63

INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 2: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

INDEX

Page 3: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 4: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

CJA TELECOMS TIME LINE2004 - CJATelecoms Founded

2012 – Telkom MobileManaged Services

2010 – NSN Cell CManaged Services

2009 - CJA TelecomsConverted To

(Pty) Ltd

2008 – Leo NamibiaManaged Services

2005 – Major TelkomSDH Contractor

2006 – Eskom CivilProjects

2004 – MW Roll-out InMozambique - VC

2009 – MW Roll-out InVodacom SA Network

2009 – BTS Roll-out InCell C Network

2011 – BTS Roll-out InTM Network

2014 – MTN Site &Tower Maintenance

2015 – MTN Wi-Fi

2015 – MTNNetwork Upgrade

2015 – MTNManaged Services

2016 - VDC SiteMaintenance

2017 – Huawei MTNLithium Battery

Project

2017 – Huawei – MTN(KZN) Tower

Refurbishment

2017 – Ansys RailContainer Plinth Project

2015 – Prasa

2018 – ZTE Cell CMW / RAN & DWDM

Project

2017 – MTN AztecBattery Safes

Page 5: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

TIME LINE

2004 - CJA TelecomsFounded

2009 - CJA TelecomsConverted To (Pty) Ltd

Optimize Tools & Processes

Expand OperationsInto Namibia/CT

Build BusinessRelationshipsAd Hoc

Projects

Entering New Markets - MS

Value Added Services/Generators/Security Matured

QA/Management Systems

Expand OperationsAcross RSA

Page 6: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

Vision

CJA Telecommunications will be “fearless” in our pursuit of being the preferred Turnkey Solutions provider throughoutSouthern Africa.

Company Origin

CJA Telecommunications was established as a Close Corporation in 2004 to service Telkom South Africa as a Turnkey Contractor.CJA Telecommunications was converted to a (Pty) Ltd in 2009.

ISO

CJA Telecommunications are 9001:2015 & 18001:2007 approved.

BEE Status

CJA Telecommunications is a level 2 certified company.

CJA (Pty) Ltd Registration - 2009/016657/07

Company VAT number - 4090220080

Page 7: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

OBJECTIVESTo continuously deliver professional quality services to our clients.

CJA

Valu

e

Customer Satisfaction

Customer Requirements

Page 8: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 9: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

Deploy/Built:- Civils- Container Reticulation- Tower Rigging- RF Installations and Upgrades- MW Link Installations & Commissioning- BTS Installations & Commissioning- Optimization- Power Installations and Certification

Operate:- FO (NOC Functions)- BO (Performance management)- Preventative maintenance (Site and Tower)- Corrective maintenance- Spares Management

Design:- TSS, LOS and Planning Surveys- Planning- Structural Engineering & Design- Azimuth Verification & Drive Testing

Page 10: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

EQUIPMENT COMPETENCY

- BTS EquipmentNSN Flexi & Multi-RadioMotorola, Huawei CDMA, ZTE

- Transmission EquipmentNSN Flexi-PacketEricsson Mini-Link EXPIC MW LinksCeragon, SRAL, Nera, Siae, Tellabs, Cisco

- Fibre EquipmentHiT 7025 to 7035SDH SMA 1/4/16PDH, FSP3000, FSP150Rurtel, DRMass, Exicom

- Rectifier EquipmentCK Delta, EmersonGrintek, ZTEARP 48FPMA Power System

Page 11: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 12: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

HUAWEI – MTN (GC, KZN, WR AND NER)

Managed Services (2015- Current)

- Full Site Passive Preventative Maintenance.- Full Tower Maintenance.- 5350 Sites.- Field Maintenance Engineers Stationed

Regionally.- CJA Representation in All Major Cities.- Performance Review Reporting.- Trend and Fault Analysis.- Power, Cooling and Environmental Systems- Air conditioner Service and Replacements- Supporting NOC.- EMS and AD HOC repair services

Page 13: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

ERICSSON / MOBAX – VDC (NGA, CEN, WR)

Managed Services (2016 - 2018)

- Full Site Passive Preventative Maintenance.- 3903 Sites.- Field Maintenance Engineers Stationed

Regionally.- CJA Representation in All Major Cities.- Performance Review Reporting.- Trend and Fault Analysis.- Power, Cooling and Environmental Systems.- Air conditioner Service and Replacements.- Dedicated NOC.- EMS and AD HOC repair services.- Generator deployment/refuelling in NGA.

Page 14: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

TELKOM MOBILE (NATIONAL) (GC, NER, KZN, CR)

Managed Services – Huawei Equipment Maintenance (2012 - Current)

- Event Maintenance on Service Affecting Alarms.- Full Site Routine Preventative Maintenance.- 3000 Sites Across South Africa.- Field Maintenance Engineers Stationed

Regionally.- CJA Representation in All Major Cities.- Performance Review Reporting.- Trend and Fault Analysis.- Power, Cooling and Environmental Systems.- Air conditioner Replacements.- Battery Rundown Tests and Servicing.- Dedicated NOC.- Spares Management.- EMS and ADHOC projects

Equipment Maintained:Huawei 2G/3G and LTE BTSEnetel, Grintek andARP Rectifier Systems

Page 15: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

ERICSSON – MTN (CENTRAL REGION)Managed Services (2015 - 2018)

- Full Site Passive Preventative Maintenance.- Full Tower Maintenance.- 900 Sites.- Field Maintenance Engineers Stationed

Regionally.- Performance Review Reporting.- Trend and Fault Analysis.- Power, Cooling and Environmental Systems.- Air conditioner Service and Replacements.- Battery Rundown Tests and Servicing.- EMS and AD HOC repair services.

Page 16: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

SAAB GRINTEK

Vodacom Self Provide Transmission Project (2009-2016)

- Line of Site Surveys.- RFO Surveys and Installations.- Site Work Instruction Documentation.- Nera Microwave Installations and Commissioning.- Siae Microwave Installations and Commissioning.- Vodacom Business Microwave Installations.- Cisco Installations and Commissioning.- Tellabs Installations.- UPS Installations.- Link Soak Testing.- Frequency Scans.

Equipment Used:

TellabsCiscoSiaeNera

Page 17: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

CELL C MAINTENANCEManaged Services - NSN Equipment Maintenance (2010 - 2013)

- Event Maintenance on Service Affecting Alarms.- Routine Preventative Maintenance.- 1391 Sites in Central and NER.- 24 Teams Stationed Regionally.- Reporting on KPI, Network performance, Trend

analysis.- Vandalized Site Re-Instatements.- Quality Inspections and New Site Handovers.- Network Optimization and Improving Cell

Availability.- Dedicated NOC.- Spares Management.

Equipment Maintained:

NSN Flexi and Multi-RadioBTSNSN Flexi PacketTransmissionNSN A-Series HubSRAL & Ceragon TXequipmentDelta Rectifier

Page 18: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

NOKIA SIEMENS NETWORKS

NSN Roll-Out Projects (2009 - 2013)

- Flexi BTS Installations and Commissioning.- Multi-Radio Installations and Commissioning.- UMTS 2100 Layer Upgrades.- Capacity Expansions.- LTE upgrades.- Flexi-Packet Transmission Installations and

Commissioning.- TSS and Line-of-Sight Surveys.- RF Installations.- RF and Transmission Optimization.- New Site Builds.- Delta Rectifier Installations.- Issuing of Certificate of Compliance.- Logistics.

Page 19: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

TELKOM SOUTH AFRICASDH and DWDM Services (2006 - 2014)

- SDH End to End Solution:- Site Visits- Element Planning- Pre-Build Planning- Network Integration Planning- Element Build and Integration

Equipment Used:

HiT 7025, 7030, 7035, 7050,7065, 7070, 7080, 7300, 7500,FSP3000, FSP150, IP Radio.

- AVDA DWDM Installation and Commissioning.- Fibre Optic Installations and Splicing.- Spares Management.

Page 20: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

HUAWEI

Huawei Site Build Projects (2012 - Current)

- BTS Installations & Commissioning.- Container Installation.- RF Installations and Swaps.- RFO Installations.- Ad hoc Civil Works.- Power Connection and Installation.- TSS Surveys.- Air conditioner Installations.- New Site Builds.- Custom Signage Towers Erection.- RPG Site Builds.

Page 21: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

LEO CELL-ONE NAMIBIA

Full Site and Equipment Maintenance for Leo Namibia (2008 - 2010)

- Event maintenance on service affecting alarms.- Routine preventative maintenance.- Generator Deployment.- Solar Site Battery and Panel Maintenance.- Ad hoc Civil Maintenance.- Air conditioner Service and Replacements.- 8 Teams stationed regionally.- New Site Surveys and Planning.- New Site RF, Transmission and RFO Installations.- Special Case Preventative and Rectification Actions.- Property Owner Requested Variations.- Event Mast Erection and Maintenance.- Rectifier and Battery Maintenance.

Page 22: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

MTC NAMIBIAMTC Roll-Out Projects (2006 - 2010)

- New Site RF, Transmission and RFOInstallations.

- Container Reticulations.- Ericsson Mini-Link E Installations and

Optimization.- Backbone Link Network Optimization.- Motorola BTS Installations.- Coastal Preventative Maintenance.- Air conditioner Service and Replacements.- Drive Testing (NEMO)- Quality Inspections.- Abseiling Site Installations and Maintenance.

- Marconi BSC EquipmentInstallations.

- CDMA Base Station Installations.

Telecom Namibia Roll-Out Projects

Page 23: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

NEOTELReutech MCT Neotel Projects (2009 - 2013)

- Container Reticulation.- Full Site Civil Works.- Plinth, Fencing, Tower, Manhole and

Sleeving.- POP Site Erection.- CDMA RF Installations.- BTS Hardware Installations.- Fibre Route Planning and Installation.- Fibre Dome Splicing, Floating and

Testing.- 7way Duct Installations.

Page 24: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

EURICO FERREIRARooftop and Greenfield Installations (2013 - 2014)

- We specialise in the installation of Rooftops andGreenfield sites.

- We are fully trained to install Rooftop & GreenfieldMcwade.

- All our teams comply with all the Health and Safetyrequirements.

- We install AC/DC cables, AC/DC-DB and change overboxes for Generators.

- Full installation of RF including Triplexes, RRU andoptic cable.

- Anritsu site masters are used to do all the sweeptest.

- As build documents are done in-house.

Page 25: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

Greenfield civils (2013 - 2015)

- We are fully trained and experienced in complete scopeinvolved in site builds.

- Excavation, back filling, fixing of reinforcement, casting. ofconcrete, levelling and securing of stubs.

- Fitment of fence and gates.- Casting of plinths and tower stubs.- Retaining walls.- As-built documents are done in-house.

ATC SA CIVILS - CELL C SITES

Page 26: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

Trial Project (2019 - Current)

- Repair infrastructure on ATC owned sites.- Repair Glamlock System and Chains.- Repair Vandalized Fences (Palisade and Clearview).- Repair and replacement of Aircraft Warning Lights and Globes.- Repair and replacement of Power cables and AC DB’s.- Removal of Bee Hives on sites.- Repair of corroded tower branches and tower members

including painting.- Generator Deployment and Refuelling

ATC - VANDALISM REPAIRS & GENERATOR DEPLOYMENT

Page 27: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

CORIANT – BROADBAND INFRACODWDM Services HiT 7100/7300 (2013 - 2015)

DWDM End to End Solution:- Site Visits- Equipment Installation- Network Integration- Software Upgrades- Equipment Cut overs

Page 28: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

ERICSSON – MTN WI-FI PROJECT

Wi-Fi Services in City/Courtyards Lodges (2014 - 2015)

Wi-Fi End to End Solution:- Site Surveys.- Design and BOQ requirements.- Material supply to E/// (Cabinets/CAT6

Cable/Fibre/ODF).- Equipment Installation.- Network Commissioning/Integration.- AP Software Upgrades.- Fibre installation/Splicing and Testing.- MTN NOC Helpdesk and Support on 24/7/365.

Page 29: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

HUAWEI – MTN WI-FI PROJECTWi-Fi Services in Road/Town Lodges (2014 - 2015)

Wi-Fi End to End Solution:- Site Surveys.- Design and BOQ requirements.- Material supply to Huawei

(Infrastructure).- AP Installation.- Fibre installation/Splicing and

Testing.- As-built documentation.

Page 30: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

ERICSSON – MTN DOT PROJECTRadio DOT Service in Pick n Pay Cresta (2015)

Radio DOT/RBS/IRU Solution:- Site Survey.- Design and BOQ requirements.- Material supply to E/// (Cabinet/CAT6

Cable/Fibre/ODF).- Equipment Installation.- Fibre installation/Splicing and Testing.

Page 31: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

PRASA implement a new technologically advanced rail signallingsystem on its commuter rail network.

The project included the modernisation of the rail signalling,communications and train management systems in high-volumecorridors, such as Naledi, in Soweto, to Johannesburg; Pretoria toJohannesburg; Mabopane to Pretoria; Mamelodi to Pretoria;KwaMashu–Durban–Umlazi; Khayelitsha, Mitchells Plain and Philippito Cape Town; Kraaifontein–Bellville–Cape Town; and from Simon’sTown to Cape Town.

The new system enhances operational capacity, allow for betterflexibility, improve safety and reduce train delays and reliance on thehuman factor.

Civil and Radio Communication Project 2015 - 2016

PRASA

Page 32: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

PRASA

Page 33: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

ERICSSON – VDC GENERATOR PROJECTVDC Generator Project (2017 – 2018)

- Refuel/Deploy/Collect- 1606 sites- 250h Services- 750h Services- Repairs (Emergency/Breakdowns)- Operating areas:

• Brits• Klerksdorp Satellite Office• Lichtenburg• Mafikeng• Potchefstroom• Pretoria• Rustenburg

Page 34: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

HUAWEI – MTN AZTEC LEAD ACID BATTERY PROJECTMTN Power Project (2017 - 2018)

- The Aztec Battery Safe Rack is a new technologybrought in to safe guard batteries from theft.

- It uses special Aztec bolts which can only be tightenedor loosened by a special tool.

Page 35: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

Introduction ESM-48100A1 is an energy storage module based on innovative Li-ion technology. It is especially

designed for telecom sites with advanced features:- Long lifespan- Wide range of charging voltage- Fast charging- Intelligent management- Software anti-theft

ESM-48100A1 can be paralleled with lead-acid battery directly, which helps carriers fully reusethe legacy batteries when site expands.

Features- Intelligent software anti-theft design.- Long cycle life with 4500 cycles @ 0.5C, 85% DOD, 35°C.- Easy maintenance with SOC (state of charge) and SOH (state of health) detection.

MTN Power Project (2017 – Current)

HUAWEI – MTN LITHIUM LI-ION BATTERY PROJECT

Page 36: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

Swop out Lead Acid Batteries ESM-48100A1 is an energy storage module based on innovative Li-ion technology. It is especially

designed for telecom sites with advanced features:- Long lifespan- Wide range of charging voltage- Fast charging- Intelligent management

TM Power Project (2019 – Current)

HUAWEI – TM LITHIUM LI-ION BATTERY PROJECT

Page 37: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

Tower Refurbishment Project (2017 – Current)

CJA Telecommunications is experienced in refurbishingchallenging structures that demand and demonstrate highlevel of skill and versatility.

- Routine maintenance on site.- Rust treatment.- Member replacement.- Electrical cable navigation (NAV) lights.- Replacement of navigation (NAV lights.

HUAWEI – MTN (KZN)

Page 38: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

New slab for Ansys Rail

- The construction of the CAS system atTransvalia.

- The purpose of the newly built railway rail isto transport coal to the Majuba PowerStation.

Container Plinth Project 2017 - Current

ANSYS RAIL

Page 39: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

ZTE MICROWAVE AND RAN

Cell C Roll out Project (2018 - Current)

- ZTE Equipment: MW-NSB & MW-LTE Upgrade- RFO Surveys and Installations.- Site Work Instruction Documentation and As-built.- XPIC Microwave Installations and Commissioning.- RAN Installations and Commissioning.- New DBS site installation (RRU on tower)- Link Soak Testing.- Frequency Scans.- Capacity expansion.

Page 40: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

ZTE DWDM

Cell C Roll out Project (2018 - Current)

- ZTE Equipment- ZXWM M900 DWDM backbone systems- End-to-end comprehensive solution for Cell C- RFO Surveys and Installations.- Site Work Instruction Documentation and As-built.- Power and Fibre Installation.- Power pre-balance and Commissioning.- Link Soak Testing.- Service expansion with OSC / NCP and OHP boards.

Page 41: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

CJA GENERATOR SERVICES- Gen availability - 24/7/365- Deployment, Collection and Refuelling services- Reduce downtime on your operation/network- 250h & 750h Services for all types of Generators- Flexible rental agreements available- SLA as per customer requirements- Control room 24/7/365

SpecificationsEngine: F.A.W Model Nr 4DX21-45DAlternator: Leroy SomerBase Tank size: 250 LitreRated Output: 40 KVA - 3 PhaseConnection Type: Base load panel with 63A female socketSound Attenuated Level: 72 Decibels on 10 meterDry Weight: 2350 kgDimensions LxWxH: 3770 x 1720 x 1960

Page 42: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

CURRENT CJA REGIONS

KWAZULU-NATAL

LIMPOPO

WESTERN REGION

MPUMALANGA

GAUTENG CENTRAL/NORTH EASTERN REGION

CENTRAL REGION

Page 43: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 44: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

PRETORIA – HEAD OFFICESILVERTON

Page 45: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

PRETORIA – HEAD OFFICE

Page 46: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

PRETORIA – HEAD OFFICE

Page 47: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

CAPE TOWN – REGIONAL OFFICE

Page 48: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

DURBAN – REGIONAL OFFICE

Page 49: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

BLOEMFONTEIN – REGIONAL OFFICE

Page 50: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

FLEET (185+)

Page 51: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

TRAINED AND CERTIFIED STAFF

Page 52: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

ACHIEVEMENT

Page 53: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

Test Equipment Competency- Anritsu Site Master- Bird Site Master- 3Z Alignment Tool- Field Fox Spectrum Analyser- Nemo Outdoor Drive Test Tool- EXFO FTB-200 Optical Time Domain- Reflectometer- FUJIKURA Fusion Splicers- Fluke Light Source Meter & Fibre Tester

Software Tools Competency- Unibase- BPM- NAM Tool- Netplan PNI and LNI- Citrix- eWAP- SAP- Telswitch Stac- TX Ops- EMOS- TMNet- SMNOS- NSN BTS Manager 2G and 3G- NSN Telnet- Local Craft Terminal- M2000- Web-Force

Page 54: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 55: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

CJA Telecommunications is Proud to be Part of Various SocialResponsibility Projects.3% of Our Annual Income is Dedicated to Social Projects.

Food to Schools, Adopt a ChildSchool Classroom Improvements and Maintenance

We are also Involved withOn-going Internal SkillsDevelopment Programs toEnrich Our Employees.

Page 56: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

CJA VALUES

Page 57: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 58: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 59: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 60: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 61: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests
Page 62: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

CODE OF ETHICS

INDIVIDUAL COMMITMENT FORM

By completing this Individual Commitment form I agree to the Ethical guidelines as implemented within CJA Telecommunications. I alsoagree that if I do not abide within the Code of Ethics as stipulated below, I will be held accountable for such conduct by the CJAManagement / Disciplinary procedures.

I commit:

• To be entirely truthful in all I say.• To be faithful to my family and work relationships.• To do nothing out of selfish ambition or conceit, but to look out for the interests of others.• To refuse to elicit, accept or pay any bribes, and to report those who do.• To be a diligent leader without being harsh and unfair to our suppliers and colleagues.• To be a peacemaker.• To do my work wholeheartedly.• To submit myself to just and ethical governing authorities.• To support my fellow colleagues whenever they are in need.• To collaborate with my peers and colleagues to create a exciting working environment

Page 63: INDEX [] Company Profile-2019_v2.pdf · 2015–MTN Wi-Fi 2015–MTN Network Upgrade 2015–MTN Managed Services 2016-VDC Site Maintenance 2017–Huawei MTN ... - Battery Rundown Tests

CONTACT US

224 Battery StreetSilvertonPretoria

South [email protected]

[email protected]@cjatelecoms.co.za

[email protected]@[email protected]