Author
others
View
0
Download
0
Embed Size (px)
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 1
Image Acquisition 2007
Maria ERLANDSSONPär ÅSTRANDJRC Ispra, Community Image Data portal
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 2
Presentation outlineNumber of sites and success rates; HR, VHRBackup usageExpenditureCampaign related issues
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 3
2004-2007 overviewTotal no of sites VHR + RFV VHR + HR HR + AP AP + RFV
2004 13 64 82 1282005 27 134 49 592006 32 142 50 472007 53 170 57 29
223 VHR zones227 HR zones
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 4
WA P S
HE LL
HA AR
LU
MA R2
UK
IE
ES
FR
DE
SE
DK
LT
LV
EE
PL
CZ
SK
HU
AT
SI
IT
GR
CY
FI
CH
PT
MT
RO
BG
RO09
ACHT
TWEN
GRON
ALTU
SALA
VAPE
RO10
SENAPOZA
RO01
MOTA
GUCA
ZAMO
ORGA
RO02
DITT
TREI
RO07
STAI
RO04
LADE
FAHRLINC
HULL
SUED
REMO
BELL
DAVE
SIRA
ROTH
WISB
HARR
LUCK
RO08
HERT
TRAV
NORD
VES7
BAZ7
ARGO
BAC7
VIPA
CSO7
KRAI
IZAI
PES7
BATA
OB4ZEHD
BEK7
ANSP
BAR7
DALE
RO06
ONCY
GEDI
LIMB
NOVI
KRUM
VAGA
OB21
SOM7
RETH
ZEEL
ORNA
REMY
LAIX
UTRE
OB20
DURB
BRAB
OB17
KAST
RO03
JURBHORY
SUND
GIRE
LAUW
LIMA
THIB
CSTR
KEMP
LIER
LESV
KARI
SERA
BIRR
ABRE
MDEG
RO05
ZELE
OB26
GRAU
BALT
CALLATHE
DELV
ELTA
CUNE
LATI
GLAB
CASH
QUIT
FOUR
OB24GORT
BIEL
COLM
ACAP
YOUG
CANA
FIRE
OCHE
MANO
MONA
SALE
ORIS
URET
ESNU
COSE
RECA
CHEU
DUSE
OB14
OFAL
OB19
OISS
AUDR
JA03
AREZ
WESTP
AL01
RIBA
CATN
SE02SE03
TERN
KOSI
CHIE
ANGL
CA01
OB16
HU02
PESA
AGNA
CO01
SIGU
OB1
MA01
MA02
ISER
MACE
VIBO
YNYS
AIZP
JABB
DAXE
CATA
POTE
PLAI
PRES
CRE1
MREV
VEKR
OUDT
LECC
URGE
SANO
CENU
OB13
TRAP
OCON
MOBA
OB18
ATAI
OALV
OB8
CRE2
NUOR
WHED
OB22
FROSI
HILB
AVAL
WERD
TALS
ESOD
OB11
PUYM
MOOS
OB15
OB6
OB2
JA01
AOSTA
ASTI
HU01
ALBA
GR01
COMO
LAIU
VIEV
OB5
STAK
HALJ
KABA
OB23
KR_07
MS_07
OB7
MB_07
NKUN
LJ_07KK_07
MANA
BILZ
JA02
OB25
SE01
OB9OB3
OB10OB12
BE
MALT
PLEV
PLOV
SHOU
VEN7 CAV7ALC7
BRA7 SAN7
MAT7
NOS7
FIG7BRI7
COR7
MAR7SEB7
LESB
BEAREZIN
OUTU
AREU
MANGEUZA
ONIE
ISSA
CURTJEOI
THIESEUR
SOLI
VALD
GAMM
BLAUWEST OSTE
TIEFBERG
MEIS
ALTE
KRUE
HEDE
BALLGROS
HUDE
CANH
BORN LUEH VOLS
MERI
FROS
IKONOSIKONOS137 control zones,
109.981 km²QUICKBIRDQUICKBIRD86 control zones,
43.850 km²SPS SPS onlyonly4 sites, 3.734 km²
227 HR 227 HR sitessites, , In In averageaverage 3 3
windows/zonewindows/zone
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 5
IRS SP2 SP4 SP5 LS5 DMCAutumn 11 26 35 36 26 1 135 0 1 99% 98% 95%Winter 0 9 9 6 0 0 24 0 1 96% 96% 94%Spring1 15 41 45 64 4 0 169 4 0 100% 97% 97%Spring2 2 32 42 31 2 0 109 4 9 92% 99% 93%Summer1 4 10 27 32 1 0 74 2 7 91% 100% 90%Summer2 3 31 63 36 2 0 135 0 2 99% 100% 84%Summer3 0 0 8 3 0 0 11 0 2 85% 100% 100%Total 35 149 229 208 35 1 657 10 22 97% 99% 94%
Success2007
Success 2006
Success 2005
No of acquired images Total Close Fail
Success rates HR
The bad weather in the late spring/early summer is the reason for failed acquisitions (DE, NL, UK, SE)10 windows were closed before window end without acquisition due to availability of VHR dedicated or aerial photographyHowever, in many cases VHR & HR windows are overlapping images are often acquired on the same day and duplicate imagery have to be purchased
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 6
HR sensors (optical & SAR)
~90% acquired by SPOT family2 MS requested SAR data (BE-FL, IE)First image of triplet acquired for 17 control zones
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 7
VHR prime success rates VHR Dedicated 2005 2006 2007
No of sites/ success rate161
100 %181
100 %223
97 %
Total area126.000 km2
99 %127.000 km2
100 %153.000 km2
97 %Average acquisition time 33 days 25 days 22 days
No of extended windows 35
22 %17
9 %27
12 %Average site size 813 km2 760 km2 669 km2
3 clear trends: Total area increases, the average control zone becomes smaller and the average time needed to collect the imagery decreases6 Sites failed (BE, NL, FR, IE). Mainly due to cloudy weather but also internal competition between sitesIn July, 2 QB sites (FR) were re-allocated to IK.An ad hoc request was received for 6 additional control zones (DE) due to failure of the aerial photography planned. 3 sites were collected by IK, and one by SPS, during a 2 week window
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 8
EROS AEROS A15 control zones, 10.540
km²
EROS BEROS B8 control zones, 3.927
km²
FormosatFormosat 2216 control zones, 13.183
km²
SPSSPS31 control zones, 25.807
km²
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 9
VHR backup success70 sites (31%) programmed with backup in the northern part
of Europe and ”difficult” site
Sensors used: EROS A & B, SPS, Formosat2
Orbview 3 failed just before start of campaign & was substituted with EROS B
New! Backup programming cancelled when dedicated acquired
-27 Sites (37%) closed without coverage, 2 failed- 33.000 km² collected
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 10
Survey of back up usage (1/2)
Backup programmed in CwRS Campaign 2007Total VHR sites 227Backup sites 75
Dedicated 70Extra sites 5 (*)
Backup % 31% (**)Backup FAILED 2Backup CLOSED by dedicated 27
Delivered 41FULL 29
PARTIAL (73-99% coverage) 12Backup delivered % 59% (**)Backup acquired within 20 days 37% 26
(*)(**) excluding the "extra" sites
4 FR SPS - 3/4 acquired, 1 DE SPS acquired (used for
59 % delivered whencancelling programmationafter dedicated acquisition
Possibility to increaseefficiency if opening backupwindow later than VHR prime
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 11
Survey of back up usage (2/2)
11 of 29 images deliveredused for CAPI
1 used for LPIS update
EROS B used for editingof parcel boundaries (SE)
Formosat 2 used for CAPI with multispectral HR (UK)
Backup usage in CwRS Campaign 2007
Usage CAPI description LPIS update
use of dedicated
primeortho
corrected other (***)FULL 29 9 1 19 15 5
EROS A 1 buildings 1 3 1
EROS B 1parcel boundaries 5 4
SPS 7
well used in CAPI, buildings, vectorisation of parcles outside control zone or where cloud cover 7
F2 0 0PARTIAL (73-99%) 12 2 10 2 1
EROS A 1 buildings and scrub 1 1
F2 1
CAPI in conjunction with S5 MSP; remaining by QB 1
SUM 41 11 1 29 17 6Total backup usage 29% i.e. 12/41
Total dedicated failed sites in Campaign 2007 6Total sites dedicated / backup failed sites in Campaign 2007 3UTRE IK fail contractor used this years aerial photographyBIRR QB, SPScloudy proposed, but nothing delivered to contractorPLAI QB fail cloudy proposed, but nothing delivered to contractor, contractor used archive VHR
(***) late deliveries (EROS B) (4), or orthorection problems (2)
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 12
38%
1%5%
56%
HR opticalHR SARVHR backupVHR dedicated
Expenditure2007 budget 6M EuroTotal expenditure 2007 campaign (incl. Autumnacquired 2006) 5,6 M Euro
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 13
Campaign related problemsLate deliveries of Qb data
Reluctancy from contractors to use backup(many extensions requested) and provide ancillarydata
Slow response on IDQA & validation → high administrative burden for staff
Madrid, 12-14 November 2007 – Geomatics in support of the CAP 14
Roadmap & proposed changes for 2008 to bepresented later in this session
Poster available with detailed information
Thank you!