Page 1: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

ZEM dSZEMedS: ImplementationImplementation

Page 2: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

lImplementation Case:IIS Marconi Pieralisi Jesi ItalyIIS Marconi‐Pieralisi, Jesi, Italy

Page 3: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

General data3

IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Name of the School

IIS MARCONI PIERALISI Hi h S h l

Type of school 

IIS MARCONI PIERALISI High School

Hi h S h lHigh School 

Number of students Owner

public766+356

Location

Municipality of Jesi (AN), ItalyVi R ff ll S i 8

Year of construction 

1946 1960Via Raffaello Sanzio 8Altitude: 97 m AMSL

1946 – 1960Renovation in 2007 and 2009

Page 4: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

4

General dataIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I l

Building typology  Heated area (m2 )

IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

4‐2 floors buildings 12425 m2

Heating degree days : 1899 (DPR 412/1993 – base 20)

Cooling degree days (base 26):

Site

Urban Plane

Building 1Building 2

Page 5: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

5

Current SituationIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I lIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Page 6: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

6

Current SituationIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I lIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Page 7: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

7

Current SituationIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I lIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Building 1 Building 2g g

Page 8: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

8

Current SituationIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I lIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Building 1 Building 2g g

Page 9: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

9

Current Situation

Renovation needs  Building use

IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

High Priority: energy efficiencySchedule for High school: 

Standard Use: From 9th of September till 14th of June

High Priority: energy efficiency

Reduce Use:  From 15th of June till 12th of August  

From 19th of August till 6th of September

2nd, 3rd, 4th of January

12th, 16th of April

23rd, 24th, 27th, 30th , 31st of December                                   

Main Building: Marconi: Monday till Friday: 07.30 to 20.00, Saturday: 07.30 to 14.00

Pieralisi: Monday till Friday: 07 30 to 21 45 Saturday: 07 30 to 14 00Pieralisi: Monday till Friday: 07.30 to 21.45, Saturday: 07.30 to 14.00

Gymnasium:  Marconi: Monday till Friday: 07.30 to 20.00, Saturday: 07.30 to 14.00

Pieralisi: Monday till Friday: 07.30 to 19.30, Saturday: 07.30 to 14.00

Page 10: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

10

Current SituationIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I l

Building envelope: WallsBuilding 1

IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Brick Wall with air gap

Building 2Precast Concrete Blocks

Building envelope: RoofBuilding 1

no insulationno insulation

Replacement of building 2 in 2007‐2009Insulation and waterproofing

Building envelope: GroundfloorGround floor consists of concrete

Building envelope: WindowsBuilding 1

D bl l d ith th l b k i l i i (6 7/12/6 7)Double glazed with thermal break, in aluminium (6.7/12/6.7)

Replacement of building 2 in 2007‐2009Double glazed with thermal break, in aluminium

Page 11: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

11

Current Situation

Airtightness: No measurements

IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Heating/Cooling: Radiators, manual control, activity sectors

V til ti N h i l V til tiVentilation: No mechanical VentilationVentilation by opening windows

Lighting: Fluorescent tubes T8 controlled by users

Appliances: Lab: PC, Projector, PrinterOffice: PC, Printer, Copy Machine

DHW: Not available

Cooking: No cooking

Current final energy consumption kWh/m2 conditioned area (from

*97.34 kWh/m² y for heating*27 63 kWh/m² y for electricitykWh/m2 conditioned area (from 

bills, metering etc.):

27.63 kWh/m y for electricity*Total =124.96 kWh/m² per year

Page 12: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

12

Current Situation

Equipment Age and Maintenance Needs

IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Lighting : Fluorescent lamp T8 : continuous replacement.

HVAC/ B il B il i t ll d i 2007 d 2010 S b il d ti b ilHVAC/ Boiler: Boilers installed in 2007 and 2010. Some boilers are condensation boilers

HVAC/Distribution Network: Final element radiators installed in 2007Radiant heating in the new sector (condensation boiler)Radiant heating in the new sector (condensation boiler)

HVAC/other components no

HVAC/other components 2.8 kWp PV panels on the Roof (about 2520 kWh/y)

Windows Replacement in 2007‐2009

Other Building Components no

Other Maintenance Needs noOther Maintenance Needs no

Other Renovation Needs Structural Compliance just in 1980’s sector

Page 13: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

13

Current Situation

Health & Comfort

IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Summer comfort: No data

I t i i lit N d tInterior air quality: No data

Visual comfort: No data

Running Contracts and Management

Running cost: Energy (2013): 104339 (G)+ 68502 (E) =  172.841 €Water: no dataMaintenance: no data

Energy Supply Contract CONSIP – Ministerial Central Society for PA SupplyingContract expiring in March 2017

Energy Management Contract CONSIP – Ministerial Central Society for PA SupplyingContract expiring in March 2017

M d di l b h P i h i l ffiBuilding Maintenance Managed directly by the Province technical office

Page 14: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

14NZEB RenovationIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

ZEMedS Goals: ‐ Requeriment 1: CPE‐ProdRES≤ 0

Primary energy consumption yearly (heating, cooling, ventillation, DHW and lighting) is produced bylocal renewable energieslocal renewable energies.

‐ Requeriment 2: CFE≤ 25 kWh/m2 y

FE consumption yearly (heating, cooling, ventillation and lighting) per conditioned area

‐ Requeriment 3: Indoor air quality guaranteed (CO2≤1000 ppm) and temperature above 28ºC ≤40 hours yearly during occupancy

National factors for conversion in energy and CO2 have been taken into account (data 2014).gy 2 ( )

Primary Energy from non‐renewable energy sources covered by rene able energ

Final energy consumption (all uses except DHW & cooking)

Overheating limited toIndoor Environmental 

Quality (IEQ) is guaranteedrenewable energy

0

p g) g

0 kWh/m².year 

(annual balance)

CFE  ≤ 25 kWh/m².year

40 hours over 28ºC annually

CO2 ≤ 1000 ppm

Page 15: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

15NZEB Renovation StatusIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Actual status refering to the the foreseen ZEMedS Renovation Process

Diagnostic/Current Planning Design Companies Works Reception Use and /Currentsituation

Planning Design consulting Works of works maintenance

Diagnostic/ Current Situtation:An extended energy audit (including at least a basic environmental monitoring) is needed in order to collectAn extended energy audit (including at least a basic environmental monitoring) is needed, in order to collect detail information.

Page 16: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

16Energy Saving PotentialIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Actual Final Energy Consumption ZEMedS Targetgy p(heating, cooling, ventillation and lighting)

Consumption by BillsFinal energy 

consumption (all uses 

ZEMedS Target

Consumption by BillsNatural Gas: 115.798 nm3/year = 97.34 kWh/m².yearElectricity: 27.63 kWh/m².yearOther Fuel: 0 kWh/m² year

p (except DHW & cooking)

CFE  ≤ 25 kWh/m² yearOther Fuel: 0 kWh/m .year

Total: 124.96 kWh/m².year

Estimation:

kWh/m .year

Heating/Cooling and Ventilation: Estimation:

Specific Electricity Consumption (not including Lighting): 11 kWh/m².yearDomestic Hot Water Consumption: 1 kWh/m².yearExpected Total Consumption after successful ZEMedS Renovation:

CHVAC ≤ 20 kWh/m².year

Lighting: Cligh ≤ 5 kWh/m².year

Expected Total Consumption after successful ZEMedS Renovation: 37 kWh/m².year

Energy Saving Potential(heating, cooling, ventillation and lighting)

Theoretical Saving88 kWh/m².year

Theoretical Gain70 %

Page 17: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

17Energy Saving PotentialIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Actual Final Energy Consumption ZEMedS Targetgy p(heating, cooling, ventillation and lighting)

Consumption by BillsFinal energy 

consumption (all uses 

ZEMedS Target

Consumption by BillsNatural Gas: 115.798 nm3/year = 1.209.394 kWh/yearElectricity: 343.282 kWh/yearOther Fuel: 0 kWh/year

p (except DHW & cooking)

CFE  ≤ 25 kWh/m² yearOther Fuel: 0 kWh/year

Total: 1.552.676 kWh/year

Estimation:

kWh/m .year

Heating/Cooling and Ventilation: Estimation:

Specific Electricity Consumption (not including Lighting): 136.675 kWh/yearDomestic Hot Water Consumption: 12.425 kWh/yearExpected Total Consumption after successful ZEMedS Renovation:

CHVAC ≤ 20 kWh/m².year

Lighting: Cligh ≤ 5 kWh/m².year

Expected Total Consumption after successful ZEMedS Renovation: 459.725 kWh/year

Theoretical SavingEnergy Saving Potential(heating, cooling, ventillation and lighting)

Theoretical Saving1.092.951 kWh/year

Theoretical Gain70 %

Page 18: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

18Renewable Energy Source PotentialIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

System Considerations and Recommendation PotentialSystem Considerations and Recommendation PotentialProduction

Photo VoltaicS

Flat Roof, south oriented panels125 kW ( b 3000 2 f f f )

12.28kWh/ ²System 125 kWp (about 3000 m2 of roof surface) kWh/m².year

Solar Thermal for DHW

XX kWh/m².yearfor DHW kWh/m .year

RES Heat Pump XX kWh/m².year

Others

RES Potential RES Production Potential12.28 kWh/m².year

Page 19: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

19Recommended MeasuresIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Solar Protection PV system

E Building

NOW Use and management

Demandreduction

Energyefficientsystems

Renewable energysupply

u d gManagement System

NZEB

Controlled naturalControlled naturalventilation BMS for Heating

Page 20: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

20Recommended MeasuresIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

Measure Why is recommended and whatMeasure Why is recommended and what

Building Management S

Avoid wastes due to managementSystem

Solar protection Comfort (visual, overheating)

Controlled Natural Ventilation

Energy Saving and ComfortAvoid wastes due to management

Photovoltaic System Further Electric Energy Production

Page 21: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

21Specific Features and RemarksIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

f kSpecific Remarks

The school is composed by 2 different building blocks with different history and features.The “Pieralisi” block was almost completely renovated between 2007‐2010. Structural Compliance has to be assessed in the 80’s building.They were analyzed together in this project because the energy meters were shared, so the 

il bl i d f d h f h b ildiavailable consumption data referred to the sum of the two buildings.

Page 22: Implementation Case - IIS Marconi-Pieralisi Jesizemeds.eu/sites/default/files/IIS Marconi-Pieralisi Jesi.pdf · Implementation Case: IISMarconiIIS Marconi‐Pieralisi, Jesi, Italy

22Funding OpportunitiesIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy

l f iRelevant Information:• Until the Energy Supplying and Management Contract are managed through 

CONSIP (Ministerial Central Society for PA Supplying and Purchasing), the ESCOs cannot be involved in the funding mechanism

Funding Potential:g• Self funding: no • Regional Initiatives: 

– DGR 124 02 03 2015 – Regional Government Criteria for getting Ministerial Fund “3‐year PlanningDGR 124 02.03.2015  Regional Government Criteria for getting Ministerial Fund  3 year Planning for School Buildings” (art.10 Law 128/2013, DM 23.01.2015, also known as “IEB loan decree”

– ERDF – Thematic Objective 4 – Action 13.1 Promozione dell’eco‐efficienza e riduzione di consumi di energia primaria negli edifici e strutture pubbliche

• National Funding: 

• European Direct Funding: