Report No: ISR6594
Implementation Status & ResultsMoldova
Social Investment Fund 2 Project (P079314)
Operation Name: Social Investment Fund 2 Project (P079314) Project Stage: Implementation Seq.No: 20 Status: ARCHIVED Archive Date: 19-May-2012
Country: Moldova Approval FY: 2004
Product Line: IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan
Implementing Agency(ies): Moldova Social Investment Fund
Key DatesBoard Approval Date 17-Jun-2004 Original Closing Date 31-Mar-2010 Planned Mid Term Review Date Last Archived ISR Date 30-Nov-2011Effectiveness Date 15-Sep-2004 Revised Closing Date 31-Mar-2013 Actual Mid Term Review Date 21-May-2007
Project Development ObjectivesSocial Investment Fund 2 Project (P079314)Project Development Objective (from Project Appraisal Document)
The revised project development objective is to support the implementation of the National Development Strategy by empowering poor communities and vulnerable population groups to manage their priority needs, and to contribute to employment and wage incomes in selected poor rural communities during the current economic contraction and during the recovery.
Has the Project Development Objective been changed since Board Approval of the Program?
Yes No
Component(s)
Component Name Component Cost
COMPONENT 1: COMMUNITY DEVELOPMENT 17.38COMPONENT 2: SOCIAL CARE SERVICES DEVELOPMENT 1.16COMPONENT 3: COMMUNICATION, MONITORING AND EVALUATION AND CAPACITY BUILDING
0.42
COMPONENT 4: PROJECT MANAGEMENT 1.04
Overall RatingsPrevious Rating Current Rating
Progress towards achievement of PDO Moderately Satisfactory SatisfactoryOverall Implementation Progress (IP) Satisfactory Highly SatisfactoryOverall Risk Rating
Implementation Status Overview
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
The World Bank
Page 2 of 5
Pub
lic D
iscl
osur
e C
opy
Pub
lic D
iscl
osur
e C
opy
Report No: ISR6594
MSIF disbursed almost all (first) Additional Financing credit and continues to advance implementation of the Second Additional Financing. For both credits, it has exceeded the number of originally planned community sub-projects. A longstanding issue which prevented MSIF from funding schools sub-projects in 2011 has been resolved. In November 2011, following the approval of the list of schools that will continue to function following network optimization, the Government and the World Bank amended legal provisions for the Second Additional Financing and restructured the project. This list now forms the basis for approving MSIF’s investments in schools rehabilitation sub-projects. Importantly, after a long period of uncertainty, the Second Additional Financing may start disbursing for community infrastructure sub-projects in Transnistria.
LocationsNo Location data has been entered
Results
Project Development Objective Indicators
Indicator Name Core Unit of Measure Baseline Current End Target
Number of communities with higher community contribution than required
Number Value 0.00 496.00 107.00Date
Comments
01-Jun-2007This indicator was introduced at MTR in 2007
31-Dec-2011
Employment on public works supported by the Second Additional Financing: direct project beneficiaries
Number Value 0.00 100032.00 170000.00Date
Comments
04-Mar-2010 31-Dec-2011MSIF estimate measured in man-days.
31-Mar-2013
of which female PercentageSub Type
Supplemental
Value 21.00 20.00
Increase in wage incomes in communities with sub-projects supported by the Second Additional Financing in 2010 and 2011.
Amount(USD) Value 0.00 13090000.00 22500000.00Date
Comments
04-Mar-2010The indicator relates to wages of community residents engaged in works on a daily basis.
31-Dec-2011This is MSIF s interim estimate based on wage bill reported by contractors, in MDL. It will be validated by a special evaluation study.
31-Dec-2011Target is established in MDL
Increase in consumption expenditures in communities with sub-projects supported by the Second Additional Financing in 2010 and 2011.
Amount(USD) Value 0.00 17500000.00Date
Comments
04-Mar-2010 31-Dec-2011Current number is not available. The indicator will be measured by a special evaluation study towards the close of the Project.
01-Mar-2013Target is established in MDL
The World Bank
Page 3 of 5
Pub
lic D
iscl
osur
e C
opy
Pub
lic D
iscl
osur
e C
opy
Report No: ISR6594
Double labor-intensiveness of sub-projects supported by the Second Additional Financing.
Percentage Value 23.00 25.60 46.00Date
Comments
19-May-2010Schools, kindergartens, community ctrs, health centers: 23%. Water & sanitation: 15%. Village roads:12%. Gas pipelines: 10%.
31-Dec-2011Informed by MSIF project MIS based on budgets of contractors. Schools, kindergartens, community ctrs, health centers: 25.6%. Water&sanitation: 21.8%. Village roads:24.7%. Gas pipelines: 27.7%.
31-Mar-2013Schools, kindergartens, community ctrs, health centers: 46%. Water & sanitation: 30%. Village roads:24%. Gas pipelines: 20%.
% of respondents (in a survey), who express increased satisfaction with local government's way of managing community priority develo pment needs.
Text Value 48.5% N/A 30%Date
Comments
01-Sep-2004The indicator was adopted in May 2007.
31-Dec-2011This rate will be updated by a special evaluation study toward the close of the Project.
31-Mar-2013
% of respondents in institutions surveyed who express that their capacity to manage community priority development needs has improve d because of SIF training and implementation of the sub-projec
Text Value 0% N/A 60%Date
Comments
01-Sep-2004The indicator was adopted in May 2007.
31-Dec-2011This rate will be updated by a special evaluation study toward the close of the Project.
31-Mar-2013
Number of communities which have made initiatives for new community activities to address development needs during the sub-project i mplementation and up to two years after its completion
Text Value 0 N/A 107Date
Comments
01-Jun-2007This indicator was introduced at MTR in 2007.
31-Dec-2011The number will be updated by a special evaluation study toward the close of the Project.
31-Mar-2013
Intermediate Results Indicators
Indicator Name Core Unit of Measure Baseline Current End Target
Participation in community planning and sub-project management: Direct project beneficiaries participation
Number Value 0.00 416804.00 200000.00Date
Comments
31-Oct-2009Introduced in 2009 for the 2nd Additional Financing
31-Dec-2011 01-Mar-2013
of which female PercentageSub Type
Supplemental
Value 65.00 40.00
The World Bank
Page 4 of 5
Pub
lic D
iscl
osur
e C
opy
Pub
lic D
iscl
osur
e C
opy
Report No: ISR6594
Total number of micro projects completed Text Value 0 939 712 sub-projectsDate
Comments
01-Sep-2004 31-Dec-2011Original credit: 730 (for components 1 and 2) 1st Additional Financing: 57 2nd Additional Financing: 152
30-Sep-2010This is the sum of the targets of all three IDA Credits. The target is 474 for the original credit, 45 for the 1st Additional Financing and 193 for the 2nd Additional Financing.
Data on Financial Performance (as of 13-Apr-2012)
Financial Agreement(s) Key DatesProject Loan No. Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date
P079314 IDA-39310 Effective 17-Jun-2004 18-Jun-2004 15-Sep-2004 30-Sep-2012P079314 IDA-45550 Effective 24-Mar-2009 04-May-2009 28-Aug-2009 30-Sep-2012P079314 IDA-46820 Effective 26-Jan-2010 22-Feb-2010 19-May-2010 31-Mar-2013P079314 TF-54460 Closed 11-Feb-2005 11-Feb-2005 11-Feb-2005 31-May-2009P092516 TF-56111 Effective 24-Feb-2006 24-Feb-2006 24-Feb-2006 15-Jul-2016P079314 TF-93407 Effective 17-Mar-2009 17-Mar-2009 17-Mar-2009 17-Mar-2013
Disbursements (in Millions)Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed
P079314 IDA-39310 Effective USD 20.00 20.00 0.00 20.73 0.00 104.00 P079314 IDA-45550 Effective USD 5.00 5.00 0.00 4.99 0.34 100.00 P079314 IDA-46820 Effective USD 20.00 20.00 0.00 12.02 7.38 60.00 P079314 TF-54460 Closed USD 4.14 4.32 0.00 4.23 0.00 98.00 P092516 TF-56111 Effective USD 1.97 1.97 0.00 0.36 1.61 18.00 P079314 TF-93407 Effective USD 1.95 1.95 0.00 0.71 1.24 36.00
Disbursement Graph
The World Bank
Page 5 of 5
Pub
lic D
iscl
osur
e C
opy
Pub
lic D
iscl
osur
e C
opy
Report No: ISR6594
Key Decisions Regarding ImplementationMSIF will continue working with communities to support their priority social infrastructure. It will re-start its work in Transnistria.
Restructuring HistoryBoard Approved on 24-Mar-2009, Level one Approved on 26-Jan-2010, Level two Approved on 10-Dec-2010, Level two Approved on 26-Oct-2011