternatives

CN $0.00 $0.00 ($1,800,571.20) $1,800,571.20 M 13

100% Local

Funds

CN $0.00 $0.00 ($450,142.80) $450,142.80

Comments: Modify 2017-2017 STIP. Move CN from FY2016 to FY2017. Not in an MPO Area.

Indiana Department

of Transportation

1400025 SR 258 Replace

Superstructure

3.67 miles west of SR 11 over

Indian Creek

Seymour 0 On Federal Aid Bridge Consulting PE $0.00 $0.00 $87,500.00 ($87,500.00)M 13

Comments: Move $87,500 of the PE phase in FY 2015 to FY 2016 and leave $87,500 in FY 2015 for total PE of $175,000 in both years. Modification to the current STIP. No MPO.

Jackson County Total

Federal: $0.00 Match :$0.00 2014: 2015: -$122,500.00 2016: -$2,128,214.00 2017: $2,250,714.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 11 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Jay County

Jay County 1382082 VA

VARI

Bridge Inspections Inspection and Reinspection of

all bridges 20 feet and longer

Greenfield 0 Multiple Local Bridge

Program

PE $15,560.00 $0.00 $21,300.00 ($87,500.00) $81,760.00M 13

100% Local

Funds

PE $0.00 $3,890.00 $5,325.00 ($21,875.00) $20,440.00

Comments: NO MPO - FY 14 PE add 21,300 Federal and 5,325 Local. Move PE from FY 16 to FY15 and reduce Federal (5,740) from 87,500 to 81,760 reduce local (1,435) from 21,875 to 20,440.

Jay County Total

Federal: $15,560.00 Match :$3,890.00 2014: $26,625.00 2015: $102,200.00 2016: -$109,375.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 12 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Jefferson County

Indiana Department

of Transportation

1173314 SR 7 Slide Correction SR-7 at Hanging Rock Hill in

Madison

Seymour .198 NHS Road ROW RW $0.00 $0.00 $60,000.00 ($60,000.00)M 13

Comments: Move RW phase in FY 2015 of $60,000 to FY 2016. Modification to current STIP. No MPO.

Jefferson County Total

Federal: $0.00 Match :$0.00 2014: 2015: -$60,000.00 2016: $60,000.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 13 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Jennings County

Jennings County 1382875 IR 1005 Br Repl,

Comp.Cont.Precast

Conc. Beam

Bridge 52 over Otter Creek on

Co RD 560 E

Seymour 0 On Federal Aid 100% Local

Funds

CN $0.00 -$16,000.00 ($456,400.00) $440,400.00 M 13

Local Bridge

Program

CN $16,000.00 $0.00 ($1,745,600.00) $1,761,600.00

Comments: Modify 2014-2017 STIP. Move CN amount $1,761,600 (F) to FY2017. Move $440,400 (L) to FY2017. $80,000 Utilities CN (F) to remain in FY2016. $20,000 Utilities CN (L) to remain in

FY2016. Not in an MPO area.

Indiana Department

of Transportation

1400137 US 50 Small Structure

Replacement

6.79 miles east of US 31 Seymour 0 NHS Bridge Consulting PE $0.00 $0.00 $62,500.00 ($62,500.00)M 13

Comments: Move $62,500 of the PE phase to FY 2016 and leave $62,500 in FY 2015. Modification to the current STIP. No MPO

Jennings County Total

Federal: $16,000.00 Match :-$16,000.00 2014: 2015: -$62,500.00 2016: -$2,139,500.00 2017: $2,202,000.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 14 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Johnson County

Johnson County 1005947 IR 1001 New Road

Construction

New road connecting Clark

School Rd (700 N) &

Worthsville Rd (750 N)

Seymour 1.1 On Federal Aid 100% Local

Funds

PE $0.00 -$12,500.00 ($12,500.00)M 13

Group IV Program PE $37,840.00 $0.00 $37,840.00

Comments: Modify 2014-2017 STIP. Add PE of $37,840 for total amount of federal PE $157,840. Deduct PE Local amount of $12,500 for total of 37,500 local money. INDY MPO Quarter 2, 2015

Administrative 14-08.1 dated 3/25/15.

Franklin 1400301 ST 1001 Intersect. Improv. W/

Added Turn Lanes

Intersection of Eastview and

Upper Shelbyville Road

Seymour 0 On Federal Aid 100% Local

Funds

CN $0.00 $0.00 ($130,000.00) $130,000.00 M 13

Statewide

Consulting

CN $0.00 $0.00 ($200,000.00) $200,000.00

Statewide

Construction

CN $0.00 $0.00 ($800,000.00) $800,000.00

Comments: Modify 201-2017 STIP. Update phases CE/CN to FY2017 for federal and local matches. INDY MPO Quarter 2, 2015 Administrative 14-08.1

Franklin 1400302 ST 1001 Intersect. Improv. W/

Added Turn Lanes

Intersection of Eastview Drive

and Hurricane Road

Seymour 0 On Federal Aid 100% Local

Funds

CN $0.00 $0.00 ($130,000.00) $130,000.00 M 13

Statewide

Consulting

CN $0.00 $0.00 ($200,000.00) $200,000.00

Statewide

Construction

CN $0.00 $0.00 ($800,000.00) $800,000.00

Comments: Modify 2014-2017 STIP. Move CN/CE from FY2016 to FY2017. Modify/Add CE/CN 800,000 Statewide Construction money and 200,000 Statewide Consulting money to FY2017.

Johnson County Total

Federal: $37,840.00 Match :-$12,500.00 2014: 2015: $25,340.00 2016: -$2,260,000.00 2017: $2,260,000.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 15 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Lake County

Lake Station 1173429 ST 1001 Intersection

Improvement,

Roundabout

Intersection Improvement

Central Ave at Fairview Ave.

LaPorte 0 On Federal Aid Northwest Indiana

MPO

PE $150,832.00 $0.00 $150,832.00M 13

100% Local

Funds

PE $0.00 $37,708.00 $37,708.00

Comments: NIRPC Admin Mod Nar 2015-2. PE increase funds to $300,832 federal and $75,208 local in FY 15

Griffith 1382658 IR 1025 Bike/Pedestrian

Facilities

Oak Savannah Trail: Oak Ridge

Prairie to Erie Lackawanna Trail

LaPorte .36 On Federal Aid Northwest Indiana

MPO

PE $0.00 $0.00 ($48,000.00) $48,000.00M 13

100% Local

Funds

PE $0.00 $0.00 ($12,000.00) $12,000.00

Comments: NIRPC Admin Mod Mar 2015-2 PE change FY from 16 to 15

Hobart 1401034 IR 1004 Intersect. Improv. W/

Added Turn Lanes

Colorado St Intersection

Improvement at US 30

LaPorte .25 On Federal Aid 100% Local

Funds

PE $0.00 $8,889.00 ($11,111.00) $20,000.00M 13

Northwest Indiana

MPO

PE $80,000.00 $0.00 ($100,000.00) $180,000.00

Comments: NIRPC Admin Mod Mar 2015-2 PE change FY from 16 to 15 and increase award to $180,000 federal and $20,000 local

Lake County Total

Federal: $230,832.00 Match :$46,597.00 2014: 2015: $448,540.00 2016: -$171,111.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 16 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Madison County

Alexandria 1298668 ST 1001 Bike/Pedestrian

Facilities

Tyler, Harrison, 6th, 11th, Cook,

Central Ave. & Bills Creek Road

in Alexandria

Greenfield 0 On Federal Aid Local Safety

Program

CN $120,587.00 $0.00 $120,587.00M 13

Comments: MCCOG - Adding 120,587 100% Federal to FY 15 CN - resolution 3-2015

Madison County Total

Federal: $120,587.00 Match :$0.00 2014: 2015: $120,587.00 2016: 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 17 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Marion County

Indianapolis 1173081 ST 1001 Other Intersection

Improvement

East Stop 11 at Madison Ave Greenfield 0 On Federal Aid Indianapolis MPO CN $27,556.00 $0.00 $27,556.00 M 13

100% Local

Funds

CN $0.00 $3,062.00 $3,062.00

Comments: 14-08.1 - ADMINISTRATIVE - Q2 2015 increased funding for CN/CE based on contract's low bid and split CE between FY 15 & 16 to meet annual allocation.

Indianapolis 1173082 ST 1015 Other Intersection

Improvement

10th St at Tibbs Ave Greenfield 0 On Federal Aid 100% Local

Funds

CN $0.00 -$87,979.00 ($92,077.00) $4,098.00 M 13

Indianapolis MPO CN -$3,504.00 $0.00 $36,878.00 ($40,382.00)

Comments: 14-08.1 - ADMINISTRATIVE - Q2 2015 revised funding for CN/CE based on contract's low bid and split CE between FY 15 & 16 to meet annual allocation.

Lawrence 1383086 ST 1023 Enhancement Oaklandon Road from Fox

Road to 75th Street in the City

of Lawrence

Greenfield 0 Off Federal Aid 100% Local

Funds

CN $0.00 $0.00 ($68,400.00) $68,400.00 M 13

Indianapolis MPO CN $0.00 $0.00 ($273,600.00) $273,600.00

Comments: 16-00 - IRTIP - 0 2016-2019 move CN from FY 2016 to FY 2017

Southport 1383158 ST 1047 Road Reconstruction

(3R/4R Standards)

South St from Madison Ave to

Walnut St, South St

Reconstruction

Greenfield 0 Off Federal Aid 100% Local

Funds

CN $0.00 -$117,600.00 ($117,600.00) M 13

Indianapolis MPO CN -$470,400.00 $0.00 ($470,400.00)

Comments: 16-00 - IRTIP - 0 2016-2019 add local PE & RW to FY 2016. Move CN from FY 2017 to FY 2018.

Indianapolis 1400938 VA 1073 Other Type Project

(Miscellaneous)

Knozone Outreach and

Education Program - FY 2016

thru 2018

Greenfield 0 Off Federal Aid Indianapolis MPO PE $320,000.00 $0.00 $320,000.00 M 13

100% Local

Funds

PE $0.00 $80,000.00 $80,000.00

Comments: 16-00 - IRTIP - 0 2016-2019 increased PE in FY 2017

Indianapolis 1400944 ST 1051 Bike/Pedestrian

Facilities

Monon Bicycle/Pedestrian

Bridge over 38th Str.28 miles

east of 38th & College

Greenfield 0 Off Federal Aid Indianapolis MPO CN -$1,640,000.00 $0.00 ($1,640,000.00) M 13

100% Local

Funds

CN $0.00 -$410,000.00 ($410,000.00)

Comments: 16-00 - IRTIP - 0 2016-2019 add local PE to FY 2016 & local RW to FY 2017. Moved CN from FY 2017 to FY 2018.

Marion County Total

Federal: -$1,766,348.00 Match :-$532,517.00 2014: -$92,077.00 2015: -$40,382.00 2016: -$270,406.00 2017: -$1,896,000.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 18 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Monroe County

Monroe County 0101232 IR 1007 Covered Bridge

Rehabilitation

Cedar Ford Covered Bridge

#38 over Bean Blossom Creek

on N Maple Grove Rd

Seymour 0 On Federal Aid National Historic

Covered Bridge

CN -$57,600.00 $0.00 ($869,600.00) $812,000.00 M 13

100% Local

Funds

CN $0.00 -$14,400.00 ($217,400.00) $203,000.00

Comments: Modify 2014-2017 STIP. All CN to FY2017. Not in an MPO Area.

Monroe County 0801059 ST 1025 Road Reconstruction

(3R/4R Standards)

Fullerton Pike - Phase 1 Seymour .4 On Federal Aid 100% Local

Funds

CN $0.00 -$73,285.00 ($73,285.00) M 13

Comments: Modify 2014-2017 STIP. Deduct $73,285 (L) money from STIP for grand total of $772,851.00. Bloomington MPO Adoption Resolution FY2015-05.

Monroe County 0902215 IR 1030 Bike/Pedestrian

Facilities

Unionville Rail Trail- Phase 1 Seymour 1.75 On Federal Aid Local Trans

Enhancement

Program

CN $0.00 $0.00 ($1,770,400.00) $1,770,400.00 M 13

100% Local

Funds

CN $0.00 $0.00 ($441,800.00) $441,800.00

Comments: Modify 2014-2017 STIP. Move CN from FY2016 to FY2017. Not in an MPO Area.

Monroe 1382431 ST 1001 Bike/Pedestrian

Facilities

Karst Farm Trail Phase 3 Seymour 0 On Federal Aid Bloomington MPO PE -$19,440.00 $0.00 $18,960.00 ($38,400.00)M 13

100% Local

Funds

PE $0.00 -$4,860.00 $4,740.00 ($9,600.00)

Comments: Modify 2014-2017 STIP. Deduct PE from FY2015 and add to FY2016 $18,960 (F) and $9,600 (L). Bloomington MPO Adoption Resolution FY2015-05 dated 3/6/2015.

Bloomington 1297060 VA 1033 Other Intersection

Improvement

Intersection of Old SR 37 &

North Dunn St & East/South

approaches

Seymour 0 On Federal Aid 100% Local

Funds

RW $0.00 -$100,000.00 ($100,000.00)M 13

Bloomington MPO

- PYB

CN $1,353,155.00 $0.00 $1,353,155.00

Comments: Modify 2014-2017 STIP. Increase CN (F) for FY2016 by $1,353,155 for grand total of 1,524,813.00. Increase CN (L) by $22,338 for grand total of $212,338. Bloomington MPO Adoption

Resolution FY2015-05.

Monroe County 1297633 IR 1017 Other Type Project

(Miscellaneous)

Hunters Creek Road from

SR446 to Tower Ridge Road

Seymour 0 On Federal Aid 100% Local

Funds

CN $0.00 $0.00 ($5,751,460.00) $5,751,460.00 M 13

Federal Lands

Access Program

CN $0.00 $0.00 ($241,840.00) $241,840.00

Comments: Modify 2014-2017 STIP. Move CN from FY2016 to FY2017. Not in an MPO Area.

Monroe County Total

Federal: $1,276,115.00 Match :-$192,545.00 2014: 2015: -$148,000.00 2016: -$7,915,645.00 2017: $9,147,215.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 19 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Ohio County

Indiana Department

of Transportation

1006484 SR 156 Slide Correction 0.60 miles W of E Jct SR 56

and SR 156

Seymour .2 On Federal Aid Road ROW RW $0.00 $0.00 $110,000.00 ($110,000.00)M 13

Comments: Move RW phase from FY 2015 to FY 2016. Modification to the current STIP. No MPO.

Ohio County Total

Federal: $0.00 Match :$0.00 2014: 2015: -$110,000.00 2016: $110,000.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 20 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Owen County

Indiana Department

of Transportation

0710605 SR 46 Pavement

Replacement, Small

Town

W jct SR-67/US-231 to

Fairview

Seymour .96 On Federal Aid Road ROW RW $207,320.00 $51,830.00 $1,150,000.00 ($890,850.00)M 13

Comments: Reduce RW phase in FY 2015 to $209,150 and move balance to FY 2016 and increase to $1,150,000. Modification to the current STIP. No MPO.

Indiana Department

of Transportation

1296705 US 231 Bridge Replacement,

Concrete

2.92 miles S of SR-46 over

Rattlesnake Creek on US-231.

Seymour 0 NHS Bridge ROW RW $0.00 $0.00 $35,000.00 ($35,000.00)M 13

Comments: Move RW Phase from FY 2015 to FY 2016. Modification to the current STIP. No MPO.

Owen County Total

Federal: $207,320.00 Match :$51,830.00 2014: 2015: -$925,850.00 2016: $1,185,000.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 21 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Porter County

Portage 1382010 IR 1001 Road Reconstruction

(3R/4R Standards)

Samuelson Road

Reconstruction, Central Ave to

Portage Ave

LaPorte .41 On Federal Aid 100% Local

Funds

CN $0.00 -$45,960.75 $551,348.25($597,309.00)M 13

100% Local

Funds

RW $0.00 $0.00 ($40,600.00) $40,600.00

Demonstration

Fund Program

CN -$183,845.00 $0.00 $2,205,393.00($2,389,238.00)

Demonstration

Fund Program

RW $0.00 $0.00 ($162,400.00) $162,400.00

Comments: NIRPC Admin Mod Mar 2015-2. PE 2015 increase award to $477,948 federal and $119,487 local. RW change FY from 14 to 17. CN Change FY from 15 to 17 and decrease funds to

$2,205,393 federal and $551,349 local

Valparaiso 1400569 IR 1019 Auxiliary Lanes,

Accel & Decel or Turn

Lanes

Calumet Ave from Burlington

Beach Rd to Bullseye Lake Rd

LaPorte .6 On Federal Aid 100% Local

Funds

RW $0.00 $0.00 $32,600.00 ($32,600.00)M 13

Northwest Indiana

MPO

RW $0.00 $0.00 $130,400.00 ($130,400.00)

Comments: NIRPC Admin Mod Mar 2015-2 Change PE FY from 15 to 16

Porter County Total

Federal: -$183,845.00 Match :-$45,960.75 2014: -$203,000.00 2015: -$3,149,547.00 2016: $163,000.00 2017: $2,959,741.25

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 22 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Putnam County

Indiana Department

of Transportation

0800852 SR 240 Small Structure

Replacement

1.65 mi W of SR 75 Crawfordsville 0 On Federal Aid Bridge Consulting PE $4,800.00 $1,200.00 $6,000.00M 13

Comments: No MPO; Modify 2014-2017 STIP; Add PE fund to FY15 6K

Putnam County Total

Federal: $4,800.00 Match :$1,200.00 2014: 2015: $6,000.00 2016: 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 23 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Ripley County

Indiana Department

of Transportation

1173315 SR 62 Slide Correction SR 62 approximately 3 miles E

of SR 129

Seymour .03 On Federal Aid Road ROW RW -$29,600.00 -$7,400.00 $15,000.00 ($52,000.00)M 13

Comments: Move all but $10,000 of RW in FY 2015 to FY 2016 and decrease to $15,000. New total of $25,000 in the two years. Modification to the current STIP. No MPO.

Indiana Department

of Transportation

1400023 SR 101 Bridge Deck

Replacement

2.21 miles north of US 50 over

Hogan Creek

Seymour 0 On Federal Aid Bridge Consulting PE $0.00 $0.00 $55,000.00 ($55,000.00)M 13

Comments: Move $55,000 of the PE phase from FY 2015 to FY 2016 for total PE of $110,000, leaving $55,000 in each year. Modification to the current STIP. No MPO.

Ripley County Total

Federal: -$29,600.00 Match :-$7,400.00 2014: 2015: -$107,000.00 2016: $70,000.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 24 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Shelby County

Indiana Department

of Transportation

1296598 I 74 Bridge Painting 0.87 miles East of SR-44 (Blue

Ridge Road)

Greenfield 0 Interstate Bridge

Construction

CN $67,400.10 $7,488.90 $74,889.00 M 13

Comments: CN Phase move to FY 2016, Remove CN funds $74,889.00 from FY 2015. Add CN Funds $74,889.00 to FY 2016. Modification 14-13. No MPO.

Shelby County 1382080 VA

VARI

Bridge Inspections Inspection and reinspection of

all bridges 20 feet and longer

Greenfield 0 Multiple 100% Local

Funds

PE $0.00 $9,021.08 $4,510.54 ($21,250.00) $25,760.54M 13

Local Bridge

Program

PE $36,084.17 $0.00 $18,042.17 ($85,000.00) $103,042.00

Comments: NO MPO - add PE FY 14 Federal of 18,042.17 (total 103,042.17) and Local 4,510.54 (total 25,760.54) Move FY 16 PE to FY 15 and increase Federal to 103,042.17 an increase of 18,042.17)

Increase Local to 25,760.54 an increase of 4,510.54.

Shelby County Total

Federal: $103,484.27 Match :$16,509.98 2014: $22,552.71 2015: $128,802.54 2016: -$31,361.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 25 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Switzerland County

Indiana Department

of Transportation

1296621 SR 156 Bridge Rehabilitation

Or Repair

0.97 miles W of SR-250 over

Fisk Creek on SR-156

Seymour 0 On Federal Aid Bridge ROW RW $0.00 $0.00 ($10,000.00) $10,000.00 M 13

Comments: Move RW Phase from FY 2016 to FY 2017. Modification to the current STIP. No MPO

Switzerland County Total

Federal: $0.00 Match :$0.00 2014: 2015: 2016: -$10,000.00 2017: $10,000.00

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 26 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Various County

Indiana Department

of Transportation

0902214 SR 64 HMA Overlay,

Preventive

Maintenance

From Harrison/Floyd CL to I-64 Seymour 4.835 On Federal Aid District Other

Construction

CN $400,000.00 $100,000.00 $1,500,000.00 ($1,000,000.00)M 13

Comments: Move CN phase from FY 2015 to FY 2016 and increase by $500,000. Modification to the current TIP/STIP. Modified to KIPDA's TIP by Modification #5 sent to Central Office 3/24/15.

Various County Total

Federal: $400,000.00 Match :$100,000.00 2014: 2015: -$1,000,000.00 2016: $1,500,000.00 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 27 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Vigo County

Indiana Department

of Transportation

1382283 US 41 Bridge Maintenance

And Repair

Old US 41 (N Clinton St) Bridge

over US 41, 6.13 mi N of Middle

Jct SR 63

Crawfordsville 0 On Federal Aid Bridge

Construction

CN -$30,400.00 -$7,600.00 ($38,000.00)M 13

Comments: Date of e-mail confirmation is corrected to February 24, 2015 rather than March 24, 2015.

Vigo County Total

Federal: -$30,400.00 Match :-$7,600.00 2014: 2015: -$38,000.00 2016: 2017:

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.

Page 28 of 29 Report Created:4/1/2015 3:10:13PM

State Preservation and Local Initiated Projects FY 2014 - 2017

Indiana Department of Transportation (INDOT)

SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

CATEGORY

PROGRAM PHASE FEDERAL MATCHEstimated

Cost left to

Complete

Project*

2014 2015 2016 2017STIP

NAME

Wayne County

Wayne County 1382081 VA

VARI

Bridge Inspections Inspection and Reinspection of

all bridges 20 feet and longer

Greenfield 0 Multiple 100% Local

Funds

PE $0.00 $26,772.20 $19,769.60 ($30,000.00) $37,002.60M 13

Local Bridge

Program

PE $32,952.40 $0.00 $4,942.40 ($120,000.00) $148,010.00

Comments: No MPO - add to FY 14 PE 19,769.60 Federal and add 4,942.4Local. Move PE FY 16 to FY 15 and add 28,010 (from 120,000 to 148,010) Federal and add 7,002.60 Local (from 30,000 to

37.002.60).

Wayne County Total

Federal: $32,952.40 Match :$26,772.20 2014: $24,712.00 2015: $185,012.60 2016: -$150,000.00 2017:

Grand Total

Federal: -$377,227.13 2015: -$6,329,506.862014: -$1,168,187.29 2017: $22,961,131.252016: -$16,424,099.00Match : -$583,434.77

*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

fiscally constrained and is for information purposes.