INDIAN POWER SECTOR. India has a FEDERAL structure Electricity a concurrent subject – Both Central and State Govts. responsible for its development. SG. SG. SG. SG. SG. SG. SG. SG. SG. SG. INDIAN POWER GRIDS. NATIONAL GRID. SYNCHRONOUSLY LINKED - PowerPoint PPT Presentation
Citation preview
INDIAN POWER SECTORINDIAN POWER SECTOR
India has a FEDERAL structureIndia has a FEDERAL structure
Electricity a concurrent subject – Both Central Electricity a concurrent subject – Both Central and State Govts. responsible for its developmentand State Govts. responsible for its development
INDIAN POWER GRIDSINDIAN POWER GRIDS
SOUTHERNSOUTHERN
REGIONREGION
(29,000 MW(29,000 MW))
NATIONAL GRID
NORTHERNNORTHERN
REGION REGION
(29,000 MW)(29,000 MW)
. . . . SG SG. . . . SG SG
WESTERN WESTERN REGIONREGION
(31,500 MW)(31,500 MW)
EASTERN EASTERN REGION REGION
(16,000 MW)(16,000 MW)
NORTH-NORTH-EASTERN EASTERN
REGIONREGION
(2500 MW)(2500 MW)
SYNCHRONOUSLY LINKEDSYNCHRONOUSLY LINKED
INSTALLED CAP :50,000 MW , LENGTH : 2500 Kms INSTALLED CAP :50,000 MW , LENGTH : 2500 Kms
. . . . SG SG. . . . SG SG . . . . SG SG
INSTALLED CAPACITY : 1,08,000 MWINSTALLED CAPACITY : 1,08,000 MW PEAK DEMAND: 82,000 MWPEAK DEMAND: 82,000 MW
TOTAL STATE GRIDS (SG) : 33TOTAL STATE GRIDS (SG) : 33
INDIAN POWER SECTOR PRIOR TO REFORMSINDIAN POWER SECTOR PRIOR TO REFORMS
Structure Structure
SEBs vertically integrated: Generation, Transmission SEBs vertically integrated: Generation, Transmission
and Distribution under one umbrella.and Distribution under one umbrella.
Administrative MechanismAdministrative Mechanism
Power sector administrated by GoI, REBs & SEBsPower sector administrated by GoI, REBs & SEBs
Planning & project approval through GoI/CEAPlanning & project approval through GoI/CEA
Tariff setting of central sector utilities by GoI/CEATariff setting of central sector utilities by GoI/CEA
Licensing function by the state Govts Licensing function by the state Govts
Grid operation by RLDCs Grid operation by RLDCs
In 1991, private sector participation in generation allowedIn 1991, private sector participation in generation allowed
In 1998, Central Electricity Regulatory Commission (CERC) for the In 1998, Central Electricity Regulatory Commission (CERC) for the
centre and State Electricity Regulatory Commissions (SERC) for centre and State Electricity Regulatory Commissions (SERC) for
the states setupthe states setup
In 1998, Transmission recognized as a distinct activity In 1998, Transmission recognized as a distinct activity
• Private sector participation in transmission also allowedPrivate sector participation in transmission also allowed
• POWERGRID notified as Central Transmission Utility (CTU) POWERGRID notified as Central Transmission Utility (CTU)
• State Govt. to notify State Transmission Utility (STU)State Govt. to notify State Transmission Utility (STU)
In 1991, private sector participation in generation allowedIn 1991, private sector participation in generation allowed
In 1998, Central Electricity Regulatory Commission (CERC) for the In 1998, Central Electricity Regulatory Commission (CERC) for the
centre and State Electricity Regulatory Commissions (SERC) for centre and State Electricity Regulatory Commissions (SERC) for
the states setupthe states setup
In 1998, Transmission recognized as a distinct activity In 1998, Transmission recognized as a distinct activity
• Private sector participation in transmission also allowedPrivate sector participation in transmission also allowed
• POWERGRID notified as Central Transmission Utility (CTU) POWERGRID notified as Central Transmission Utility (CTU)
• State Govt. to notify State Transmission Utility (STU)State Govt. to notify State Transmission Utility (STU)
POWER SECTOR REFORMSPOWER SECTOR REFORMS
Un-bundling & corporatisation of SEBs to make separate Un-bundling & corporatisation of SEBs to make separate corporations for Generation, Transmission and distribution for corporations for Generation, Transmission and distribution for better accountabilitybetter accountability
Formation of Power Trading Corporation (PTC) to facilitate Formation of Power Trading Corporation (PTC) to facilitate trading of power especially providing payment security to IPPstrading of power especially providing payment security to IPPs
In Distribution sector, Accelerated Power Development Reform In Distribution sector, Accelerated Power Development Reform Program (APDRP) undertaken for upgrading of sub-transmission Program (APDRP) undertaken for upgrading of sub-transmission and distribution networkand distribution network
Indian Electricity Act,2003 promulgated, consoliding previous Indian Electricity Act,2003 promulgated, consoliding previous Acts and moreActs and more
POWER SECTOR REFORMSPOWER SECTOR REFORMS CONTD CONTD
POWER SECTOR DEVELOPMENTPOWER SECTOR DEVELOPMENT
1950’s 1970’s 1990’s
STATEProvince
REGIONAL
NATIONAL
• Constitution of CEA as NATIONAL PLANNER
• CEA to concur power projects
• Constitution of Vertically integrated SEBs for development on state level
• Constitution of CEA as NATIONAL PLANNER
• CEA to concur power projects
• Constitution of Vertically integrated SEBs for development on state level
• Development on Regional basis
• Constitution of REBs for regional grid operation
• Central Gen. cos. Constituted to develop big project on regional basis
• Development on Regional basis
• Constitution of REBs for regional grid operation
• Central Gen. cos. Constituted to develop big project on regional basis
• Formation of CTU
• CTU assigned the role of Grid operation (TSO)
• Formation of Regulatory bodies CERC & SERC
• Formation of CTU
• CTU assigned the role of Grid operation (TSO)
• Formation of Regulatory bodies CERC & SERC
CENTRAL GEN Cos./ IPPsCENTRAL GEN Cos./ IPPs
POWERGRIDPOWERGRID
CTU & Grid Operator ( RLDCs)CTU & Grid Operator ( RLDCs)
CEACEA
Central GovtCentral Govt
State GovtsState Govts
STUsSTUsTRANSMISSION TRANSMISSION
LICENCEESLICENCEES
INDIAN POWER SECTOR – CENTRAL LEVELINDIAN POWER SECTOR – CENTRAL LEVEL
RegulatorRegulator
(CERC)(CERC)
GENERATING COS.GENERATING COS.
STUs/ Grid Operator ( SLDCs)STUs/ Grid Operator ( SLDCs)
STATE GOVTs.STATE GOVTs.RegulatorRegulator
(SERC)(SERC)
DISCOMsDISCOMs
CENTRAL GOVTs.CENTRAL GOVTs.
INDIAN POWER SECTOR – STATE LEVELINDIAN POWER SECTOR – STATE LEVEL
FUNCTIONS OF VARIOUS PLAYERSFUNCTIONS OF VARIOUS PLAYERS
Central GovernmentCentral Government
To prepare & publish National Electricity Policy and To prepare & publish National Electricity Policy and Tariff Policy in consultation with State Govts. and CEA Tariff Policy in consultation with State Govts. and CEA for development of power system based on optimal for development of power system based on optimal utilisation of resourcesutilisation of resources
Formulate a National Policy, in consultation with State Formulate a National Policy, in consultation with State Govts. and state commissions, for rural electrificationGovts. and state commissions, for rural electrification
Central govt. to establish an Appellate TribunalCentral govt. to establish an Appellate Tribunal
Appellate TribunalAppellate Tribunal
To hear appeals against the orders of the adjudicating To hear appeals against the orders of the adjudicating officer or the appropriate commission.officer or the appropriate commission.
Appellate Tribunals to have all powers of civil courtAppellate Tribunals to have all powers of civil court
Appeal against Judgment of Appellate tribunal only in Appeal against Judgment of Appellate tribunal only in Supreme courtSupreme court
FUNCTIONS OF VARIOUS PLAYERSCONTD
Central Electricity Authority (CEA)Central Electricity Authority (CEA)
To prepare National electricity plan in accordance with To prepare National electricity plan in accordance with the National electricity policy of Central Govt. and notify the National electricity policy of Central Govt. and notify the samethe same
Specify technical standard for construction, operation Specify technical standard for construction, operation & maintenance of electrical plants, electric lines and & maintenance of electrical plants, electric lines and connectivity to the gridconnectivity to the grid
Advice the appropriate Govt./Commission on all Advice the appropriate Govt./Commission on all technical matters related to Generation, transmission technical matters related to Generation, transmission and distributionand distribution
FUNCTIONS OF VARIOUS PLAYERSFUNCTIONS OF VARIOUS PLAYERSCONTD CONTD
Central Electricity Regulatory Commission (CERC)Central Electricity Regulatory Commission (CERC)
To regulate tariff of central generating companies To regulate tariff of central generating companies
To determine the tariff & regulate inter-state transmission of To determine the tariff & regulate inter-state transmission of electricity electricity
To issue licensees to function as transmission licensees To issue licensees to function as transmission licensees (other than CTU) and electricity trader with respect to inter-(other than CTU) and electricity trader with respect to inter-state operationstate operation
Aid & Advice the Central Govt. for formulation of National Aid & Advice the Central Govt. for formulation of National electricity policy & Tariff policy.electricity policy & Tariff policy.
To specify the Grid CodeTo specify the Grid Code
Develop appropriate policies & procedures for Develop appropriate policies & procedures for Environmental regulation of the power sectorEnvironmental regulation of the power sector
FUNCTIONS OF VARIOUS PLAYERSCONTD
Regional Load Despatch Center (RLDC)Regional Load Despatch Center (RLDC)
Apex body to ensure integrated operation of the power Apex body to ensure integrated operation of the power system in the regionsystem in the region
Give directions and exercise supervision and control Give directions and exercise supervision and control which is required for integrated operation to achieve which is required for integrated operation to achieve maximum economy and efficiencymaximum economy and efficiency
Scheduling/Re-scheduling of generation and contigency Scheduling/Re-scheduling of generation and contigency analysisanalysis
System restoration following Grid disturbancesSystem restoration following Grid disturbances
Metering & Data collectionMetering & Data collection
Compiling & furnishing data pertaining to system Compiling & furnishing data pertaining to system operationoperation
FUNCTIONS OF VARIOUS PLAYERSCONTD
Central Transmission Utility (CTU)Central Transmission Utility (CTU)
Discharge all functions of planning & co-ordination for Discharge all functions of planning & co-ordination for inter-state transmission system with state transmission inter-state transmission system with state transmission utilities, Central Govt., State Govt., Generating utilities, Central Govt., State Govt., Generating companies, Authority, Licensees etccompanies, Authority, Licensees etc
To ensure development of an efficient, coordinated To ensure development of an efficient, coordinated and economical system of inter-state transmission and economical system of inter-state transmission lines for smooth flow of electricity from generating lines for smooth flow of electricity from generating stations to load centersstations to load centers
To exercise supervision & control over the inter-state To exercise supervision & control over the inter-state transmission systemtransmission system
To ensure integrated operation of the regional grids To ensure integrated operation of the regional grids through RLDCsthrough RLDCs
FUNCTIONS OF VARIOUS PLAYERSFUNCTIONS OF VARIOUS PLAYERSCONTD CONTD
State Electricity Regulatory Commission (SERC)State Electricity Regulatory Commission (SERC)
To determine the tariff for electricity within the stateTo determine the tariff for electricity within the state
To regulate operation of power system within the To regulate operation of power system within the statestate
Issue licensees for Transmission, distribution & Issue licensees for Transmission, distribution & trading of electricity within the statetrading of electricity within the state
To specify State Grid Code consistent with Grid CodeTo specify State Grid Code consistent with Grid Code
Advice state Govt. on matters like promotion of Advice state Govt. on matters like promotion of competition, efficiency, investment and economy in competition, efficiency, investment and economy in the electrical industry the electrical industry
FUNCTIONS OF VARIOUS PLAYERSFUNCTIONS OF VARIOUS PLAYERSCONTD CONTD
POWER SECTOR WORLD-WIDEPOWER SECTOR WORLD-WIDE
U.K ELECTRICITY STRUCTUREU.K ELECTRICITY STRUCTURE
PowerGen National Power
Independent Generators
British Energy
National Electric Grid & Pool
Regional Electricity Companies
Generators/Suppliers
Other Licensed Suppliers
Small Users (<100 kW)
Large Users (>100 kW)
Regulator (OFFER)
48 Generators
Private Tx. Co TRANSENER
6 REGIONAL Co. National Electricity Regulatory Agency (ENRE)
Independent System Operator (ISO) , CAMMESA
CAMMESA Looks after the National Load Dispatch Center
CAMMESA Looks after the National Load Dispatch Center
Scenario after 1992 UNBUNDLING in Power Sector
Scenario after 1992 UNBUNDLING in Power Sector
ARGENTINA POWER SECTORARGENTINA POWER SECTOR
RTE
(TSO)
Producer EDF
Other Producers
Foreign Producers & suppliers
Foreign TSOs
Distributor
EDF
Foreign TSOs Foreign
consumers
Eligible consumers
Non eligible consumers
FRANCE POWER SECTORFRANCE POWER SECTOR
Other Distributors
REGULATOR
POWER SYSTEM MODELS- SCHEMATICPOWER SYSTEM MODELS- SCHEMATIC
G GG
D DDT + SO
G
D
G
D
I.I. EUROPEAN, SOUTH AFRICA & INDIAN MODELEUROPEAN, SOUTH AFRICA & INDIAN MODEL
II.II. FRENCH MODELFRENCH MODEL
T + SOG
D EdF
RTE
POWER SYSTEM MODELSPOWER SYSTEM MODELS -SCHEMATIC-SCHEMATIC Contd Contd
III.III. MALAYSIAN AND KOREAN MODELMALAYSIAN AND KOREAN MODEL
IV.IV. AMERICAN MODELAMERICAN MODEL
G GG
T + SO D +
G G G
D D D
T T
G
D
G
D
G
D
TSO SORTO
INDEPENDENT SYSTEM OPERATOR (ISO)INDEPENDENT SYSTEM OPERATOR (ISO)
• System operation is independent of the function of System operation is independent of the function of transmission system development transmission system development
• ISO prevalent when there are multiple transmission ISO prevalent when there are multiple transmission agenciesagencies
TRANSMISSION SYSTEM OPERATOR (TSO)TRANSMISSION SYSTEM OPERATOR (TSO)
• Grid operation as well as transmission system Grid operation as well as transmission system development with single entitydevelopment with single entity
• TSO prevalent where unbundling has taken place and TSO prevalent where unbundling has taken place and there is one transmission utility there is one transmission utility
SUMMARY – POWER SYSTEM MODELSUMMARY – POWER SYSTEM MODEL
ADVANTAGES OF TSOADVANTAGES OF TSO
• TSO, having no interest in generation and trading of TSO, having no interest in generation and trading of electricity is impartial and has same interest as that of electricity is impartial and has same interest as that of system operator.system operator.
• On-hand experience of systems constraints, direct control On-hand experience of systems constraints, direct control over planning and development of transmission system. over planning and development of transmission system. Can therefore take immediate measures for system Can therefore take immediate measures for system improvement schemes on short-term and long-termimprovement schemes on short-term and long-term
• More coordinated approach towards development and More coordinated approach towards development and operation of gridsoperation of grids
• No duplication of assets and expertiseNo duplication of assets and expertise