    SLEDs/PLETs

    FMC offers a complete range of sled systems including PLETs (Pipeline End Terminations), PLEMs (Pipeline EndManifolds) and In-line Sleds to meet virtually all manifold project requirements. Sled designs include optionsfor first-end, second-end or midline installations from vessels with J-lay, S-lay or reeled capabilities. Inaddition, sleds range in complexity from a single hub with manual isolation valve to multiple hubs withactuated valves, chemical injection, pig launching capabilities and more.

    Single and Dual Flowlines

    Insulated / Non-Insulated

    Multiple Hubs

    Piggable

    Thermal Expansion Capability

    Skirted / Piled

  • 8/10/2019 In Line Sled (Ils)

    2/6

    Diverless technique adapted fordeepwater repairs, future tie-ins09/01/2012

    Email

    Print

    0

    Facebook

    0

    Twitter

  • 8/10/2019 In Line Sled (Ils)

    3/6

    0

    LinkedIn

    0

    Share

    Grip and Seal rectifies GoM hurricane damage

    Edgar KeijserGerald DouglasOil States IndustriesVirtually all deepwater field developments depend upon pipelines. Failure of a pipeline due to corrosion, defect, or an

    external event can lead to loss of production and, in the worst case, pollution.

    Pipelines can fail for a variety of reasons, and the type and extent of damage and water depth in which this occurs willdefine the manner in which the repair can be handled.

    ROV-installed clamp.

    Isolated pipeline damage is characterized by a small hole or crack and is most often a result of localized corrosion; a

    defect in a pipeline weld that went undetected during installation; a metallurgical defect; or impact from a dropped item.In general, a clamp that firmly encapsulates the pipeline and provides a reliable seal around the damaged area should beadequate for the repair.Extensive pipeline damage can result from an unfortunate incident during pipelay operations or an event during the life of

    a fieldfor instance dragging of anchors, mudslides, upheaval buckling, or pipe walking. In most cases, the pipeline

    cannot be lifted back to the surface, and the damaged pipeline section has to be removed and replaced subsea with an "onbottom" repair spool piece.

  • 8/10/2019 In Line Sled (Ils)

    4/6

    Diverless connector deployed.

    Localized pipeline corrosion can be repaired by installing a high-integrity pressure vessel around the pipe at the damaged

    location. Typically this is accomplished using a Grip and Seal split-sleeve type clamp whereby two clamp halves arejoined together by studs and nuts. These clamps incorporate tension bowls and slips that grip the pipe at both ends of theclamp, transferring the thrust loads through the clamp body. The slips ensure a smooth circumferential distributed load onthe pipeline.

    Longitudinal face seals and circumferential seals (typically made from purpose-built elastomeric materials) are energizedby the studs to ensure a perfect seal around the damaged area. In shallow waters, over 3,000 split sleeve clamps have beeninstalled worldwide, in diameters ranging from 3-48 in. (7.6 cm--1.2 m), and pressure ratings from ANSI 600 to API10,000. Several of these clamps have been in service for over 25 years.

    Dual Grip and Seal connector showing the "grips" and seals at each side of the

    connector.

    To repair pipelines in deepwater, ROV-installable and operable versions of split-sleeve type clamps have been developed.

    Alignment saddles are normally incorporated for landing and positioning of the clamp on the pipeline. The design of thebody bolts allows for tightening by a standard work-class ROV using a low torque or impact-type wrench, or integratedhydraulic stud tensioners. Following activation by the ROV of the hydraulic pressure, the connector mechanically locks sothat hydraulic pressure does not have to be maintained. Standard diverless Grip and Seal type split -sleeve clamps have

  • 8/10/2019 In Line Sled (Ils)

    5/6

    been manufactured for pipe sizes from 8-44 in. (20.3 cm--1.12 m) OD and ratings of ANSI 900 to 2500, and have been

    installed in water depths up to 7,000 ft (2,133 m).When a pipeline is damaged severely and or deformed over a certain length, the affected section must be removed andreplaced. If the pipeline cannot be lifted back to the surface, an "on bottom" pipeline repair has to be performed. A spool

    piece repair (pipe replacement) necessitates cutting of the pipeline in order to remove the damaged section, with thereplacement section connected to the pipeline on the seafloor. While hyperbaric welding can be used to connect the spool

    piece directly to the pipe in shallow water within the range of diver operations, this technique can be extremely costly.

    Horizontal piggable midline tie-in sled.

    Where it is economically viable to use divers, a bolted flanged connection method is generally employed. After thedamaged pipeline section has been cut and removed, a standard flange is attached to each pipeline end in order to connect

    the repair spool piece to the pipeline. For a permanent connection, Grip and Seal connectors are most often used tostructurally attach to and seal against the outside of the existing pipe. Wedge-shaped slip segments, positioned radiallyinside the body of the connector, are most commonly applied to attach the connector to the pipeline and are often selfenergizing; the higher the tension or compression force, the tighter the grip on the pipeline.

    The sealing system generally consists of one or two stacks of circumferential elastomeric packers. When axiallycompressed by the bolts, the elastomeric packer flows radially inward against the pipe OD and outwardly against theconnector body. To facilitate subsea installation, end-gap adjustments (up to one pipe diameter) can be incorporated inconnectors. This provides flexibility in positioning of the repair spool piece prior to fixing the connector on the pipeline.

    When the damaged pipeline section is removed, divers will stab the end connectors over each pipe end. When spool piecemetrology has been performed, the repair spool piece can be fabricated and lowered subsea. Divers will position the repairspool piece and bolt each spool piece flange to the mechanical connector flange. Finally, the pipeline end connector boltsare actuated to Grip and Seal on the pipe end. Thousands of these mechanical pipe end connectors have been installed by

    divers, on new construction projects and for pipeline repairs, in sizes ranging from 2--48 in. (5 cm1.22 m), and a widevariety of pressure ratings.Deepwater pipelines are now routinely tied in and connected subsea using ROVs and remotely operated pipelineconnection systems. Diverless mechanical pipeline connectors are most frequently used to tie in new spool pieces. The

    mechanical connector system comprises a male hub connection structure on which the female hub connector assembly isconnected. For a deepwater on-bottom repair, where the damaged pipeline section has to be cut and removed, thechallenge is to attach a male hub connection structure to each pipeline end in order to install and connect the repair spool

    piece subsea.

    Following a survey of the damaged section of the pipeline, the pipeline is raised using the diverless pipe lift frames, afterwhich the damaged section is cut out and removed. The diverless Grip and Seal connector with the male hub connectionstructure is deployed using a temporary installation (gantry) frame and fitted on a support frame. The support base plate

    provides stability and is equipped with mud mats to allow for soft seabed conditions.The temporary installation (gantry) frame is operated by the ROV and used to stab the connector over the pipeline end.

    After installation and testing of the connector, the pipeline is laid back on the seabed using the diverless pipeline lift frameand the pipeline end connector fixed in the cradle on the support frame. The temporary lift frame is then removed and theoperation repeated for the other pipeline end. The repair spool piece can now be measured, fabricated, and shipped to siteand installed in line with normal installation procedures, following which the repair is complete.

    Various iterations of the systems described above have been designed and fabricated for operators in the Gulf of Mexico.All the systems went through various phases of testing prior to acceptance by the clients and stored onshore, ready for usewhen required. Following damage caused by the Katrina and Rita hurricanes, systems were deployed for repairs of Shell'sMars and Entreprise's Typhoon pipelines.

  • 8/10/2019 In Line Sled (Ils)

    6/6

    Further design advances led to the development of a second generation system ideally suited to situations where the repair

    spool piece is relatively short, and where the seabed is sufficiently flat. More importantly, the amount of steel work left onthe seabed after the repair is greatly reduced.The (single) diverless Grip and Seal connector is modified to form a dual Grip and Seal connector whereby the end of the

    repair spool piece and the pipeline end are contained within one connector housing. A dual Grip and Seal connector isfitted to each end of the repair spool pieces and equipped with an ROV-operable telescopic action. When the repair spool

    piece is positioned on the seabed and aligned with the pipeline ends via the diverless pipeline lift frames, the connector is

    stabbed over the pipeline end using the telescopic device, allowing the connector to Grip and Seal around both thepipeline end and spool piece end. Dual Grip and Seal connectors have been manufactured for various oil companies in

    sizes ranging from 6 to 24-in. (15.2-61 cm). They were selected for Total's Girassol 12-in. (30.5-cm) diverless pipelinerepair in deepwater Angolan block 17, performed at the end of 2009.The most effective and economical method of adapting deepwater pipelines to allow for future subsea tie-ins involves useof "midline tie-in sleds" modular units that consist of flowline piping; a connection structure for a future diverless

    pipeline connection; a block valve to isolate the future tie-in line; a piggable Y fitting to combine the trunkline with thefuture tie-in line; and mud mats.The sled is welded into the pipeline like an ordinary joint of pipe and is designed to be easily installed via S-lay or J-lay.In a later stage, the new pipeline is installed close to the existing pipeline and the new tie-in is performed using a jumper,

    fitted with standard diverless pipeline connectors, and connected to the midline tie-in sled at one end on the existingpipeline and the pipeline end termination (PLET) of the new line.A pipeline network is generally designed upfront with midline tie-in sleds built in to the pipeline system and installedduring the pipelay operations, to facilitate connection of future pipelines into the existing pipeline network. However,

    during the Mars pipeline repairs, Shell took the opportunity to fit out the repair spoolpiece with a future tie-in hub. The

    same applies for the Typhoon repair where a future tie-in point was incorporated in the repair connection structure.Shell's Perdido field is in the Alaminos Canyon block 857 in the Gulf of Mexico, in 7,800 ft (2,377 m) of water. The fieldis in an area with little export infrastructure: to install an export line all the way to shore would be extremely costly and amajor challenge due to the difficult seabed conditions. The closest existing offtake system was the ExxonMobil Hoover

    Offshore Oil Pipeline System (HOOPs). Shell obtained approval from ExxonMobil to tie the Perdido export pipeline intoHOOPS, even though there was no connection link available in the HOOPS line, and any pipeline shut down would haveto be kept to a minimum. But based on its experience with the Mars on-bottom diverless pipeline repairs, Shell decided, asan industry "first," to use the same pipeline repair principle for the Perdido tie-in.

    The operation entailed:

    Cutting and removing a 28-ft (8.5-m) long section from the HOOPS pipeline

    Using a Grip and Seal connector, attaching a single pipeline connection hub on the upstream end of the pipeline

    Using a Grip and Seal connector, attaching a dual pipeline connection hub (including a piggable Y) to thedownstream part of the pipeline

    Installing a jumper on the two HOOPS hubs in order to ensure flow through the existing HOOPS pipeline.

    A pipeline connection hub is now available for the future Perdido export line tie-in. The system went through variousrigorous onshore SITs and shallow water tests which resulted in a successful subsea installation, in 4,500 ft (1,372 m)water depth, using multiple ROVs, with the shutdown of the HOOPS pipeline limited to 17 days. The Perdido export linewas subsequently connected to the connection hub on the HOOPS pipeline tie-in assembly.

    AcknowledgmentBased on a paper presented at the Offshore West Africa 2012 conference in Abuja, Nigeria, Jan. 25, 2012.